Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 05/24/2016 Item #16A12
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT T THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIG Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarde o the County AOliort6 Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the Count) Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office i .o/K/7 4. BCC Office Board of County 1D b� Commissioners/ 5. Minutes and Records Clerk of Court's Office 1/16 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff John Houldsworth Phone Number x-5757 Contact/ Department Agenda Date Item was May 24,2016 / Agenda Item Number 16-Al2 Approved by the BCC Type of Document Plat - Coquina at Maple Ridge,Phases 2-3 Number of Original One Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? -to __. 5--Pk5 2. Does the document need to be sent to another agency for additional signatures? If yes, J fi provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH signed by the Chairman,with the exception of most letters, must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on May 24,2016 and all changes made sv during the meeting have been incorporated in the attached document. The County Attorney's Office has reviewed the changes,if applicable. 1111, 9. Initials of attorney verifying that the attached document is the version approved by the • �i BCC,all changes directed by the BCC have been made, and the document is ready for the Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCMPANY ALL ORIGINAL DOCUMENTS a2 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SWTIT� Print on pink paper. Attach to original document. The completed routing slip and original documents are to he forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office (..p?..16( /b 4. BCC Office Board of County `1 ‘1>•- Commissioners VO 1\AO= 5. Minutes and Records Clerk of Court's OfficekeY litho ; rO wt PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff John Houldsworth / Phone Number x-5757 / Contact/ Department Agenda Date Item was May 24,2016 V Agenda Item Number 16-Al2 Approved by the BCC Type of Document Construction and Maintenance Agreement Number of Original Two Attached and Performance Bond - Coquina at Maple Documents Attached Ridge,Phases 2-3 PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? Cdcfc,_ ay...._ ....144- Si%S 2. Does the document need to be sent to another agency for additional signatures. If yes, 'Jl-r- N /� provide the Contact Information(Name; Agency;Address;Phone)on an attached sheet. / 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH signed by the Chairman, with the exception of most letters, must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on May 24,2016 and all changes made 1 � during the meeting have been incorporated in the attached document. The County 3- iffq)i 0 Attorney's Office has reviewed the changes,if applicable. f3, 9. , Initials of attorney verifying that the attached document is the version approved by the fe r,,„P BCC,all changes directed by the BCC have been made,and the document is ready for t, Chairman's signature. / 1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS O ginal 9.03.04,Revised 1.26.05,Re ._ .24.05; '- `ed 11/30/12 1 6 A 1 2 MEMORANDUM Date: July 5, 2016 To: John Houldsworth, Senior Site Plan Reviewer Growth Management Department From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re The final Plat of Coquina at Maple Ridge - Phase 2 and 3, (Application Number PL20150002721) standard form Construction and Maintenance Agreement and Performance Bond 106506910 Attached for your records is a copy of the document referenced above, (Item #16Al2) approved by the Board of County Commissioners on Tuesday May 24, 2016. The original document is being held in the Minutes and Records Department for the Board's Official Record. If you have any questions, please contact me at 252-8406. Thank you. Attachment 1 6 A 1 2 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this - . day of }Lt,,'kz_ / / , 20 16 between CC Ave Maria,LLC hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board. RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of certain plat of a subdivision to be known as: Coquina at Maple Ridge Phase 2 and 3 B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: Roadway, drainage, water& sewer improvements within twelve(12) months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of$1,976,585.79 - which amount represents 10% of the total contract cost to complete the construction plus 100% of the estimated cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or his designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee. After the one year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or his designee to inspect the required improvements. The County Manager or his designee shall inspect the improvements and, if found to be still in compliance with the Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 16Al2 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or his designee to reduce the dollar amount of the subdivision performance security on the basis of work complete, Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or his designee. The County Manager or his designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or his designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer and the respective successors and assigns of the Developer. IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives thist 711- day of . ,,, _ / / , 2016 . SIGNED IN THE PRESENCE OF: (Name of Entity) CC Ave Maria, LLC " 1Itt, 8011 • 0iI CI_ By' _— • N1 ° Printed Name LN I c N I\Ck. M, C 1{V4'1. Brian Gog - , Vice President Printed Name/Title Gr. -v--t. -r. (President,VP, or CEO) 4A,..1:, iJat,i i a.s.. (Provide Proper Evidence of Authority) Printed Name ATTEST: DWIGHT E. BROCK,CLERK BOA D OF COUN Y COMMISSIONERS O LLIER CO TY LORIDA Deputy tc�t as ,' S* P-i-kne ( DONNA FIALA, CHAIRMAN Approlvetignattp i d legality: 4 Item# .169.447, 1 Scott A. Stone,Assistant County Attorney Agenda �21--. 1 Date Date ri--I'1 • a I0 ( 14.it" � Deputy ierk Milk Detail by Entity Name Page 1 of 3 1 6 A 1 2 FLORIDA DEPARTMENT OF STATEJv DIVISION OFRPR " O ,ter ��� .014410,6 win ,r -S Detail by Entity Name Florida Limited Liability Company CC AVE MARIA, LLC Filing Information Document Number LI3000048773 FEI/EIN Number 38-3926685 Date Filed 04/02/2013 State FL Status ACTIVE Last Event CORPORATE MERGER Event Date Filed 04/08/2015 Event Effective Date NONE Principal Address 135 SAN LORENZO AVENUE, STE. 740 CORAL GABLES, FL 33146 Changed: 06/26/2013 Mailing Address 135 SAN LORENZO AVENUE, STE. 740 CORAL GABLES, FL 33146 Changed: 06/26/2013 Registered Agent Name &Address EISENACHER, HAROLD 135 SAN LORENZO AVENUE, STE. 740 CORAL GABLES, FL 33146 Name Changed: 04/08/2015 Address Changed: 04/08/2015 Authorized Person(s) Detail Name &Address Title MGR GOGUEN, BRIAN 2600 GOLDEN GATE PARKWAY NAPLES, FL 34015 http://search.sunbiz.org/Inquiry/CorporationSearch/SearchRe sultDetail?inquirytype=Entity... 6/29/2016 PERFORMANCE BOND 1 6 A 2 No. 106506910 KNOW ALL PERSONS BY THESE PRESENTS: that CC Ave Maria, LLC 135 San Lorenzo Avenue, Suite 750 Coral Gob|ew, Florida 33146 (hereinafter referred to as"Owner") and Travelers Casualty and Surety Company of America One Tower Square, 3B Hartford, CT 06813 (800)873-1477 (hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter referred to as"County") in the total aggregate sum of One million nine hundred seventy-six thousand five hundred eighty-five and 79 cents Dollars /$1.97G'585.7Q) in lawful money of the United Statem, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and asaigna, jointly and sevwna||y, firmly by these presents, Owner and Surety are used for singular or plural, as the context requires. THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by the Board a certain subdivision plat named Coquina at Maple Ridge Phase 2 and 3 and that certain subdivision shall include specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter"Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed and shall continue until the date of final acceptance by the Board of County Commissioners of the specific improvements described in the Land Development Regulations (hereinafter the"Guaranty Period") NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save harmless the County from and against all costs and damages which it may suffer by reason of Owner's failure to do so, and shall reimburse and repay the County all outlay and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PROV|OED. FURTHER, that the said Sunoty, for value received horaby, stipulates and agrees that no uhange, extension of time, a|K*radion, addition or deletion to the proposed specific improvements shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, addition or deletion to the proposed specific improvements. PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediabu|y, without formal and separate amendments henato, so as to bind the Owner and the Surety to the full and faithful performance in accordance with the Land Development Regulations. The term ^Amendment." wherever used in this Bond, and whether referring to this Bond, or other documents shall include any alteration, addition or modification of any character whatsoever. 1 6 A 1 2 IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this 20th day of June, 2016. WITNESSES: CC Ave M. ia, LLC ,,.���� � fI • 'l~r+ U V..av—tc 3tV' By: •401v-• Alk.,. Printed Name'Im 6.C 11,fPi-k Brian Goguen,Vic• Pre ident 1 1 , Printed Name/Title Printed Name IV 1 4.14 S c t DI a L (Provide Proper Evidence of Authority) .r ACKNOWLEDGEMENT STATE OF FLORIDA COUNTY OF COLLIER THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS . TDAY OF June , 2016, BY Brian Gowen the Vice President OF CC Ave Maria, LLC WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCEDmmia AS IDENTIFICATION. Notary Public-State of Florida \\ ft s'SGYLLA M O��'4,� •��,NdSlpy•�G,9 t (� (SEAL) 'Ikiiii• CNII • 06wl 1*� gym• Printed Name r i 3 ti M.6i YI. �_y,',, #EE871810 471 �1#4 i gS iiii++�#� WITNESSES: Trave rscasualty and Surety Company of America �j/ jigEti �� IdL& //Y� By: / .J Printed Name: Kristi Tulin /��f lcu3,;-.., C - -I1 vauy Charity A. Moser,Attorney-In-Fact ((( Provide Proper Evidence of Authority) p Printed Name: Lorraine Jones-Murray ACKNOWLEDGMENT STATE OF •f t E, COUNTY OF r(II P 6' n� TH,� FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 90 DAY OF JU( , 20 ft. , BY Charity A. Moser AS Attorney-In-Fact OF Travelers Casualty and Surety Co ny of America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED tIDENTIFICATION. :Public- to Florida (SEAL) uuBODO; '1'r.,l .uw A' MY COMMISSION 9 FF 941634 Printed Name: 1_111 II l�� C ( ,�� , EXPIRES:April 6,2020 L (4 . Bonded ThN wan Pubk undloviters WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER I 6 A 1 ? TRAVELERS POWER OF ATTORNEY 1 Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company r Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company i t 1 Attorney-In Fact No. 229466 Certificate No. 006358581 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company,St. Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc.,is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Huntley A. Hornbeck II.Kristin M.Nciert,Marc E.Williams,Stephen J.Benzo,Charity A.Moser.and Dawn Y.Coleechio of the City of Naples ,State of Florida their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Com ave caused this instrument totheirsigned be and corporate seals to be hereto affixed,this one1st p day of , Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company o�eut rir ;• .,.y Fii /i J1` �� 64y.. p��N..�N34 Pl:n3uq npa ,re YID >, f ��"OIIP011 97 4J!'•......9,�, 4,11r.-,-." f� ,� -�Y ,��"�DI:� �, PDRATED 'z: A>C; w:`GOx�ORgT.^' 9a '� =q,1982 ,9 I 19� �;J1 1 t m — Tn z: _._ .'� f(w/tmre a 6 o 'ey .'! ~ 1951 _3 *i q�3 tet.SEAL o •, ••o 1�tCOwkB N 1896 h * t� i +., •'E"'cq•; ''",, /+ oAs.381iL;'s! W 4. \ y� �Q 1 �. ANG f N'4 !r.........r.! . . hM+ Attu t� State of Connecticut By: r.,/ 41 City of Hartford ss. Robert L.Raney, -nior Vice President • 1st June 2015 On this the day of , ,before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. 0•T� In Witness Whereof,I hereunto set my hand and official seal. TAA (�f f<d A C. . My Commission expires the 30th day of June,2016. * p�«G * Marie C.Tetreault,Notary Public a 58440-8-12 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER • A This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is 1 FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies;which is in full force and effect and has not been revoked. /A n411 IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this (At d day of C 20 LLO Kevin E.Hughes,Assistant Sec tary . F n ♦kC0OR 1951tFD *,:ot r.aM...^.uSGt4 S Jp+"M:VgfyOn WU JptT4y'\ (1::"4:1:1 N Y -1 rf4 9 4Sn VQR,5'11529}_f% r` s ;„„t ,or, �yy. Pa 'NeN�fi;« 3E.AAfis,38bL e ` ! ...4.....;—;;,4 To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the above-named individuals and the details of the bond to which the power is attached. I. I I F s k ( WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER . . 16A12 y-,, Project: Coquina Phase 2 OPC i -.NN i ;Y } 1. ; ! ''4''''' Task; Engineer's OPC for Fee Calc Prepared 8y; CW Date: 313!2016 Checked By: DJH Date: 3/3/2016 PHASE 2 CONTINGENCY Calculation Summary SUBTOTAL PERCENT DOLLAR TOTAL EARTHWORK $ 71,727.50 10% $ 7,.172.75 $ 78,900.25 PAVING $ 218,946.80 10% $ 21,894.68 $ 240,84I.48 DRAINAGE $ 129,144.00 10% $ 12,914.40 $ 142,058.40 POTABLE WATER $ 112,642.60 10% $ 11,264.26 $ 123,906,86 SANITARY SEWER $ 200,004.20 10% $ 20,000.42 $ 220,004.62 IRRIGATION $ 81,555.50 10% $ 8,155.55 $ 89,711.05 LANDSCAPE AND LIGHTING $ 81,725.00 10% 5 8,172.50 $ 89,897.50 Total Probable Construction Cost: $ 895,745.60 10% $ 89,574.56 $ 985,320.16 Collier County PPL 100%Construction Bond: $ 641,408.68 10%Maintenance Bond: $ 64,140.87 Total Bond Amount: $ 705,549.55 AMUC 100%Construction Bond: $ 343,911.48 10%Maintenance Bond: $ 34,391.15 Total Bond Amount: $ 378,302.63 NOTES 1)This Opinion of Probable Cost shall be used for Fee Calculation and Bonding Purposes Only. 2) This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules,regulations,ordinances,and construction costs in effect on the date of this document.Interpretations of these construction costs may affect this Opinion of Probable Cost,and may require adjustments to delete, decrease,or increase portions of this Opinion of Probable Cost. 3)All costs provided in this OPC are based on recent contract prices,or the Engineers'latest known unit costs.These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete,petroleum,or the availability of materials and labor. 14itiititftirr 4)This cost estimate does not include the cost of any building construction. qs*s rd .,,els"r N-i t J. Hil 4 0,,,, 5)This cost estimate assumes dry utilities(LCEC,cable,telephone)will be installed at no-cost to the developer. ,,`� ,r ..,.,45:;-%,.., -%p,, 6► Due to the preliminary nature of the project,this cost estimate includes a 10%contingency in each section. re I 7)Bonding for lake excavation provided in separate bond,with the lake excavation permit. # ✓ l yrs t. y''.1Plfi ,P.E. I%l 1 gl tration450727 Peninsula Engineering Certificate of Authorization 428275 P5Active_ProjettsVP-CCAL4008V001 Cortuna_Pttese2 PPLVDesign_PemitriOPCAUfretec\DRAFT_Coquina Ph2 ©PC•FeeCalc,xlsx 1 6 A 1 2 Project: Coquina Phase 2 OPC Task: tnqineer's OPC for ree Calc Prepared By: CW Date: 3/3/2016 Checked By: DJH Date: 3/3/2016 EARTHWORK ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE EROSION CONTROL(TURBIDITY BARRIER,INLET EW-1 PROTECTION,SEED AND MULCH) 7,000. LF $ 1,00 $ 7,000,00 EMBANKMENT-EXCESS TO FUTURE DEVELOPMENT EW-2 AREA!STOCKPILE 49,730 CY 5 1.10 $ 54,703.00 EW-3 EMBANKMENT(COMPACTED IN-PLACE) 5,483 CY $ 1.50 $ 8224.50 EW-4 HOPES MAINTENANCE 3 MONTH $ 600.00 $ 1,800.00 $ $, $ $ $ $ - SUB-TOTAL EARTHWORK= $ 71,727.50 10%CONTINGENCY= $ 7,172.75 TOTAL EARTHWORK= $ 78,900.25 P Active_Proiects‘P-CCAM-0081001_C,oquina_Phase2_PPL\Deskpaftrmit1OPC's‘FeeCalckDRAFT_Coquina_Ph2_0PC-FeeCalc.xlsx 1 6 A 1 2 Project Covina Phase 2 OPC Task: Engineer's OPC for Fee Calc Prepared By: CW Date:3/3/2016 Checked By: DJH Date:3/3/2016 PAVING ID DESCRIPTION OTT UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4"ASPHALTIC CONCRETE TYPE S-III(FIRST LIFT) 4,130 SY $ 495 $ 20,443.50 PAV-2 3/4"ASPHALTIC CONCRETE TYPE S-III(SECOND LIFT) 4,130 SY $ 4 95 $ 20,443.50 PAV-3 5"L1MEROCK BASE 5,169 SY $ 875 $ 45,228.75 PAV-4 17 STABILIZED SUBGRADE 5,378 SY $ 155 $ 8,335,90 PAV-5 TYPE"F"CURB 53 LF $ 13.09 $ 689.00 PAV-6 TYPE'CY CURB 40 LF $ 900 $ 360.00 PAV-7 T VALLEY GUTTER 3,572 LF $ 7 95 $ 28,39740 PAV-8 3'VALLEY GUTTER CROSSING 65 LF $ 25.00 $ 1,625.00 PAV-8 CONCRETE SIDEWALK(r THICK) 18,049 SF $ 3.75 $ 67,683.75 PAV-10 SODDING 2,005 SY $ 2.00 $ 4,010.00 PAV-11 ,SIGNAGE 1 LS $ 2,500.00 $ 2,500.00 PAV-12 ROADWAY STRIPING 1 IS $ 2,500.00 $ 2,500.00 PAV-13 TEMPORARY LIMEROCK TURN-AROUND 1,912k SY $ 8.75 $ 16,730.00 SUB-TOTAL PAVING= $ 218,946.80 10%CONTINGENCY= $ 21,894,68 TOTAL PAVING $ 240,841.48 PAActive_Projeds\P-CCAM-0081001_Coguina_Phase2_PPL1DesigykOrmihOPC's\FeeCalcORAFT_Coguina_Ph2_0PC-FeeCalc.idsx 1 6 A 1 2 Project: Coquina Phase 2 OPC I ask. Engineer's OPC for Fee Calc Prepared By: CW Date:3/3/2016 Checked By: DJH Date:3/3/2016 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 8"HDPE SECONDARY DRAINAGE PIPE _ 725 LF 14.80 $ 10,730.00 DRA-2 .12"HOPE SECONDARY DRAINAGE PIPE 325 LF 17.90 $ 5,817.50 DRA-3 15"RCP STORM SEWER 248 LF 32.10 S 7,960.80 DRA-4 18"fRCP STORM SEWER 181 LF $ 36.80 $ 6,660.80 ORA-5 f24"RCP STORM SEWER 277 IF 53.70 $ 14,874.90 ORA-8 18"HEADWALL 1 EA $ 2,238.00 $ 2,238.00 DRA-7 24"HEADWALL 2 EA $ 2,450.00 $ 4,900.00 DRA-8 VALLEY GUTTER INLET(DOUBLE) 8 EA 3,546.00 $ 28,368.00 DRA-9 GRATE INLET 2.. EA .$ 2,427 00 $ 4,854.00 DRA-10 'YARD DRAIN 38 EA $ 1,030.00 $ 39,140.00 DRA-11 TYPE"C"CATCH BASIN 2 EA $ 1,800.00 3,600.00 SUB-TOTAL DRAINAGE= $ 129,144.00 10%CONTINGENCY= $ 1Z914.40 TOTAL DRAINAGE• $ 142,05040 PAActive_Projects1P-CCAM-0081001_Coquina_Phase22PLNDesigrippennlhOPCs‘FeeCalc1DRAFT_Coquina_Ph2_0PC-FeeCalc.xlsx . 1 6 A 1 2 Project: Cortuina Phase 2 OPC Task: Tngineer's OPC for Fee Calc Prepared By: CW Dale: 3/3/2016 Checked By: DJH Date:3/3/2016 POTABLE WATER ,.., ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE WAT-1 6"PVC WATER MAIN(C900,0R18) 50. LF $ 13.40 $ 670.00 WAT-2 8"PVC WATER MAIN(C900,DR18) 1,832 LF $ 15.80 $ 28,945.60 WAT-3 8"PVC WATER MAIN(C900, 0R14) 93 15 $ 18.00 $ 1,674.00 WAT-4 "GATE VALVE 1 EA $ 915.00 $ 915.00 WAT-5 8"GATE VALVE 6 EA $ 1,567.00 $ 9,402.00 WAT-6 FIRE HYDRANT ASSEMBLY(COMPLETE) 3 EA . $ 3,798.00 $ 11,394.00 ' WAT-7 AIR RELEASE VALVE 2 EA $ 1,600.00 $ 3,200.00 - . ... WAT-8 TEMP.BLOW-OFF W/BACTERIA SAMPLE POINT 2 EA $ 1,000.00 $ 2,000.00 ... WAT-9 _TEMP.BACTERIAL SAMPLE POINT 1 EA $ 176.00 $ 176.00 WAT-10 PERM.BACTERIAL SAMPLE POINT 1 EA $ 1,916.00 $ 1,916.00 1-112'DO EILE WATER SEIRVICE(SHORT SIDE) WAT-11 (COMPLETE) 18 EA $ 969.00 $ 17,442.00 "i-W"DOUBLE WATER SERVICE(LONG SIDE) WM-12'(COMPLETE) 20 EA $ 1250.00 $ 25,000.00 1'SI1IGLE WATER SERVICE(SHORT SIDE) WAT-13 (COMPLETE) . 4 EA $ 575.00 $ 2,300.00 4 WAT-14 1"SINGLE WATER SERVICE(LONG SIDE)(COMPLETE) 3 EA $ 799.00 $ 2,397.00 WAT-15 TESTING 1 LS $ 2,000.00 $ 2,000.00 WAT-16 CONNECT TO EX.WATER MAIN 1 EA $ 2,211.00 $ 2,211.00 ... - . WAT-17 TESTING 1 LS $ 1,000.00 $ 1,000.00 . — $ SUB-TOTAL POTABLE WATER= $ 112,642.60 10%CONTINGENCY= $ 11,26426 TOTAL POTABLE WATER= $ 123,906.86 PAActiye_Projects1P-CCAM-0081001_Coquina_Phase2_PPLIDesignifterrnit1OPC'sWeeCalc‘DRAFT_CoquIna_Ph2_0PC-FeeCatc.)dsx 1 6 A 1 2 Project Coquina Phase 2 OPC Task: En$ineer's OPC for Fee daic Prepared By: CW Date:3/3/2016 Checked By: DJH Date: 3/3/2016 SANITARY SEWER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE SAN-1 8"SDR 26 PVC GRAVITY SEWER MAIN(0'-6'CUT) LF $ 29.30 $ - SAN-2 8"SDR 26 PVC GRAVITY SEWER MAIN(6*-8CUT) IF 1,010 $ 35.80 $ - SAN-3 .fr SDR 26 PVC GRAVITY SEWER MAIN(8%10'CUT) IF $ 40.00 $ 40,400.00 SAN-4 8"SDR 26 PVC GRAVErf SEWER MAIN(10'-12'CUT) 1.104. LF $ 46.70 $ 51,556.80. SAN-5 8"SOR 26 PVC GRAVITY SEWER MAIN(17-14'CUTE LF $ 50.80 $ . SAN-6 8"SDR 26 PVC GRAVITY SEWER MAIN(14'-16'CUT) LF $ 83.70 $ SAN-7 4'SANITARY SEINER MANHOLE(6'-84CUT) EA , $ 4,801.00 $ - SAN-8 .4'SANITARY SEWER MANHOLE(8%10'CUT) 4 EA $ 5,211 00 $ 20,844.00 SAN-9 ,il'SANITARY SEWER MANHOLE(10'-12'CUT) 2, EA $ 7,058.00 $ 14,116.00 SAN-10 4'SANITARY SEWER MANHOLE(17-14'CUT) 2 EA $ 9,039.00 $ 18,078.00 SAN-11 CONNECT TO EX.MANHOLE EA -$ 4.567.00 $ - SAN-12 66"SERVICE LATERAL(SINGLE) , $ EA ... $ 829.00 $ 4,145.00 SAN-13 6"SERVICE LATERAL(DOUBLE) 39 EA $ 908.00 $ 35,412.00 SAN-14 TELEVISION INSPECTION 2,114 LF . $ 8.60 $ 13,952.40. SAN-15 TESTING 1 LS $ 1,500.00 $ 1,500.00.. SUB-TOTAL SANITARY SEWER= $ 200,004.20 10%CONTINGENCY= $ 20,000.42 TOTAL SANITARY SEWER= $ 220,004.82 P:\Active_Projects‘P-CCAM-008\001_Coquina_Phase2_PPUDesiappnarmihOPC's‘FeeCalclDRAFT_Coquina_Ph2_0PC-FeeCalc.xlsx 1 6 A 1 2 Project: Coquina Phase 2 OPC Task: Engineer's OPC for Fee Cak Prepared By: CW Date: 3/3/2016 Checked By: DJH Date: 3/3/2016 IRRIGATION ID DESCRIPTION OTY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 "PVC IRRIGATION MAIN(C900,DR18) 1,775 LF S 1040 $ 18,460.00 IRR-2 4"PVC IRRIGATION MAIN(C900,DR14) 55 LF $ 11.30 S 621.50 IRR-3 4"GATE VALVE 4 EA 5 809.00 $ 3,236.00 I-1/k Doti [t ARtAtOisi SERVIOE(SHORT SIDE) IRR-4 (COMPLETE) 19 EA S 960.00 $ 18,240.00 1-1/2"DOUBLE IRRIGATION SERVICE(LONG SIDE) IRR-5 (COMPLETE) 18 EA $ 1,347.00 S 24,246.00 SINGLE IRRIGATION SERVICE(SHORT SIDE) IRR-6 (COMPLETE) 8 EA $ 594.00 $ 4,752.00 staat IRR GA1'ION StIIVICE(LON( SIDE) IRR-7 (COMPLETE) 4 EA $ 731.00 2,924.00 REMOVE EX.BLOW-OFF AND CONNECT TO EX. IRR-8 IRRIGATION MAIN 1 EA $ 731.00 $ 731.00 IRR-9 TESTING 1, LS $ 2,000.00 $ 2,000.00 IRR-10 TEMPORARY BLOW-OFF 2 EA $ 1,809.00 5 3,618 00 IRR-11 AIR RELEASE VALVE 1 EA $ 2,727 00 $ 2,727.00 IRR-12 $ , _ SUB-TOTAL IRRIGATION= $ 81,555.50 10%CONTINGENCY= $ 8,155.55 TOTAL IRRIGATION= $ 89,711.05 PAActlye_Projects‘P-CCAM-008t001_Coquina_Phase2_PPUDesignufiermit\OPC's1FeeCaldDRAFT_Coquina_Ph2_0PC-FeeCak.xlsx 1 6 A 1 2 Project: Coquina Phase 2 OPC Task: En9ineers OPC for Fee Calc Prepared By: CW Date: 3/3/2016 Checked By: DJH Date: 3/3/2016 LANDSCAPE AND UGHTING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE LL-1 STREET LIGHTING 10 EA $ 2,250.00 $ 22,500.00 LL-2 STREET TREES(PER LF OF ROAD) 1,850 LF $ 18 50 $ 34,225.00 • LL-3 LANDSCAPE 1 LS $ 25,000 00 $ 25,000.00 $$ $ $ 4 $ • • SUB-TOTAL LANDSCAPE AND LIGHTING= $ 81,725.00 10%CONTINGENCY= $ 8,172.50 TOTAL LANDSCAPE AND LIGHTING= $ 89,197.50 PAActive_Projects\P-CCAM-008\001_Coquina_Phase2_PPLOesignoftrmittOf'C's\FeeCalc1DRAFT_CoquIna_Ph2_0PC-FeeCalcAsx k , 1 6 .A 1 2 , Project Coquina Phase 3 OPC ) F N 1 N s (i 1 A,7, . Task: Engineers OPC for Fee Calc ' Prepared By: CW Dates 1/27/2016 ENGINEERING- 4 Checked By: DJH Date: 1(27/2018 PHASE 3 CONTINGENCY Calculation Summary SUB-TOTAL PERCENT DOLLAR TOTAL EARTHWORK $ 1,800.00 10% $ 180.00 $ 1,980.00 PAVING $ 232,506.65 10% $ 23,250.67 $ 255,75732 DRAINAGE $ 107,50630 10% $ 10,750.63 $ 118,256.93 POTABLE WATER $ 105,579.00 10% $ 10,55 790 $ 116,136.90 SANITARY SEWER $ 112,128.10 10% $ 11,212.81 $ 123,340.91 IRRIGATION $ 88,139.50 10% $ 8,813.95 $ 96,953.45 LANDSCAPE AND LIGHTING $ 90,136,82 10% $ 9,013.68 $ 99,150.50 Total Probable Construction Cost: $ 737 796.37 10% $ 73,779.64 $ 814576.01 Collier County PPL 100%Construction Bond: $ 572,098.20 10%Maintenance Bond: $ 57,209.82 Total Bond Amount: $ 629,308.02 AMUC 100%Construction Bond: $ 239,477.81 10%Maintenance Bond: $ 23,947.78 Total Bond Amount: $ 263,425.59 NOTE5; 1)This Opinion of Probable Cost shall be used for Fee Cakulation and Bonding Purposes Only. 2)This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules,regulations,ordinances,and construction costs in effect on the date of this document.Interpretations of these construction costs may affect this Opinion of Probable Cost,and may require adjustments to delete, decrease,or increase portions of this Opinion of Probable Cost. 3)All costs provided in this OPC are based on recent contract prices,or the Engineerslatest known unit costs.These costs cannot be guaranteed at this time due to unpredictable and uncontrollable increases in the cost of concrete,petroleum,or the availability of materials and labor. 4) This cost estimate does not include the cost of any building construction. 5) This cost estimate assumes dry utilities(LCEC,cable,telephone)will be Installed at no-cost to the developer 0,„i.Alit' • ,, 6) Due to the preliminary nature of the project,this cost estimate includes a 10%contingency in each section. 7) Bonding for lake excavation provided in separate bond,with the lake excavation permit. -•.'''' ,'- .:, , '*----i. '' •`• '; ,,: • "",,-. l ,,, , ft-7,9 7 ..... .1. ,-; ,i,.....4............___ r•, - - ..,),;(4.- iti ,,,t, st,: (AIL OF naviit H4t,P.E. ic. iii.keipstratiord160727 k),r,per*,ko4neerms ion1128275 A.V4sit 141",#)40110' PAActivayrojectstP•CCAM•008‘001_Coquina_Ptiase2_PPLOesign_PerminDPC'stifeeDate\DRAFT_coquina_Ph3_0PC-FeeCato 1 6 A 1 2 Project: Coquina Phase 3 OPC Task: Engineer's OPC for Fee Calc Prepared By: CW Date: 1127/2016 Checked By: OJH Date' 1/27/2016 EARTHWORK DESCRIPTION OTY UNIT TYPE UNIT PRICE TOTAL PRICE EW-1 MOPES MAINTENANCE 3 MONTH $ 800.00 $ 1,800.00 EW-2 $ $ $ _ $ $ $ SUB-TOTAL EARTHWORK= $ 1,800,00 10%CONTINGENCY= $ 180.00 TOTAL EARTHWORK= $ 1,980,00 PAActiveyrojectsiP-CCAM-008‘001_,Coquinayhase2,„„PPUDesignoftannt6OPC's1FeeCalc\DRAFT_Coquina_Ph3_0PC-FeeCalc 1 6 A 1 2 Project Coquina Phase 3 OPC Task: Engineer's OPC for Fee Calc Prepared By: CW Date: 1/27/2016 Checked By: DJH Date: 1/27/2016 PAVING ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE PAV-1 3/4"ASPHALTIC CONCRETE TYPE S-III(FIRST LIFT) 4,778 SY $ 4 95 $ 23,651.10 PAV-2 3/4"ASPHALTIC CONCRETE TYPE S-Ill,(SECOND LIFT) 4,778 SY _ $ 4.95 $ 23,651..10 PAV-3 8"LIMEROCK BASE 5,965 SY $ 875 $ 52,193.75 PAV-4 12"STABILIZED SUBORN:* 6,202 SY $ 1.55 $ 9,613.10 PAV-5 TYPE'0CURB 100 LF $ 800 $ 900.00 PAV-6 2'VALLEY GUTTER 4,198 LF $ 7 95 $ 33,374.10 PAV-7 CONCRETE SIDEWALK(4"THICK) 21,178 SF $ 3.75 $ 79.417.50 PAV-8 SODDING 2,353 SY ,$ 2.00 $ 4,706.00 PAV-9 SIGNAGE 1 LS $ 250000 $ 2,500.00 PAV-10 ROADWAY STRIPING 1 LS $ 2,500 00 $ 2,500.00 SUB-TOTAL PAVING= $ 232,506.65 10%CONTINGENCY= $ 23,250.67 TOTAL PAVING: $ 255,757.32 PActive_Projects\P-CCAM-0081001_Coquina_Phase2_PPL‘Designaformi8OPC's\FeeCalc1DRAFT_Coquina_Ph3_0PC-FeeCalc 1 6 A 12 Project: Coquina Phase 3 OPC Task: engineer's OPC for Fee Calc Prepared By: CW Date: 1/27/2016 Checked By: DJH Date: 1/27/2016 DRAINAGE ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE DRA-1 8"HOPE SECONDARY DRAINAGE PIPE 736 LF $ 14 80 $ 10,892.80 DRA-2 12"HDPE SECONDARY DRAINAGE PIPE 185 LF $ 17 90 $ 3,311.50 DRA-3 15"RCP STORM SEWER 151. IF $ 32.10 $ 4,847.10 DRA-4 18"RCP STORM SEWER 237 IF $ 36.80 $ 8,721,60 DRA-5 24"RCP STORM SEWER 139 IF $ 53.70 $ 7,464.30 ORA-6 18"HEADWALL 2 EA $ 2,23800 $ 4,476.00 DRA-7 24"HEADWALL 1 EA $ 2,450,00 $ 2,450.00 ORA-8 yALLEY GUTTER INLET(DOUBLE) 6 EA 3,546.00 $ 21,276.00 DRA-9 JUNCTION BOX 1 EA $ 2,500 00 $ 2,500.00 DRA-10 GRATE INLET 1 EA $ 2,42700 $ 2,427.00 DRA-11 YARD DRAIN 38 EA $ 1,030.00 $ 39,140.00 SUB-TOTAL DRAINAGE= $ 107,506.30 10%CONTINGENCY= $ 10,750.63 TOTAL DRAINAGE a $ 118,258.93 PAActive_Projects1P-CCAM-008\001_Coquina_Phase2_PPLIDesigropierrnit1OPC's‘FeeCaloNDRAFT_Coquina_Ph3_0PC-FeeCalc 1 6 A 12 Project: Coquina Phase 3 OPC Task: Engineer's OP( for Fee Calc Prepared By: CW Date: 1/27/2016 Checked By: DM Date: 1/27/2016 POTABLE WATER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE • WAT-1 6"PVC WATER MAIN(C900,DR18) 1,539 LF $ 1140 20622,60 WAT-2 6"PVC WATER MAIN(C900,DR14) 44 LF $ 15 00 $ 660.00 WAT-3 8"PVC WATER MAIN(C900,DR18) 443 LF $ 1580 $ 6,999.40 • — WAT-4 6"GATE VALVE 4 EA $ 915,00 $ 3,660.00 WAT-5 FIRE HYDRANT ASSEMBLY(COMPLETE) S EA $ 3,798.00 $ 18,990.00 WAT-6 AIR RELEASE VALVE 1 EA $ 1,600,00. $ 1,600,00 WAT-7 TEMP.BLOW-OFF W/BACTERIA SAMPLE POINT 1 EA $ 1,000.00 $ 1,000.00 WAT-8 PERM,BACTERIAL SAMPLE POINT 1 EA 1 1916.00 $ 1,916.00 1-1/2.400UE31.1 WAfER SERVICE(SHORT SIDE) WAT-9 (COMPLETE) 17 EA $ 969.00 $ 16,473.00 1-1/21bdutui WATER SERVICE(LOW SIDE) WAT-10 (COMPLETE) 19 EA $ 1,250.00 $ 23,750.00 i*SINGLE WATER SERVICE(SHORT SIDE) WAT-11 (COMPLETE) 4, EA $ 575.00 $ 2,300.00 WAT-12 1"SINGLE WATER SERVICE(LONG SIDE)(COMPLETE) 3 EA $ 799.00 $ 2,397.00 WAT-13 TESTING 1 LS ,$ 2,000.00 $ 2,000.00 WAT-14 CONNECT TO EX.WATER MAIN 1 EA $ 2,211 00 $ 2,211.00 WAT-15 TESTING 1 LS $ 1,00000 $ 1,000.00 • _ SUB-TOTAL POTABLE WATER= $ 105,579.00 10%CONTINGENCY= $ 10,557.90 TOTAL POTABLE WATER al $ 116,136.90 PlActivefrojects\P-CCAM-008‘001_Coquina_Phase2_PPLADesignapgrmit1OPC's‘FeeCalcIDRAFT_Coquina_Ph3_0PC-FeeCalo 1 6 A 12 Project: Coquina Phase 3 OPC Task: Engineer's OPC froiree dalc Prepared By: CW Date: 1/27/2018 Checked By: 0.111 Date: 1/27/2016 SANITARY SEWER ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL.PRICE SAN-1 8"SDR 26 PVC GRAVITY SEWER MAIN(0'-6CUT) 707 IF $ 29,30 20,715.10 SAN-2 8"SDR 26 PVC GRAVITY SEWER MAIN(6%.8'CUT) 669 IF $ 35.60 $ 23,816.40 SAN-3 8"SDR 26 PVC GRAVITY SEWER MAIN(84-10'CUT) IF $ 40.00 $ SAN-4 )"SDR 28 PVC GRAVITY SEWER MAIN(1(1-12'CUT) IF $ 46.70 $ SAN-5 8"SDR 26 PVC GRAVITY SEWER MAIN(12'-14'CUT) LF $ 50 80 $ • SAN-6 8"SDR 26 PVC GRAVITY SEWER MAIN(14'-16'CUT) LF $ 83.70 $ SAN-7 4'SANITARY SEWER MANHOLE(6'-8'CUT) 2 EA /$ 4,801 00 $ 9,602,00 SAN-8 4'SANITARY SEWER MANHOLE(8'-10'CUT) 2 EA $ 5,211 00 $ 10,422.00 SAN-9 4'SANITARY SEWER MANHOLE(1(1-12'CUT) EA $ 7,068 00 $ SAN-10 4'SANITARY SEWER MANHOLE(12'-14'CUT) EA $ 9,039 00 $ SAN-11 6"SERVICE LATERAL(SINGLE) k EA $ 829.00 $ 2,487.00 SAN-12 6"SERVICE LATERAL(DOUBLE) 38 EA 908.00 $ 34,504,00 SAN-13 TELEVISION INSPECTION 1,376 IF $ 660 $ 9,081.60 SAN-14 TESTING 1 LS $ 1,500 00 $ 1,500.00 SUB-TOTAL.SANITARY SEWER= $ 112,128.10 10%CONTINGENCY 11,212,81 TOTAL SANITARY SEWER 123,340.91 P:\Active_Projects\P-CCAM-008‘001_Coquina_Phase2_PPL\Designoftermit\OPC'slFeeCalc\DRAFT_Coquina_Pti3_0PC-FeeCalc 1 6 A 12 Project Coquina Phase 3 OPC Task: Engineer's OPC for Fee Calc Prepared By: CW Date: 1/27/2016 Checked By: DJH Date: 1/27/2016 IRRIGATION ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE IRR-1 -4"PVC IRRIGATION MAIN(C900,DR18) 2,111. LF $ 10.40 $ 21,954.40 IRR-2 4"PVC IRRIGATION MAIN(c900,OR141 37. LF $ 11 30 $ 418.10 IRR-3 4"GATE VALVE 5‘ EA $ 809 00 $ 4,045.00 1-1/2"DOUBLE IRRIGATION SERVICE(SHORT SIDE) IRR-4 (COMPLETE) 18, EA $ 960.00. $ 17,280.00 1-1/2"DOUBLE IRRIGATION SERVICE(LONG SIDE) IRR-5 (COMPLETE) 18 EA $ 1,34700 $ 24,246.00 1"SINGLE IRRIGATION SERVICE(SHORT' IRR-6 (COMPLETE) 8 EA $ 594 00 4,752.00 1"SINOLE IRRIGATION SERVICE(LONG SIDE) IRR-7 (COMPLETE) 2 EA _ $ 731 00 $ 1,462.00 REMOVE Ei BLOW-OPF ANS CONNECT TO EX. IRR-8 IRRIGATION MAIN S EA $ 731.00 3,655.00 IRR-9 TESTING 1 LS $ 2,00000 $ 2,000.00 IRR-10 PERMANENT BLOW-OFF 2 EA $ 2,500.00 $ 5,000.00 IRR-11 AIR RELEASE VALVE 1 EA $ 2,72700 $ 2,727,00 • IRR-12 4"PVC IRRIGATION CONDUIT 60 LF $ 10 00 $ 600.00 SUB-TOTAL IRRIGATION= $ 88,139 50 10%CONTINGENCY= $ 8,813.95 TOTAL IRRIGATION 96,953.45 PAActive_Projects\P-CCAM-0081001_Coquina_Phase2_PPL1Design,aftrrnd1OPC's1FeeCaloORAFT_Coquina_Ph3_0PC-FeeCatc