Loading...
Agenda 06/28/2016 Item #16A 4 6/28/2016 16.A.4. EXECUTIVE SUMMARY Recommendation to approve the short-list of professional engineering consultants pursuant to Request for Proposal (RFP) number 16-6560, CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project and to enter into negotiations between Collier County and AECOM Technical Services,Inc.,for "Construction Engineering and Inspection (CEI)Services for the White Boulevard over Cypress Canal Bridge Replacement Project,"Project No.66066. OBJECTIVE: To obtain professional Construction Engineering Inspection(CEI) Services for the White Boulevard over Cypress Canal Bridge Replacement Project. CONSIDERATIONS: On March 18, 2016, the Collier County Growth Management Department, through its Transportation Engineering Division, issued RFP number 16-6560 and requested proposals from professional engineering consulting firms pre-qualified by the Florida Department of Transportation (FDOT)to provide CEI services for this project. One thousand three hundred ninety one(1,391) notices of the RFP were sent out and fifty-one(51)were downloaded. Four proposals were received on April 11, 2016. On May 11, 2016, a selection committee ranked the four (4) firms based on an evaluation of their proposals. The selection committee by consensus ranked the firms as follows: 1. AECOM Technical Services,Inc. tTh 2. Johnson Engineering,Inc. 3. Keith and Schnars,PA 4. Calvin,Giordano&Associates,Inc. Staff is requesting that the Board provide authorization to begin contract negotiations with the top ranked firm, AECOM Technical Services, Inc., and in the event that an agreement cannot be reached with that firm,continue negotiating with the remaining firms in the order ranked above. FISCAL IMPACT:Approval of this item does not result in a direct fiscal impact;however,the source of funding for the future contract(subject to board approval at a subsequent meeting)will be Gas Taxes and Water Capital. Approval of this item will not have an impact on operational and maintenance costs; however, the completed project can be expected to have the following operational and maintenance impacts: • The bridge and roadway features will be new, therefore, minimal to no maintenance costs are expected to be incurred within the first 5 to 7 years of service and will be absorbed into the regular maintenance schedule thereafter. • Annual operation costs of water mains replaced during the project will remain the same or decrease. • The new stormwater features will require minimal maintenance and normal maintenance will be absorbed into the regular maintenance schedule resulting in minimal cost impact. GROWTH MANAGEMENT IMPACT: The project is in accordance with the goals and objectives of the Transportation Element of the Growth Management Plan. Packet Page-451- 6/28/2016 16.A.4. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT RECOMMENDATION: To approve the short-list of ranked professional engineering consulting firms for RFP number 16-6560 and direct staff to begin negotiating an agreement with the top-ranked firm, AECOM Technical Services,Inc.,subject to the Board's final approval at a subsequent meeting. Prepared by: Anthony O. Stotts, P.E., Sr. Project Manager,Transportation Engineering Division, Growth Management Department Attachments: 1) 16-6560 Final Ranking Sheet 2)16-6560 Solicitation http://apps3.colliergov.net/agenda/ftp/2016BCCMeetings/AgendaJun2816/Growth Mgmt/16- 6560 Solicitation.pdf 3) 16-6560 Solicitation Addenduml 4) 16-6560 AECOM Technical Services,Inc.Proposal http://apps3.colliergov.net/agenda/ftp/2016BCCMeetings/Agendaiun2816/GrowthMgmt/AECOM-16- 6560 White Blvd.pdf Packet Page-452- 6/28/2016 16.A.4. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.4. Item Summary: Recommendation to approve the short-list of professional engineering consultants pursuant to Request for Proposal (RFP) number 16-6560, CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project and to enter into negotiations between Collier County and AECOM Technical Services, Inc.,for"Construction Engineering and Inspection (CEI) Services for the White Boulevard over Cypress Canal Bridge Replacement Project," Project No. 66066. Meeting Date: 6/28/2016 Prepared By Name: StoltsAnthony Title:Project Manager, Senior,Transportation Road Maintenance 5/19/2016 8:36:50 AM Submitted by Title:Project Manager, Senior,Transportation Road Maintenance Name: StoltsAnthony 5/19/2016 8:36:51 AM Approved By Name: TaylorLisa Title:Management/Budget Analyst, Senior, Capital Construction&Maintenance Budget/Fiscal Date: 5/19/2016 9:02:39 AM Name: PutaansuuGary Title:Project Manager,Principal,Transportation Road Maintenance Date: 5/19/2016 10:43:21 AM Name: KhawajaAnthony Title: Chief Engineer-Traffic Operations,Traffic Operations Date: 5/19/2016 4:21:50 PM Packet Page -453- 6/28/2016 16.A.4. Name: Oscar Martinez Title:Project Manager,Principal,Public Utilities Engineering Date: 5/20/2016 10:12:46 AM Name: HerreraSandra Title:Manager-Procurement,Procurement Services Date: 5/20/2016 2:52:59 PM Name: JohnsonScott Title: Manager-Procurement,Procurement Services Date: 5/23/2016 3:42:42 PM Name: MarkiewiczJoanne Title:Division Director-Procurement Services,Procurement Services Date: 5/24/2016 10:03:37 AM Name: EvelynColon Title:Procurement Specialist,Procurement Services Date: 5/24/2016 2:24:15 PM Name: ChmelikTom Title:Division Director-Public Utilities Eng,Public Utilities Engineering Date: 5/24/2016 4:51:56 PM Name: ShueGene Title:Division Director-Operations Support,Growth Management Department Date: 5/31/2016 9:47:22 AM Name: KearnsAllison Title:Manager-Financial&Operational Sprt, Capital Construction&Maintenance Budget/Fiscal Date: 6/1/2016 12:50:02 PM Name: LynchDiane Title: Supervisor-Operations,Road Maintenance Date: 6/1/2016 2:05:34 PM Name: LynchDiane Title: Supervisor-Operations,Road Maintenance Date: 6/1/2016 2:06:35 PM Name: TeachScott Title:Deputy County Attorney, County Attorney Date: 6/2/2016 7:48:24 AM Packet Page-454- 6/28/2016 16.A.4. Name: MarcellaJeanne Title: Executive Secretary,Transportation Administration Date: 6/2/2016 3:08:04 PM Name: KlatzkowJeff Title: County Attorney, Date: 6/3/2016 8:31:41 AM Name: IsacksonMark Title: Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Date: 6/15/2016 10:46:23 AM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 6/16/2016 11:13:23 AM Packet Page -455- 6/28/2016 16.A.4. a) . m: c c c c oE \\ 2 E R R E 0 o c ƒ ` ` & c « c :- § c k } \U k - ^Tu cn 05 / ` / CO. y 9 2 _, ,— m n & '- - a)\ 44 0 7 $ / 2 « Cr) # % j .,z $. . E 4 E a ~�d \ o c ' _ U 2 EL E c .. . . .. � a) ) « ^§ •3 q n # 2 m § _\2 2 co E ƒ_ a. m 0 a y. \ \ ƒ . n ce _ e @ % Lr3 ® % cr) 2 j . e -.0,_. % a L. m E = I 0_ ( / % > _ q n # C7 g c.»co \ < U ƒ \ o f^ . / _c r > a 0 E o \ \ \ q n o $ / / _ .»»< 0 a ® . » >, > k � 7 \ \ .} \ Tii 2 0_ c \ . : . w ■ e - . . . > 2 — . . 2 = G 7 . . . co = c m / E .0 § 2 0.).- a) c k2 : a @ 3 w E . » § . a) n _ / / . ƒ I_ c .2' E 0 : y . � � 2 g 2 ° « ° / . 7 % @ 4-2 -c E § E 2\\ @ gA 2 � a � �/ � CD E / !(1) en. )\ S § ƒ = m ¥ E7. 2 = _\\ f c) : u., 04,_ k { E 2] # B W ® \ q / & °i LL d ƒ / \ \ E £ ± / / � 7 � � � 3 2 e . . . 2\ ƒ k / U / � Packet Page -456- 6/28/2016 16.A.4. ouier County Email: evelyncolon@colliergov.net Administrative Services Department Telephone: (239) 252-2667 Procurement Sere cis Division FAX: (239) 252-2810 ADDENDUM 1 Memorandum Date: March 28, 2016 From: Evelyn Colon, Procurement Strategist To: Interested Bidders Subject: Addendum # 1 Solicitation #and Title 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project The following additional information is issued as an addendum identifying the following for the referenced solicitation: In order to receive copies of the plans for the construction project, please fill out the exempt document form and submit a copy of the form along with a copy of your driver's license to: evelyncolon(a colliergov.net. You will receive an email with a link and password that will provide copies of the plans. • Please see the attached "Exempt Document Form". If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Please sign below and return a copy of this Addendum with your submittal for the above referenced solicitation. (Signature) Date (Name of Firm) Addendum 1 Packet Page -457- Attached : Are the hyperlink documents from the Executive Summary REQUEST FOR PROPOSALS In accordance with Florida Statute 287.055, Consultants’ Competitive Negotiation Act. COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS CCNA Solicitation 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Evelyn Colon, Procurement Strategist (239) 252-2667 (Telephone) (239) 252-2810 (Fax) evelyncolon@colliergov.net (Email) This proposal solicitation document is prepared in a Microsoft Word format. Any alterations to this document made by the Consultant may be grounds for rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government. Table of Contents LEGAL NOTICE ......................................................................................................................... 3 EXHIBIT I: SCOPE OF WORK, SPECIFICATIONS AND RESPONSE FORMAT ...................... 4 EXHIBIT II: GENERAL RFP INSTRUCTIONS............................................................................ 9 EXHIBIT III: COLLIER COUNTY PURCHASE ORDER TERMS AND CONDITIONS ................14 EXHIBIT IV: ADDITIONAL TERMS AND CONDITIONS FOR RFP ...........................................18 ATTACHMENT 1: CONSULTANT’S NON-RESPONSE STATEMENT ......................................26 ATTACHMENT 2: CONSULTANT CHECK LIST .......................................................................27 ATTACHMENT 3: CONFLICT OF INTEREST AFFIDAVIT ........................................................28 ATTACHMENT 4: CONSULTANT DECLARATION STATEMENT ............................................29 ATTACHMENT 5: IMMIGRATION AFFIDAVIT CERTIFICATION ..............................................31 ATTACHMENT 6: CONSULTANT SUBSTITUTE W – 9 ............................................................32 ATTACHMENT 7: INSURANCE AND BONDING REQUIREMENTS ........................................33 ATTACHMENT 8: REFERENCE QUESTIONNAIRE .................................................................35 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 2 Legal Notice Pursuant to approval by the County Manager, Sealed Proposals to provide CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project will be received until 3:00PM, Naples local time, on April 11, 2016 at the Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. CCNA Solicitation 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Services to be provided may include, but not be limited to the following: Construction Engineering and Inspection Services, including but not limited to, contract administration, inspection, and materials sampling and testing. A pre-proposal conference is not applicable for this solicitation. All statements should be made upon the official proposal form which must be obtained only on the Collier County Purchasing Department Online Bidding System website: www.colliergov.net/bid. Collier County does not discriminate based on age, race, color, sex, religion, national origin, disability or marital status. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA, BY: /S/ Joanne Markiewicz Director, Procurement Services Division This Public Notice was posted on the Collier County Purchasing Department website: www.colliergov.net/purchasing and in the Lobby of Purchasing Building "G", Collier County Government Center on March 18, 2016. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 3 Exhibit I: Scope of Work, Specifications and Response Format As requested by the Growth Management Division (hereinafter, the “Division”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for Proposal (hereinafter, “RFP”) with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and specifications stated or attached. The Consultant, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. The results of this solicitation may be used by other County departments once awarded according to the Board of County Commissioners Purchasing Policy. Brief Description of Purchase The Scope of Work provided in this exhibit describes and defines the Construction Engineering and Inspection (CEI) services which are required for contract administration, inspection, and materials sampling and testing for the construction project listed herein. The County’s anticipated cost for CEI services for the White Boulevard over Cypress Canal Bridge Replacement Project is approximately $331,291. Background The White Boulevard over Cypress Canal Bridge Replacement Project includes but is not limited to replacement of an obsolete bridge, utility relocation, and improvements to the roadway approaches. The principal intent of this RFP is to select a consulting firm to provide CEI and Related Services for this Collier County transportation project. The assigned Consultant will be responsible for executing all of the requirements of the Contract and the attached Scope of Services relative to the project they are assigned by the committee. Detailed Scope of Work See Exhibit “A” for a detailed Scope of Work Term of Contract See Exhibit “A”, paragraph 3.0 LENGTH OF SERVICE. Projected Solicitation Timetable The following projected timetable should be used as a working guide for planning purposes only. The County reserves the right to adjust this timetable as required during the course of the RFP process. Event Date Issue Solicitation Notice March 18, 2016 Last Date for Receipt of Written Questions March 30, 2016 @ 3:00PM Addendum Issued Resulting from Written Questions or Pre- Proposal Conference April 1, 2016 Solicitation Deadline Date and Time April 11, 2016 @ 3:00PM 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 4 Anticipated Evaluation of Submittals April 13, 2016 Anticipated Board of County Commissioner’s Approval Date May 2016 Anticipated Completion of Contract Negotiations June 2016 Anticipated Board of County Commissioner’s Contract Approval Date June 2016 Response Format The Consultant understands and agrees to abide by all of the RFP specifications, provisions, terms and conditions of same, and all ordinances and policies of Collier County. The Consultant further agrees that if the contract is awarded the work will be performed in accordance with the provisions, terms and conditions of the contract. To facilitate the fair evaluation and comparison of proposals, all proposals must conform to the guidelines set forth in this RFP. Any portions of the proposal that do not comply with these guidelines must be so noted and explained in the Acceptance of Conditions section of the proposal. However, any proposal that contains such variances may be considered non-responsive. Proposals should be prepared simply and economically, providing a straightforward concise description of the Consultant’s approach and ability to meet the County’s needs, as stated in the RFP. All proposals should be presented as described in the RFP in PDF or Microsoft Word format with Tabs clearly marked. If applicable, the utilization of recycled paper for proposal submission is strongly encouraged. The items listed below are to be submitted with each proposal and submitted in the order shown. Each section should be clearly labeled, with pages numbered and separated by tabs. Failure by a Consultant to include all listed items may result in the rejection of its proposal. Proposals will be assessed minus one (–1) point for each additional page over the limit described for each section below. Tab I, Cover Letter / Management Summary (5 Points) In this tab, include: Provide a cover letter, signed by an authorized officer of the firm, indicating the underlying philosophy of the firm in providing the services stated herein. Include the name(s), telephone number(s) and email(s) of the authorized contact person(s) concerning proposal. Submission of a signed Proposal is Consultant's certification that the Consultant will accept any awards as a result of this RFP. Tab II, Consultant Approach and Understanding of the White Boulevard over Cypress Canal Bridge Replacement Project (35 Points, 5 page maximum) In this tab, include: Provide a narrative portraying the Consultants understanding of the project and what approach will be used to manage/monitor the project during construction. Identify and 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 5 describe the key features of the project that are crucial to successful completion of construction. Explain what the potential risks are and what the Consultant’s team will do to manage and or mitigate these risks during construction. The narrative should focus on the specific aspects of the White Boulevard over Cypress Canal Bridge Replacement Project. Tab III, Qualifications/Certifications and Experience of the Assigned Team and Staff (35 Points, 5 page maximum) In this tab, include: Provide a brief narrative and/or chart(s) demonstrating the qualifications and certifications of the assigned team and staff that are relative to successful completion of the project herein. Experience and successful performance of the assigned team and staff on projects similar to those indicated herein is preferred. (Resumes and Certifications of the assigned team/staff must be provided under this tab, but do not count against the page maximum for this tab). See Exhibit “A”, for personnel qualification and certification requirements. Please note: FDOT Certification of the Consultant’s Project Administrator is a requirement of the contract. Project Administrator experience with bridge projects is preferred. Tab IV, Performance of the Consultant (20 Points) In this tab, include: Provide the following information in the format listed below in order to be considered responsive and to provide comparative scoring. Vendors who do not provide information in the format described below may receive the lowest number of points allowable in this criteria. i. Identify the number of FDOT Certified staff presently employed by the firm. __________________ ii. Identify the number of successfully performed [completed or active] CEI and related services projects performed by the Consultant that included all three (3) Rule Chapter 14-75 types of work during the last five (5) years: a. 10.1 – Roadway CEI b. 10.3 – Construction Materials Inspection, and c. 10.4 – Minor Bridge and Miscellaneous Structures CEI __________________ iii. Identify the number of projects with alternate combinations of work types; all projects must include “10.4 – Minor Bridge and Miscellaneous Structures CEI” as a minimum during the last five (5) years. __________________ TOTAL (Add lines 1 – 3 and enter total) __________________ (Add lines 1 – 3) 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 6 Prior to the Selection Committee reviewing proposals, the following methodology will be applied to each consultant’s information provided in this area: • The County shall total each of the consultant’s responses and create a ranking from highest number to lowest number (TOTAL). Responses marked with an N/A or not completed (or some similar notation will be given the score of zero (0)). Consultants who do not turn in information as requested will be given the lowest number of criteria points (0). • The greatest number of criteria points allowed in this criterion will be awarded to the agency who has the highest TOTAL. • The next highest consultant’s TOTAL will be divided by the highest consultant’s TOTAL which will then be multiplied by criteria points to determine the consultant’s criteria points awarded. Each subsequent consultant’s criteria point score will be calculated in the same manner. • Points awarded will be extended to the first decimal point (per Microsoft Excel). The points awarded by consultant will be distributed to the Selection Committee prior to their evaluation of the proposals. The Selection Committee will review the consultant’s proposal to ensure consistency and completion of all tasks in the RFP, and review the Points Awarded per consultant. The Selection Committee may, at their sole discretion modify the criteria points assigned after a thorough review of the proposal and prior to final ranking by the final Selection Committee. Tab V, References (5 Points) Submit fully completed References with the firm’s proposal – not to exceed five (5) references from individuals who have had similar work to the County’s scope of services outlined herein. In order for the firm to be awarded any points for this tab, the County requests that the firm submits five (5) completed reference forms from clients whose projects are of a similar nature to this solicitation as a part of their proposal. The County will only use the methodology calculations for the first five (5) references (only) submitted by the vendor in their proposal. Prior to the Selection Committee reviewing proposals, the following methodology will be applied to each vendor’s information provided in this area: i. The County shall total each of the firm’s reference scores and create a ranking from highest number of points to lowest number of points. ii. The highest number of points, five (5), will be awarded to the vendor who has the highest reference score. iii. The firm’s reference score will be divided by the highest vendor’s reference score which will then be multiplied by five (5) points to determine the vendor’s Points Awarded. Each subsequent firm’s reference score will be calculated in the same manner. iv. Points awarded will be extended to the first decimal point (per Microsoft Excel). For illustrative purposes only, see chart for an example of how these points would be distributed among the five proposers. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 7 Consultant Name Consultant Total Reference Score Points Awarded Consultant ABC 445 5 Consultant DEF 435 4.8 Consultant GHI 425 4.7 Consultant JKL 385 4.3 Consultant MNO 385 4.3 Consultant PQR 250 2.8 Note: Sample chart reflects a 20 point reference criterion. The points awarded by Consultant will be distributed to the Selection Committee prior to their evaluation of the proposals. The Selection Committee will review the Consultant’s proposal to ensure consistency and completion of all tasks in the RFP, and review the Points Awarded per Consultant. The Selection Committee may, at their sole discretion, contact references, and/or modify the reference points assigned after a thorough review of the proposal and prior to final ranking by the final Selection Committee. Tab VI, Acceptance of Conditions Indicate any exceptions to the general terms and conditions of the RFP, and to insurance requirements or any other requirements listed in the RFP. If no exceptions are indicated in this tabbed section, it will be understood that no exceptions to these documents will be considered after the award, or if applicable, during negotiations. Exceptions taken by a Consultant may result in evaluation point deduction(s) and/or exclusion of proposal for Selection Committee consideration, depending on the extent of the exception(s). Such determination shall be at the sole discretion of the County and Selection Committee. Tab VII, Required Form Submittals • Attachment 2: Consultant Checklist • Attachment 3: Conflict of Interest Affidavit • Attachment 4: Consultant Declaration Form’ • Attachment 5: Immigration Affidavit and company’s E-Verify profile page and memorandum of understanding • Attachment 6: Consultant Substitute W9 • Attachment 7: Insurance Requirements • Attachment 8: Reference Questionnaire • Other: FDOT Certifications 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 8 Exhibit II: General RFP Instructions 1. Questions Direct questions related to this RFP to the Collier County Purchasing Department Online Bidding System website: www.colliergov.net/bid. Consultants must clearly understand that the only official answer or position of the County will be the one stated on the Collier County Purchasing Department Online Bidding System website. For general questions, please call the referenced Procurement Strategist noted on the cover page. 2. Pre-Proposal Conference The purpose of the pre-proposal conference is to allow an open forum for discussion and questioning with County staff regarding the RFP with all prospective Consultants having an equal opportunity to hear and participate. Oral questions will receive oral responses, neither of which will be official, nor become part of the RFP. Only written responses to written questions will be considered official, and will be included as part of the RFP as an addendum. All prospective Consultants are strongly encouraged to attend, as, this will usually be the only pre-proposal conference for this solicitation. If this pre-proposal conference is denoted as “mandatory”, prospective Consultants must be present in order to submit a proposal response. 3. Compliance with the RFP Proposals must be in strict compliance with this RFP. Failure to comply with all provisions of the RFP may result in disqualification. 4. Ambiguity, Conflict, or Other Errors in the RFP It is the sole responsibility of the Consultant if the Consultant discovers any ambiguity, conflict, discrepancy, omission or other error in the RFP, to immediately notify the Procurement Strategist, noted herein, of such error in writing and request modification or clarification of the document prior to submitting the proposal. The Procurement Strategist will make modifications by issuing a written revision and will give written notice to all parties who have received this RFP from the Purchasing Department. 5. Proposal, Presentation, and Protest Costs The County will not be liable in any way for any costs incurred by any Consultant in the preparation of its proposal in response to this RFP, nor for the presentation of its proposal and/or participation in any discussions, negotiations, or, if applicable, any protest procedures. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 9 6. Delivery of Proposals All proposals are to be delivered before 3:00PM, Naples local time, on or before April 11, 2016 @ 3:00PM to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Evelyn Colon, Procurement Strategist The County does not bear the responsibility for proposals delivered to the Purchasing Department past the stated date and/or time indicated, or to an incorrect address by Consultant’s personnel or by the Consultant’s outside carrier. However, the Procurement Director, or designee, reserves the right to accept proposals received after the posted close time under the following conditions: • The tardy submission of the proposal is due to the following circumstances, which may include but not be limited to: late delivery by commercial carrier such as Fed Ex, UPS or courier where delivery was scheduled before the deadline. • The acceptance of said proposal does not afford any competing firm an unfair advantage in the selection process. Consultants must submit one (1) paper copy clearly labeled “Master,” and five (5) compact disks (CD’s) with one copy of the proposal on each CD in Word, Excel or PDF. List the Solicitation Number and Title on the outside of the box or envelope. 7. Validity of Proposals No proposal can be withdrawn after it is filed unless the Consultant makes their request in writing to the County prior to the time set for the closing of Proposals. All proposals shall be valid for a period of one hundred eighty (180) days from the submission date to accommodate evaluation and selection process. 8. Method of Source Selection The County is using the Competitive Sealed Proposals methodology of source selection for this procurement, as authorized by Ordinance Number 2013-69 establishing and adopting the Collier County Purchasing Policy. If the County receives proposals from less than three (3) firms, the Procurement Director shall review all the facts and determine if it is in the best interest of the County to solicit additional proposals or request that the Selection Committee rank order the received proposals. The County may, as it deems necessary, conduct discussions with qualified Consultants determined to be in contention for being selected for award for the purpose of clarification to assure full understanding of, and responsiveness to solicitation requirements. 9. Evaluation of Proposals Collier County will evaluate and select these Services in accordance with Florida Statute 287.055, 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 10 Consultants’ Competitive Negotiation Act. The County’s procedure for selecting is as follows: 1. The County Manager or designee shall appoint a selection committee to review all proposals submitted. 2. The Request for Proposal is issued. 3. Subsequent to the receipt closing date for the proposals, the Procurement professional will review the proposals received and verify each proposal to determine if it minimally responds to the requirements of the published RFP. 4. Selection committee meetings will be open to the public and the Procurement professional will publicly post prior notice of such meeting(s) in the lobby of the Purchasing Building and on the County’s Procurement Services Internet site. 5. Prior to the first meeting (Organization Meeting) of the selection committee, the Procurement professional will post a notice announcing the date, time and place of the meeting at least three (3) working days prior to the meeting. At the initial organization meeting, the selection committee members will receive instructions, the submitted proposals, and establish the next selection committee meeting date and time. After the first meeting, the Procurement professional will publically announce all subsequent committee meeting dates and times. The subsequent meeting dates and times will be posted with at least one (1) day advanced notice. 6. Selection committee members will independently review and score each proposal based on the evaluation criteria stated in the request for proposal using the Individual Selection Committee Score and Rank Form and prepare comments for discussion at the next meeting. The Individual Selection Committee Score and Rank Form is merely a tool to assist the selection committee member in their review of the proposals. 7. At the scheduled selection meeting, the members will present their independent findings / conclusions / comments based on their reading and interpretation of the materials presented to each other, and may ask questions of one another. At the conclusion of that discussion, members of the public will be offered an opportunity (not to exceed three (3) minutes) to provide comments. 8. At the conclusion of public comments (provided for in number 7), the selection committee members will individually rank order each proposer. Collier County selection committee members may consider all the material submitted by the Proposer and other information Collier County may obtain to determine whether the Proposer is capable of and has a history of successfully completing projects of this type, including, without limitation, additional information Collier County may request, clarification of proposer information, public comments, and/or additional credit information. 9. Once the individual ranking has been completed, the Procurement professional will direct selection committee members to read their individual ranking publically. The Procurement professional will record individual rankings on the Final Ranking Sheet which will mathematically compile into an overall selection committee rank of proposers. 10. In any of the selection committee meeting deliberations, by consensus, members may request to invite proposers in to clarify their proposals, ask for additional information, present materials, interview, ask questions, etc. The members may consider any and all information obtained through this method in formulating their 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 11 individual ranking and subsequent selection committee overall ranking and final ranking. 11. The selection committee’s overall rank of firms in order of preference (from highest beginning with a rank of one (1) to the lowest) will be discussed and reviewed by the Procurement Strategist. By final consensus, and having used all information presented (proposal, presentation, references, etc.), the selection committee members will create a final ranking and staff will subsequently enter into negotiations. Award of the contract is dependent upon the successful and full execution of a mutually agreed contract, pending the final approval by the Board of County Commissioners. The County reserves the right to withdraw this RFP at any time and for any reason, and to issue such clarifications, modifications, addendums, and/or amendments as it may deem appropriate, including, but not limited, to requesting supplemental proposal information. Receipt of a proposal by the County or a submission of a proposal to the County offers no rights upon the Consultant nor obligates the County in any manner. Acceptance of the proposal does not guarantee issuance of any other governmental approvals. Proposals which include provisions requiring the granting of zoning variances may not be considered. 10. References The County reserves the right to contact any and all references submitted as a result of this solicitation. 11. Proposal Selection Committee and Evaluation Factors The County Manager or designee will appoint a Selection Committee to review all proposals submitted. The factors to be considered in the evaluation of proposal responses are listed below. Tab I, Cover Letter / Management Summary 5 Points Tab II, Consultant Approach and Understanding of the White Boulevard over Cypress Canal Bridge Replacement Project 35 Points Tab III, Qualifications/Certifications and Experience of the Assigned Team and Staff 35 Points Tab IV, Performance of the Consultant 20 Points Tab V, References 5 Points TOTAL 100 Points Tie Breaker: In the event of a tie, both in individual scoring and in final ranking, the firm with the lowest paid dollars by Collier County to the Consultant (as obtained from the County’s financial system) within the last five (5) years will receive the higher individual ranking. This information will be based on information provided by the Consultant, subject to verification at the County’s option. If there is a multiple firm tie in either individual scoring or final ranking, the firm with the lowest volume of work shall receive the higher ranking, the firm with the next lowest volume of work shall receive the next highest ranking and so on. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 12 12. Acceptance or Rejection of Proposals The right is reserved by the County to waive any irregularities in any proposal, to reject any or all proposals, to re-solicit for proposals, if desired, and upon recommendation and justification by Collier County to accept the proposal which in the judgment of the County is deemed the most advantageous for the public and Collier County. Any proposal which is incomplete, conditional, obscure or which contains irregularities of any kind, may be cause for rejection. In the event of default of the successful Consultant, or their refusal to enter into the Collier County contract, the County reserves the right to accept the proposal of any other Consultant or to re-advertise using the same or revised documentation, at its sole discretion. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 13 Exhibit III: Collier County Purchase Order Terms and Conditions 1. Offer This offer is subject to cancellation by the COUNTY without notice if not accepted by VENDOR within fourteen (14) days of issuance. 2. Acceptance and Confirmation This Purchase Order (including all documents attached to or referenced therein) constitutes the entire agreement between the parties, unless otherwise specifically noted by the COUNTY on the face of this Purchase Order. Each delivery of goods and/or services received by the COUNTY from VENDOR shall be deemed to be upon the terms and conditions contained in this Purchase Order. No additional terms may be added and Purchase Order may not be changed except by written instrument executed by the COUNTY. VENDOR is deemed to be on notice that the COUNTY objects to any additional or different terms and conditions contained in any acknowledgment, invoice or other communication from VENDOR, notwithstanding the COUNTY’S acceptance or payment for any delivery of goods and/or services, or any similar act by VENDOR. 3. Inspection All goods and/or services delivered hereunder shall be received subject to the COUNTY’S inspection and approval and payment therefore shall not constitute acceptance. All payments are subject to adjustment for shortage or rejection. All defective or nonconforming goods will be returned pursuant to VENDOR'S instruction at VENDOR’S expense. To the extent that a purchase order requires a series of performances by VENDOR, the COUNTY prospectively reserves the right to cancel the entire remainder of the Purchase Order if goods and/or services provided early in the term of the Purchase Order are non-conforming or otherwise rejected by the COUNTY. 4. Shipping and Invoices a) All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remain with VENDOR. b) No charges will be paid by the COUNTY for packing, crating or cartage unless otherwise specifically stated in this Purchase Order. Unless otherwise provided in Purchase Order, no invoices shall be issued nor payments made prior to delivery. Unless freight and other charges are itemized, any discount will be taken on the full amount of invoice. c) All shipments of goods scheduled on the same day via the same route must be consolidated. Each shipping container must be consecutively numbered and marked to show this Purchase Order number. The container and Purchase Order numbers must be indicated on bill of lading. Packing slips must show Purchase Order number and must be included on each package of less than container load (LCL) shipments and/or with each car load of equipment. The COUNTY reserves the right to refuse or return any shipment or equipment at VENDOR’S expense that is not marked with Purchase Order numbers. VENDOR agrees to declare to the carrier the value of any shipment made under this Purchase Order and the full invoice value of such shipment. d) All invoices must contain the Purchase Order number and any other specific information as identified on the Purchase Order. Discounts of prompt payment will be computed from the date of receipt of goods or from date of receipt of invoices, whichever is later. Payment will be made upon receipt of a proper invoice and in compliance with Chapter 218, Fla. Stats., otherwise known as the “Local Government Prompt Payment Act,” and, pursuant to the Board of County Commissioners Purchasing Policy. 5. Time Is Of the Essence 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 14 Time for delivery of goods or performance of services under this Purchase Order is of the essence. Failure of VENDOR to meet delivery schedules or deliver within a reasonable time, as interpreted by the COUNTY in its sole judgment, shall entitle the COUNTY to seek all remedies available to it at law or in equity. VENDOR agrees to reimburse the COUNTY for any expenses incurred in enforcing its rights. VENDOR further agrees that undiscovered delivery of nonconforming goods and/or services is not a waiver of the COUNTY’S right to insist upon further compliance with all specifications. 6. Changes The COUNTY may at any time and by written notice make changes to drawings and specifications, shipping instructions, quantities and delivery schedules within the general scope of this Purchase Order. Should any such change increase or decrease the cost of, or the time required for performance of the Purchase Order, an equitable adjustment in the price and/or delivery schedule will be negotiated by the COUNTY and VENDOR. Notwithstanding the foregoing, VENDOR has an affirmative obligation to give notice if the changes will decrease costs. Any claims for adjustment by VENDOR must be made within thirty (30) days from the date the change is ordered or within such additional period of time as may be agreed upon by the parties. 7. Warranties VENDOR expressly warrants that the goods and/or services covered by this Purchase Order will conform to the specifications, drawings, samples or other descriptions furnished or specified by the COUNTY, and will be of satisfactory material and quality production, free from defects and sufficient for the purpose intended. Goods shall be delivered free from any security interest or other lien, encumbrance or claim of any third party. These warranties shall survive inspection, acceptance, passage of title and payment by the COUNTY. 8. Statutory Conformity Goods and services provided pursuant to this Purchase Order, and their production and transportation shall conform to all applicable laws, including but not limited to the Occupational Health and Safety Act, the Federal Transportation Act and the Fair Labor Standards Act, as well as any law or regulation noted on the face of the Purchase Order. 9. Advertising No VENDOR providing goods and services to the COUNTY shall advertise the fact that it has contracted with the COUNTY for goods and/or services, or appropriate or make use of the COUNTY’S name or other identifying marks or property without the prior written consent of the COUNTY’S Purchasing Department. 10. Indemnification VENDOR shall indemnify and hold harmless the COUNTY from any and all claims, including claims of negligence, costs and expenses, including but not limited to attorneys' fees, arising from, caused by or related to the injury or death of any person (including but not limited to employees and agents of VENDOR in the performance of their duties or otherwise), or damage to property (including property of the COUNTY or other persons), which arise out of or are incident to the goods and/or services to be provided hereunder. 11. Warranty of Non-Infringement VENDOR represents and warrants that all goods sold or services performed under this Purchase Order are: a) in compliance with applicable laws; b) do not infringe any patent, trademark, copyright or trade secret; and c) do not constitute unfair competition. VENDOR shall indemnify and hold harmless the COUNTY from and against any and all claims, including claims of negligence, costs and expense, including but not limited to attorneys' fees, which arise from any claim, suit or proceeding alleging that the COUNTY’S use of the goods and/or services provided under this Purchase Order are inconsistent with VENDOR'S representations and warranties in section 11 (a). If any claim which arises from VENDOR'S breach of section 11 (a) has occurred, or is likely to occur, VENDOR may, at the COUNTY’S option, procure for the COUNTY the right to continue using the goods or 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 15 services, or replace or modify the goods or services so that they become non-infringing, (without any material degradation in performance, quality, functionality or additional cost to the COUNTY). 12. Insurance Requirements The VENDOR, at its sole expense, shall provide commercial insurance of such type and with such terms and limits as may be reasonably associated with the Purchase Order. Providing and maintaining adequate insurance coverage is a material obligation of the VENDOR. All insurance policies shall be executed through insurers authorized or eligible to write policies in the State of Florida. 13. Compliance with Laws In fulfilling the terms of this Purchase Order, VENDOR agrees that it will comply with all federal, state, and local laws, rules, codes, and ordinances that are applicable to the conduct of its business. By way of non- exhaustive example, this shall include the American with Disabilities Act and all prohibitions against discrimination on the basis of race, religion, sex creed, national origin, handicap, marital status, or veterans’ status. Further, VENDOR acknowledges and without exception or stipulation shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the awarded firm(s) to comply with the laws referenced herein shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. Any breach of this provision may be regarded by the COUNTY as a material and substantial breach of the contract arising from this Purchase Order. 14. Force Majeure Neither the COUNTY nor VENDOR shall be responsible for any delay or failure in performance resulting from any cause beyond their control, including, but without limitation to war, strikes, civil disturbances and acts of nature. When VENDOR has knowledge of any actual or potential force majeure or other conditions which will delay or threatens to delay timely performance of this Purchase Order, VENDOR shall immediately give notice thereof, including all relevant information with respects to what steps VENDOR is taking to complete delivery of the goods and/or services to the COUNTY. 15. Assignment VENDOR may not assign this Purchase Order, nor any money due or to become due without the prior written consent of the COUNTY. Any assignment made without such consent shall be deemed void. 16. Taxes Goods and services procured subject to this Purchase Order are exempt from Florida sales and use tax on real property, transient rental property rented, tangible personal purchased or rented, or services purchased (Florida Statutes, Chapter 212), and from federal excise tax. 17. Annual Appropriations The COUNTY’S performance and obligation to pay under this Purchase Order shall be contingent upon an annual appropriation of funds. 18. Termination This Purchase Order may be terminated at any time by the COUNTY upon 30 days prior written notice to the VENDOR. This Purchase Order may be terminated immediately by the COUNTY for breach by VENDOR of the terms and conditions of this Purchase Order, provided that COUNTY has provided VENDOR with notice of such breach and VENDOR has failed to cure within 10 days of receipt of such notice. 19. General a) This Purchase Order shall be governed by the laws of the State of Florida. The venue for any action brought to specifically enforce any of the terms and conditions of this Purchase Order shall be the Twentieth Judicial Circuit in and for Collier County, Florida b) Failure of the COUNTY to act immediately in response to a breach of this Purchase Order by VENDOR shall not constitute a waiver of breach. Waiver of the COUNTY by any default by VENDOR hereunder shall not be 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 16 deemed a waiver of any subsequent default by VENDOR. c) All notices under this Purchase Order shall be sent to the respective addresses on the face page by certified mail, return receipt requested, by overnight courier service, or by personal delivery and will be deemed effective upon receipt. Postage, delivery and other charges shall be paid by the sender. A party may change its address for notice by written notice complying with the requirements of this section. d) The Vendor agrees to reimbursement of any travel expenses that may be associated with this Purchase Order in accordance with Florida Statute Chapter 112.061, Per Diem and Travel Expenses for Public Officers, employees and authorized persons. e) In the event of any conflict between or among the terms of any Contract Documents related to this Purchase Order, the terms of the Contract Documents shall take precedence over the terms of the Purchase Order. To the extent any terms and /or conditions of this Purchase Order duplicate or overlap the Terms and Conditions of the Contract Documents, the provisions of the Terms and/or Conditions that are most favorable to the County and/or provide the greatest protection to the County shall govern. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 17 Exhibit IV: Additional Terms and Conditions for RFP 1. Insurance and Bonding Requirements The Consultant shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in the Insurance and Bonding attachment of this solicitation. The Consultant shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Consultant waive against each other and the County’s separate Consultants, Contractors, Design Consultant, Subcontractors agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Consultant and County shall, where appropriate, require similar waivers of subrogation from the County’s separate Consultants, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining, its own liability insurance. Certificates issued as a result of the award of this solicitation must identify “For any and all work performed on behalf of Collier County.” The General Liability Policy provided by Consultant to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Consultant under this solicitation and shall contain a severability of interests provisions. Collier County Board of County Commissioners shall be named as the Certificate Holder. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County.The "Certificate Holder" should read as follows: Collier County Board of County Commissioners Naples, Florida The amounts and types of insurance coverage shall conform to the minimum requirements set forth in Insurance and Bonding attachment, with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Consultant has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Consultant must identify on the Certificate of Insurance the nature and amount of such self - insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self -insured retentions or deductibles will be Consultant’s sole responsibility. Coverage(s) shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Consultant and/or its insurance carrier shall provide 30 days written notice to the County of policy cancellation or non-renewal on the part of the insurance carrier or the Consultant. The Consultant shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Consultant from its insurer and nothing contained herein shall relieve Consultant of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Consultant hereunder, Consultant shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 18 Should at any time the Consultant not maintain the insurance coverage(s) required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Consultant for such coverage(s) purchased. If Consultant fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Consultant under this Agreement or any other agreement between the County and Consultant. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Consultant shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Consultant to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. 2. Offer Extended to Other Governmental Entities Collier County encourages and agrees to the successful Consultant extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful Consultant. 3. Additional Items and/or Services Additional items and / or services may be added to the resultant contract, or purchase order, in compliance with the Purchasing Policy. 4. County’s Right to Inspect The County or its authorized Agent shall have the right to inspect the Consultant’s facilities/project site during and after each work assignment the Consultant is performing. 5. Vendor Performance Evaluation The County has implemented a Vendor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, vendors will be evaluated on their performance upon completion/termination of this Agreement. 6. Additional Terms and Conditions of Contract Collier County has developed standard contracts/agreements, approved by the Board of County Commissioners (BCC). The selected Consultant shall be required to sign a standard Collier County contract within twenty one (21) days of Notice of Selection for Award. The resultant contract(s) may include purchase or work orders issued under one, or any combination of price methodologies by the County’s project manager: Lump Sum (Fixed Price): a firm fixed total price offering for a project; the risks are transferred from the County to the contractor; and, as a business practice there are no hourly or material invoices presented, rather, the contractor must perform to the satisfaction of the County’s project manager before payment for the fixed price contract is authorized. Time and Materials: the County agrees to pay the contractor for the amount of labor time spent by the contractor's employees and subcontractors to perform the work (number of hours times hourly 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 19 rate), and for materials and equipment used in the project (cost of materials plus the contractor's mark up). This methodology is generally used in projects in which it is not possible to accurately estimate the size of the project, or when it is expected that the project requirements would most likely change. As a general business practice, these contracts include back-up documentation of costs; invoices would include number of hours worked and billing rate by position (and not company (or subcontractor) timekeeping or payroll records), material or equipment invoices, and other reimbursable documentation for the project. Unit Price: the County agrees to pay a firm total fixed price (inclusive of all costs, including labor, materials, equipment, overhead, etc.) for a repetitive product or service delivered (i.e. installation price per ton, delivery price per package or carton, etc.). The invoice must identify the unit price and the number of units received (no contractor inventory or cost verification required). The County reserves the right to include in any contract document such terms and conditions, as it deems necessary for the proper protection of the rights of Collier County. A sample copy of this contract is available upon request. The County will not be obligated to sign any contracts, maintenance and/or service agreements or other documents provided by the Consultant. The County’s project manager, shall coordinate with the Vendor / Contractor the return of any surplus assets, including materials, supplies, and equipment associated with the scope or work. 7. Public Records Compliance The Vendor/Contractor agrees to comply with the Florida Public Records Law Chapter 119 (including specifically those contractual requirements at F.S. § 119.0701(2) (a)-(d) and (3)), ordinances, codes, rules, regulations and requirements of any governmental agencies. Should any project that is active on a work order extend past the contract termination date, that work order will be active and extended as necessary until completion of such project. 8. Payment Method Payments are made in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes. Vendor’s invoices must include: • Purchase Order Number • Description and quantities of the goods or services provided per instructions on the County’s purchase order or contract. Invoices shall be sent to: Board of County Commissioners Clerk’s Finance Department ATTN: Accounts Payable 3299 Tamiami Trail E Ste 700 Naples FL 34112 Or emailed to: bccapclerk@collierclerk.com. Collier County, in its sole discretion, will determine the method of payment for goods and/or services as part of this agreement. Payment methods include: • Traditional – payment by check, wire transfer or other cash equivalent. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 20 • Standard – payment by purchasing card. Collier County’s Purchasing Card Program is supported by standard bank credit suppliers (i.e. VISA and MasterCard), and as such, is cognizant of the Rules for VISA Merchants and MasterCard Merchant Rules. The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County’s credit card for transactions relating to this solicitation. The County will entertain bids clearly stating pricing for standard payment methods. An additional separate discounted price for traditional payments may be provided at the initial bid submittal if it is clearly marked as an “Additional Cash Discount.” Upon execution of the Contract and completion of each month’s work, payment requests may be submitted to the Project Manager on a monthly basis by the Contractor for services rendered for that prior month. Services beyond sixty (60) days from current monthly invoice will not be considered for payment without prior approval from the Project manager. All invoices should be submitted within the fiscal year the work was performed. (County's fiscal year is October 1 - September 30.) Invoices submitted after the close of the fiscal year will not be accepted (or processed for payment) unless specifically authorized by the Project Manager. Payments will be made for articles and/or services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of “laches” as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off-set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed of for materials delivered in association with a contract. Invoices shall not reflect sales tax. After review and approval, the invoice will be transmitted to the Finance Division for payment. Payment will be made upon receipt of proper invoice and in compliance with Chapter 218 Florida Statutes, otherwise known as the “Local Government Prompt Payment Act.” Collier County reserves the right to withhold and/or reduce an appropriate amount of any payment for work not performed or for unsatisfactory performance of Contractual requirements. 9. Environmental Health and Safety All Consultants and Sub Consultants performing service for Collier County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Consultants and Sub Consultants shall be responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site. All firewall penetrations must be protected in order to meet Fire Codes. Collier County Government has authorized OSHA representatives to enter any Collier County facility, property and/or right-of-way for the purpose of inspection of any Consultant’s work operations. This provision is non-negotiable by any department and/or Consultant. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 21 All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 10. Licenses The Consultant is required to possess the correct Business Tax Receipt, professional license, and any other authorizations necessary to carry out and perform the work required by the project pursuant to all applicable Federal, State and Local Law, Statute, Ordinances, and rules and regulations of any kind. Additionally, copies of the required licenses must be submitted with the proposal response indicating that the entity proposing, as well as the team assigned to the County account, is properly licensed to perform the activities or work included in the contract documents. Failure on the part of any Consultant to submit the required documentation may be grounds to deem Consultant non-responsive. A Consultant, with an office within Collier County is also required to have an occupational license. All State Certified contractors who may need to pull Collier County permits or call in inspections must complete a Collier County Contractor License registration form and submit the required fee. After registering the license/registration will need to be renewed thereafter to remain “active” in Collier County If you have questions regarding professional licenses contact the Contractor Licensing, Community Development and Environmental Services at (239) 252-2431, 252-2432 or 252-2909. Questions regarding required occupational licenses, please contact the Tax Collector’s Office at (239) 252-2477. 11. Survivability Bids (ITBs/RFPs): The Consultant/Contractor/Vendor agrees that any Work Order/Purchase Order that extends beyond the expiration date of Solicitation 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project resultant of this solicitation will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of any Work Order/Purchase Order. 12. Principals/Collusion By submission of this Proposal the undersigned, as Consultant, does declare that the only person or persons interested in this Proposal as principal or principals is/are named therein and that no person other than therein mentioned has any interest in this Proposal or in the contract to be entered into; that this Proposal is made without connection with any person, company or parties making a Proposal, and that it is in all respects fair and in good faith without collusion or fraud. 13. Relation of County It is the intent of the parties hereto that the Consultant shall be legally considered an independent Consultant, and that neither the Consultant nor their employees shall, under any circumstances, be considered employees or agents of the County, and that the County shall be at no time legally responsible for any negligence on the part of said Consultant, their employees or agents, resulting in either bodily or personal injury or property damage to any individual, firm, or corporation. 14. Termination Should the Consultant be found to have failed to perform his services in a manner satisfactory to the County, the County may terminate this Agreement immediately for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non-performance. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 22 15. Lobbying All firms are hereby placed on NOTICE that the Board of County Commissioners does not wish to be lobbied, either individually or collectively about a project for which a firm has submitted a Proposal. Firms and their agents are not to contact members of the County Commission for such purposes as meeting or introduction, luncheons, dinners, etc. During the process, from Proposal closing to final Board approval, no firm or their agent shall contact any other employee of Collier County in reference to this Proposal, with the exception of the Procurement Director or his designee(s). Failure to abide by this provision may serve as grounds for disqualification for award of this contract to the firm. 16. Certificate of Authority to Conduct Business in the State of Florida (Florida Statute 607.1501) In order to be considered for award, firms must be registered with the Florida Department of State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501 and provide a certificate of authority (www.sunbiz.org/search.html) prior to execution of a contract. A copy of the document may be submitted with the solicitation response and the document number shall be identified. Firms who do not provide the certificate of authority at the time of response shall be required to provide same within five (5) days upon notification of selection for award. If the firm cannot provide the document within the referenced timeframe, the County reserves the right to award to another firm. 17. Single Proposal Each Consultant must submit, with their proposal, the required forms included in this RFP. Only one proposal from a legal entity as a primary will be considered. A legal entity that submits a proposal as a primary or as part of a partnership or joint venture submitting as primary may not then act as a sub- consultant to any other firm submitting under the same RFP. If a legal entity is not submitting as a primary or as part of a partnership or joint venture as a primary, that legal entity may act as a sub- consultant to any other firm or firms submitting under the same RFP. All submittals in violation of this requirement will be deemed non-responsive and rejected from further consideration. In addition, consultants that have participated and/or will participate in the development of scope, background information or oversight functions on this project are precluded from submitting a Proposal as either a prime or sub- consultant. 18. Protest Procedures Any prospective vendor / proposer who desires to protest any aspect(s) or provision(s) of the solicitation (including the form of the solicitation documents or procedures) shall file their protest with the Procurement Director prior to the time of the bid opening strictly in accordance with the County’s then current purchasing ordinance and policies. The Board of County Commissioners will make award of contract in public session. Award recommendations will be posted outside the offices of the Purchasing Department on Wednesdays and Thursdays. Any actual or prospective respondent who desires to formally protest the recommended contract award must file a notice of intent to protest with the Procurement Director within two (2) calendar days (excluding weekends and County holidays) of the date that the recommended award is posted. Upon filing of said notice, the protesting party will have five (5) days to file a formal protest and will be given instructions as to the form and content requirements of the formal protest. A copy of the "Protest Policy" is available at the office of the Procurement Director. 19. Public Entity Crime 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 23 A person or affiliate who has been placed on the convicted Consultant list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted Consultant list. 20. Security and Background Checks If required, Consultant / Vendor / Contractor / Proposer shall be responsible for the costs of providing background checks by the Collier County Facilities Management Department, and drug testing for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four (4) years. 21. Conflict of Interest Consultant shall complete the Conflict of Interest Affidavit included as an attachment to this RFP document. Disclosure of any potential or actual conflict of interest is subject to County staff review and does not in and of itself disqualify a firm from consideration. These disclosures are intended to identify and or preclude conflict of interest situations during contract selection and execution. 22. Prohibition of Gifts to County Employees No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, the current Collier County Ethics Ordinance and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. 23. Immigration Law Affidavit Certification Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States. The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet-based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Consultants / Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Consultant’s/bidder’s proposal. Acceptable 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 24 evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Consultants are also required to provide the Collier County Purchasing Department an executed affidavit certifying they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents. If the Bidder/Consultant does not comply with providing the acceptable E-Verify evidence and the executed affidavit the bidder’s / Consultant’s proposal may be deemed non-responsive. Additionally, Consultants shall require all subcontracted Consultants to use the E-Verify system for all purchases not covered under the “Exceptions to the program” clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website: http://www.dhs.gov/E-Verify. It shall be the Consultant’s responsibility to familiarize themselves with all rules and regulations governing this program. Consultant acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 25 Attachment 1: Consultant’s Non-Response Statement The sole intent of the Collier County Purchasing Department is to issue solicitations that are clear, concise and openly competitive. Therefore, we are interested in ascertaining reasons for prospective Consultants not wishing to respond to this solicitation. If your firm is not responding to this RFP, please indicate the reason(s) by checking the item(s) listed below and return this form via email or fax, noted on the cover page, or mail to Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. We are not responding to CCNA Solicitation 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project for the following reason(s): Services requested not available through our company. Our firm could not meet specifications/scope of work. Specifications/scope of work not clearly understood or applicable (too vague, rigid, etc.) Project is too small. Insufficient time allowed for preparation of response. Incorrect address used. Please correct mailing address: Other reason(s): Name of Firm: ________________________________________________________ Address: ________________________________________________________ City, State, Zip: ________________________________________________________ Telephone: ________________________________________________________ Email: ________________________________________________________ Representative Signature: ________________________________________________________ Representative Name: _____________________________________ Date _____________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 26 Attachment 2: Consultant Check List IMPORTANT: THIS SHEET MUST BE SIGNED. Please read carefully, sign in the spaces indicated and return with your Proposal. Consultant should check off each of the following items as the necessary action is completed: The Proposal has been signed. All applicable forms have been signed and included, along with licenses to complete the requirements of the project. Any addenda have been signed and included. The mailing envelope has been addressed to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Evelyn Colon, Procurement Strategist CCNA Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project The mailing envelope must be sealed and marked with Proposal Number, Proposal Title and Due Date. The Proposal will be mailed or delivered in time to be received no later than the specified due date and time. (Otherwise Proposal cannot be considered.) If submitting a manual bid, include any addenda (initialed and dated noting understanding and receipt). If submitting bid electronically, bidder will need to download all related documents on www.colliergov.net/bid. The system will date and time stamp when the addendum files were downloaded. ALL COURIER-DELIVERED PROPOSALS MUST HAVE THE RFP NUMBER AND TITLE ON THE OUTSIDE OF THE COURIER PACKET Name of Firm: ________________________________________________________ Address: ________________________________________________________ City, State, Zip: ________________________________________________________ Telephone: ________________________________________________________ Email: ________________________________________________________ Representative Signature: ________________________________________________________ Representative Name: ________________________________________ Date ___________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 27 Attachment 3: Conflict of Interest Affidavit By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the firm (employees, officers and/or agents) has a possible conflict have been fully disclosed. Additionally, the firm (employees, officers and/or agents) agrees to immediately notify in writing the Procurement Director, or designee, if any actual or potential conflict of interest arises during the contract and/or project duration. Firm: ____________________________________________________________________ Signature and Date: ____________________________________________________________________ Print Name ____________________________________________________________________ Title of Signatory ____________________________________________________________________ State of _______________________________________________________________________ County of _______________________________________________________________________ SUBSCRIBED AND SWORN to before me this ____________ day of __________________, 20___________, by _______________________________________________, who is personally known to me to be the ________________________________________ for the Firm, OR who produced the following identification ________________________________________. Notary Public My Commission Expires ___________________________________________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 28 Attachment 4: Consultant Declaration Statement BOARD OF COUNTY COMMISSIONERS Collier County Government Complex Naples, Florida 34112 RE: CCNA Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Dear Commissioners: The undersigned, as Consultant declares that this proposal is made without connection or arrangement with any other person and this proposal is in every respect fair and made in good faith, without collusion or fraud. The Consultant agrees, if this proposal is accepted, to execute a Collier County document for the purpose of establishing a formal contractual relationship between the firm and Collier County, for the performance of all requirements to which the proposal pertains. The Consultant states that the proposal is based upon the proposal documents listed by the above referenced CCNA Solicitation. IN WITNESS WHEREOF, WE have hereunto subscribed our names on this _____ day of _____________, 200__ in the County of _______________, in the State of _____________. Firm’s Legal Name: Address: City, State, Zip Code: Florida Certificate of Authority Document Number Federal Tax Identification Number CCR # or CAGE Code __________________________________________________________________________ Telephone: FAX: Signature by: (Typed and written) Title: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 29 Additional Contact Information Send payments to: (required if different from above) Company name used as payee Contact name: Title: Address: City, State, ZIP Telephone: FAX: Email: Office servicing Collier County to place orders (required if different from above) Contact name: Title: Address: City, State, ZIP Telephone: Email: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 30 Attachment 5: Immigration Affidavit Certification CCNA Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with formal Invitations to Bid (ITB’s) and Request for Proposals (RFP) submittals. Further, Consultants / Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Consultant’s/bidder’s proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Failure to include this Affidavit and acceptable evidence of enrollment in the E-Verify program may deem the Consultant / Bidder’s proposal as non-responsive. Collier County will not intentionally award County contracts to any Consultant who knowingly employs unauthorized alien workers, constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e) Section 274A(e) of the Immigration and Nationality Act (“INA”). Collier County may consider the employment by any Consultant of unauthorized aliens a violation of Section 274A (e) of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA shall be grounds for unilateral termination of the contract by Collier County. Consultant attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and subsequent Amendment(s)) and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Consultant’s / Bidder’s proposal. Company Name ____________________________________________________________________ Print Name Title _______________________ Signature Date _______________________ State of ___________________ County of _________________ The foregoing instrument was signed and acknowledged before me this ______day of ________________, 20___, by _______________________________ who has produced _____________________________ as identification. (Print or Type Name) (Type of Identification and Number) _____________________________________ Notary Public Signature _____________________________________ Printed Name of Notary Public _____________________________________ Notary Commission Number/Expiration The signee of this Affidavit guarantees, as evidenced by the sworn affidavit required herein, the truth and accuracy of this affidavit to interrogatories hereinafter made. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 31 Attachment 6: Consultant Substitute W – 9 Request for Taxpayer Identification Number and Certification In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information for tax reporting purposes from individuals and companies who do business with the County (includin g social security numbers if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5) require that the county notify you in writing of the reason for collecting this information, which will be used for no other purpose than herein stated. Please complete all information that applies to your business and return with your quote or proposal. 1. General Information (provide all information) Taxpayer Name ________________________________________________________________________________ (as shown on income tax return) Business Name ________________________________________________________________________________ (if different from taxpayer name) Address ____________________________________ City ______________________________________________ State ______________________________________ Zip______________________________________________ Telephone __________________ FAX ______________________ Email _________________________________ Order Information Address ___________________________________ Remit / Payment Information Address ____________________________________________ City __________ State ________ Zip ___________ City _____________ State _________ Zip______________ FAX ______________________________________ Email _____________________________________ FAX ______________________________________________ Email _____________________________________________ 2. Company Status (check only one) Individual / Sole Proprietor Corporation Partnership Tax Exempt (Federal income tax-exempt entity under Internal Revenue Service guidelines IRC 501 (c) 3) Limited Liability Company Enter the tax classification (D = Disregarded Entity, C = Corporation, P = Partnership) 3. Taxpayer Identification Number (for tax reporting purposes only) Federal Tax Identification Number (TIN) _______________________________________________________________ (Consultants who do not have a TIN, will be required to provide a social security number prior to an award). 4. Sign and Date Form: Certification: Under penalties of perjury, I certify that the information shown on this form is correct to my knowledge. Signature ___________________________________________________________ Date _________________________________ Title _______________________________________________________________ Phone Number ________________________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 32 . Attachment 7: Insurance and Bonding Requirements Insurance / Bond Type Required Limits 1. Worker’s Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements 2. Employer’s Liability $100,000 single limit per occurrence 3. Commercial General Liability (Occurrence Form) patterned after the current ISO form Bodily Injury and Property Damage $1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. Indemnification To the maximum extent permitted by Florida law, the Contractor/Vendor/Consultant shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys’ fees and paralegals’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/Vendor/Consultant or anyone employed or utilized by the Contractor/Vendor/Consultant in the performance of this Agreement. 4. Automobile Liability $ 1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 5. Other insurance as noted: Watercraft $ __________ Per Occurrence United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ __________ Per Occurrence Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ __________ Per Occurrence Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ __________ Per Occurrence Pollution $ __________ Per Occurrence Professional Liability $1,000,000 per claim and in the aggregate • $1,000,000 per claim and in the aggregate • $2,000,000 per claim and in the aggregate Project Professional Liability $__________ Per Occurrence Valuable Papers Insurance $__________ Per Occurrence Employee Dishonesty / Crime $__________ Per Occurrence 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 33 Including Employee Theft, Funds Transfer Fraud, Include a Joint Loss Payee endorsement naming Collier County. 6. Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers’ check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 7. Performance and Payment Bonds For projects in excess of $200,000, bonds shall be submitted with the executed contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as “A-“ or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders’ surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 8. Consultant shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Consultant shall provide County with certificates of insurance meeting the required insurance provisions. 9. Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. 10. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. 11. Thirty (30) Days Cancellation Notice required. RLA 1/12/2016 Consultant’s Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm _______________________________________ Date ____________________________ Consultant Signature _________________________________________________________________________ Print Name _________________________________________________________________________ Insurance Agency _________________________________________________________________________ Agent Name _______________________________________ Telephone Number _________________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 34 Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: (Name of Company Requesting Reference Information) (Name of Individuals Requesting Reference Information) Name: (Evaluator completing reference questionnaire) Company: (Evaluator’s Company completing reference) Email: FAX: Telephone: Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: ___________________________ Completion Date: _____________________________ Project Budget: _______________________________ Project Number of Days: _______________________ Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 2 Ability to maintain project schedule (complete on-time or early). 3 Quality of work. 4 Quality of consultative advice provided on the project. 5 Professionalism and ability to manage personnel. 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 7 Ability to verbally communicate and document information clearly and succinctly. 8 Abiltity to manage risks and unexpected project circumstances. 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 Overall comfort level with hiring the company in the future (customer satisfaction). TOTAL SCORE OF ALL ITEMS Please FAX this completed survey to: _______________________________________ By ________________ 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 35 EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR The White Boulevard over Cypress Canal Bridge Replacement Project Project Description: The principal intent of this project is to provide CEI and Related Services for the replacement of an existing functionally obsolete bridge (#034020), utility relocation and improvements to the roadway approaches on White Boulevard. County Project Number: 66066.10 The latest design documentation is available upon request and successful completion of the required exempt documents form. 1.0 PURPOSE: This scope of services describes and defines the Construction Engineering and Inspection (CEI) services which are required for contract administration, inspection, and materials sampling and testing for each of the construction project listed below. 2.0 SCOPE: Provide services as defined in this Scope of Services, the referenced Florida Department of Transportation (FDOT) manuals, and procedures. The project for which the services are required is: County Project Number: 66066.10 Descriptions: The principal intent of this project is to provide CEI and Related Services for the replacement of an existing functionally obsolete bridge on White Boulevard (#034020). The Consultant and/or Sub-consultant(s) must be FDOT qualified (Rule Chapter 14-75) to perform the assigned work and/or services required of the project. As a minimum, the Consultant must be qualified to perform the following types of work: • 10.1 – Roadway CEI • 10.3 – Construction Materials Inspection • 10.4 – Minor Bridge and Miscellaneous Structures CEI Exceptions to these minimum types of work qualifications may be considered at the discretion of the County. Any exceptions to these minimum types of work qualifications must be preapproved by the County in writing. Exercise independent professional judgment in performing obligations and responsibilities under this Agreement. Pursuant to Section 4.1.4 of the Construction Project Administration Manual (CPAM), the authority of the Consultant’s lead person, such as the Senior Project Engineer, and the Consultant’s Project Administrator shall be identical to the FDOT’s Resident Engineer and Project Administrator respectively and shall be interpreted as such. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 36 Services provided by the Consultant shall comply with FDOT manuals, procedures, and memorandums in effect as of the date of execution of the Agreement unless otherwise directed in writing by the County. Such FDOT manuals, procedures, and memorandums are found at the State Construction Office’s website. On a single Construction Contract, it is a conflict of interest for a professional firm to receive compensation from both the County and the Contractor either directly or indirectly. Other projects developing within the geographical area of Collier County may be added at the County’s discretion. The Consultant must perform to the satisfaction of the County’s representatives for consideration of additional CEI services. 3.0 LENGTH OF SERVICE: The Contract shall begin upon written notification to proceed (NTP) by the County and end when the “as-built” documents are accepted by the County and the final pay application is processed. See Exhibit “A”, paragraph 12.0, for “CERTIFICATION OF FINAL ESTIMATES”. Please note: No work is authorized after the final completion date indicated in the NTP unless the time of the contract is extended before the final completion date indicated in the NTP. Invoices for unauthorized work will not be paid. Any request for time extension must be justified (as determined by the County) and shall be submitted to the County’s Construction Project Manager a minimum of thirty (30) days prior to the final completion date indicated in the NTP. For estimating purposes, the CEI Services Contract shall begin approximately thirty (30) days prior to written notification to proceed to the Contractor for the Construction Contract and end approximately thirty (30) days after final acceptance of the Construction Contract. County’s Construction Project Manager will track the execution of the Construction Contract such that the Consultant is given timely authorization to begin work. While no personnel shall be assigned until written notification by the County has been issued, the Consultant shall be ready to assign personnel within two weeks of notification. For the duration of the project, coordinate closely with the County and Contractor to minimize rescheduling of Consultant activities due to construction delays or changes in scheduling of Contractor activities. The anticipated letting schedule and construction time for the project is tabulated below: Construction Contract Estimate Financial Project ID Start Date Duration (Days) 66066.10 2nd Quarter 2016 578 4.0 DEFINITIONS: A. Agreement: The Professional Services Agreement between the County and the Consultant setting forth the obligations of the parties thereto, including but not limited to the performance of the work, furnishing of services, and the basis of payment. B. Contractor: The individual, firm, or company contracting with the County for performance of work or furnishing of materials. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 37 C. Construction Contract: The written agreement between the County and the Contractor setting forth the obligations of the parties thereto, including but not limited to the performance of the work, furnishing of labor and materials, and the basis of payment. D. Construction Project Manager: The County employee assigned to manage the Construction Engineering and Inspection Contract and represent the County during the performance of the services covered under this Agreement. E. Construction Training/Qualification Program (CTQP): The FDOT program for training and qualifying technicians in Aggregates, Asphalt, Concrete, Earthwork, and Final Estimates Administration. Program information is available at CTQP website. F. Consultant: The Consulting firm under contract to the County for administration of Construction Engineering and Inspection services. G. Consultant Project Administrator: The employee assigned by the Consultant to be in charge of providing Construction Contract administration services for the Construction Project. H. Consultant Senior Project Engineer: The Engineer assigned by the Consultant to be in charge of providing Construction Contract administration for the Construction Project. This person may supervise other Consultant employees and act as the lead Engineer for the Consultant. I. Transportation Engineering Director: The administrative head of the County’s Construction Offices / The Engineer assigned to administer Construction Contracts for the County. J. County Construction Manager: The County employee assigned to administer the Consultant Construction Engineering and Inspection Program in the County. K. County Professional Services Administrator: The Administrative Head of the Professional Services Office. L. County Manager: The County Administrator of the County. M. Engineer of Record: The Engineer noted on the Construction plans as the responsible person for the design and preparation of the plans. N. Road Maintenance Director: The County employee assigned to administer Maintenance Contracts for the County. O. Community Liaison: The County employee assigned to manage the Public Information Program. P. Resident Compliance Specialist: The employee assigned by the Consultant to oversee project specific compliance functions. Q. Owner: The Board of County Commissioners for Collier County, Florida. A political subdivision of the State of Florida R. County: Collier County, a political subdivision of the State of Florida. 5.0 ITEMS TO BE FURNISHED BY THE COUNTY TO THE CONSULTANT: A. The County, on an as needed basis, will furnish the following Construction Contract documents for each project. These documents may be provided in either paper (as indicated below) or electronic format. 1. Construction Plans, five (5) [11” x 17”] hard copy sets, 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 38 2. Specification Package five (5) [8-1/2” x 11”] hard copy sets, 3. One (1) hard copy of the Executed Construction Contract, 4. One (1) hard copy of the Utility Agency’s Approved Material List (if applicable), and 5. One (1) hard copy of executed Utility Work Schedules (if applicable). B. A list of all standard forms for use under the terms of this Agreement will be provided in one (1) hard copy or electronic format at the Pre-Services meeting. All directives, procedures, and standard forms can be accessed through the County’s website. 6.0 ITEMS FURNISHED BY THE CONSULTANT: 6.1 FDOT Documents: All applicable FDOT documents referenced herein shall be a condition of this Agreement. All FDOT documents, directives, procedures, and standard forms are available through the FDOT’s Internet website. Most items can be purchased through the following address. All others can be acquired through the FDOT’s District Office or on-line at the FDOT’s website. Florida Department of Transportation Maps and Publication Sales 605 Suwannee Street, MS 12 Tallahassee, Florida 32399-0450 Telephone No. (850) 488-9220 http://www.dot.state.fl.us/construction/ 6.2 Office Automation: Provide all software and hardware necessary to efficiently and effectively carry out the responsibilities under this Agreement. Provide each inspection staff with a laptop computer running software (such as, Site Manager application through Citrix, Primavera/Sidetrack, Claim Digger, etc.) for project scheduling, documentation, and control. Each inspection staff laptop computer must have mobile broadband connection at the jobsite. All computer coding shall be input by Consultant personnel using equipment furnished by them. Ownership and possession of computer equipment and related software, which is provided by the Consultant, shall remain at all times with the Consultant. The Consultant shall retain responsibility for risk of loss or damage to said equipment during performance of this Agreement. Field office equipment should be maintained and operational at all times. Current technical specifications for office automation can be viewed at: http://www.dot.state.fl.us/Construction/DesignBuild/ConsultantCEI/OfficeAutomation.shtm 6.3 Field Office: The County may require a field office for this project. The Consultant shall be reimbursed for allowed expenses associated with this field office. The office must have, at a minimum, the following essential items to support the project: • Office space within a desired radius (to be approved by the County) of the project for the duration of the project, • Office telephone, and • Copier rental/lease. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 39 Consultant shall list this fixed monthly cost as a line item of the cost proposal titled “Field Office Expenses”, and shall also be listed as such on invoices submitted to the County for payment. 6.4 Vehicles: Vehicles will be equipped with appropriate safety equipment and must be able to effectively carry out requirements of this Agreement. Vehicles shall have the name and phone number of the consulting firm visibly displayed on both sides of the vehicle. 6.5 Field Equipment: Supply survey, inspection, and testing equipment essential to perform services under this Agreement; such equipment includes non-consumable and non-expendable items. Hard hats shall have the name of the consulting firm visibly displayed. Equipment described herein and expendable materials under this Agreement will remain the property of the Consultant and shall be removed at completion of the work. Handling of nuclear density gauges shall be in compliance with their license. Retain responsibility for risk of loss or damage to said equipment during performance of this Agreement. Field office equipment shall be maintained and in operational condition at all times. 6.6 Licensing for Equipment Operations: Obtain proper licenses for equipment and personnel operating equipment when licenses are required. The license and supporting documents shall be available for verification by the County, upon request. Radioactive Materials License for use of Surface Moisture Density Gauges shall be obtained through the State of Florida Department of Health. 7.0 LIAISON RESPONSIBILITY OF THE CONSULTANT: For the duration of the Agreement, keep the County’s Construction Project Manager in Responsible Charge informed of all significant activities, decisions, correspondence, reports, and other communications related to its responsibilities under this Agreement. Facilitate communications between all parties (i.e. architectural, mechanical, materials, landscaping, local agencies, etc.) ensuring responses and resolutions are provided in a timely manner. Maintain accurate records to document the communication process. Submit all administrative items relating to Invoice Approval, Personnel Approval, User IDs, Time Extensions, and Change Orders to the County’s Construction Project Manager for review and approval. 8.0 PERFORMANCE OF THE CONSULTANT: During the term of this Agreement and all Change Orders thereof, the County will review various phases of Consultant operations, such as construction inspection, materials sampling and testing, and administrative activities, to determine compliance with this Agreement. Cooperate and assist County representatives in conducting the reviews. If deficiencies are indicated, remedial action shall be implemented immediately. County recommendations and Consultant responses/actions are to be properly documented by the Consultant. No additional compensation shall be allowed for remedial action taken by the Consultant to correct deficiencies. Remedial actions and required response times may include but are not necessarily limited to the following: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 40 A. Further subdivide assigned inspection responsibilities, reassign inspection personnel, or assign additional inspection personnel, within one week of notification. B. Immediately replace personnel whose performance has been determined by the Consultant and/or the County to be inadequate. C. Immediately increase the frequency of monitoring and inspection activities in phases of work that are the Consultant's responsibility. D. Increase the scope and frequency of training of the Consultant personnel. 9.0 REQUIREMENTS OF THE CONSULTANT: 9.1 General: It shall be the responsibility of the Consultant to administer, monitor, and inspect the Construction Contract such that the project is constructed in reasonable conformity with the plans, specifications, and special provisions for the Construction Contract. Observe the Contractor’s work to determine the progress and quality of work. Identify discrepancies, report significant discrepancies to the County, and direct the Contractor to correct such observed discrepancies. Consult with the County’s Construction Project Manager as necessary and direct all issues, which exceed delegated authority to the County’s Construction Project Manager for County action or direction. Inform the County’s Construction Project Manager of any significant omissions, substitutions, defects, and deficiencies noted in the work of the Contractor and the corrective action that has been directed to be performed by the Contractor. For the duration of the project, all Technicians and Inspector provided by the Consultant and/or Sub-Consultant(s) for the project must be CTQP qualified to perform the assigned duties and/or tasks. 9.2 Survey Control: Check or establish the survey control baseline(s) along with sufficient baseline control points and bench marks at appropriate intervals along the project in order to: (1) make and record measurements necessary to calculate and document quantities for pay items, (2) make and record pre-construction and final cross section surveys of the project site in those areas where earthwork (i.e., embankment, excavation, subsoil excavation, etc.) is part of the construction project, and (3) perform incidental engineering surveys. 9.3 On-site Inspection: Monitor the Contractor's on-site construction activities and inspect materials entering into the work in accordance with the plans, specifications, and special provisions for the Construction Contract to determine that the project is constructed in reasonable conformity with such documents. Maintain detailed accurate records of the Contractor's daily operations and of significant events that affect the work. The Consultant will monitor off-site activities and fabrication unless otherwise stipulated by this Agreement. Perform underwater bridge construction inspections of bridges with permanently submerged structural members in compliance with CPAM Section 10.6, Underwater Bridge Construction Inspection. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 41 Monitor and inspect Contractor’s Work Zone Traffic Control Plan and review modifications to the Work Zone Traffic Control Plan, including Alternate Work Zone Traffic Control Plan, in accordance with the FDOT’s procedures. Consultant employees performing such services shall be qualified in accordance with the FDOT’s guidelines of Traffic Training (Topic No. 625-010- 010-h). 9.4 Sampling and Testing: Perform sampling and testing of component materials and completed work in accordance with the Construction Contract documents. All sampling and testing shall be executed in conjunction with a licensed independent laboratory, hired by the Consultant, that is approved in writing by the County’s Construction Project Manager. The minimum sampling frequencies set out in the FDOT's Materials Sampling, Testing and Reporting Guide shall be met. In complying with the aforementioned guide, provide daily surveillance of the Contractor's Quality Control activities and perform the sampling and testing of materials and completed work items for verification and acceptance. The Consultant will perform inspection and sampling of materials and components at locations remote from the project site and perform testing of materials normally done in a laboratory remote from the project site. Determine the acceptability of all materials and completed work items on the basis of either test results or verification of a certification, certified mill analysis, DOT label, DOT stamp, etc. The County will monitor the effectiveness of the Consultant's testing procedures through observation and independent assurance testing. Sampling, testing and laboratory methods shall be as required by the FDOT's Standard Specifications, Supplemental Specifications or as modified by the Special Provisions of the Construction Contract. Documentation reports on sampling and testing performed by the Consultant shall be submitted during the same week that the construction work is done. Transport samples to the appropriate laboratory. The Consultant shall provide daily surveillance of the Contractor’s Quality Control activities at the project site in regard to concrete and perform acceptance testing and sampling. 9.5 Engineering Services: While under contract with the County, the Consultant will, coordinate the Construction Contract administration activities of all parties other than the Contractor involved in completing the construction project. Services shall include maintaining the required level of surveillance of Contractor activities, interpreting plans, specifications, and special provisions for the Construction Contract. Maintain complete, accurate records of all activities and events relating to the project and properly document all project changes. The following services shall be performed: (1) Attend a pre-service meeting for the Agreement in accordance with CPAM. Provide appropriate staff to attend and participate in the pre-service meeting. At the pre-service meeting the Consultant shall submit Action Request packages for Personnel Approval for immediate staff needs and a copy/computer file of the final negotiated staffing. The Consultant shall record a complete and concise record of the proceedings of the meeting 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 42 and distribute copies of these minutes to the participants and other interested parties within seven (7) days of the meeting date. (2) Prepare and submit to the County’s Construction Project Manager for county approval, within thirty (30) days after the pre-service meeting, a hard copy of the project specific Consultant Contract administration documents listed below. The Consultant Contract administration documents, which shall be routinely used by the Consultant throughout the project, shall be in the format and content provided by the County Construction Management Department. The CONSULTANT Contract administration documents consist of but are not limited to: a. Action Request Form, b. Contract Status Report, or other approved fund tracking report, c. CEI CONSULTANT Firm Estimated Staffing (completed in accordance with the original CONSULTANT Contract agreement), d. CEI CONSULTANT Fee Proposal, and e. CEI CONSULTANT Data. (3) Schedule and conduct a Pre-construction conference in accordance with Article 8-3.5 of the FDOT Standard Specification for Road and Bridge Construction. The purpose of these meetings is to discuss the required documentation, including as-builts, necessary for permit(s) compliance. Record significant information revealed and decisions made at this conference and distribute copies of these minutes to the appropriate parties. The meeting shall also be electronically recorded and the Consultant shall maintain all tapes of the meeting for the duration of the Contract. (4) Verify that the Contractor is conducting inspections, preparing reports and monitoring all storm water pollution prevention measures associated with the project. For each project that requires the use of the NPDES General Permit, provide at least one inspector who has successfully completed the "Florida Stormwater, Erosion, and Sedimentation Control Training and Certification Program for Inspectors and Contractors”. The Consultant’s inspector will be familiar with the requirements set forth in the FEDERAL REGISTER, Vol. 57, No. 187, Friday, September 5, 1992, pages 4412 to 4435 "Final NPDES General Permits for Storm Water Discharges from Construction Sites" and the FDOT’s guidelines. (5) Analyze the Contractor’s schedule(s) (i.e. baseline(s), revised baseline(s), updates, as- built, etc.) for compliance with the contract documents. Elements including, but not limited to, completeness, logic, durations, activity, flow, milestone dates, concurrency, resource allotment, and delays will be reviewed. Verify the schedule conforms with the construction phasing and MOT sequences, including all contract modifications. Provide a written review of the schedule identifying significant omissions, improbable or unreasonable activity durations, errors in logic, and any other concerns as detailed in CPAM. (6) Analyze problems that arise on a project and proposals submitted by the Contractor; work to resolve such issues, and process the necessary paperwork. (7) Monitor, inspect and document utility construction for conformance with Utility Agency’s Standards and the Utility Agency’s Approved Materials List. Facilitate coordination and communication between Utility Agency’s representatives, County’s staff and Contractors executing the work. Identify potential utility conflicts and assist in the resolution of utility issues including County and Local Government owned facilities. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 43 Identify, review, and track progress of Joint Project Agreements, and/or other County and utility agreements if applicable. Address work progress, track reimbursement activities, and address betterment and salvage determination. Prepare all necessary documentation to support reimbursement activities and betterment and salvage determination. (8) Produce reports, verify quantity calculations and field measure for payment purposes as needed to prevent delays in Contractor operations and to facilitate prompt processing of such information in order for the County to make timely payment to the Contractor. (9) Prepare and make presentations for meetings and hearings before the Dispute Review Boards in connection with the project covered by this Agreement. (10) Monitor each Contractor and Subcontractor’s compliance with specifications and special provisions of the Construction Contract in regard to payment in accordance with County procedures. (11) The County will provide Public Information Services. (12) Video tape the pre-construction conditions throughout the project limits. Provide a digital photo log or video of project activities, with heavy emphasis on potential claim items/issues and on areas of real/potential public controversy. (13) Provide a digital camera for photographic documentation of pre-construction state and of noteworthy incidents or events during construction. These photographs will be filed and maintained on the Consultant’s computer using a Digital Photo Management system. Photographs shall be taken the day prior to the start of construction and continue as needed throughout the project. Photographs shall be taken the days of Conditional, Partial and Final Acceptance. 9.6 Geotechnical Engineering: The prime Consultant may engage the services of a geotechnical subconsultant to perform some of the services indicated in this section. However, the prime Consultant will be responsible to the County for the satisfactory performance and timeliness of these services. Become familiar with the existing site conditions and the contract documents. Observe and record the progress and quality of foundation work to determine that the foundations are constructed at the correct locations and elevations, identify discrepancies, and direct the Contractor to correct such observed discrepancies. Attend the Preconstruction Conference and/or special geotechnical meeting for the Construction Contract. All services under this section will be performed in accordance to FDOT Specification Section 455. Inspect and verify that the Contractor has performed the foundation work in accordance with applicable FDOT Specification Section 455 and other contract documents. Provide qualified Geotechnical Engineers and CTQP qualified inspectors in Pile Driving inspection, relevant to the foundation type(s) required in the plans. Schedule meetings and facilitate communications between the Contractor and any Specialty Contractors, and the CEI. Observe and verify that all work is performed in accordance with the contract documents. Assure that any specialty work is completed as necessary to accomplish its intent. The following geotechnical engineering services shall be performed: Piles: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 44 • Process and review the Pile Installation Plan in accordance with CPAM. • Provide comments regarding the suitability of hammer driving system(s) included in the Pile Installation Plan. • Schedule a pre-pile installation meeting to review and discuss the pile installation procedures. Make sure the Contractor’s field superintendent, CEI’s pile inspectors, and the County is invited. Prepare and distribute meeting minutes to the attendees. • Inspect and record the test pile driving process in accordance with CPAM. • Inspect the conditions of the piles prior to installation, including any pile splices. • Observe and verify that concrete piles were properly supported during storage and handled with appropriate pick-up details per contract documents. • Inspect the pile driving installation. Complete the FDOT pile driving logs. • Observe the performance of any static or statnamic load tests and review the details are implemented as planned. • Evaluate problems encountered during construction and coordinate with the County and the Contractor to resolve such problems, including possible additional testing and withdrawing the Pile Installation Plan. 10.0 PERSONNEL: 10.1 General Requirements: Provide qualified personnel necessary to efficiently and effectively carry out its responsibilities under this Agreement. Acceptable staffing of personnel to be assigned to this project is outlined herein and in Exhibit “A-A.” Pursuant to Section 4.1.4 of the Construction Project Administration Manual (CPAM), the authority of the Consultant’s lead person, such as the Senior Project Engineer, and the Consultant’s Project Administrator shall be identical to the FDOT’s Resident Engineer and Project Administrator respectively and shall be interpreted as such. FDOT Certification of the Consultant’s Project Administrator is a requirement of the contract. 10.2 Personnel Qualifications: Provide competent personnel qualified by experience and education. Submit in writing to the County’s Construction Project Manager the names of personnel proposed for assignment to the project, including a detailed resume for each containing at a minimum: salary, education, and experience. The Consultant Action Request form for personnel approval shall be submitted to the County’s Construction Project Manager at least two weeks prior to the date an individual is to report to work. Personnel identified in the Consultant technical proposal are to be assigned as proposed and are committed to performing services under this Agreement. Personnel changes will require written approval from the County’s Construction Project Manager. Staff that has been removed shall be replaced by the Consultant within one week of County Construction Project Manager’s notification. Before the project begins, all project staff shall have a working knowledge of the current CPAM and must possess all the necessary qualifications/certifications for fulfilling the duties of the position they hold. Cross training of the Consultant’s project staff is highly recommended to achieve a knowledgeable and versatile project inspection team but shall not be at any additional cost to the County and should occur as workload permits. Visit the training page on the State Construction Office website for training dates. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 45 Minimum qualifications for the Consultant personnel are set forth herein and in Exhibit “A-A”. Exceptions to these minimum qualifications may be considered on an individual basis at the discretion of the County. Any exceptions to these minimum qualifications must be preapproved by the County in writing. However, a Project Administrator working under the supervision and direction of a Senior Project Engineer or an Inspector working under the supervision and direction of a Senior Inspector shall have six months from the date of hire to obtain the necessary qualifications/certifications provided all other requirements for such positions are met and the Consultant submits a training plan detailing when such qualifications/certifications and other training relative to the FDOT’s procedures, Specifications and Design Standards will be obtained. The County will have the final approval authority on such exceptions. 10.3 Staffing: Once authorized, the Consultant shall establish and maintain appropriate staffing throughout the duration of construction and completion of the final estimate. Responsible personnel, thoroughly familiar with all aspects of construction and final measurements of the various pay items, shall be available to resolve disputed final pay quantities until the County has received a regular acceptance letter. Construction engineering and inspection forces will be required of the Consultant while the Contractor is working. If Contractor operations are substantially reduced or suspended, the Consultant will reduce its staff appropriately. In the event that the suspension of Contractor operations requires the removal of Consultant forces from the project, the Consultant will be allowed ten (10) days maximum to demobilize, relocate, or terminate such forces. 11.0 QUALITY ASSURANCE (QA) PROGRAM: 11.1 Quality Assurance Plan: Within thirty (30) days after receiving award of an Agreement, furnish a QA Plan to the County’s Construction Project Manager. The QA Plan shall detail the procedures, evaluation criteria, and instructions of the Consultant’s organization for providing services pursuant to this Agreement. Unless specifically waived, no payment shall be made until the County approves the Consultant QA Plan. Significant changes to the work requirements may require the Consultant to revise the QA Plan. It shall be the responsibility of the Consultant to keep the plan current with the work requirements. The Plan shall include, but not be limited to, the following areas: A. Organization: A description is required of the Consultant QA Organization and its functional relationship to the part of the organization performing the work under the Agreement. The authority, responsibilities and autonomy of the QA organization shall be detailed as well as the names and qualifications of personnel in the quality control organization. B. Quality Assurance Reviews: Detail the methods used to monitor and achieve organization compliance with Agreement requirements for services and products. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 46 C. Quality Assurance Records: Outline the types of records which will be generated and maintained during the execution of the QA program. D. Control of Subconsultants and Vendors: Detail the methods used to control subconsultant and vendor quality. E. Quality Assurance Certification: An officer of the Consultant firm shall certify that the inspection and documentation was done in accordance with FDOT specifications, plans, standard indexes, and FDOT procedures. 11.2 Quality Assurance Reviews: Conduct semi-annual Quality Assurance Reviews to ensure compliance with the requirements of the Agreement. Quality Assurance Reviews shall be conducted to evaluate the adequacy of materials, processes, documentation, procedures, training, guidance, and staffing included in the execution of this Agreement. Quality Assurance Reviews shall also be developed and performed to achieve compliance with specific QA provisions contained in this Agreement. The semi-annual reviews shall be submitted to the County’s Construction Project Manager in written form no later than one (1) month after the review. On short duration CCEI projects (nine (9) months or less), the CCEI shall perform an initial QA review within the first two (2) months of the start of construction. On asphalt projects, the CCEI shall perform an initial QA review on its asphalt inspection staff after the Contractor has completed ten (10) full work days of mainline asphalt paving operations, or 25% of the asphalt pay item amount (whichever is less) to validate that all sampling, testing, inspection, and documentation are occurring as required of the CCEI staff. 11.3 Quality Records: Maintain adequate records of the quality assurance actions performed by the organization (including subcontractors and vendors) in providing services and products under this Agreement. All records shall indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective actions taken. All records shall be available to the County, upon request, during the Agreement term. All records shall be kept at the primary job site and shall be subject to audit review. 12.0 CERTIFICATION OF FINAL ESTIMATES: 12.1 Final Estimate and As-Built Plans Submittal: Prepare documentation and records in compliance with the Agreement, Statewide Quality Control (QC) Plan, or Consultant’s approved QC Plan and the FDOT’s Procedures as required by Section 4.1.4 of Review and Administration Manual. Submit the Final Estimate(s) and one (1) set of final Signed and Sealed “as-built” documents (including, as applicable, all Signed and Sealed revisions to the contract documents [including but not limited to, all revised drawings, specifications, calculations, technical special provisions, load ratings, etc.]). The “as-built” documents must represent all of the Contractor’s work in accordance with the Review and Administration Manual. Revisions to the Certified Final Estimate will be made at no additional cost to the County. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 47 12.2 Certification: Consultant personnel preparing the Certified Final Estimate Package shall be CTQP Final Estimates Level II. Duly authorized representative of the Consultant firm will provide a notarized certification on a form pursuant to FDOT’s procedures. 12.3 Offer of Final Payment: Prepare the Offer of Final Payment package as outlined in Chapter 14 of the Review and Administration Manual. The package shall accompany the Certified Final Estimates Package submitted to the County’s Construction Project Manager for review. The Consultant shall be responsible for forwarding the Offer of Final Payment Package to the Contractor. 13.0 AGREEMENT MANAGEMENT: 13.1 General: With each monthly invoice submittal, the Consultant will provide a Status Report for the Agreement. This report will provide the an accounting of the additional Agreement calendar days allowed to date, an estimate of the additional calendar days anticipated to be added to the original schedule time, an estimate of the Agreement completion date, and an estimate of the Consultant funds expiration date per the Agreement schedule for the prime Consultant and for each subconsultant. The Consultant will provide a printout from the Equal Opportunity Reporting System showing the previous month’s payments made to subconsultants. Invoices not including this required information may be rejected. 13.2 Invoicing Instructions: Monthly invoices shall be submitted to the County in a format approved by the County, no later than the 20th day of the month following the month being invoiced. If the Consultant cannot submit their monthly invoice on time, the Consultant shall notify the County, prior to the due date the reason for the delay and the planned submittal date. Once submitted, the Consultant shall notify the County’s Construction Project Manager via Email of the total delay in calendar days and the reason(s) for the delay(s). 14.0 OTHER SERVICES: Upon written authorization by the County’s Construction Project Manager, the Consultant will perform additional services in connection with the project not otherwise identified in this Agreement. The following items are not included as part of this Agreement, but may be required by the County to supplement the Consultant services under this Agreement. A. Assist in the timely preparation of all claims and necessary rebuttals with the organization of any and all supporting documentation as needed or required by the County pursuant to the Collier County Alternative Dispute Resolution Procedures. B. Provide qualified engineering witnesses and exhibits for any litigation or hearings in connection with the Contract. C. Assist the County Attorney or his designee as directed in the preparation for Binding Arbitration and Pre-Suit Mediation. D. Provide on- and off-site inspection services in addition to those provided for in this Agreement. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 48 15.0 POST CONSTRUCTION CLAIMS REVIEW: In the event the Consultant for the project submits a claim for additional compensation and/or time after the Consultant has completed this Agreement, the Consultant shall, at the written request from the County, analyze the claim, prepare a recommendation to the County’s Construction Project Manager covering validity and reasonableness of charges, and/or assist in negotiations leading to settlement of the claim. Compensation will be separately reimbursed by a Supplement to this Agreement. 16.0 COUNTY AUTHORITY: The County shall be the final authority in considering modifications to the Construction Contract for time, money or any other consideration except matters agreed to by the Contractor through contract changes negotiated by the Consultant, as authorized in Section 9.1 herein. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 49 EXHIBIT "A-A" MINIMUM QUALIFICATIONS FOR CONSTRUCTION ENGINEERING AND INSPECTION PERSONNEL Note: Exceptions to these minimum qualifications may be considered on an individual basis at the discretion of the County. Any exceptions to these minimum qualifications must be preapproved by the County in writing. ARCHITECT- Registered as an architect in accordance with Florida Statute 481 and four years of experience as a registered architect. Qualifications include the ability to communicate effectively, review architectural plans and specifications. Plans and organizes staff; develops and reviews policies and reviews programs for conformity with FDOT standards. A master’s degree may be substituted for two years experience. (This position is not eligible for straight or premium overtime pay.) CEI ASPHALT PLANT INSPECTOR- High School Graduate or equivalent plus one (1) year experience in the surveillance and inspection of hot mix asphalt plant operations and have the following: QUALIFICATIONS: CTQP Asphalt Plant Level I CTQP Asphalt Plant Level II CEI BRIDGE PROJECT ADMINISTRATOR (PAINTING/ LEAD ABATEMENT/ STRUCTURAL STEEL REPAIR): CERTIFICATIONS: NACE Level III Certified or BCI Level II Certified SSPC C-3 Lead Paint Removal AWS Certified Welding Inspector (CWI) familiar with ANSI/AASHTO/AWS Bridge Welding Code CEI BRIDGE SENIOR INSPECTOR (PAINTING/ LEAD ABATEMENT/ STRUCTURAL STEEL REPAIR): CERTIFICATIONS: NACE Level III Certified or BCI Level II Certified SSPC C-3 Lead Paint Removal AWS Certified Welding Inspector (CWI) familiar with ANSI/AASHTO/AWS Bridge Welding Code CEI BRIDGE INSPECTOR (PAINTING/ LEAD ABATEMENT/ STRUCTURAL STEEL REPAIR): CERTIFICATIONS: NACE Level I or BCI Level I SSPC C-3 Lead Paint Removal AWS Certified Welding Inspector (CWI) familiar with ANSI/AASHTO/AWS Bridge Welding Code CASTING YARD ENGINEER/ MANAGER- (Concrete Post-Tensioned Segmental Box Girder Bridges (CPTS)) Must be a registered Professional Engineer in the State of Florida (or if registered in another state, have the ability to obtain registration in Florida with 6 months) with a minimum of one (1) year, or non- registered with a minimum of three (3) years of experience with the use of geometry control computer programs and with the performance of surveying procedures required for the production of precast concrete box segments at a casting yard. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 50 GEOTECHNICAL ENGINEER for Category I Bridge Pile Foundations- Registered in the State of Florida as a Professional Engineer (or if registered in another state, the ability to obtain registration in the State of Florida within six months) plus four (4) years of experience as a Geotechnical Engineer in responsible charge of geotechnical work, including at least two Category I bridges with pile foundations. Experience performing. Analyzing and interpreting the results of: non-destructive testing of pile foundations, dynamic and static load testing, the Pile Driving Analyzer (PDA), CAPWAP and WEAP as appropriate. GEOTECHNICAL ENGINEER for Category I Bridge Drilled Shaft Foundations- Registered in the State of Florida as a Professional Engineer (or if registered in another state, the ability to obtain registration in the State of Florida within six months) plus four (4) years of experience as a Geotechnical Engineer in responsible charge of geotechnical work, including at least two Category I bridges with drilled shaft foundations. Experience performing analyzing and interpreting the results of: the Shaft Inspection Device, non-destructive tests of drilled shaft foundations and load tests as appropriate. GEOTECHNICAL ENGINEER for Category II Bridge Pile Foundations- Registered in the State of Florida as a Professional Engineer (or if registered in another state, the ability to obtain registration in the State of Florida within six months) plus five (5) years of experience as a Geotechnical Engineer in responsible charge of geotechnical work, including at least one Category II bridge with pile foundations. Experience performing, analyzing and interpreting the results of: non-destructive testing of pile foundations, dynamic and static load testing, the Pile Driving Analyzer (PDA), CAPWAP and WEAP as appropriate. GEOTECHNICAL ENGINEER for Category II Bridge Drilled Shaft Foundations: Registration in the State of Florida Board as a Professional Engineer (or if registered in another state, the ability to obtain registration in the State of Florida within six months) plus five (5) years of experience as a Geotechnical Engineer in responsible charge of geotechnical work, including at least one Category II bridge with drilled shaft foundations. Experience performing, analyzing and interpreting the results of: the Shaft Inspection Device, non-destructive tests of drilled shaft foundations and load tests as appropriate. GEOTECHNICAL TECHNICIAN for Pile Foundations- Qualified CTQP Pile Driving Inspector, knowledgeable in pile installation in conjunction with dynamic load tests with a minimum of three (3) years of experience on at least two (2) FDOT bridge projects: for projects with Embedded Data Collectors (EDCs), certified EDC monitoring equipment operator. GEOTECHNICAL TECHNICIAN for Drilled Shaft Foundations- Qualified CTQP Drilled Shaft Inspector, knowledgeable in drilled shaft installation with a minimum of three (3) years of experience on at least two (2) FDOT bridge projects. CEI SENIOR ITS INSPECTOR- High School graduate or equivalent plus four (4) years of experience in construction inspection, two (2) years of which shall have been in ITS construction inspection plus the following: QUALIFICATIONS: Fiber Installation Inspection and OTDR Fiber Testing DMS Operation and Testing Controller Operation and Testing CCTV Installation, Operation and Testing MVDS Operations and Testing FDOT SEMP Training Familiarity with Existing Communication Equipment and Switches CERTIFICATIONS: IMSA Traffic Signal Inspector Level I Or a Civil Engineering Degree and one (1) year of ITS CEI experience. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 51 Responsible for performing highly complex technical assignments in fields surveying and construction layout, making and checking engineering computations, inspecting construction work and conducting field tests and is responsible for coordinating and managing the lower level inspectors. Work is performed under the general supervision of the Project Administrator. CEI ITS INSPECTOR- High School Graduate or equivalent plus two (2) years of experience in construction inspection, one (1) year of which shall have been in ITS construction inspection, plus the following: QUALIFICATIONS: Fiber Installation Inspection and OTDR Fiber Testing DMS Operation and Testing Controller Operation and Testing CCTV Installation, Operation and Testing Familiarity with Existing Communication Equipment and Switches MVDS Operations and Testing CERTIFICATIONS: IMSA Traffic Signal Inspector Level I Or a Civil Engineering Degree Responsible for performing assignments in assisting Senior Inspector in the performance of their duties. Receive general supervision from the Senior Inspector who reviews work while in progress. Civil Engineering graduates must obtain certifications within the first year of working as an inspector or Engineer Intern. Exceptions will be permitted on a case-by-case basis so long as qualifications and certifications are appropriate for specific inspection duties. SOFTWARE ENGINEER- An Electrical Engineering Degree and five (5) years of experience in traffic signal design, analysis and implementation; software design analysis, programming and software/hardware and staging for traffic signal control system. (This position is not eligible for straight or premium overtime pay.) COMMUNICATIONS ENGINEER- An Electrical Engineering Degree plus registration in the State of Florida as a Professional Engineer desirable and ten (10) years of experience involving computer controlled systems for computerized traffic signal systems. The experience should include design review, equipment specifications, installation supervision, equipment and reliability analysis. (This position is not eligible for straight of premium overtime pay.) SYSTEMS TECHNICIAN- High School Graduate plus five (5) years of experience in Electronic Systems and/or Traffic Engineering technician level work, detailed experience and training in the use of Otter’s and other equipment related to fiber optic communication testing. Requires certification of this training or equivalent training. CEI LANDSCAPE INSPECTOR- High School Graduate or equivalent plus five (5) years of roadway landscape construction experience or Florida Nursery Growers and Landscape Association (FNGLA) Certified Landscape Contractor Certification plus two (2) years of roadway landscape construction experience or a degree in a related field plus three (3) years of roadway landscape construction experience. The individual must be skilled at plant identification, classification, and grades and standards for nursery plants as established by the manual “Grades and Standards for Nursery Plants” by the Florida Department of Agriculture and Consumer Services. The individual must be knowledgeable of current Florida Department of Transportation standards for landscape installation, including plans reading and irrigation system construction. The individual must have the ability to read and interpret contract documents. The individual will receive general supervision from the Senior Inspector who reviews work while in progress. CEI SENIOR ENVIRONMENTAL SPECIALIST- A Master’s Degree in Physical or Natural Science and equivalent and seven (7) years of professional experience or a Bachelor’s Degree in Environmental Science 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 52 and ten (10) years of professional experience and general background and knowledge in wetlands ecology, environmental permitting, wildlife surveys, wetland assessment, mitigation and management, management and erosion control practices, and/or hazardous waste and oil spill remediation, site restoration, environmental audits, contamination assessments, soil and groundwater remediation, and underground storage tank services as appropriate for the project. For project work involving management and erosion control practices, the individual shall be a qualified FDEP Stormwater Management Inspection. QUALIFICATIONS: NPDES FDEP Qualified CERTIFICATIONS: FDEP CEI ENVIRONMENTAL SPECIALIST- A Bachelor’s Degree in Environmental Science and three (3) years of professional experience and general background and knowledge in wetlands ecology, environmental permitting, wildlife surveys, wetland assessment, mitigation and management, management and erosion control practices, and/or hazardous waste and oil spill remediation, site restoration, environmental audits, contamination assessments, soil and groundwater remediation, and underground storage tank services as appropriate for the project. For project work involving management and erosion control practices, the individual shall be a qualified FDEP Stormwater Management Inspection. QUALIFICATIONS: NPDES FDEP Qualified CERTIFICATIONS: FDEP PUBLIC INFORMATION OFFICER- High School Graduate or equivalent and be knowledgeable in public information and/or advertising involving mass circulation or distribution of literature, mass advertising or other similar activities and performed such work for at least three (3) years. CEI RESIDENT COMPLIANCE SPECIALIST- High School Graduate or equivalent with one (1) year of experience as a resident compliance specialist on a construction project or two (2) years of assisting the compliance specialist in monitoring the project. Should have prior experience in both State and Federal Aid funded construction projects with FDOT and knowledge of EEO/AA laws and FDOT’s DBE and OJT programs. Ability to analyze, collect, evaluate data, and take appropriate action when necessary. Must attend all training workshops or meetings for Resident Compliance Specialists as well as spend time at the District Compliance office as determined necessary. CEI SENIOR INSPECTOR BUILDING STRUCTURES- High School Graduate plus eight (8) years of experience in construction inspection with four (4) years of experience in performing highly complex technical assignments in field surveying and construction layout, making and checking engineering computations, inspecting construction work and conducting fields tests. Senior Building Structures Inspector must be fully knowledgeable of all aspects of the building construction to include masonry work and familiarization with the local and State building codes and ordinances. Work is performed under the general supervision of the Project Engineer. CEI BUILDING INSPECTOR/ ELECTRICAL- High School Graduate plus five (5) years experience as a qualified building inspector or general contractor. Experience shall be actual field experience as a qualified building inspector or job superintendent. Inspector must be fully knowledgeable of all local and State building codes and ordinances. CEI UTILITY COORDINATOR- High School Graduate or equivalent and be knowledgeable of FDOT’s Standards, policies, procedures, and agreements and shall have a minimum of four (4) years of experience performing utility coordination in accordance with FDOT’s Standards, policies, procedures and agreements. 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project 53 Prepared for: Collier County Board of County Commissioners CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project MASTER CCNA Solicitation: 16-6560 April 11, 2016 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 i Contents I. Cover Letter / Management Summary II. Consultant Approach and Understanding III. Qualifications/Certifications, Experience of Assigned Team and Staff IV. Performance of the Consultant V. References VI. Acceptance of Conditions VII. Required Form Submittals Tab I Cover Letter / Management Summary Tab I - Cover Letter / Management SummaryI AECOM Technical Services, Inc. 4415 Metro Parkway Suite 404 Fort Myers, Florida 33916 Tel.: 239 278 7996 Fax: 239 278 2575 April 8, 2016 Evelyn Colon, Procurement Strategist Collier County Government Purchasing Department 3327 Tamiami Trail E Naples, FL 34112 RE: Tab I – Letter of Transmittal – Solicitation 16-6560 – CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Dear Ms. Colon: The AECOM Team is pleased to submit our qualifications in response to your request for proposal (RFP) to provide CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project. As specified in the RFP, we have attached one paper copy labeled "Master" and five (5) CDs with one copy of the proposal in pdf format for your review. AECOM is a full-service A/E and CEI firm with over 1,100 talented people in offices statewide, including more than 85 CEI personnel. We assign our staff to projects based on matching their particular skills to the project at hand. Transportation and infrastructure have been our bread-and-butter work since opening major, permanent operations in Florida in 1957, with our largest office located in Tampa. Of particular relevance, we have served all Florida Department of Transportation (FDOT) Districts and dozens of county and municipal clients statewide, including Collier County. In a number of cases, these services have been continuous for over 25 years. We believe this attests to the high caliber of our services and our commitment to our clients. We are currently finalizing an agreement with the County to provide CEI services for the Vanderbilt Drive Bridge Replacement Project, and expect to begin providing services this year. We believe the two projects are timed so we can provide CEI services for the White Boulevard project by offering many of the same members from the Vanderbilt Drive team. Sharing team members is not only cost effective, but provides Collier County ease of communication since one manager will be overseeing both jobs. Our proposed Project Manager, Crystal Gorman, PE, is a long-time resident of Collier County, and has over 10 years of construction management experience on various large-scale roadway/bridge projects, including more than three years of serving as Senior PE for AECOM and more than eight years as an FDOT employee where she served as the Interstate Construction Resident Engineer in Southwest Florida. Crystal recently completed the US 27/SR 80 interchange reconstruction project in Hendry County, which was delivered to FDOT as the “FTBA Best in Construction Award for Best Interchange” in the State in 2013. Crystal’s extensive experience on large bridge and roadway reconstruction projects and her enthusiasm to serve Collier County puts her in a strong position as leader and coordinator for our team. Our Project Engineer, Steve Nappi, PE, has extensive experience administering construction contracts under FDOT and local government specifications. Steve is a valuable asset to the team with nearly 11 years of experience ranging from structural design to being in responsible charge for FDOT on multiple highly complex projects. He is highly dedicated to his clients, and this experience has made him fully aware of the County’s expectations of the CEI and their required documentation. Crystal and Steve have a solid working relationship having worked together on several local government CEI jobs. Additionally, our proposed team is well-versed in documenting compliance with contract documents and agency requirements, and in proactive, effective communication with the client and its contractors to avoid delays and budget over-runs. We are extremely well organized and are experienced in managing these types of projects. Contacts: J. Larry Sauls, PE Vice President 813.675.6728 larry.sauls@aecom.com Crystal Gorman, PE Vice President 239.634.2318 crystal.gorman@aecom.com Ms. Evelyn Colon Collier County Government April 8, 2016 Page 2 By choosing AECOM to provide these CEI services, Collier County will continue to receive quality personnel, quality service, and quality results. Our goal is to work in partnership with you so that this project is completed on schedule, within budget, and with sensitivity to the community. Sincerely AECOM Technical Services, Inc. J. Larry Sauls, PE Vice President Authorized Officer Tab II Consultant Approach and Understanding of the White Boulevard over Cypress Canal Bridge Replacement Project II Tab II - Consultant Approachand Understanding AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 II-1 II Consultant Approach and Understanding Consultant's Understanding of the Project AECOM is pleased to present this letter of interest for the upcoming White Boulevard at Cypress Canal Bridge Replacement Project. We have performed a preliminary plan review of the 100% submittal and visited the jobsite to ensure we gain a solid understanding of the project. We understand that the County wishes to replace the existing two-lane bridge over Cypress Canal with a more robust concrete structure. The wider replacement will have two 12-foot travel lanes, two 5.5-foot shoulders and two 6.5- foot raised concrete sidewalks. The intermediate bents will rest on eight 18-inch square concrete piles, while the end bents will rest on six 18-inch square piles. The relocated raw water line will require two 18-inch square piles to span the Canal totaling 30 piles for the project. The three-span bridge deck will be 1’-6” thick cast in place concrete and poured in five segments; unless the Contractor proposes an alternate pour sequence and receives approval from the Engineer of Record (EOR). Quadguard II crash cushions and a bicycle rail on concrete parapet wall round out the safety features of the new bridge. Construction of this project requires the use of a temporary structure to divert traffic to the north, which will result in minimal impact to the traveling public. Utility relocations are required by both FP&L and Comcast. The overhead electric relocation must be performed prior to construction to facilitate installation of the temporary structure, as well as removal of the existing bridge and subsequent replacement. The Comcast line currently attached to the existing bridge will require removal prior to demolition. The raw water line is to be relocated by the Contractor under this contract and will require coordination with Collier County Utilities. The typical section for the roadway shows two 12-foot travel lanes, two 4-foot shoulders, with 2-feet of Type F curb and gutter and two 6-foot concrete sidewalks. New roadway construction will utilize 12 inches of stabilized subgrade, 10 inches of limerock base, 3 inches of type SP structural course and 1.5 inches of FC-12.5 for the friction course. Areas of the existing roadway remaining per plan will be milled 1.5 inches and 1.5 inches of FC-12.5 will be placed. The roadside slopes will consist of a 4:1 slope beginning 2 feet from the edge of sidewalk for a distance of ten feet until sloping 3:1 into the ditch bottoms. From the varying ditch width, the slope will rise 3:1 tying back into original grade. The wider cross section requires significant drainage improvements, which eliminates existing mitered ends and ditches in front of residences. These improvements will require the Contractor to relocate fences and install mailboxes, which will have to be handled delicately as many are custom works. New driveway turnouts will be installed at four active driveways and two at lots that are not cleared. These turnouts will include installation of 24” & 42” reinforced concrete pipes to carry storm water to the control structures. Close coordination with the property owners will be required to ensure their satisfaction and prevent the AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 II-2 County from receiving unnecessary complaints for these activities. Due to the limited right of way of the facility, construction access and staging will be a challenge that will need to be addressed in advance of construction commencement. Approach AECOM has a strong reputation for effectively communicating with project stakeholders. Our Team always strives to keep everyone involved with the project informed of major work items including schedules and potential traffic impacts. Effective communication comes naturally to our project team – regular communication with the Collier County Project Manager will occur to keep the PM updated on project progress, Contractor schedule, project conflicts, requests for information, quality control issues, Contractor performance issues, notices of intent to claim, and any public concerns. All AECOM Project Engineers are issued iPhones, and all inspection staff members are provided with cameras, cell phones, laptop computers and wireless Internet cards; essentially mobile offices, to effectively communicate with fellow staff, the Contractr, and the County. AECOM also recognizes that email is the standard method of communication for most construction projects. All verbal directions or notices to the Contractor will be followed up in writing whether in the field or at the office. Daily work reports produced by our inspection staff will be clear and concise, but with the necessary detail to track all project progress. Detail is extremely important should a claim or conflict arise on the project where daily work reports are used for justification. Good communication is one of the most important factors of a successful project. Fostering a positive CEI-Contractor relationship at the beginning of any project allows issues to be resolved and decisions to be made at the lowest, most cost-effective level. With this philosophy, we have been able to resolve project issues and bring equitable solutions to our client that the CEI team and Contractor have agreed upon. The AECOM Team remains completely committed to proactive problem resolution and accepts responsibility to resolve problems with a “solve it here - solve it now” approach. The AECOM Team will focus on a few key points in our approach. 1.Keep an open dialogue with the Contractor. Open discussion on project issues or upcoming work items often produces solutions. Working together as a team builds trust. 2.Stay ahead of progress (be proactive) by looking at the plans for upcoming phases of work. AECOM’s philosophy of “never be complacent” on a project with a positive trajectory will always be in the back of our minds. Catching issues early before they occur helps keep the project on schedule, which is good for both the Contractor and the County. 3.The Contractor appreciates prompt responses. AECOM consistently provides immediate action on any incoming correspondence from the Contractor and other stakeholders. We set short but reasonable timeframes for turnaround and keep track of outstanding items in up-to- date project logs. 4.While the Contractor appreciates responsiveness, AECOM expects the same. We include action items at the end of each weekly meeting agenda, which are then documented in all meeting minutes for follow up. Issues that cannot be resolved at the project level will be escalated to the Collier County Project Manager. Early detection of problems in the plans, whether they are errors, omissions, conflicts, or unforeseen conditions result in fewer time delays and will keep cost increases to an absolute minimum. Immediately upon final selection of this CEI contract, if we are selected, and upon award of the construction contract, we will begin coordination efforts we feel are critical to the success of this project. 1.To follow up on our efforts during this CEI contract pursuit, the AECOM Team would execute a full constructability review of the White Boulevard at Cypress Canal Bridge Replacement contract plans. Upon final selection, we would prepare our constructability comments and meet with the Collier County Project Manager and the EOR to discuss our findings. This would also be an opportunity for us to discuss with the EOR their approach to the design and obtain any clarification on intent of specific plan items. 2.Upon award and execution of the Construction Contract, the AECOM Team will schedule a meet-and-greet session with the low-bid Contractor. This informal meeting is to set the stage for a favorable project kick-off and helps establish a partnering attitude. The AECOM Team has found this special coordination effort to be extremely successful in the past. 3.AECOM has a very comprehensive Quality Assurance/ Quality Control (QA/QC) Program. One of our first orders of business would be to produce a QA Plan specifically tailored to this project and submit it to the Collier County Project Manager for their review and acceptance. The AECOM Team is proud of our approach to Quality Assurance, and we believe it will provide additional success for this and future projects for Collier County. Pre-construction Activities: A successful CEI project requires commencement of services long before the Contractor starts work. This is initiated with a thorough AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 II-3 plan of the activities to be completed. Our team is prepared to properly execute these services for a proficient project start. •Hold CEI pre-service meetings and pre-construction conference •Set up field office or field trailer •Coordinate utilities, permit applications/notices of commencement •Obtain pre-project photos/videos, and perform existing condition surveys •Review plans, specifications, and other contract documents •Develop file system/document control guidelines •Review of Contractor’s baseline CPM schedule, QC Plan, and other pre-construction submittals Construction Activities: Once the day-to-day construction activities begin, the following activities will be part of our routine services to ensure the Contractor provides the best construction quality to Collier County, and minimize the risks for unnecessary costs or claims to the lowest extent possible. •Hold pre-activity meetings for all construction phases and critical activities •Hold weekly progress meetings •Prepare status reports and CEI invoices in the County’s preferred format •Create daily work reports/prepare weekly engineer summaries •Log and monitor RFI’s •Process monthly estimates •Execute adjacent project coordination (if applicable) •Produce documentation/electronic processing •Perform inspection of work and materials verification testing •Review Contractor’s pipe videos/reports •Monitor bridge construction and geotechnical services •Ensure Contractor adheres to contract documents and environmental permits •Perform CPM schedule review/monitoring and practice claim avoidance/dispute resolution •Negotiate and process supplemental agreements/ change orders •Enforce safety with reporting and monitoring •Monitor compliance with EEO, DBE, and OJT training requirements (if applicable) •Obtain project photographs/video documentation •Perform project walk through and maintenance acceptance •Monitor warranties •Initiate the permit transfer from construction to operations Post Construction Activities: Post-construction activities will be a continuation of work efforts initiated prior to the project start. Our team’s efforts from pre- construction through post-construction will culminate in successful completion of the project, submittal of the final estimate and documentation, processing of close- out forms, and submittal of permit documentation to the proper agencies. •Issue final acceptance of project •Prepare, perform QA, and submit the final estimate •Provide the offer of final payment •Certify and submit as-built drawings •Gather and track warranty information •Hold project closeout meeting •Summarize any outstanding issues/provide support to Collier County The AECOM Team prides themselves on their meticulous filing system and document process controls. All documents and correspondence will be scanned and filed on a daily basis for quick retrieval in accordance with the County’s preferences. Review Contractor’s Schedule: Effective use of the schedule begins with a timely baseline submittal. The AECOM Team intends to work closely with the Contractor as soon as possible to formulate a baseline schedule. While providing assistance, we will be careful not to dictate means and methods or resource allocation. Our goal is to have a baseline schedule established for the project at the pre-construction conference so that a detailed discussion can occur for the benefit of those present. •Upon submittal of the baseline schedule, the review will include the following at a minimum: •Completion date meets contract time or sooner •Logical sequence of activities •MOT phasing reflected in sequence •Milestones included AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 II-4 • Check for reasonable production rates • Adequate breakdown of activities to eliminate durations in excess of 30 days • Utility relocation durations included • Cost loading analysis (if applicable) • Contractor submittals with adequate review periods in accordance with specs • Include narrative identifying critical path • Check that there is not an excess of activities shown on the critical path Project Schedule Updates: The AECOM Team will ensure the schedule remains the focal point of the project team by discussing in detail the schedule status at the weekly progress meetings. The Contractor’s schedule update should reflect construction progress during the previous month. In updating his schedule, the Contractor may choose to modify his sequence of events and activities, or alter durations. If this occurs, we will want to know why and whether there is an effect on the overall project. If the update is accepted, the submitted schedule then becomes the basis for future, “scheduled vs. actual” activity analysis. Two-Week Look-Ahead: The AECOM Team will ensure that the Contractor’s two-week work plan is based on the controlling items of work identified in the schedule. Noncritical schedule activities will be monitored closely as well. In the weekly meetings we will discuss with the Contractor the plan for performing the work by using a two-week look-ahead schedule. This will ensure that all required equipment and materials are at the site for construction and ready to proceed in a timely fashion. Claims Avoidance and Construction Schedule: We are fully cognizant that late delivery of the project inconveniences the traveling public, involves increased administration and construction costs to the County, and may adversely affect the County’s reputation. Consequently, we believe that timely completion and maintenance of the construction schedule to be of the utmost importance. In the pre-construction phase, a preliminary schedule is the most valuable tool to analyze for potential conflicts, overestimating/underestimating production, unrealistic milestones, interface conflicts, and more. The most effective means of dealing with claims is to recognize the potential for their occurrence early in the project and take the necessary steps to eliminate the problems that may lead to such claims. Special meetings prior to the commencement of major activities on the project are also extremely useful in the avoidance of claim situations. When circumstances arise in which claims are justified and unavoidable, we will take steps to resolve the field problem in order to minimize impacts on the Contractor’s progress, thus settling claims with the Contractor before they become large and costly problems. The most common causes of claims on a construction project are design deficiencies, utility conflicts, and unknown site conditions. The AECOM Team recognizes that many of these problems are not beyond the ability of the CEI to prevent, minimize, or resolve. The AECOM Team has the ability to anticipate the type of claim that could be presented and advise Collier County on the probable value of the claim, as well as the recommended position to take. We have the experience to successfully negotiate substantiated claims and defend the County against unsubstantiated ones. Once a claim situation is identified, the CEI team will be notified and asked to be conscientious of all activities surrounding the claim. CEI staff will be expected to document factual, concise observations in daily work reports, photograph or videotape anything supporting the claim or our defense, and track the Contractor’s work effort on appropriate forms. Key Features AECOM has reviewed the plans and visited the site to determine the key features of this project. The most apparent key feature is the temporary structure and lane shift that will carry traffic around the construction zone of the replacement bridge. The use of a temporary bridge expedites construction as the new bridge will not have to be constructed in phases while allowing the traveling public safe and efficient travel through the work zone. As with any MOT phase, the safe implementation of the temporary bridge and lane shift are critical. AECOM staff maintains the required MOT certifications and will closely monitor MOT inspection reports, ensure the worksite traffic supervisor performs their duties under the Contract and perform independent inspections to determine MOT is in accordance with the contract documents and is working as intended. Any discrepancies or suggestions for improvements will immediately be brought to the attention of the Contractor. The Contractor may elect to utilize a Bailey or Acrow bridge for this application which can be rented from the State. The Contractor will benefit financially by completing the project as quickly as possible as the temporary bridge can be removed from service and taken off rent. Drainage is another key feature of this project. The utilization AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 II-5 of underground pipes and structures will allow the facility to be widened, adding shoulders and sidewalks, making the roadway safer for both the vehicular traffic and pedestrians to travel. As previously stated, there is not much area available for staging so the work must be properly scheduled in a manner to allow work to progress without crews being in the same area. We will assist the Contractor by discussing their CPM schedule and 2-week look ahead at weekly progress meetings. Lastly, this is a bridge replacement project making bridge construction a key feature. We have provided staffing specializing in bridge construction, which will prove valuable when issues arise. Our staff has been involved in the administration of numerous complex signature bridges and has worked through extremely complicated issues when encountered. We are well aware of the methods of bridge building in the State of Florida and will continue to assist the Contractor in delivering a quality bridge. Potential Risks We have assessed some of the potential risks associated with this contract and will discuss three of them. The first is utility relocation. FP&L has an overhead electric line to the north of the existing bridge. This line will not allow properly sized cranes to perform the work under this contract, which is why coordination of this relocation is imperative. AECOM will contact FP&L to see where the relocated line will be placed, checking to be sure the new location will not pose OSHA safety concerns during construction of the new bridge. Our staff will monitor the progress against the construction schedule and will utilize standard forms found in the CPAM if delays appear to be eminent. Comcast has a line attached to the existing bridge that also requires relocation. Again, we will coordinate this relocation so it will not be in conflict with other underground work on the contract and monitor the work closely. The raw water line is to be relocated to the south by the Contractor. The Contractor is to adhere to the County specifications when performing this work and is required to provide a minimum 20-day notice prior to taking the line out of service. Once the line is removed from service, it must be reconnected within 12 hours. AECOM will coordinate a pre-work meeting between the County and the Contractor and will ensure that items discussed in the meeting are met satisfactorily and the time restrictions are adhered to. The work under this contract requires the relocation of fence and installation of driveway turnouts for residents along the corridor. Some of this work requires construction easements that must be procured prior to beginning. AECOM will confirm easements are obtained prior to allowing the Contractor to work in these areas. Residents will be notified in advance of both the construction impacting their access and relocations of their property. The fences along the south side of the roadway will need to be checked against the cross- sections to determine if the fill needs to be adjusted to avoid undermining foundations or creating large gaps beneath the fence bottoms. Communication and coordination with the property owners will be essential so no surprises occur, causing undue complaints to the County. AECOM believes we can stay ahead of this and ensure property owners satisfaction throughout the duration of the project. There are potential environmental risks specifically attributed to storm water run-off and turbidity caused by in-water bridge construction operations. The Contractor is responsible for maintaining drainage throughout the duration of the project. AECOM will assist the Contractor by reviewing the plans prior to beginning construction to identify possible issues of maintaining the drainage between phases. Items will be discussed and brought to the attention of the Contractor so they can be resolved. There is a note in the plans that no dewatering is allowed unless a dewatering permit is issued by SFWMD. AECOM will bring this to the attention to the Contractor prior to construction and will also seek input from SFWMD to determine the options we have for this specific project. In-water turbidity causing operations will be monitored to ensure compliance with the applicable permits. We anticipate a request to preform holes for pile installation due to the hard layer encountered approximately 5 feet from the canal bottom as evidenced in the bore logs. There is also the in-water work required to install rip rap and control structure outfalls, as well as the removal of the existing rip rap and bridge structure. Again, AECOM will monitor these operations, ensuring compliance with permits and stepping in when necessary. Tab III QualiƮ cations/CertiƮ cations and Experience of the Assigned Team and StaƬ III Tab III – QualiƮ cations/CertiƮ cations and Experience AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 III-1 III Qualifications / Certifications and Experience of the Assigned Team / Staff Qualifications/Certifications The AECOM Team proposed for this project, and shown on the organizational chart on the next page, is intimately familiar with Collier County, the inspection criteria, and expectations. We recognize that training is a vital part of today’s CEI business. Due to the number of required certifications necessary for construction inspection and materials testing, AECOM has developed a qualifications database that identifies training experience and certifications for all CEI personnel. This database is used and monitored to ensure that certifications are renewed as necessary, and to track personnel classification and each individual’s area of expertise. AECOM prides itself in dedicating a considerable amount of funds annually to properly train our staff. We understand the principle of cross training and know this is important to properly and efficiently execute our CEI role. You will find that our team members have more than the required qualifications/ certifications for their respective classifications, which allows for a well-rounded yet diversified team. When selecting subconsultants, AECOM ensures that proposed personnel are properly certified for their respective positions. Experience/Performance on Similar Projects The AECOM Team has extensive CEI experience on projects very similar to Collier County’s White Boulevard over Cypress Canal Bridge Replacements project. The CEI and support personnel included on this project team have worked nearly their entire professional careers on FDOT and County transportation projects in this area. We are intimately familiar with multiple systems of project documentation and document processing software, and thoroughly familiar with the requirements, procedures, manuals, processes, and expectations of Collier County. We are currently finalizing an agreement with the County to provide CEI services for the Vanderbilt Drive Bridge Replacement Project, and expect to begin providing services this year. We believe the two projects are timed so we can provide CEI services for the White Boulevard project by offering many of the same members from the Vanderbilt Drive team. These team members were hand- picked, not only for their relevant project experience on similar bridge replacement projects, but also for their local knowledge. We are eager to offer this team for the White Boulevard bridge replacement project for Collier County, and are confident that we can exceed your expectations. AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 III-2 Organizational Chart AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 III-3 Team Member Role Years of ExperienceAsphalt Paving L1 / 2Concrete Field Tech L 1/2Earhwork L1/2Final Estimates L1/2Drilled ShaftPile DrivingAsphalt Plant L 1/2MOT (Advaned/Int.)Critical StructuresFDEP StormwaterQC ManagerNuclear Density Guage SafetyIMSA Traffic Signal L1MSE Wall InspectorCrystal Gorman, PE Senior PE / PM 12 t A t t Steve Nappi, PE Project Engineer 10 2 t t A t t t t Julio Castro Sr. Inspector 10 t 1 t 1 t I t t t t Mark Smalley Sr. Inspector (alternate)30 t t t 1 t t I t t t t t Joe Monahan Inspector 11 1 1 t 1 I t t t t t Michael Blevins Asphalt Plant Insp. (if needed)3 1 1 t t Project Team Certifications The AECOM Team members are currently working together to complete ongoing assignments and have successfully worked together in the past. Through these and other prior contracts, our Team has become thoroughly familiar with all types of construction. More importantly, our staff has developed an awareness of current FDOT and County practices, procedures, and specifications that are applicable to the White Boulevard Bridge project. There are several items within the CEI scope of services that require full attention from the CEI Team to ensure the contract runs seamlessly. Many of those items are discussed in other sections within this proposal; AECOM takes pride in our proactive approach to contract management. Since our Team has worked together on previous contracts, they understand each other’s expectations and responsibilities that are invaluable in successfully completing a CEI contract. Several examples of recent relevant AECOM CEI projects, either as a prime or as a major sub-consultant, that include similar bridge work, are described below. AECOM is proud of its performance in providing CEI services. It is our belief that these projects include all construction aspects that will be included under this CEI contract: • Gasparilla Island Swing Span/Bridge Replacement, GIBA, Charlotte County • Honore Avenue Phase VII, Sarasota County • I-75 Sumter Blvd. to River Rd., Sarasota County •Matlacha Bridge Replacement, Lee County •Treasure Island Isle of Palms and Isle of Capri Bridge Replacements, Pinellas County •Vanderbilt Drive Bridge Replacement over Cocohatchee River (Frank Halas Bridge), Collier County •Ocean Avenue Bridge, Palm Beach County •Bridge of Lions Historic Rehabilitation, St. Johns County •Royal Park Bridge Replacement, Palm Beach County •US 17 from CR 634 to 7th Avenue, Hardee County •SR 80/US 27 Interchange, Hendry County •I-75 Design/Build Bridge Widenings and Deck Replacements, Sarasota County •I-75 Design/Build Group at US301, University Parkway, SR 70, and Fruitville Interchanges, Sarasota and Manatee Counties •Alligator Creek Trail, Sarasota County •I-75 Design/Build from Colonial Boulevard to SR 82, Lee County •I-75 from SR 82 to Luckett Road, Lee County •Raymond Road Bridge Replacement, Sarasota County •Miriam Creek Bridge, Polk County •US 27 Flyover, Polk County •I-75 Design/Build/Finance (iROX) from Golden Gate Parkway to Colonial Boulevard, Collier and Lee Counties AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 III-4 • US 17 Design/Build from CR 764 South to Desoto County Line, Charlotte County • SR 80 from West of Orange River Road to East of SR 31, Lee County Our success is demonstrated through the repeat business that we receive from our long-term clients. Collier County is not a new client for AECOM; however, we do understand that references are of the utmost importance in communicating our abilities to you. We have provided above recent project experience and references below that we believe will provide the satisfaction you need to better understand our experience and qualifications. References • Nikesh Patel, P.E., FDOT Interstate Resident Construction Engineer, 941-465-0411, Nikesh.patel@dot.state.fl.us • Sarah Clarke, Lee County DOT Project Manager, 239-533-8718, sclarke@leegov.com • Kathy Banson-Verrico, Gasparilla Island Bridge Authority Executive Director, 941-697-2271, kathygiba@earthlink.net In preparation for this project, we have spent a considerable amount of time reviewing the contract documents, the roadway and structures plans, and reviewing the site conditions. During this review, we took note of each specific construction aspect of the job and built our team ensuring that we’ve appropriately covered each item with regard to staffing and experience. In this section, we will outline how the AECOM Team is experienced in each of these areas. The White Boulevard Bridge replacement project includes the following major construction elements: • Roadway Reconstruction • New Bridge Construction over Cypress Canal • Milling and Resurfacing • Temporary Bridge • Utility Adjustments/Coordination • Drainage Installations • Pedestrian Facilities • Signing and Pavement Markings On nearly all of our past projects, roadway re- construction, drainage installations, milling and resurfacing, utility relocation, and signing and pavement markings have been included. These are standard roadway construction elements in almost every transportation project, and our team can safely say we are experts in these areas. AECOM personnel also pride themselves on keeping abreast of current construction issues that are ongoing throughout the state. The remainder of the above-listed elements, however, are not as common. The AECOM Team has the necessary experience in each of these categories. Bridge Construction – The AECOM Team has a tremendous amount of bridge construction experience, as shown in our staff’s resumes and in the projects listed above. Our team members have worked on all types of bridge projects, including bridge widenings, bridge replacements, bridge rehabilitations, and new bridges. AECOM fully understands all aspects related to structures and the importance of effectively administering this portion of the contract. AECOM anticipates several pre-activity meetings for the bridge construction including, but not limited to, pile installation, concrete placement, temporary bridge/ MOT and utility relocations. The Contractor will be required to submit a Pile Installation Plan, which we will review with our geotechnical team for completeness and acceptability. The plan will be monitored during test pile driving operations along with performing PDA to determine authorized pile lengths and establish driving criteria. Any inefficiency in the Pile Installation Plan will be reevaluated and revisions made should the hammer-pile-soil system cause undue stress to the piles. Once lengths and driving criteria are established, the production pile installation will be monitored for conformance to contract requirements from delivery of the piles, lifting and handling of the piles and driving operations. Formwork and reinforcing steel will be inspected for adherence to tolerances prior to all concrete placements. Curing and form removal will be monitored after placement to ensure form removal does not occur prior Royal Park Bridge, Palm Beach County AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 III-5 to allowed timeframes or strength test results being achieved. The concrete placement for the deck will be discussed in detail at the concrete pre-activity meeting. Topics to be covered will include lighting during the placement, initial screed demonstrations, placement rates, weather limitations, moisture-evaporation rate monitoring, and finishing and curing activities. During concrete placement for the deck, depth checks will be performed, for overall depth as well as reinforcing steel cover. Sampling and testing will be performed during placement as is typical. Plastic finish requirements will be in accordance with Specifications, and the laser profile report will be reviewed prior to deck planing to ensure optimal planing machine settings are applied. The laser profile report after planing will be reviewed to ensure smoothness requirements are met or exceeded as required by Specifications. Utility Adjustments – 80-90% of our past project experience includes utility coordination and utility relocations. We have worked with County and City water facilities, sewer facilities, overhead and underground electrical, fiber optics, overhead and underground phone and cable facilities to name a few. It will be important to establish contact and begin coordination with each affected utility as soon as possible prior to construction. The AECOM Team, with our Project Engineer Steve Nappi taking the lead, fully anticipates assisting this coordination effort with both the contractor and Utility Agencies/Owners to facilitate the relocation efforts and minimize potential delays to the project. Pedestrian and Bicycle Facilities – The AECOM Team has significant experience with pedestrian and bike facilities. The components of these facilities: grading, concrete, asphalt, striping, signage, ADA access and slopes, etc., are similar to other components within our area of expertise. We will use our inspection principles to ensure these items are constructed per plan and meet ADA requirements. Bridge of Lions Historic Rehabilitation, St. Johns County Gasparilla Island Swing Bridge in Lee County I-75 Design/Build/Finance (iROX) from Golden Gate Parkway to Colonial Boulevard, Collier and Lee Counties Crystal T. Gorman, PE Senior Project Engineer / Project Manager Ms. Gorman has over 12 years of construction experience including roadway and bridge construction oversight and construction engineering and inspection (CEI). As Senior Project Engineer for AECOM, Ms. Gorman leads our Southwest Florida CEI team on State and local municipality road and bridge projects. Previously, Ms. Gorman served as the Interstate Construction Resident Engineer for the Florida Department of Transportation where she managed large highway and bridge construction projects. In this capacity she supervised and directed the activities of the interstate residency; ensured contract work was completed in compliance with plans and specifications and proper administration, inspection and testing was being performed; reviewed and provided feedback and recommendations on supplemental agreements, work orders, time issues, and claims; managed CEI consultant teams, regularly reviewing their work for contract compliance and monitoring their budgets; provided support to CEI Teams and Contractors in resolving project issues and changes while also serving as a liaison between our project teams and other agencies, stakeholders, FHWA, and the public; and assisted with organizing public meetings and events, and other various public outreach duties. Ms. Gorman was also responsible for writing Request for Proposals and developing contract packages for large Design-Build and Public/Private Partnership projects. She also evaluated design-build proposals and assisted in the selection of design-build firms for projects. Senior Project Engineer, Honore Avenue/Pinebrook Road Extension, Phase VII, Sarasota County, Florida (5/14-Present): Providing project administration and CEI services on this $11.1M new roadway project. The project consists of 2.61 miles of new two-lane divided roadway construction from Laurel Road to SR 681 and 1.12 miles of friction course on an existing roadway build as part of Phase VI in Sarasota County. The construction also includes a new bridge over Fox Creek, milling and resurfacing, pond construction, stormwater infrastructure, new signalization, signing and pavement markings, landscaping, lighting, guardrail, sidewalks, and utility coordination. Sarasota County Reference: Robbin Levar, Project Manager; (941) 650-9815 Senior Project Engineer, SR 93/I-75 Widening from Sumter Boulevard to River Road, FDOT District One, Sarasota County, Florida (7/13-Present): Providing project administration and CEI services on this $35.6M interstate widening project. The project includes roadway widening from four to six lanes, milling and resurfacing, cross slope correction, bridge widening to eight lanes, median and linear pond construction with associated drainage, box culvert extensions, ITS adjustments, lighting, cable barrier and guardrail, signing and pavement markings, and utility coordination. [FPID: 413044-4-52-01 (Federal Funds)] FDOT Reference: Marléna Gore, Project Manager; (863) 272-5008 Senior Project Engineer, US 41 at Biscayne Drive and Price Blvd. at Biscayne Drive Intersection Improvements, City of North Port, Florida (6/14-1/15): Provided project administration and CEI services on this $700K intersection improvements LAP contract. The project consisted of construction of additional turn lanes, replacement of mast arm structures and signalization, milling and resurfacing, pedestrian facilities, drainage adjustments, signing and pavement markings, and utility coordination. [FPID: 429872-1-58- 01 and 431041-1-58-01] City of North Port Reference: Ben Newman, PE, Project Engineer; (941) 240-8320 Senior Project Engineer, Isle of Capri and Isle of Palms Bridge Replacements, Design-Build, City of Treasure Island, Pinellas County, Florida (1/13-1/14): Provided project administration and CEI services on this $3.5M bridge construction project. The project included two new bridges over intracoastal waterways, permanent sheet piling, utility relocations, milling and resurfacing, drainage improvements, sidewalk, lighting, landscaping and aesthetic features, and signing and pavement markings. Reference: Hal Bruce, Public Works Project Manager; (727) 547-4575 x257 Senior Project Engineer, US 27/SR 80 Interchange, FDOT District One, Hendry County (10/12-1/14): Provided project administration and construction engineering inspection services on this $18M roadway and bridge construction project. The project included new construction, reconstruction, MSE Walls, milling and resurfacing, widening, drainage improvements, lighting, signing and Areas of Expertise Project Management Construction Engineering and Inspection Education BS/2004/Civil Engineering/ University of Florida Associates/2001/Engineering/ Edison College FDOT/Construction Academy Registration 2009/Professional Engineer/ Florida #69830 Certifications TIN #: G65511880 CTQP 8-17/Final Estimates, Level 1 8-17/Final Estimates, Level 2 Taken & Passed/QC Manager OTHER 10-16/FDOT MOT Advanced 1-16/Critical Structures Construction Issues SSC Years of Experience With AECOM: 3 Years With Other Firms: 9 Years Crystal T. Gorman, PE - 2 pavement markings and signalization and new bridge construction (over SR 25/US 27) on SR 80. [FPID: 408286-7-52-01 (Federal Funds)] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 Resident Engineer, SR 93/I-75 Widening from SR 78 to Charlotte County Line, FDOT District One, Lee County, Florida (5/12- 10/12): The $17.4M improvements consisted of adding lanes, milling and resurfacing with cross slope corrections, steel girder bridge widening, signing and pavement markings, lighting including new high mast lighting at interchange, drainage improvements, and utility relocations. [FPID: 413041-2-52-01 (State Funded)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, SR 93/I-75 Design-Build Collector/Distributor System and Airport Access to Southwest Florida International Airport, FDOT District One, Lee County, Florida (2/12-10/12): The $54.1M improvements consist of the design and construction of a new interchange, adding lanes, milling and resurfacing, new bridges, signing and pavement markings, lighting, drainage improvements including pond construction, installing intelligent transportation system components, signalization, retaining walls, landscaping and aesthetic features and utility relocations. The project involves significant coordination with Lee County Port Authority. [FPID: 416649-2-52-01 (State Funded)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519- 2223 Resident Engineer, SR 93/I-75 Design-Build/Finance – Widening from SR 80 to SR 78 including the Caloosahatchee River Bridge, FDOT District One, Lee County, Florida (2/12-10/12): The $71.8M improvements consisted of adding lanes, milling and resurfacing, bridge widening including a Category II structure over a major waterway, signing and pavement markings, lighting, drainage improvements including pond construction, installing intelligent transportation system components, sound walls, retaining walls, and utility relocations. [FPID: 413066-1-52-01 (Federal Funds)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, SR 93/I-75 Widening from Tucker’s Grade to Jones Loop Road, FDOT District One, Charlotte County, Florida (6/11-10/12): The $12.2M improvements consisted of adding lanes, milling and resurfacing with cross slope corrections, steel girder bridge widening, signing and pavement markings, drainage improvements, and utility relocations. [FPID: 413042-3-52-01 (Federal Funds)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, SR 93/I-75 Widening from Luckett Road to SR 80 and Interchange Improvements at SR 80, FDOT District One, Lee County, Florida (2/11-10/12): The $29.2M improvements consisted of adding lanes, milling and resurfacing, pavement widening, bridge widening of both steel and concrete girders, signing and pavement marking, signalization, installing intelligent transportation system components, lighting including new high mast lighting at two interchanges, drainage improvements, retaining walls, sound walls, landscaping, and three JPA’s and coordination with ten reimbursable utilities. [FPIDs: 411038-1-52-01/411042-1- 52-01 (Federal Funds)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, Florida High Speed Rail – Design-Build Early Works Projects, FDOT District One, Hillsborough, Polk, Osceola and Orange Counties, Florida (7/10-3/11): Served as the District Resident Engineer providing leadership and project management for Florida High Speed Rail during the project development stages prior to the project being canceled in March 2011. The duties included writing the Request for Proposals for the Design-Build projects, developing the scope, man-hours, and estimates for the CEI contract, and coordination with District One, Seven and Five and Central Office partners for project delivery and troubleshooting project roadblocks. FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, SR 93/I-75 from SR 82 to Luckett Road, FDOT District One, Lee County, Florida (3/10-8/11): The $7.6M improvements consisted of adding lanes, milling and resurfacing, pavement widening, bridge widening and bridge deck replacement, signing and pavement marking, installing intelligent transportation system components, lighting including new high mast lighting at interchange, drainage improvements, and utility relocations. [FPID: 411037-1-52-01 (ARRA Federal Funds)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519-2223 Resident Engineer, SR 93/I-75 Widening from River Road to SR 681, FDOT District One, Sarasota County, Florida (2/10- 10/12): The $31.7M improvements consisted of adding lanes, milling and resurfacing, pavement widening, bridge widening, new bridge construction, signing and pavement markings, signalization, lighting, drainage improvements including pond construction, retaining walls, landscaping, utility relocations, and coordination on a local fund agreement with Sarasota County to realign two miles of I-75. [FPID: 406314-3-52-01 (Federal Funds)] FDOT Reference: Jon Sands, PE, District One Construction Engineer; (863) 519- 2223 134215 Qualifications Search Qualifications TRAINEE MATERIAL GROUP QUALIFICATION EXPIRATION DATE G65511880 Management Final Estimates - Level 1 8/14/2017 G65511880 Management Final Estimates - Level 2 8/14/2017 Back Crystal Gorman, PE - G65511880 Steven M. Nappi, PE Project Engineer Mr. Nappi has extensive experience in managing and administering road and bridge construction projects for the Florida Department of Transportation (FDOT). With a strong background in structural engineering, he has successfully held positions with increasing levels of responsibility in both the private and government sectors. Swing Span Project Engineer, Boca Grande Causeway Swing Bridge Replacement, Gasparilla Island Bridge Authority (GIBA), Placida, Florida (11/13-Present): This project requires the replacement of a structurally deficient swing span bridge located on the Boca Grande Causeway. The total bridge replacement length is 678 feet which includes a 219-foot swing span. The fixed portion of the bridge utilizes Florida I-beam girders founded on hammerhead pier caps and cast in place footings with 24-inch precast concrete piles. The new swing span has a 224-foot span. “Fish belly” main girders were used to resemble the old bridge. The new swing pivot on 2’-6” bronze and steel spherical discs housed in a pivot box. Eccentric wheel end lift assemblies and span locks are located on the rest piers which raise and center the bridge respectively. The project also includes the fender system, bridge tender house and all mechanical and electrical equipment. Included with the bridge replacement will be rehabilitation and repair of bulkhead walls, construction of temporary and permanent Mechanically Stabilized Earth (MSE) walls, construction of critical temporary sheet pile walls required for phased construction, and a total of 0.24 miles of roadway construction. Mr. Nappi is responsible for all construction and administrative aspects of the swing span which include review of contract documents and shop drawings, coordinating field inspection of structural, mechanical and electrical components, assisting in preparation of progress pay estimates, updating shop drawing submittal logs, final as-builts, computation books and pay item overruns/underruns, and reviewing daily reports of construction. GIBA Reference: Kathy Verrico, Executive Director; (941) 697-2271, ext. 2 Project Engineer/Office Engineer, CR 78 (Pine Island Road) Matlacha Bascule Bridge Replacement, Lee County DOT, Florida (5/12-11/13): This 675-foot-long, $17.3M bascule bridge replacement project includes reconfiguration of the roadway approaches, new bulkhead seawalls, and storm drainage collection and treatment system. Project consisted of constructing a new single-leaf bascule bridge with multiple maintenance of traffic phases while maintaining traffic on the existing adjacent bascule bridge. The new bridge is constructed of pre-cast prestressed pile foundations, micro-silica mass reinforced concrete substructure, pre-cast prestressed transversely post-tensioned superstructure deck slabs with a 5.5-inch reinforced concrete topping. The movable portion of the bridge consists of an 87.5-foot-long fracture critical steel plate main girder span rotated on trunnion bearings by twin hydraulic cylinders, each connected to the bottom plate of the span’s trunnion girders. The movable bridge deck consists of both open and filled sections using lightweight concrete, along with steel traffic railings with above deck span locks. Responsibilities include preparing agendas for progress meetings and recording minutes, preparing CPPR, holiday and weather letters, reviewing and approving estimates, tracking claims, shop drawing submittal logs, concrete lots, and pay item overruns/underruns, updating final as-builts and computation book, and reviewing daily reports of construction. Lee County DOT Reference: Sarah Clarke, Project Manager; (239) 533-8718 FDOT Project Manager, FDOT District One, Fort Myers Operations Center, Florida (4/09-3/12): As Project Manager for the FDOT District One Fort Myers Operations Center, assigned to numerous contracts where his duties included but were not limited to: reviewing claims and providing recommendations on entitlement, reviewing supplemental agreements/work orders to ensure accuracy and conformance with Department procedures, providing interpretations of contract documents, attending weekly progress meetings, holding additional meetings as required to mitigate delays and overseeing Consultant teams assigned to projects in Charlotte, Lee and Collier Counties. The projects have ranged in complexity from intersection improvements to new bridge construction. Areas of Expertise Construction Engineering and Inspection Education BS/2005/Engineering; Minor-Structural Engineering and Mathematics/Roger Williams University, Rhode Island Registration 2010/Professional Engineer/ Florida #72412 Certification TIN #: N10079383 CTQP 5-16/Drilled Shaft Inspection 9-17/Final Estimates, Level 1 9-17/Final Estimates, Level 2 No Expiration/QC Manager OTHER 7-16/FDOT MOT Work Zone Advanced 1-13/Critical Structures Construction Issues SSC Nuclear Density Gauge Safety Training FDEP/Stormwater Management Inspector (SWPPP) #17903 Years of Experience With AECOM: 3.5 Years With Other Firms: 6.5 Years Steven M. Nappi, PE - 2 As the Project Manager, in responsible charge of the projects he was assigned and was tasked with delivering construction projects within the District’s cost and time measures. His successful track record is a testament to his knowledge of both construction methods and Department procedures. FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, I-75 at Alley Recreational Access, Collier County, FDOT District One, Florida (9/11-1/13): Involved the construction of a recreational area complete with a parking facility and a boat ramp at MM 49.0. Extensive embankment was required to fill in existing ponds. [FPID: 200741-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, SR 29 from North of 9th Street to North of 29A, Collier County, Florida (8/11-2/12): Milled and resurfaced SR 29 and SR 29A. During construction, the FDOT discovered that a widening project within the limits of this construction was slated to be let within a year of completion of our project. We were able to incorporate the scope of the widening job into our project via a supplemental agreement while still meeting the Department’s cost and time measures. This project also required the installation of strain poles, pedestrian signals, drainage structures and sidewalks. [FPID: 425215-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, SR 45 (US 41) from San Carlos Boulevard to Corkscrew Road Widening, Lee County, Florida (1/11-3/12): This $14.0M project widened the last 3.4 miles of US 41 in the area from four lanes to six. In order to accomplish this, the existing bridge spanning the Estero River needed to be widened and significant utility relocations were performed both prior to and during construction. Drainage was placed under numerous MOT phases and mast arms were installed. [FPID: 195765-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, US 41 Wildlife Crossing - Roadside Animal Detection System (RADS), Collier and Charlotte Counties, Florida (1/11-01/12): The first project of its type in the state of Florida which utilizes break of beam technology to detect animals crossing the roadway and flashing signs to warn motorists. [FPID: 195338-2-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, SR 951 Jolley Bridge, Collier County, Florida (9/09-9/11): This $25.0M design-build project required the construction of a new 1,600-foot bridge spanning Big Marco Pass which would carry southbound traffic onto Marco Island. The new bridge dwarfed its two-lane predecessor by incorporating two 12-foot travel lanes, six- and ten-foot shoulders and an eight-foot sidewalk. The contractor utilized two (non-redundant) drilled shafts as foundations for the bridge and the superstructure consisted of Florida I-beams and stay-in-place metal decking with an 8.5-inch reinforced concrete deck. The project also included the widening of a two lane facility to four lanes, construction of ponds to handle the added volume of waste water, utility relocations, the construction of a fender system which tied into the existing, demolition of fishing piers and MSE walls. [FPID: 195410-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, Cape Haze Drive Bridge Replacement, Charlotte County, Florida (11/09-5/10): This project called for the demolition of an existing two-lane bridge and replacing with a three sided precast structure complete with shoulders and sidewalks. [FPID: 426725-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, CR 901 Cocohatchee River Bridge at Vanderbilt Drive, Collier County, Florida (4/09-11/10): This project required the demolition of the existing bridge spanning the Cocohatchee River and replacing it with a new bridge utilizing pile foundations and precast post tensioned concrete slabs. MSE walls, drainage and roadway approaches were also required under the contract. [FPID: 408440-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Manager, SR 84 from Heritage Trail to County Side Drive/Falling Water Blvd., Collier County, Florida (10/09- 2/10): Milled and resurfaced SR 84 placing FC 5 on the mainline and SP 12.5 on turn lanes. [FPID: 422400-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 FDOT Project Administrator, FDOT District One, Fort Myers Operations Center, Florida (10/07-4/09): Mr. Nappi held the position of Project Administrator for the FDOT District One Fort Myers Operations Center. He was assigned to two contracts where his duties included but were not limited to: performing pre-bid plan reviews to ensure constructability and conformance with applicable design criteria and offering suggestions to resolve issues, reviewing/accepting original and subsequent updates to CPM schedules and ensuring Contractor adhered to them, issuing appropriate work orders or supplemental agreements to correct plan deficiencies, unforeseen field condition or settle claims, reviewing/approving monthly progress payments and processing estimates and performing project closeout functions including final acceptance. FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 134215 Qualifications Search Qualifications TRAINEE MATERIAL GROUP QUALIFICATION EXPIRATION DATE N10079383 Geotech Drilled Shaft Inspection 5/18/2016 N10079383 Management Final Estimates - Level 1 9/27/2017 N10079383 Management Final Estimates - Level 2 9/27/2017 N10079383 Management QC Manager Does Not Expire Back Steve Nappi, PE - N10079383 Michele Rastelli Administrative Assistant Ms. Rastelli has five years of experience working in office administration, customer service and marketing. She possesses exceptional organizational skills and is detail-oriented. Ms. Rastelli is proficient in Microsoft Word, Excel, PowerPoint, and Adobe Acrobat. Administrative Assistant, Honore Avenue/Pinebrook Road Extension, Phase VII, Sarasota County, Florida (10/15-Present): Providing administrative support on this $11.1M new roadway project. The CEI project consists of 2.61 miles of new two-lane divided roadway construction from Laurel Road to SR 681 and 1.12 miles of friction course on an existing roadway build as part of Phase VI in Sarasota County. The construction also includes a new bridge over Fox Creek, milling and resurfacing, pond construction, stormwater infrastructure, new signalization, signing and pavement markings, landscaping, lighting, guardrail, sidewalks, and utility coordination. Sarasota County Reference: Robbin Levar, Project Manager; (941) 650-9815 Administrative Assistant, SR 93/I-75 Widening from Sumter Boulevard to River Road, FDOT District One, Sarasota County, Florida (10/15-Present): Providing administrative support on this $35.6M interstate widening project. The project includes roadway widening from four to six lanes, milling and resurfacing, cross slope correction, bridge widening to eight lanes, median and linear pond construction with associated drainage, box culvert extensions, ITS adjustments, lighting, cable barrier and guardrail, signing and pavement markings, and utility coordination. [FPID: 413044-4-52-01 (Federal Funds)] FDOT Reference: Marléna Gore, Project Manager; (863) 272-5008 Prior Experience Sales, Installation & Billing Support, Tri-County Air Conditioning & Heating, Inc., Sarasota, Florida (5/13-10/15): Responsible for providing customer service, identifying opportunities to streamline job processes from initial sales call through project completion and billing, and coordinating cross functional teams. In addition, responsible for maintaining active business licenses and registrations with multiple municipalities. District Marketing Coordinator, H&R Block, Sarasota, Florida (10/10-4/13): Responsible for assisting Office Managers in the formulation and implementation of office-level local marketing plans. Developed promotional materials based on company standards and identified and prioritized potential marketing opportunities. In addition, served as a company representative at community events in the area. Areas of Expertise Construction Administration Education Bachelor of Science/2010/Marketing/ Central Connecticut State University Years of Experience With AECOM: <1 Year With Other Firms: 5 Years Julio Castro Senior Inspector Mr. Castro has served as a roadway inspector with 10 years of experience performing field inspections, asphalt placement, and soil and concrete testing and sampling. He assisted with other inspector duties, including sub-grade and base densities, Site Manager Data entry, daily construction activities observations, material testing, and providing complete documentation for soil and concrete sampling on highway construction within the project. Inspector, I-75 from north of SR 951 to north of Golden Gate Parkway, FDOT District One, Naples, Florida (10/15-Present): Provided inspection services for this I-75 widening project that includes adding lanes, milling and resurfacing, bridge reconstruction, signing and pavement markings, drainage improvements, and noise wall construction. Responsibilities include: monitoring and inspection of asphalt paving operations, sampling, testing and acceptance of earthwork operations, and entering activities in Site Manager. [FPID: 406313-4-52-01] FDOT Reference: Marlena Gore, Interstate Project Manager; (863) 272-5008 Inspector, SR 739 from Winkler Avenue to Hanson Street, FDOT District One, Ft. Myers, Florida (3/13-10/15): Provided inspection services for this $22M corridor improvement project that includes milling and resurfacing, reconstruction and new construction, as well as coordination with Seminole Gulf Railway. Responsible for coordination of quality control (QC), verification sample and testing in accordance with FDOT specifications and design standards, scheduling CEI personnel, coordination of requests for information (RFI) responses and plan revisions due to a cost-saving initiative with the contractor, LIMS sample entry, utility coordination between contractor and utility owners and daily operations with road and bridge construction. Responsible for tracking and documenting claims. [FPID: 195718-2-52-01] FDOT Reference: Dennis Day; (239) 985-7870 Quality Control Inspector, SR 80 (from CR 833 to a West of SR 25 (US 27), FDOT District One, Hendry County, Florida (5/12-3/13): Provided quality control (QC) inspection of drainage installation, subsoil removal, embankment placement subgrade and base construction for this $7 project. Monitored QC inspection services for the new bridge along SR 80 and roadway construction on this segment of SR 80. Entered QC samples into LIMS and documented test results into earthwork record system. [FPID: 408286-2-52-01] FDOT Reference: Dennis Day; (239) 985-7870 Quality Control Inspector, SR 80 (from East of Birchwood Parkway to West of Dalton Lane), FDOT District One, Hendry County, Florida (5/12-3/13): Provided quality control (QC) inspection of drainage installation, subsoil removal, embankment placement subgrade and base construction for this $15M project. Monitored QC inspection services for the new bridge along SR 80 and roadway construction on this segment of SR 80. Entered QC samples into LIMS and documented test results into earthwork record system. [FPID: 408286-3-52-01] FDOT Reference: Dennis Day; (239) 985-7870 Asphalt Plant Inspector, Various Projects, Florida (2009-2013): Provided asphalt plant inspections for a number of projects in Florida including: FAA projects at Marco Island and Naples Municipal airports; US 41 and Krome Avenue in Miami for the U.S. Army Corps of Engineers; and the I-75/Colonial Boulevard Intersection for Johnson Engineering. Quality Control, AMEC Engineering and Consulting, Naples, Florida (2006-2009): Conducted inspections, lab and field testing for soil, asphalt and concrete. Entered data for soil and concrete testing on CMT program. Reviewed blueprint and applied preliminary commercial roofing inspection knowledge. Completed several project inspections of auger cast pile installation. Asphalt plant inspection for Florida Turnpike Miami and 951 (Collier Boulevard) Naples. Areas of Expertise Construction Engineering and Inspection Education National School of Art (Cuba)/1987 Music Certification TIN #: C23642169 CTQP 5-16/Asphalt Paving Technician, Level 1 6-16/Asphalt Paving Technician, Level 2 4-18/Concrete Field Inspector, Level 1 10-20/Earthwork Construction Inspection, Level 1 4-17/Earthwork Construction Inspection, Level 2 4-20/Drilled Shaft Inspection 4-20/Final Estimates, Level 1 OTHER ACI Concrete Field Testing Technician Grade 1 6-18/IMSA Traffic Signal Level I FDOT Intermediate MOT IMSA Traffic Signals Level 1 Nuclear Radiation Safety Critical Structures Construction Issues Years of Experience With AECOM: <1 Year With Other Firms: 10 Years Julio Castro - 2 Quality Control Inspector, National Concrete, Grand Cayman, Cayman Islands (1998-2004): Responsible for entering data in the Concrete Command 1 System. Assisted with inventory, concrete field and lab tests, concrete inspection and estimates. Trained and supervised more than 25 staff members. 134215 Qualifications Search Qualifications TRAINEE MATERIAL GROUP QUALIFICATION EXPIRATION DATE C23642169 Asphalt Asphalt Paving Technician - Level 1 5/10/2016 C23642169 Asphalt Asphalt Paving Technician - Level 2 6/15/2016 C23642169 Concrete Concrete Field Technician - Level 1 4/27/2018 C23642169 Earthwork Earthwork Construction Inspection - Level 1 10/9/2020 C23642169 Earthwork Earthwork Construction Inspection - Level 2 4/27/2017 C23642169 Geotech Drilled Shaft Inspection 4/8/2020 C23642169 Management Final Estimates - Level 1 4/30/2020 Back Julio Castro - C23642169 Mark Smalley Senior Inspector Mr. Smalley has over 30 years of construction experience including more than 8 years of road and bridge construction inspection, and 10 years of threshold inspection experience. Prior to entering the inspection field, he worked as a superintendent on high-rise projects, monitoring concrete, steel, electrical and plumbing installation for buildings up to 42 stories. Senior Inspector, FDOT Fort Myers Operations Continuing Services Inspection Contract C9A69, Fort Myers, Florida (12/15-Present): Services provided under this contract as a subconsultant to Jacobs consisted of inspection of various roadway and structures components for various construction projects administered by Fort Myers Operations. FDOT Reference: Juan Carrillo, EI; (239) 985-7884 Senior Inspector, Honore Avenue/Pinebrook Road Extension Phase VII, Sarasota County, Florida (5/14-12/15): This is an $11.5M construction project consisting of over 3.5 miles of new two-lane divided roadway between Laurel Road and SR 681. The project included a five-span, 413 LF bridge over Fox Creek utilizing AASHTO Type III beams, over 4,000 LF of 18-inch and 24-inch prestressed concrete pile, over 250,000 pounds of reinforcing steel and just under 1,000 CY of structural concrete. The project also included MOT, erosion control, earthwork with two pond liners, over 16,000 LF of storm drainage, subgrade, base, asphalt, curb & gutter, landscaping, signing, pavement markings and two new signalized intersections at SR 681 and Laurel Road. County Project Manager: Robbin Levar; (941) 650-9815 Senior Inspector, SR 93/I-75 Freeway Management System, FDOT District One, Sarasota and Manatee Counties, Florida (3/14-5/14): Services provided under this contract as a subconsultant to Allied Engineering consisted of inspection of the installation of ITS components, such as transformer and disconnect boxes. Also inspection of grounding and conduit on I-75 from MM 172 to MM 227 in both the northbound and southbound directions. [FPIDs: 414730-1-52-01 and 414732-1-52-01] FDOT Reference: Jim Nichols, Project Manager; (941) 465-0633 Senior Inspector, SR 93/I-75 Widening from Sumter Boulevard to River Road, FDOT District One, Sarasota County, Florida (1/14-3/14): The improvements under this Contract consisted of milling and resurfacing, widening, drainage improvements, lighting, signing and pavement marking and bridge widening at the Deer Prairie Creek Bridge. [FPID: 413044-4-52-01] FDOT Reference: Marléna Gore, Project Manager; (863) 272-5008 Senior Inspector, Ponce De Leon Emergency Bridge Repair, FDOT District One, Sarasota County (12/13-1/14): The Ponce De Leon Bridge over I-75 was damaged in a traffic accident on 12/18/13. The FDOT assigned URS to administer and inspect the emergency repairs needed for this bridge. Provided inspection and testing duties for this work. [FPID: N/A] FDOT Reference: Bill Jones, PE, Assistant DCE; (863) 519-2224 Senior Inspector, New Interchange US 27/SR 80 Interchange, FDOT District One, Hendry County, Florida (9/13-12/13): The $18M improvements under this Contract consisted of new construction, reconstruction, milling and resurfacing, widening, drainage improvements, lighting, signing and pavement marking and signalization and new bridge construction on SR 80 over US 27. [FPID: 408286-7-52-01] FDOT Project Manager: Dennis Day (239) 985-7800 Sr. Bridge Inspector, SR 739 (Metro Parkway Extension) from Six Mile Cypress to US 41, FDOT District One, Lee County, Florida (10/11-2/13): As a subconsultant to AIM Engineering, provided inspection of concrete reinforcing for pier foundations, pier columns, interior and end bent caps, bridge deck slab reinforcing, logging bridge deck reinforcing coverage, recording Bidwell dry run data, tendon profiling/stressing, gravity walls and tendon profiling/stressing, as well as all scaffolding connections and form work, wick Areas of Expertise Construction Engineering and Inspection Building Inspection Education Graduate/1978/Oil City Senior High School Registrations 01-2008/Standard Inspector/ Florida #BN6051 (Ch.468 FS) ICC Building Inspector (Residential & Commercial) Certifications TIN #: S54055260 CTQP 11-18 /Asphalt Paving Tech, Level 1 11-18/ Asphalt Paving Tech, Level 2 9-17/Concrete Field Technician, Level 1 4-17/Concrete Field Technician, Level 2 5-17/Earthwork Construction Inspection, Level 1 10-18 /Earthwork Construction Inspection, Level 2 7-18/Drilled Shaft Inspector 10-18/Pile Driving Inspection 5-19/Final Estimates, Level 1 No Expiration Date/QC Manager OTHER 11-17/ACI Concrete Field Technician, Level 1 4-17/ACI Concrete Transportation Construction Inspector 9-16/FDOT MOT Intermediate FDEP Stormwater Management Inspector # 20333 CPN Nuclear Gauge/Hazmat Certification Critical Structures Construction Issues Course Years of Experience With AECOM: 2 Years With Other Firms: 28 Years Mark Smalley - 2 drainage system installation, various pipe and MES installation, recording and totaling truck volumes, erosion control inspection, MOT inspection and EEO interviews and forms. [FPID: 195719-1-52-01] FDOT Reference: Dennis Day, Project Manager; (239) 985-7800 Sr. Inspector, District Wide CEI Support C Contract, FDOT District One, Florida (7/11-10/11): Provided inspection services for improvements under this design/build contract consisting of sidewalks at the Desoto County Middle School. [FPID: 429237-1-52- 01] FDOT Reference: Susan Hindman, Project Manager; (863) 386-6112 Inspector, Oil Well Road Widening, Collier County, Florida (5/11-7/11): Duties included soil sampling and testing, density testing on soil surrounding structures, HDPE and PVC pipe installation, and logging test results. Reference: Cal Santarelli; (239) 334-3878 Inspector, SR 739 (Metro Parkway Extension) from Six Mile Cypress to US 41, FDOT District One, Lee County, Florida (4/11-5/11): Provided inspection and density testing on embankment, sub-grade and base for this extension project. [FPID: 195719-1-52- 01] FDOT Reference: Dennis Day, Project Manager; (239) 985-7800 Building Inspector, Devane Park, FDOT District One, Highlands County, Florida (1/11-4/11): Provided inspection of structural steel connections, wooden truss installation and roofing (Gazebo) while applying applicable Florida Building Codes. [FPID: 409096-1- 52-01] FDOT Reference: Susan Hindman, Project Manager, Sebring Ops Center; (863) 386-6112 Bridge Inspector, SR 739 (Metro Parkway Extension) from Six Mile Cypress to US 41, FDOT District One, Lee County, Florida (9/10-1/11): Provided inspection services as a subconsultant to AIM Engineering for the Metro Parkway Extension project. Responsibilities included inspection of Wick drainage system installation, various pipe and MES installation, inspection of reinforcing and formwork for pier columns and foundations, recording and totaling truck volumes, erosion control inspection, MOT inspection and EEO interviews and forms. [FPID: 195719-1-52-01] FDOT Reference: Dennis Day, Project Manager; (239) 985-7800 ITS Inspector, I-75 Design-Build from Lee County Line to Sarasota County Line, FDOT District One, Charlotte County, Florida (7/10-9/10): Served as an ITS Inspector on this Charlotte County Freeway Management System (FMS) project. Project responsibilities included drawing review, drilled shaft inspection, providing structural inspections of all connections of DMS sign cantilevered mast arms and uprights. Also involved in the inspection of the installation of new fiber optics, controller cabinets, cameras and the Vehicle Detection System. [FPID: 414738-1-62-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985- 7800 Senior Signal Inspector, SR 78 at Andalusia and Cultural Park Boulevard CEI Services, FDOT District One, Lee County, Florida (5/10-7/10): Provided signal installation inspection services as a subconsultant to WilsonMiller. [FPID: 425136-1-62-01] FDOT Reference: Josephine Mak, Project Manager; (239) 985-7800 ITS Inspector, I-75 Design-Build from the Lee County Line to the Sarasota County Line, FDOT District One, Charlotte County, Florida (3/10-5/10): Served as an ITS Inspector on this Charlotte County FMS project. Project responsibilities included drawing review, drilled shaft inspection, providing structural inspections of all connections of DMS sign cantilevered mast arms and uprights. This project also involved installing new fiber optics, controller cabinets, cameras and the Vehicle Detection System. [FPID: 414738- 1-62-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 Building Inspector, Historical Train Station, FDOT District One, Wauchula, Hardee County, Florida (10/09-3/10): Responsible for inspecting the renovations to the interior and exterior of the Historical Wauchula train station. [FPID: 414526-1-62-01] FDOT Reference: Susan Hindman, Project Manager, Sebring Ops Center; (863) 386-6112 Inspector, Mast Arms (Various Locations), FDOT District One, Collier County and City of Naples, Florida (3/09-8/09): Under the Jacobs Engineering Group GEC Services Contract, assigned to the Collier County/City of Naples Mast Arm Inspection task order for mast arm removal, replacement, and wiring. Responsibilities included preconstruction condition surveys, inspections of mast arm splicing, verifying bolted connections, signal head mounting, dimensional inspections for plates and wall thicknesses of components, overseeing various stages of burn in periods, keeping a photo journal of each step of each process throughout construction as well as verifying MOT to be as required. This project included replacement and/or removal of approximately 81 different signal uprights and/or mast arms. [FPID: 409988-2-62-01] FDOT Reference: Steve Nappi, Project Manager (formerly with Ft. Myers Ops); (239) 229-5853 134215 Qualifications Search Qualifications TRAINEE MATERIAL GROUP QUALIFICATION EXPIRATION DATE S54055260 Asphalt Asphalt Paving Technician - Level 1 11/18/2018 S54055260 Asphalt Asphalt Paving Technician - Level 2 11/21/2018 S54055260 Concrete Concrete Field Technician - Level 1 9/26/2017 S54055260 Concrete Concrete Field Technician - Level 2 4/14/2017 S54055260 Earthwork Earthwork Construction Inspection - Level 1 5/16/2017 S54055260 Earthwork Earthwork Construction Inspection - Level 2 10/31/2018 S54055260 Geotech Drilled Shaft Inspection 7/20/2018 S54055260 Geotech Pile Driving Inspection 10/24/2018 S54055260 Management Final Estimates - Level 1 5/20/2019 S54055260 Management QC Manager Does Not Expire Back Mark Smalley - S54055260 Joe Monahan Inspector Mr. Monahan has over 11 years of experience in construction engineering and inspection for the FDOT and municipal road and bridge construction projects. Typical project experience is provided below: Inspector, SR 93/I-75 Widening from Sumter Boulevard to River Road, FDOT District One, Sarasota County, Florida (1/15-Present): Providing construction engineering and inspection services on this $35.6M interstate widening project. The project includes roadway widening from four to six lanes, milling and resurfacing, cross slope correction, bridge widening to eight lanes, median and linear pond construction with associated drainage, box culvert extensions, ITS adjustments, lighting, cable barrier and guardrail, signing and pavement markings, and utility coordination. [FPID: 413044-4-52-01; T1455] FDOT Reference: Marléna Gore, Project Manager; (863) 272-5008 Inspector, CEI Services for Sarasota Continuing Services, FDOT District One, Sarasota County, Florida (3/14-5/14): Provided inspection services on SR 758 (Bee Ridge Road) from West Cattlemen Road to East of Philippe Creek. This project consisted of 0.7 miles of milling and resurfacing. [FPID: 429119-1-52-01] FDOT Reference: Marléna Gore, Project Administrator; (863) 272-5008 Inspector, CEI Services for Specific Projects Managed by Tampa and Brooksville Construction Offices, FDOT District Seven, Hillsborough County, Florida (6/13-3/14): Provided inspection services for the resurfacing of US 92 (SR 600/Dale Mabry) from Kennedy Blvd. to Hillsborough Avenue ramps and on US/USB 301 (SR 35/700) from north of Pioneer Museum Road to south of Mosstown Road in Hillsborough County. Duties included inspection of all roadway items such as underground utilities, storm sewers, grading, embankment, stabilization, base and surface course, inlets, manholes, box culverts, and any other related items to road work, milling and resurfacing asphaltic concrete. In addition, developed job reports of work performed, and kept and recorded quantities. [FPIDs: 427145-1-62-01/427165-1-62-01] FDOT Reference: Thomas A. Curley, Jr., PA; (813) 612-3300 Inspector, District Wide CEI Support Contract C, FDOT District One, Florida (12/12- 4/13): Provided inspection services under RK&K’s contract on I-75 (SR 93) from Collier County Line to Bonita Beach Road in Collier County. Project consisted of MOT, auger cast piling, drilled shaft and sound wall construction. [FPID: 431776-1-52-01] FDOT Reference: Gerald Byrne, PE, Construction Engineer; (239) 985-7800 Inspector, District Wide CEI Support, FDOT District One, Florida (7/12-9/12): Provided inspection services on SR 684 (Cortez Rd.) from 51st St. W. to 26th St. W. in Bradenton. Project consisted of replacing three cross drains [FPID: 431005-1-52-01] FDOT Reference: Carl Harman, Sarasota Operations; (941) 359-7366 Inspector, US 27 CEI Hybrid Contract, FDOT District One, Polk County, Florida (5/12): Served as an inspector under Metric Engineering on the US 27 at US 17/92 Interchange Ramps in Polk County. His duties included concrete inspection for drilled shaft installations. [FPID: 424815-1-52-01] FDOT Reference: Kirby Radford, PA Bartow Operations; (863) 519-4107 Inspector, Runway 9R-27L Runway Expansion-Phase I, Ft. Lauderdale International Airport, Ft. Lauderdale, Florida (2/12-4/12): Provided QC Management and Inspection services under Tutor Perini Corp. for the $175M runway expansion. Phase I services included CQC services, performing in-place density testing of new underground utilities, tree removal and relocation inspection, NPDES monitoring, earthwork and concrete inspection. Project consisted of expanding and elevating Runway 9R/27L to an overall length of 8,000 feet and width of 150 feet with an Engineered Materials Arresting System (EMAS) at both runway ends. Also constructed a new full-length parallel taxiway 75 feet wide on the north side of the runway. Tutor Perini Reference: Mike Hernandez; (954) 964-6027 Areas of Expertise Construction Inspection and Engineering Education Graduate/1978/High School Certification TIN#: M55049660 CTQP 2-20/Asphalt Paving Technician, Level 1 12-18/Concrete Field Technician, Level 1 12-19/Earthwork Construction Inspection, Level 1 9-17/Earthwork Construction Inspection, Level 2 7-19/Final Estimates, Level 1 OTHER 7-19/ACI Concrete Field Technician, Grade I 2-19/FDOT Intermediate MOT Critical Structures Construction Issues Course 7-16/IMSA Traffic Signal Technician, Level 1 MSE Wall Inspector 5-16/Radiation Safety and Use of Nuclear Gauge/HAZMAT Qualified Stormwater Erosion and Sedimentation Control Inspector Basic Florida Soils Training Augercast Pile Course FDOT CPPR Training Years of Experience With AECOM: <1 Year With Other Firms: 11 Years Joe Monahan - 2 Sr. Inspector, Santa Barbara Widening-Phase I, Lee County, City of Cape Coral, Florida (12/09-6/11): Assigned as the Sr. Inspector to Balfour Beatty Construction Group for this widening project. Project included widening 2.8 miles of a four-lane road to a six-lane road. The improved roadway also had three 12-foot travel lanes in each direction, six-foot sidewalks, median, new signals, street lighting and landscaping. An enclosed curb and gutter storm sewer system replaced the existing open swale ditch drainage system. Some of his responsibilities consisted of inspection and compaction testing for all new utilities, roadway inspection, drill shaft inspection, maintain the earthwork records system, milling & resurfacing, paving inspection, widening, drainage improvement and pipe lining of existing storm drain system. Allied Reference: Dean Greathouse; (239) 334-6833 (AET #38-0143) QC Inspector, I-75 Design-Build, FDOT District One, FDOT Interstate Residency, Lee and Collier Counties, Florida (6/08-12/09): This ACCI/API Joint Venture project included widening of 30 miles (from Collier County to Colonial Boulevard in Lee County) of I-75. Served as Inspector for the construction of more than 3.5 miles of pre-cast concrete panel and auger cast pile foundation noise wall, utilities inspection and in-place density test, roadway reconstruction, concrete testing for over 25 bridge widenings and NPDES monitoring. [FPID: 420655-1-52-01] FDOT Reference: Crystal Gorman, PE (now with AECOM (formerly FDOT), (239) 634- 2318 Inspector, Sanibel Bridge #A, B & C, Lee County, Florida (5/04-6/08): Performed inspection services on the Sanibel Bridge including pile driving, earthwork densities, compliance with NDEPS, drainage improvements, concrete testing and daily monitoring and weekly reports. Reference: Cal Santarelli (formerly with Allied); (239) 334-3878 Engineering Technician, Allied’s Construction Materials Testing Department, Florida (11/03-5/04): Duties consisted of nuclear density testing and compressive strength testing. Reference: Cal Santarelli (formerly with Allied); (239) 334-3878 134215 Qualifications Search Qualifications TRAINEE MATERIAL GROUP QUALIFICATION EXPIRATION DATE M55049660 Asphalt Asphalt Paving Technician - Level 1 2/24/2020 M55049660 Concrete Concrete Field Technician - Level 1 12/11/2018 M55049660 Earthwork Earthwork Construction Inspection - Level 1 12/5/2019 M55049660 Earthwork Earthwork Construction Inspection - Level 2 9/27/2017 M55049660 Management Final Estimates - Level 1 7/9/2019 Back Joe Monahan - M55049660 Tab IV Performance of the Consultant IV Tab IV – Performance ofthe Consultant AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 IV-1 i. Identify the number of FDOT Certified staff presently employed by the firm.73 ii. Identify the number of successfully performed [completed or active] CEI and related services projects performed by the Consultant that included all three (3) Rule Chapter 14-75 types of work during the last five (5) years: a. 10.1 – Roadway CEI b. 10.3 – Construction Materials Inspection, and c. 10.4 – Minor Bridge and Miscellaneous Structures CEI 13 iii. Identify the number of projects with alternate combinations of work types; all projects must include “10.4 – Minor Bridge and Miscellaneous Structures CEI” as a minimum during the last five (5) years. 13 TOTAL (Add lines 1 – 3 and enter total)99 (Add lines 1 – 3) IV Performance of the Consultant Tab V References V Tab V– References RFP_CCNA_Template_RevisedJune2009 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: AECOM (Name of Company Requesting Reference Information) Steve Nappi (Name of Individuals Requesting Reference Information) Name:Kathy Banson-Verrico (Evaluator completing reference questionnaire) Company:Gasparilla Island Bridge Authority (Evaluator’s Company completing reference) Email: kathygiba@earthlink.net FAX: (941) 697-5629 Telephone: (941) 697-2271 ext. 2 Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: Gasparilla Island Swing Span Completion Date: Spring 2016 Project Budget: $18,718,505.72 Project Number of Days: 964 Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 10 2 Ability to maintain project schedule (complete on -time or early). 10 3 Quality of work. 10 4 Quality of consultative advice provided on the project. 10 5 Professionalism and ability to manage personnel. 10 6 Project administration (completed documents, final invoice, f inal product turnover; invoices; manuals or going forward documentation, etc.) 10 7 Ability to verbally communicate and document information clearly and succinctly. 10 8 Abiltity to manage risks and unexpected project circumstances. 10 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 10 Overall comfort level with hiring the company in the future (customer satisfaction). 10 TOTAL SCORE OF ALL ITEMS 100 Please FAX this completed survey to: steve.nappi@aecom.com By 4/1/2016 RFP_CCNA_Template_RevisedJune2009 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: AECOM (Name of Company Requesting Reference Information) Steve Nappi (Name of Individuals Requesting Reference Information) Name:Sarah Clarke (Evaluator com pleting reference questionnaire) Company:Lee County (Evaluator’s Company completing reference) Email: sclarke@leegov.com FAX: N/A Telephone: (239) 533-8718 Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: Matlacha Bridge Completion Date: November 2013 Project Budget: $17,806,520.45 (original) Project Number of Days: 1070 Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 10 2 Ability to maintain project schedule (complete on-time or early). 10 3 Quality of work. 10 4 Quality of consultative advice provided on the project. 10 5 Professionalism and ability to manage personnel. 10 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 10 7 Ability to verbally communicate and document information clearly and succinctly. 10 8 Abiltity to manage risks and unexpected project circumstances. 10 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 10 Overall comfort level with hiring the company in the future (customer satisfaction). 10 TOTAL SCORE OF ALL ITEMS 100 Please FAX this completed survey to: steve.nappi@aecom.com By 4/1/2016 RFP_CCNA_Template_RevisedJune2009 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: AECOM (DBA URS) (Name of Company Requesting Reference Information) Crystal Gorman (Name of Individuals Requesting Reference Information) Name:Hal Bruce (Evaluator com pleting reference questionnaire) Company:City of Treasure Island (Evaluator’s Company completing reference) Email: hbruce@mytreasureisland.org FAX: (727) 547-4582 Telephone: (727) 547-4575 ext.257 Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: Treasure Island Palms and Capris Bridge Replacements CEI Completion Date: December 2013 Project Budget: $400K (fee) $3.5M (Const Cost) Project Number of Days: 298 Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 10 2 Ability to maintain project schedule (complete on-time or early). 10 3 Quality of work. 10 4 Quality of consultative advice provided on the project. 10 5 Professionalism and ability to manage personnel. 10 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 10 7 Ability to verbally communicate and document information clearly and succinctly. 10 8 Abiltity to manage risks and unexpected project circumstances. 10 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 10 Overall comfort level with hiring the company in the future (customer satisfaction). 10 TOTAL SCORE OF ALL ITEMS 100 Please FAX this completed survey to: steve.nappi@aecom.com By 4/1/2016 RFP_CCNA_Template_RevisedJune2009 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: AECOM (Name of Company Requesting Reference Information) Steve Nappi (Name of Individuals Requesting Reference Information) Name:Ben Newman, P.E. (Evaluator completing reference questionnaire) Company:City of North Port (Evaluator’s Company completing reference) Email: bnewman@cityofnorthport.com FAX: N/A Telephone: (941) 240-8320 Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: US 41 Pedetsrian Lighting Completion Date: Spring 2016 Project Budget: $447,228.86 Project Number of Days: 90 Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 10 2 Ability to maintain project schedule (complete on-time or early). 9 3 Quality of work. 10 4 Quality of consultative advice provided on the project. 10 5 Professionalism and ability to manage personnel. 10 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 10 7 Ability to verbally communicate and document information clearly and succinctly. 10 8 Abiltity to manage risks and unexpected project circumstances. 10 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 10 Overall comfort level with hiring the company in the future (customer satisfaction). 10 TOTAL SCORE OF ALL ITEMS Please FAX this completed survey to: steve.nappi@aecom.com By 4/1/2016 99 RFP_CCNA_Template_RevisedJune2009 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Attachment 8: Reference Questionnaire Solicitation: 16-6560 CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Reference Questionnaire for: AECOM (Name of Company Requesting Reference Information) Steve Nappi (Name of Individuals Requesting Reference Information) Name:Tim Hendrix (Evaluator com pleting reference questionnaire) Company:FDOT (Evaluator’s Company completing reference) Email: timothy.hendrix@dot.state.fl.us FAX: N/A Telephone: (850) 330-1250 Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdiual again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored “0.” Project Description: Vanderbilt Drive Cocohatchee Bridge Replacement Completion Date: November 2010 Project Budget: $3,891,346 Project Number of Days: 537 Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 10 2 Ability to maintain project schedule (complete on-time or early). 10 3 Quality of work. 10 4 Quality of consultative advice provided on the project. 10 5 Professionalism and ability to manage personnel. 10 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 10 7 Ability to verbally communicate and document information clearly and succinctly. 10 8 Abiltity to manage risks and unexpected project circumstances. 10 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 10 Overall comfort level with hiring the company in the future (customer satisfaction). 10 TOTAL SCORE OF ALL ITEMS 100 Please FAX this completed survey to: steve.nappi@aecom.com By 4/1/2016 Tab VI Acceptance of Conditions VI Tab VI – Acceptance of Conditions AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VI-1 AECOM Technical Services, Inc. (“ATS”) has reviewed the RFP for CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project (Solicitation #16-6560) as well as the Sample Professional Services Agreement. While ATS is in substantial agreement with the terms included therein, in the event of award, ATS respectfully reserves the right to negotiate final contractual provisions, including but not limited to the indemnity and insurance provisions, in an effort to reach a mutually agreeable contract in line with appropriate industry standards. VI Acceptance of Conditions Tab VII Required Form Submittals VII Tab VII - Required Form Submittals AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-1 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-2 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-3 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-4 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-5 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-6 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-7 Company ID Number: 19959 Client Company ID Number: 411650 Page 1 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify THE E-VERIFY PROGRAM FOR EMPLOYMENT VERIFICATION MEMORANDUM OF UNDERSTANDING FOR EMPLOYERS USING A E-VERIFY EMPLOYER AGENT ARTICLE I PURPOSE AND AUTHORITY This Memorandum of Understanding (MOU) sets forth the points of agreement between the Department of Homeland Security (DHS), AECOM Technology Corporation (Employer), and TALX Corporation (E-Verify Employer Agent) regarding the Employer's and E-Verify Employer Agent’s participation in the Employment Eligibility Verification Program (E-Verify). This MOU explains certain features of the E-Verify program and enumerates specific responsibilities of DHS, the Social Security Administration (SSA), the Employer, and the E-Verify Employer Agent. References to the Employer include the E-Verify Employer Agent when acting on behalf of the Employer. E-Verify is a program that electronically confirms an employee’s eligibility to work in the United States after completion of the Employment Eligibility Verification Form (Form I-9). For covered government contractors, E-Verify is used to verify the employment eligibility of all newly hired employees and all existing employees assigned to Federal contracts or to verify the entire workforce if the contractor so chooses. Authority for the E-Verify program is found in Title IV, Subtitle A, of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA), Pub. L. 104-208, 110 Stat. 3009, as amended (8 U.S.C. § 1324a note). Authority for use of the E-Verify program by Federal contractors and subcontractors covered by the terms of Subpart 22.18, “Employment Eligibility Verification”, of the Federal Acquisition Regulation (FAR) (hereinafter referred to in this MOU as a “Federal contractor with the FAR E-Verify clause”) to verify the employment eligibility of certain employees working on Federal contracts is also found in Subpart 22.18 and in Executive Order 12989, as amended. ARTICLE II FUNCTIONS TO BE PERFORMED A. RESPONSIBILITIES OF SSA 1. SSA agrees to provide the Employer (through the E-Verify Employer Agent) with available information that will allow the Employer to confirm the accuracy of Social Security Numbers provided by all employees verified under this MOU and the employment authorization of U.S. citizens. 2. SSA agrees to provide the Employer and E-Verify Employer Agent appropriate assistance with operational problems that may arise during the Employer's participation in E-Verify. SSA agrees to provide the E-Verify Employer Agent with names, titles, addresses, and telephone numbers of SSA representatives to be contacted during the E-Verify AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-8 Company ID Number: 19959 Client Company ID Number: 411650 Page 2 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify process. 3. SSA agrees to safeguard the information provided by the Employer through the E-Verify program procedures, and to limit access to such information, as is appropriate by law, to individuals responsible for the verification of Social Security Numbers and for evaluation of E-Verify or such other persons or entities who may be authorized by SSA as governed by the Privacy Act (5 U.S.C. § 552a), the Social Security Act (42 U.S.C. 1306(a)), and SSA regulations (20 CFR Part 401). 4. SSA agrees to provide a means of automated verification that is designed (in conjunction with DHS's automated system if necessary) to provide confirmation or tentative nonconfirmation of U.S. citizens’ employment eligibility within 3 Federal Government work days of the initial inquiry. 5. SSA agrees to provide a means of secondary verification (including updating SSA records as may be necessary) for employees who contest SSA tentative nonconfirmations that is designed to provide final confirmation or nonconfirmation of U.S. citizens' employment eligibility and accuracy of SSA records for both citizens and non-citizens within 10 Federal Government work days of the date of referral to SSA, unless SSA determines that more than 10 days may be necessary. In such cases, SSA will provide additional verification instructions. B. RESPONSIBILITIES OF DHS 1. After SSA verifies the accuracy of SSA records for employees through E-Verify, DHS agrees to provide the Employer (through the E-Verify Employer Agent) access to selected data from DHS's database to enable the Employer (through the E-Verify Employer Agent) to conduct, to the extent authorized by this MOU: • Automated verification checks on employees by electronic means, and • Photo verification checks (when available) on employees. 2. DHS agrees to provide to the Employer and E-Verify Employer Agent appropriate assistance with operational problems that may arise during the Employer’s participation in E-Verify. DHS agrees to provide the E-Verify Employer Agent names, titles, addresses, and telephone numbers of DHS representatives to be contacted during the E-Verify process. 3. DHS agrees to make available to the Employer (through the E-Verify Employer Agent), at the E-Verify Web site and on the E-Verify Web browser, instructional materials on E- Verify policies, procedures and requirements for both SSA and DHS, including restrictions on the use of E-Verify. DHS agrees to provide training materials on E-Verify. 4. DHS agrees to provide to the Employer (through the E-Verify Employer Agent) a notice, which indicates the Employer’s participation in the E-Verify program. DHS also agrees to AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-9 Company ID Number: 19959 Client Company ID Number: 411650 Page 3 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify provide to the Employer (through the E-Verify Employer Agent) anti-discrimination notices issued by the Office of Special Counsel for Immigration-Related Unfair Employment Practices (OSC), Civil Rights Division, U.S. Department of Justice. 5. DHS agrees to issue the E-Verify Employer Agent a user identification number and password that will be used exclusively by the E-Verify Employer Agent, on behalf of the Employer, to verify information provided by employees with DHS’s databases. 6. DHS agrees to safeguard the information provided to DHS by the Employer (through the E-Verify Employer Agent), and to limit access to such information to individuals responsible for the verification of employees’ employment eligibility and for evaluation of the E-Verify program, or to such other persons or entities as may be authorized by applicable law. Information will be used only to verify the accuracy of Social Security Numbers and employment eligibility, to enforce the Immigration and Nationality Act (INA) and Federal criminal laws, and to administer Federal contracting requirements. 7. DHS agrees to provide a means of automated verification that is designed (in conjunction with SSA verification procedures) to provide confirmation or tentative nonconfirmation of employees' employment eligibility within 3 Federal Government workdays of the initial inquiry. 8. DHS agrees to provide a means of secondary verification (including updating DHS records as may be necessary) for employees who contest DHS tentative nonconfirmations and photo non-match tentative nonconfirmations that is designed to provide final confirmation or nonconfirmation of the employees' employment eligibility within 10 Federal Government work days of the date of referral to DHS, unless DHS determines that more than 10 days may be necessary. In such cases, DHS will provide additional verification instructions. C. RESPONSIBILITIES OF THE EMPLOYER 1. The Employer agrees to display the notices supplied by DHS (through the E-Verify Employer Agent) in a prominent place that is clearly visible to prospective employees and all employees who are to be verified through the system. 2. The Employer agrees to provide to the SSA and DHS the names, titles, addresses, and telephone numbers of the Employer representatives to be contacted regarding E-Verify. 3. The Employer agrees to become familiar with and comply with the most recent version of the E-Verify User Manual. The Employer will obtain the E-Verify User Manual from the E-Verify Employer Agent. 4. The Employer agrees to comply with current Form I-9 procedures, with two exceptions: !If an employee presents a "List B" identity document, the Employer agrees to only accept "List B" documents that contain a photo. (List B documents identified in 8 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-10 Company ID Number: 19959 Client Company ID Number: 411650 Page 4 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify C.F.R. § 274a.2(b)(1)(B)) can be presented during the Form I-9 process to establish identity.) If an employee objects to the photo requirement for religious reasons, the Employer should contact E-Verify at 1-888-464-4218. !If an employee presents a DHS Form I-551 (Permanent Resident Card) or Form I- 766 (Employment Authorization Document) to complete the Form I-9, the Employer agrees to make a photocopy of the document and to retain the photocopy with the employee’s Form I-9. The photocopy must be of sufficient quality to allow for verification of the photo and written information. The employer will use the photocopy to verify the photo and to assist DHS with its review of photo non-matches that are contested by employees. Note that employees retain the right to present any List A, or List B and List C, documentation to complete the Form I-9. DHS may in the future designate other documents that activate the photo screening tool. 5. The Employer understands that participation in E-Verify does not exempt the Employer from the responsibility to complete, retain, and make available for inspection Forms I-9 that relate to its employees, or from other requirements of applicable regulations or laws, including the obligation to comply with the antidiscrimination requirements of section 274B of the INA with respect to Form I-9 procedures, except for the following modified requirements applicable by reason of the Employer's participation in E-Verify: (1) identity documents must have photos, as described in paragraph 4 above; (2) a rebuttable presumption is established that the Employer has not violated section 274A(a)(1)(A) of the Immigration and Nationality Act (INA) with respect to the hiring of any individual if it obtains confirmation of the identity and employment eligibility of the individual in good faith compliance with the terms and conditions of E-Verify; (3) the Employer must notify DHS if it continues to employ any employee after receiving a final nonconfirmation, and is subject to a civil money penalty between $550 and $1,100 for each failure to notify DHS of continued employment following a final nonconfirmation; (4) the Employer is subject to a rebuttable presumption that it has knowingly employed an unauthorized alien in violation of section 274A(a)(1)(A) if the Employer continues to employ an employee after receiving a final nonconfirmation; and (5) no person or entity participating in E-Verify is civilly or criminally liable under any law for any action taken in good faith based on information provided through the confirmation system. DHS reserves the right to conduct Form I-9 and E-Verify system compliance inspections during the course of E- Verify, as well as to conduct any other enforcement activity authorized by law. 6. The Employer agrees to initiate E-Verify verification procedures (through the E-Verify Employer Agent), for new employees within 3 Employer business days after each employee has been hired (but after both sections 1 and 2 of the Form I-9 have been completed), and to complete as many (but only as many) steps of the E-Verify process as are necessary according to the E-Verify User Manual, or in the case of Federal contractors with the FAR E-Verify clause, the E-Verify User Manual for Federal Contractors. The Employer is prohibited from initiating verification procedures before the employee has been hired and the Form I-9 completed. If the automated system to be queried is temporarily unavailable, the 3-day time period is extended until it is again operational in order to accommodate the Employer's attempting, in good faith, to make AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-11 Company ID Number: 19959 Client Company ID Number: 411650 Page 5 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify inquiries during the period of unavailability. Employers may initiate verification, through the E-Verify Employer Agent, by notating the Form I-9 in circumstances where the employee has applied for a Social Security Number (SSN) from the SSA and is waiting to receive the SSN, provided that the Employer (through the E-Verify Employer Agent) performs an E-Verify employment verification query using the employee’s SSN as soon as the SSN becomes available. 7. The Employer agrees not to use E-Verify procedures for pre-employment screening of job applicants, in support of any unlawful employment practice, or for any other use not authorized by this MOU. Employers must use E-Verify (through its E-Verify Employer Agent) for all new employees, unless an Employer is a Federal contractor that qualifies for the exceptions described in Article II.D.1.c. Except as provided in Article II.D, the Employer will not verify selectively and will not verify employees hired before the effective date of this MOU. The Employer understands that if the Employer uses the E- Verify system for any purpose other than as authorized by this MOU, the Employer may be subject to appropriate legal action and termination of its access to SSA and DHS information pursuant to this MOU. 8. The Employer (through its E-Verify Employer Agent) agrees to follow appropriate procedures (see Article III. below) regarding tentative nonconfirmations, including notifying employees in private of the finding and providing them written notice of the findings, providing written referral instructions to employees, allowing employees to contest the finding, and not taking adverse action against employees if they choose to contest the finding. Further, when employees contest a tentative nonconfirmation based upon a photo non-match, the Employer is required to take affirmative steps (see Article III.B. below) to contact DHS with information necessary to resolve the challenge. 9. The Employer agrees not to take any adverse action against an employee based upon the employee's perceived employment eligibility status while SSA or DHS is processing the verification request unless the Employer obtains knowledge (as defined in 8 C.F.R. § 274a.1(l)) that the employee is not work authorized. The Employer understands that an initial inability of the SSA or DHS automated verification system to verify work authorization, a tentative nonconfirmation, a case in continuance (indicating the need for additional time for the government to resolve a case), or the finding of a photo non- match, does not establish, and should not be interpreted as evidence, that the employee is not work authorized. In any of the cases listed above, the employee must be provided a full and fair opportunity to contest the finding, and if he or she does so, the employee may not be terminated or suffer any adverse employment consequences based upon the employee’s perceived employment eligibility status (including denying, reducing, or extending work hours, delaying or preventing training, requiring an employee to work in poorer conditions, refusing to assign the employee to a Federal contract or other assignment, or otherwise subjecting an employee to any assumption that he or she is unauthorized to work, or otherwise mistreating an employee) until and unless secondary verification by SSA or DHS has been completed and a final nonconfirmation has been issued. If the employee does not choose to contest a tentative nonconfirmation or a AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-12 Company ID Number: 19959 Client Company ID Number: 411650 Page 6 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify photo non-match or if a secondary verification is completed and a final nonconfirmation is issued, then the Employer can find the employee is not work authorized and terminate the employee’s employment. Employers or employees with questions about a final nonconfirmation may call E-Verify at 1-888-464-4218 or OSC at 1-800-255-8155 or 1- 800-237-2515 (TDD). 10. The Employer agrees to comply with Title VII of the Civil Rights Act of 1964 and section 274B of the INA, as applicable, by not discriminating unlawfully against any individual in hiring, firing, or recruitment or referral practices because of his or her national origin or, in the case of a protected individual as defined in section 274B(a)(3) of the INA, because of his or her citizenship status. The Employer understands that such illegal practices can include selective verification or use of E-Verify except as provided in part D below, or discharging or refusing to hire employees because they appear or sound “foreign” or have received tentative nonconfirmations. The Employer further understands that any violation of the unfair immigration-related employment practices provisions in section 274B of the INA could subject the Employer to civil penalties, back pay awards, and other sanctions, and violations of Title VII could subject the Employer to back pay awards, compensatory and punitive damages. Violations of either section 274B of the INA or Title VII may also lead to the termination of its participation in E-Verify. If the Employer has any questions relating to the anti-discrimination provision, it should contact OSC at 1-800-255-8155 or 1-800-237-2515 (TDD). 11. The Employer agrees to record the case verification number on the employee's Form I-9 or to print the screen containing the case verification number and attach it to the employee's Form I-9. 12. The Employer agrees that it will use the information it receives from SSA or DHS (through the E-Verify Employer Agent) pursuant to E-Verify and this MOU only to confirm the employment eligibility of employees as authorized by this MOU. The Employer agrees that it will safeguard this information, and means of access to it (such as PINS and passwords) to ensure that it is not used for any other purpose and as necessary to protect its confidentiality, including ensuring that it is not disseminated to any person other than employees of the Employer who are authorized to perform the Employer's responsibilities under this MOU, except for such dissemination as may be authorized in advance by SSA or DHS for legitimate purposes. 13. The Employer acknowledges that the information which it receives through the E-Verify Employer Agent from SSA is governed by the Privacy Act (5 U.S.C. § 552a(i)(1) and (3)) and the Social Security Act (42 U.S.C. 1306(a)), and that any person who obtains this information under false pretenses or uses it for any purpose other than as provided for in this MOU may be subject to criminal penalties. 14. The Employer agrees to cooperate with DHS and SSA in their compliance monitoring and evaluation of E-Verify, including by permitting DHS and SSA, upon reasonable notice, to review Forms I-9 and other employment records and to interview it and its AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-13 Company ID Number: 19959 Client Company ID Number: 411650 Page 7 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify employees regarding the Employer’s use of E-Verify, and to respond in a timely and accurate manner to DHS requests for information relating to their participation in E- Verify. D. RESPONSIBILITIES OF FEDERAL CONTRACTORS WITH THE FAR E-VERIFY CLAUSE 1. The Employer understands that if it is a Federal contractor subject to the employment verification terms in Subpart 22.18 of the FAR it must verify the employment eligibility of any existing employee assigned to the contract and all new hires, as discussed in the Supplemental Guide for Federal Contractors. Once an employee has been verified through E-Verify by the Employer, the Employer may not reverify the employee through E-Verify. a. Federal contractors with the FAR E-Verify clause agree to become familiar with and comply with the most recent versions of the E-Verify User Manual for Federal Contractors and the E-Verify Supplemental Guide for Federal Contractors. b. Federal contractors with the FAR E-Verify clause agree to complete a tutorial for Federal contractors with the FAR E-Verify clause. c. Federal contractors with the FAR E-Verify clause not enrolled at the time of contract award: An Employer that is not enrolled in E-Verify as a Federal contractor at the time of a contract award must enroll as a Federal contractor with the FAR E-Verify clause in E-Verify within 30 calendar days of contract award and, within 90 days of enrollment, begin to use E-Verify to initiate verification of employment eligibility of new hires of the Employer who are working in the United States, whether or not assigned to the contract. Once the Employer begins verifying new hires, such verification of new hires must be initiated within 3 business days after the date of hire. Once enrolled in E-Verify as a Federal contractor with the FAR E-Verify clause, the Employer must initiate verification of employees assigned to the contract within 90 calendar days from the time of enrollment in the system and then selecting which employees will be verified in E-Verify or within 30 days of an employee’s assignment to the contract, whichever date is later. d. Employer that are already enrolled in E-Verify at the time of a contract award but are not enrolled in the system as a Federal contractor with the FAR E-Verify clause: Employers enrolled in E-Verify as a Federal contractor for 90 days or more at the time of a contract award must use E-Verify to initiate verification of employment eligibility for new hires of the Employer who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire. Employers enrolled in E-Verify as other than a Federal contractor with the FAR E-Verify clause, must update E-Verify to indicate that they are a Federal contractor with the FAR E-Verify clause within 30 days after AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-14 Company ID Number: 19959 Client Company ID Number: 411650 Page 8 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify assignment to the contract. If the Employer is enrolled in E-Verify for 90 calendar days or less at the time of contract award, the Employer must, within 90 days of enrollment, begin to use E-Verify to initiate verification of new hires of the contractor who are working in the United States, whether or not assigned to the contract. Such verification of new hires must be initiated within 3 business days after the date of hire. An Employer enrolled as a Federal contractor with the FAR E-Verify clause in E-Verify must initiate verification of each employee assigned to the contract within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever is later. e. Institutions of higher education, State, local and tribal governments and sureties: Federal contractors with the FAR E-Verify clause that are institutions of higher education (as defined at 20 U.S.C. 1001(a)), State or local governments, governments of Federally recognized Indian tribes, or sureties performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond may choose to only verify new and existing employees assigned to the Federal contract. Such Federal contractors with the FAR E- Verify clause may, however, elect to verify all new hires, and/or all existing employees hired after November 6, 1986. The provisions of Article II, part D, paragraphs 1.a and 1.b of this MOU providing timeframes for initiating employment verification of employees assigned to a contract apply to such institutions of higher education, State, local , tribal governments, and sureties. f. Verification of all employees: Upon enrollment, Employers who are Federal contractors with the FAR E-Verify clause may elect to verify employment eligibility of all existing employees working in the United States who were hired after November 6, 1986, instead of verifying only new employees and those existing employees assigned to a covered Federal contract. After enrollment, Employers must elect to do so only in the manner designated by DHS and initiate E-Verify verification of all existing employees within 180 days after the election. g. Form I-9 procedures for existing employees of Federal contractors with the FAR E-Verify clause: Federal contractors with the FAR E-Verify clause (through their E-Verify Employer Agent) may choose to complete new Forms I-9 for all existing employees other than those that are completely exempt from this process. Federal contractors with the FAR E-Verify clause may also update previously completed Forms I-9 to initiate E-Verify verification of existing employees who are not completely exempt as long as that Form I-9 is complete (including the SSN), complies with Article II.C.4, the employee’s work authorization has not expired, and the Employer has reviewed the information reflected in the Form I-9 either in person or in communications with the employee to ensure that the employee’s stated basis in section 1 of the Form I-9 for work authorization has not changed (including, but not limited to, a lawful permanent resident alien having become a naturalized U.S. citizen). If the Employer is unable to determine that the Form I-9 complies with Article II.C.4, if the employee’s basis AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-15 Company ID Number: 19959 Client Company ID Number: 411650 Page 9 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify for work authorization as attested in section 1 has expired or changed, or if the Form I-9 contains no SSN or is otherwise incomplete, the Employer shall complete a new I-9 consistent with Article II.C.4, or update the previous I-9 to provide the necessary information. If section 1 of the Form I-9 is otherwise valid and up-to-date and the form otherwise complies with Article II.C.4, but reflects documentation (such as a U.S. passport or Form I-551) that expired subsequent to completion of the Form I-9, the Employer shall not require the production of additional documentation, or use the photo screening tool described in Article II.C.4, subject to any additional or superseding instructions that may be provided on this subject in the Supplemental Guide for Federal Contractors. Nothing in this section shall be construed to require a second verification using E-Verify of any assigned employee who has previously been verified as a newly hired employee under this MOU, or to authorize verification of any existing employee by any Employer that is not a Federal contractor with the FAR E-Verify clause. 2. The Employer understands that if it is a Federal contractor with the FAR E-Verify clause, its compliance with this MOU is a performance requirement under the terms of the Federal contract or subcontract, and the Employer consents to the release of information relating to compliance with its verification responsibilities under this MOU to contracting officers or other officials authorized to review the Employer’s compliance with Federal contracting requirements. E. RESPONSIBILITIES OF THE E-VERIFY EMPLOYER AGENT 1. The E-Verify Employer Agent agrees to provide to the SSA and DHS the names, titles, addresses, and telephone numbers of the E-Verify Employer Agent representatives who will be accessing information under E-Verify. 2. The E-Verify Employer Agent agrees to become familiar with and comply with the E- Verify User Manual and provide a copy of the manual to the Employer so that the Employer can become familiar with and comply with E-Verify policy and procedures. 3. The E-Verify Employer Agent agrees that any E-Verify Employer Agent Representative who will perform employment verification queries will complete the E-Verify Tutorial before that individual initiates any queries. a. The E-Verify Employer Agent agrees that all E-Verify Employer Agent representatives will take the refresher tutorials initiated by the E-Verify program as a condition of continued use of E-Verify, including any tutorials for Federal contractors if the Employer is a Federal contractor. b. Failure to complete a refresher tutorial will prevent the E-Verify Employer Agent and Employer from continued use of the program. 4. The E-Verify Employer Agent agrees to obtain the necessary equipment to utilize E- Verify. AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-16 Company ID Number: 19959 Client Company ID Number: 411650 Page 10 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify 5. The E-Verify Employer Agent agrees to provide the Employer with the notices described in Article II.B.4 above. 6. The E-Verify Employer Agent agrees to initiate E-Verify procedures on behalf of the Employer in accordance with the E-Verify Manual and E-Verify Web-Based Tutorial. The E-Verify Employer Agent will query the automated system using information provided by the Employer and will immediately communicate the response back to the Employer. If the automated system to be queried is temporarily unavailable, the 3-day time period is extended until it is again operational in order to accommodate the E-Verify Employer Agent’s attempting, in good faith, to make inquiries on behalf of the Employer during the period of unavailability. In all cases, the E-Verify Employer Agent will use the SSA verification procedures first, and will use DHS verification procedures only as directed by the SSA verification response. 7. The E-Verify Employer Agent agrees to cooperate with DHS and SSA in their compliance monitoring and evaluation of E-Verify, including by permitting DHS and SSA, upon reasonable notice, to review Forms I-9 and other employment records and to interview it and its employees regarding the use of E-Verify, and to respond in a timely and accurate manner to DHS requests for information relating to their participation in E- Verify. ARTICLE III REFERRAL OF INDIVIDUALS TO SSA AND DHS A. REFERRAL TO SSA 1. If the Employer receives a tentative nonconfirmation issued by SSA, the Employer must print the tentative nonconfirmation notice as directed by the automated system and provide it to the employee so that the employee may determine whether he or she will contest the tentative nonconfirmation. 2. The Employer will refer employees to SSA field offices only as directed by the automated system based on a tentative nonconfirmation, and only after the Employer records the case verification number, reviews the input to detect any transaction errors, and determines that the employee contests the tentative nonconfirmation. The Employer (through the E-Verify Employer Agent), will transmit the Social Security Number to SSA for verification again if this review indicates a need to do so. The Employer will determine whether the employee contests the tentative nonconfirmation as soon as possible after the Employer receives it. 3. If the employee contests an SSA tentative nonconfirmation, the Employer will provide the employee with a system-generated referral letter and instruct the employee to visit an SSA office within 8 Federal Government work days. SSA will electronically transmit the result of the referral to the Employer (through the E-Verify Employer Agent) within 10 Federal Government work days of the referral unless it determines that more than 10 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-17 Company ID Number: 19959 Client Company ID Number: 411650 Page 11 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify days is necessary. The Employer agrees to check the E-Verify system regularly for case updates. 4. The Employer agrees not to ask the employee to obtain a printout from the Social Security Number database (the Numident) or other written verification of the Social Security Number from the SSA. B. REFERRAL TO DHS 1. If the Employer receives a tentative nonconfirmation issued by DHS, the Employer must print the tentative nonconfirmation notice as directed by the automated system and provide it to the employee so that the employee may determine whether he or she will contest the tentative nonconfirmation. 2. If the Employer finds a photo non-match for an employee who provides a document for which the automated system has transmitted a photo, the employer must print the photo non-match tentative nonconfirmation notice as directed by the automated system and provide it to the employee so that the employee may determine whether he or she will contest the finding. 3. The Employer agrees to refer individuals to DHS only when the employee chooses to contest a tentative nonconfirmation received from DHS automated verification process or when the Employer issues a tentative nonconfirmation based upon a photo non-match. The Employer will determine whether the employee contests the tentative nonconfirmation as soon as possible after the Employer receives it. 4. If the employee contests a tentative nonconfirmation issued by DHS, the Employer will provide the employee with a referral letter and instruct the employee to contact DHS through its toll-free hotline (as found on the referral letter) within 8 Federal Government work days. 5. If the employee contests a tentative nonconfirmation based upon a photo non-match, the Employer will provide the employee with a referral letter to DHS. DHS will electronically transmit the result of the referral to the Employer within 10 Federal Government work days of the referral unless it determines that more than 10 days is necessary. The Employer agrees to check the E-Verify system regularly for case updates. 6. The Employer agrees that if an employee contests a tentative nonconfirmation based upon a photo non-match, the Employer (or the E-Verify Employer Agent) will send a copy of the employee’s Form I-551 or Form I-766 to DHS for review by: !Scanning and uploading the document, or !Sending a photocopy of the document by and express mail account (pain for at employer expense). 7. If the Employer (through the E-Verify Employer Agent) determines that there is a photo AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-18 Company ID Number: 19959 Client Company ID Number: 411650 Page 12 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify non-match when comparing the photocopied List B document described in Article II.C.4 with the image generated in E-Verify, the Employer (through the E-Verify Employer Agent) must forward the employee’s documentation to DHS using one of the means described in the preceding paragraph, and allow DHS to resolve the case. ARTICLE IV SERVICE PROVISIONS The SSA and DHS will not charge the Employer or the E-Verify Employer Agent for verification services performed under this MOU. DHS is not responsible for providing the equipment needed to make inquiries. A personal computer with Internet access is needed to access the E-Verify System. ARTICLE V PARTIES A. This MOU is effective upon the signature of all parties, and shall continue in effect for as long as the SSA and DHS conduct the E-Verify program unless modified in writing by the mutual consent of all parties, or terminated by any party upon 30 days prior written notice to the others. Any and all system enhancements to the E-Verify program by DHS or SSA, including but not limited to the E-Verify checking against additional data sources and instituting new verification procedures, will be covered under this MOU and will not cause the need for a supplemental MOU that outlines these changes. DHS agrees to train employers on all changes made to E-Verify through the use of mandatory refresher tutorials and updates to the E-Verify User Manual, the E-Verify User Manual for Federal Contractors, or the E-Verify Supplemental Guide for Federal Contractors. Even without changes to E- Verify, DHS reserves the right to require employers to take mandatory refresher tutorials. An Employer that is a Federal contractor with the FAR E-Verify clause may terminate this MOU when the Federal contract that requires its participation in E-Verify is terminated or completed. In such a circumstance, the Federal contractor with the FAR E-Verify clause must provide written notice to DHS. If an Employer that is a Federal contractor with the FAR E-Verify clause fails to provide such notice, that Employer will remain a participant in the E- Verify program, will remain bound by the terms of this MOU that apply to participants that are not Federal contractors with the FAR E-Verify clause, and will be required to use the E- Verify procedures to verify the employment eligibility of all newly hired employees. B. Notwithstanding Article V, part A of this MOU, DHS may terminate access to E-Verify if it is deemed necessary because of the requirements of law or policy, or upon a determination by SSA or DHS that there has been a breach of system integrity or security by the E-Verify Employer Agent or the Employer, or a failure on the part of either to comply with established procedures or legal requirements. The Employer understands that if it is a Federal contractor with the FAR E-Verify clause, termination of this MOU by any party for any reason may negatively affect the Employer’s performance of its contractual responsibilities. AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-19 Company ID Number: 19959 Client Company ID Number: 411650 Page 13 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify C. Some or all SSA and DHS responsibilities under this MOU may be performed by contractor(s), and SSA and DHS may adjust verification responsibilities between each other as they may determine necessary. By separate agreement with DHS, SSA has agreed to perform its responsibilities as described in this MOU. D. Nothing in this MOU is intended, or should be construed, to create any right or benefit, substantive or procedural, enforceable at law by any third party against the United States, its agencies, officers, or employees, or against the E-Verify Employer Agent, the Employer, or their agents, officers, or employees. E. Each party shall be solely responsible for defending any claim or action against it arising out of or related to E-Verify or this MOU, whether civil or criminal, and for any liability wherefrom, including (but not limited to) any dispute between the E-Verify Employer Agent or the Employer and any other person or entity regarding the applicability of Section 403(d) of IIRIRA to any action taken or allegedly taken by the E-Verify Employer Agent or the Employer. F. Participation in E-Verify is not confidential information and may be disclosed as authorized or required by law and DHS or SSA policy, including but not limited to, Congressional oversight, E-Verify publicity and media inquiries, determinations of compliance with Federal contractual requirements, and responses to inquiries under the Freedom of Information Act (FOIA). G. The foregoing constitutes the full agreement on this subject between DHS, the Employer and the E-Verify Employer Agent. AECOM Technology Corporation (Employer) hereby designates and appoints TALX Corporation (E-Verify Employer Agent), including its officers and employees, as the E-Verify Employer Agent for the purpose of carrying out AECOM Technology Corporation (Employer) responsibilities under the MOU between the Employer, the E-Verify Employer Agent, and DHS. AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-20 Company ID Number: 19959 Client Company ID Number: 411650 Page 14 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify The individuals whose signatures appear below represent that they are authorized to enter into this MOU on behalf of the Employer, the E-Verify Employer Agent and DHS respectively. If you have any questions, contact E-Verify at 1-888-464-4218. Approved by: Employer AECOM Technology Corporation Name (Please Type or Print)Title Signature Date E-Verify Employer Agent TALX Corporation Jerald Jackson Name (Please Type or Print) Electronically Signed Title 04/28/2011 Signature Date Department of Homeland Security – Verification Division USCIS Verification Division Name (Please Type or Print) Electronically Signed Title 06/29/2011 Signature Date Information Required For the E-Verify E-Verify Employer Agent Program Information relating to your Company: AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-21 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-22 Company ID Number: 19959 Client Company ID Number: 411650 Page 15 of 15 | E-Verify MOU for Employer (Client) using a E-Verify Employer Agent | Revision Date 09/01/09 www.dhs.gov/E-Verify Company Name:AECOM Technology Corporation Company Facility Address:515 S. FLOWER ST. 3rd Flr Los Angeles, CA 90071-2201 County or Parish:LOS ANGELES Employer Identification Number:611088522 North American Industry Classification Systems Code:236 Administrator: Number of Employees:10,000 and over AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-23 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-24 AECOM 1999 Avenue of the Stars Suite 2600 Los Angeles, CA 90067 www.aecom.com 213.593.8000 tel 213.593.8730 fax ASSISTANT SECRETARY’S CERTIFICATE AECOM a Delaware corporation I, Preston Hopson, DO HEREBY CERTIFY that I am the duly elected and acting Assistant Secretary of AECOM, a corporation organized under the laws of the State of Delaware (the “Corporation”), and the keeper of its records and corporate seal. I FURTHER CERTIFY that the Corporation’s full legal address is c/o The Corporation Trust Company, 1209 Orange Street, Wilmington, Delaware 19801-0000 and that the Corporation’s principal place of business is 1999 Avenue of the Stars, Suite 2600, Los Angeles, California 90067-6033. I FURTHER CERTIFY that The Earth Technology Corporation (USA), a corporation organized under the laws of the State of Delaware (“TETC (USA)”), is a direct wholly- owned subsidiary of the Corporation. I FURTHER CERTIFY that AECOM Technical Services, Inc., a corporation organized under the laws of California, is a direct wholly-owned subsidiary of TETC (USA), and an indirect wholly-owned subsidiary of the Corporation. [SIGNATURE PAGE FOLLOWS] AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-25 IN WITNESS WHEREOF, I have subscribed my name this 11th day of February, 2016. __________________________ Preston Hopson Assistant Secretary ____________________________________________________________________________ Preston HoHoHoHoHoHoHoHoHoHoHoHoHoHHoHoHHoHoHoHoHoHHHoHHHoHoHoHHoHoHoHHoHoHoHHHoHoHoHoHHoHHHHHHHoHHHHoHHoHHHHoHHHHHHHHHpson AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-26 EXHIBIT A COMPANY ORGANIZATION CHART AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-27 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-28 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-29 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-30 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-31 Licenses and Certifi cations AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-32 AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-33 Crystal Gorman, PE Steve Nappi, PE AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-34 Julio Castro Menu Home > Certification > Verify A Certification SEARCH RESULTS Castro, Angel D ACI CONCRETE STRENGTH TESTING TECHNICIAN Expires: June 22, 2017 Miami, FL 33186-4646 Castro, Angel D ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: May 18, 2018 Miami, FL 33186-4646 Castro, Arturo ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: July 10, 2017 FT LAUDERDALE, FL 33309 Castro, Charles W ACI CONCRETE TRANSPORTATION CONSTRUCTION INSPECTOR Expires: October 17, 2018 Jacksonville, FL 32225-1089 Castro, Charles W ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: July 23, 2017 Jacksonville, FL 32225-1089 Castro, Ian C ACI CONCRETE TRANSPORTATION CONSTRUCTION INSPECTOR Expires: April 12, 2019 Miami, FL 33196-2833 Castro, Ian C ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: October 12, 2018 Miami, FL 33196-2833 Castro, Jason ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: March 9, 2018 Davenport, FL 33897-4813 Castro, Jason ACI CONCRETE TRANSPORTATION CONSTRUCTION INSPECTOR Expires: December 3, 2019 Davenport, FL 33897-4813 Need Help? Chat with Us Online Now ACI & YOU Learn about the numerous resources and programs ACI offers for: ACI MEMBERSHIP Learn more about the many benefits and types of ACI Membership. TOP Verify A Certification https://www.concrete.org/certification/verifyacertification.aspx?m=result... 1 of 2 4/8/2016 10:39 AM AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-35 Mark Smalley ACI Certification Certified Personnel Search Results Last name: smalley Location: FL Country: U.S. Items 1 - 2 out of 2 matching your search criteria are shown below.Click Search Again to initiate a new search. Smalley Mark L ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I Expires: November 17, 2017 Ft Myers, FL 33905-2224 Smalley Mark L ACI CONCRETE TRANSPORTATION CONSTRUCTION INSPECTOR Expires: April 14, 2017 Ft Myers, FL 33905-2224 Copyright | Privacy Policy | Disclaimer | Home | Sitemap |Top BOOKSTORE SEARCH FEEDBACK LOGIN About ACI Bookstore & Publications Certification Chapters Committees Conventions & Events Education International Membership Students Technical Page 1 of 1ACI Certification - Certified Personnel Search Results 10/2/2013http://www.concrete.org/Certification/cert_results.asp AECOM CEI Services for the White Boulevard over Cypress Canal Bridge Replacement Project Solicitation #16-6560 VII-36 Joe Monahan About AECOM AECOM is a premier, fully integrated professional and technical services Ʈ rm positioned to design, build, Ʈ nance and operate infrastructure assets around the world for public- and private-sector clients. The Ʈ rm’s global staƬ — including architects, engineers, designers, planners, scientists and management and construction services professionals — serves clients in over 150 countries around the world. AECOM is ranked as the #1 engineering design Ʈ rm by revenue in Engineering News-Record magazine’s annual industry rankings, and has been recognized by Fortune magazine as a World’s Most Admired Company. The Ʈ rm is a leader in all of the key markets that it serves, including transportation, facilities, environmental, energy, oil and gas, water, high-rise buildings and government. AECOM provides a blend of global reach, local knowledge, innovation and technical excellence in delivering customized and creative solutions that meet the needs of clients’ projects. A Fortune 500 Ʈ rm, AECOM companies, including URS Corporation and Hunt Construction Group, have annual revenue of approximately $19 billion. More information on AECOM and its services can be found at www.aecom.com. Follow us on Twitter: @aecom Contact: J. Larry Sauls, PE Larry.Sauls@aecom.com 813.675.6728