Agenda 03/08/2016 Item #16A12 3/8/2016 16.A.12.
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Lane Park, (Application Number PL20130001482); approval of the
standard form Construction and Maintenance Agreement and approval of the amount of the
performance security. Note: This is a companion item to 16D9 that recommends acceptance of a
land donation and maintenance fees to Conservation Collier in lieu of on-site preserve
requirements.
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Lane Park, a subdivision of lands located in Section 36, Township 49 South, Range 25 East, Collier
County, Florida, following the alternative procedure for approval of subdivision plats pursuant to
Resolution 99-199. This procedure allows the Board to approve the plat and associated construction
documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division has completed the review of the construction
drawings, specifications, and final plat of Lane Park. These documents are in compliance with the
County Land Development Code and Chapter 177, Florida Statutes. This project is within the Lane Park
PUD, Ord. 15-40. All fees have been paid. Security in the amount of 10% of the total cost of the
required improvements, and 100% of the cost of any remaining improvements, together with a
Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted
by the County Manager or his designee and the County Attorney's office prior to the recording of the
final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code.
County staff recommends that the final plat of Lane Park be approved for recording.
There is a companion item on today's Agenda (16D9) to accept a land donation and maintenance fees to
Conservation Collier in lieu of on-site preserve requirements. This item cannot be approved unless the
companion item is approved.
FISCAL IMPACT: The project cost is $345,958.33 (estimated) to be borne by the developer. The
cost breakdown is as follows:
a) Water& Sewer $44,511.00
b) Drainage,Paving, Grading $301,447.33
The Security amount,equal to 110% of the
project cost, is $380,554.16
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 --Land Development Services
Revenue generated by this project: Total: $11,431.74
The Fees are based on a construction estimate of$345,958.33 and were paid in September, 2015.
The breakdown is as follows:
a) Plat Review Fee($1,000.00+$5./ac) $1,053.00
Packet Page -368-
3/8/2016 16.A.12.
b) Construction Drawing Review Fee
Water& Sewer(.75% const. est.) $ 333.83
c) Drainage,Paving, Grading
(.75% const. est.) $2,260.85
d) Construction Inspection Fee
Water& Sewer(2.25% const. est.) $1,001.50
e) Drainage,Paving, Grading
(2.25% const. est.) $6,782.56
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate
Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat
recordation, except when the applicant elects to delay obtaining a COA for non-residential
developments that are required to obtain approval of a site development plan prior to the issuance of a
building permit.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. -SAS
RECOMMENDATION: To endorse staffs recommendation to approve the final plat of Lane Park
(Application Number PL20130001482) for recording with the following stipulations:
1. Approve the amount of$380,554.16 as performance security for the required improvements; or such
lesser amount based on work completed, and as is approved by the Growth Management Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney's office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth
Management Department
Attachments:
1) Location Map
2) Plat Map
3) Opinion of Probable Cost
Packet Page -369-
3/8/2016 16.A.12.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.A.16.A.12.
Item Summary: This item requires that ex parte disclosure be provided by Commission
members. Should a hearing be held on this item, all participants are required to be sworn in.
Recommendation to approve for recording the final plat of Lane Park, (Application Number
PL20130001482); approval of the standard form Construction and Maintenance Agreement and
approval of the amount of the performance security. Note:This is a companion item to 16D9
that recommends acceptance of a land donation and maintenance fees to Conservation Collier
in lieu of on-site preserve requirements.
Meeting Date: 3/8/2016
Prepared By
Name: HouldsworthJohn
Title: Site Plans Reviewer, Senior,Development Review
2/9/2016 11:16:28 AM
Approved By
Name: McLeanMatthew
Title:Project Manager,Principal,Development Review
Date: 2/9/2016 12:42:00 PM
Name: FrenchJames
Title: Deputy Department Head-GMD, Growth Management Department
Date: 2/9/2016 4:20:46 PM
Name: PuigJudy
Title: Operations Analyst,Operations&Regulatory Management
Date: 2/17/2016 4:37:14 PM
Name: PuigJudy
Title: Operations Analyst, Operations &Regulatory Management
Date: 2/17/2016 4:38:00 PM
Name: StoneScott
Title: Assistant County Attorney, CAO Land Use/Transportation
Packet Page-370-
3/8/2016 16.A.12.
Date: 2/19/2016 10:14:15 AM
Name: MarcellaJeanne
Title: Executive Secretary, Transportation Administration
Date: 2/22/2016 8:55:21 AM
Name: IsacksonMark
Title: Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget
Date: 2/23/2016 4:37:29 PM
Name: KlatzkowJeff
Title: County Attorney,
Date: 2/24/2016 10:27:30 AM
Name: CasalanguidaNick
Title: Deputy County Manager, County Managers Office
Date: 2/28/2016 3:49:58 PM
0
Packet Page -371-
3/8/2016 16.A.12.
10
r lip lc.
rillsr, r ;
. --
I °' __u
t IIIIIM"."1"."."..... ":.
4 d
7AL,"I1L-111=111.IIIIUAIM r,'" BR . cep 0 I 0
E .11 7440.90 ilifibi6\ \No. LEs . A t:
w Ell _''_ A SITE ir:::_-.,
Irr 11211,0\.Silifill:7,. \ Appals= t
Ilk' Ili twwww��� FQX
. 0
e
�`� ______.,tea ,1 4 NI
, .. .......1 j JllIi wwpm
4110111O1111211111011% .,,,,e, i 40 I 4411
7". "-i I IIMilealliMelPt II ' A
VICINITY MAP
*NOT TO SCALE*
1
Packet Page -372-
3/8/2016 16.A.12.
b is a
ci
a
I4
o 6s ,a 7nEINa la
ayE
0! h a ae� E a �`�
6 1 FEE i!
IT 0 X 4 :1 1 ,ilpil !AO 4 In L'' N • k b o p@ o {it°I3 C y �b b ii
z < 3 S} 4 FFgg 33 4ppb o S .gg,bt a 4 agt
U ° R 8 € i 'o 1 it 6 I a�I'6
11 h ti� I VT E. 5
W o—=
cn a
W
d c0 E...
x q O d
R.z¢0.U p
a O6 FOGa.I N • 'r ppp
ZdOx..OWCO, z°Zu y.c, nb 1
£1!!G lxd 111`∎ 1_ � 7 Zilald C7 p• c,== $°•• O0d'J'.K. SI ((11,, mg hQ WOgy7o SJE ZWE..] b 4 : 6
�a W__c _ �� F 1° OF D.
zq�ry.. i[∎rTC. , y l i...1 C4 'e U 7•° gEV1 ' �'� M Lid,),Q,„,,..,. ��I O F6- 10 .E.,,„! a• EEEF W `t: g s
wCGF O �J �-!'!.. t ZE W ^I d <Cp"T.U�� fO V1ZZZ F 7 - ' .ea..�.
CV xU I l�ko UE• q o ZZ 4. ZO-.o O �qy 6�
'41Z za � ' ��r�lll�g 3 �O € g E.;"ZCQi d d2ggL) z V 3 ig8
■ H1P ,I I'I� n�� -� Gm., z b bi r'.,, I .,> ��r 1^,t. i1+ % �Ip_;r. ''\�' '•�\ 1= il.�R'o z •- Ae1U!♦111M i
OOUZOO CiIr..!.c� lll'ni=1
W U F
oaaq°"w
1aaoAZ � 0"
W.E wO k
= 0.'U
w
d Q w
Z ?L 4 h 5 ^e i g _ 66 Eho
o giR g ' :2;',' I d le t g ' q JIa a !wg aka et Et. °5 7
€ b 5 B k�
q oB7 E �€ k �a � sE� p p3 �hk �3 I' z 1
a. '.� s Q °44 7h e , 7B ', 7. d i ' 3A3 bh q€ r i : i FIT k €g E, 1 ;6
i € 2 9t 7 °^� 7 a 71 E Eh 8 2 a;
@ � k
a °° : 1 E ig 16d, b.. m4g g, 1 gill i% YL h 4pb., a s e a
Z 3 3� � 7 W 7 6 7 tS BiE e � � 8 b n 4 Ti ^ � � gli 1 4 YS
e rx� t o dl, s '. j - s IJ i5, .
q Agri
1 € i /'@gh a O to iii i
e mb k �9a as I!!b � 11 11 k � h � � � �i7e q >
U e 1 4 e b - q e
W 8 s
N.\, yi
Packet Page -373-
3/8/2016 16.A.12.
" w 9
a apC:a
N i ' ° J
:1:1= -° 6''g
o c 7',r_ ;�
N•Drr1O•E 17187' d
I e4 r�E iN) r 1 i for rig io AE) ., ..Y N ,y 4
tj JO'0.E 7'Y 1q•Y�a1 JO' .�irY • FO 4Cl
. I i 7i � rnE I:. Wry g �'E!
m em i f i � � Q u
g -1' J T U 1 1 '.F: nl errieq ! ` - a
NBnIJ'M'F
a T x(ieE� AtA[al rte' i� cif J �a7dE7" !05�• ' # ''Q
f 4 dACCESYuro 7'v useucN ' i'
b'�r� v 4?f1Et .�iC� • ' `Si`'
d 4y s 1 W
II
MARKET AVENUE
COUNTY PRODUCTION PANIC S
MATS.1-• r;�8 d SeSv'i S"I
PLAT war IS.PAM T•e)__ p
Q5 m tg w�B Ewa
e a➢]e'JI•E bD.lJ'(eEAS1.Fm) �'▪ N 897 JI•E'o'7J.BT' '^ ^� o:+".:,9,=
" "9L3,f ,_L� `, sass"3
7'-r- ,4,-, b gSY39i3,
• w(n A -I-1
; a i o y W ilt
• U
d• �WO-am m S C $ wg8 a, r' 'b 8 _-,I1▪ I W R qq'e
dmU)FZW 5 �.J�L_u__�tl �u u.r" ea1 y�
P._-z G..u� 8 "▪ 1 i h� n.ilg eat n�"
X. fn NI 8 ui o r' 4 IEkt^'
i". C co go Q A -PU
,- I1
U�d al P] :tn Ii, niii �n a 11
ti
4
S$ 88$8
44 P.7'C = IX; h "� V °
N 8B7J3 8BE 5 161.T 8' • IJT.H'A
o a z A i
=,:,..c,,,=,4 B60r(NE..0) Y w- 18 tqa tl�J3uZHu W JD " D.[
I I z u Q Q cn - r�- �+ `r - ▪r �(/1 E'L,_7.1,7k77.7"."b�� '*
W SODQOO E E 4E yc E ..f
u o ci- 4..Sao r 5vf ��) '---�A<i , g w v ! T$�'6 L
x
!iiij
liit)8i• i8 - • "i ! �' .,�nWU.ww3 33.:u�,W
' is=El F U Ri Lc- ,- _LT 973 le E 3330 `^''�-r'+ •1. 1.« •'
El 124 - ?Ar^a__.^..a''''
w 31 WC' .1 „ t t "i it EDnr�..R:^;�
A 1 7'.,____r—__ 7 ai m
Fap""� " ^iial _ ^i !^ n i° 888S8,.eSISSS
•,j,0,Z,oo 3 i��o 8i !8 :::::"z""Ne"zzz
W U F Ii�0° — I"
wxaaw0 a m �Qi _ 3"5S5fi��7!9� 5
o W y. 2 i t : u W i ., h
U1 F OO En 6S _ 8ii"i;-� i " a8
Fdd00Z 'a 1!iv� u , ` °585fie4tr=:�nA
_. W O in p8 .0>V
a
R'.U n, 'llE L L 7 ”39--YTSA-C 117.38 r ,(OE I¢) a s,7'.
a cw ; W( 4IYr�J I fit' 333•3.39 3.933,333.33.33:33,
E z Y �$ 7'i Va8II888V8SYi
px$
Zifi
2a ?8 ^
€x m " /
8 , �q
1 i W -
J
0,."' rr .U
0
a
W E q ` ..4-y 6 'a m 7'u
I B ,q5�5 0 �� ^\ LA r^\ X13 EREJ //-23§ gU U
A32 C3g CI t'-
9- m rnn PRODUCTION Ta 7's sa_. -
rai r e: iD) L
RADIO ROAD 0
(F.K.A.-sr R ROAD 858/cowry POND 856)
UNPLATTED
L. if
Packet Page -374-
3/8/2016 16.A.12.
DE
DAVIDSON
E N G I N E E R I N G 4365 Radio Road, Suite 201 • Naples FL 34104 • P { )
icµ_da%Ri,onenemeenne_uom P (239)434.6060 • F 239 434.60&4
OPINION OF PROBABLE COST
(2nd Submittal)
LANE PARK
SECTION 36,TOWNSHIP 49 S, RANGE 25 E
Collier County, Florida
PREPARED FOR:
Radio Road Joint Venture
2950 Immokalee Road, Suite 2
Naples, Florida 34110
PREPARED BY:
Davidson Engineering, Inc.
4365 Radio Road,Suite 201
Naples, Florida 34104
:S C R 4-•sr 'F''•i
No. 73996
CF 4t F'.,TjF Phi
Andrew E. Rath, P.E., Registration Ntr, 9:_6 t? RI?..1:-,1 :
Company ID No. 9496 //,/,.•/"S'.10-. VL
September 17, 2015
This Opinion of Probable Cost(OPC)is for review fee generation purposes only This OPC
revision represents the net difference of this led)PPL submittal minus original(1n)PPL
submittal. The original OPC is attached as Appendix A for reference. Lastly,Water Utilities
are owned by City of Naples(Appendix B)and are not figured into Collier County review fees.
PPL-PL20130001482
REV: 2
Packet Page -375-
3/8/2016 16.A.12.
LANE PARK (PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS
Davidson Engineering, Inc.
Prepared By: / KLW
Date Prepared: / 5/28/2015
Description
Earthwork = $ 137,34131
Pavement/Concrete = $ 66,581.02
Landscaping, Irrigation, and Lighting = $ 17,500.00
Sanitary Utilities _ = $ 44,511.00
Drainage Utilities = $ 80,025.00
Total of Construction Costs = $ 345,958.33
This EOPCC is intended to provide estimates for permit fee generation only.
Packet Page -376-
3/8/2016 16.A.12.
LANE PARK (PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS- EARTHWORK
Prepared By: Davidson Engineering, Inc. / KLW
Earthwork Description
Quantity Unit Cost
Mobilization 1 LS $2,000.00 = $ 2,000.00
Traffic Maintenance 1 LS $1,500.00 = $ 1,500.00
Silt Fence 2,395 LF $0.98 = $ 2,347.10
Temporary Construction Ent./Exit 132 SY $8.80 = $ 1,161.60
Removal of Existing Pavement 106 SY $1.31 = $ 138.86
Imported Fill 6,892 CY $12.50 = $ 86,150.00
Sod 7,775 SY $1.69 = $ 13,139.75
Site Grading 2,882 SY $4.00 = $ 11,528.00
Rough Site Grading 9,688 SY $2.00 = $ 19,376.00
Total of Construction Costs- Earthwork = $ 137,341.31
This EOPCC is intended to provide estimates for permit fee generation only.
Packet Page -377-
3/8/2016 16.A.12.
LANE PARK (PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS- PAVEMENT
Prepared By: Davidson Engineering,Inc. / KLW
Pavement Description
Quantity Unit Cost
Asphalt- 1 1/2"Type S-I 2,089 SY $4.50 = $ 9,400.50
Asphalt - 1 1/2"Type S-III 2,089 SY $5.66 = $ 11,823.74
8" Limerock Base 2,193 SY $9.00 = $ 19,741.05
12" Stabilized Subgrade 2,298 SY $2.27 = $ 5,216.23
Type D Curb- Forming and Concrete 400 LF $7.11 = $ 2,844.00
Type F Curb- Forming and Concrete 775 LF $10.66 = $ 8,261.50
2' Valley Gutter Curb 175 LF $6.27 = $ 1,097.25
6"Thick Concrete Sidewalk 1,445 SF $4.15 = $ 5,996.75
Signage &Striping 1 LS $2,200.00 = $ 2,200.00
Total of Construction Costs -Pavement = $ 66,581.02
'This EOPCC is intended to provide estimates for permit fee generation only
Packet Page-378-
3/8/2016 16.A.12.
LANE PARK (PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS-LANDSCAPING/LIGHTING
Landscaping Estimate Prepared By: Davidson Engineering, Inc. / }C
Site Lighting Estimate Prepared By: 0 / 0
Landscaping Description
Quantity Unit Cost
Site Lighting 1 LS $4,000.00 = $ 4,000.00
Landscaping 1 LS $10,000.00 = $ 10,000.00
Irrigation System 1 LS $3,500.00 = $ 3,500.00
Total of Construction Costs- Landscaping& Lighting = $ 17,500.00
This EOPCC is intended to provide estimates for permit fee generation only.
Packet Page -379-
3/8/2016 16.A.12.
LANE PARK (PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS-SANITARY UTILITIES
Prepared By: Davidson Engineering,Inc. / KLW
Description
Gravity Pipe (8" PVC SDR26) - depth:
0'-6' 638 LF I $ 22.00 = I $ 14,036.00
Manholes:
0 to 6' Deep 5 I EA J $ 3,500.00 = 1 $ 17,500.00
Miscellaneous Fees:
6" Laterals (PVC SDR26) 60 LF $ 10.00 = $ 600.00
6" Cleanout Pipe 3 EA $ 425.00 = $ 1,275.00
Jack & Bore- 10in Steel Casing 55 LF $ 120.00 = $ 6,600.00
Connect Force Main to Ex. Gravity 1 LS $ 4,500.00 _ = $ 4,500.00
Total of Construction Costs-Sanitary Utilities = ( $ 44,511.00
This EOPCC is intended to provide estimates for permit fee generation only.
Packet Page-380-
3/8/2016 16.A.12.
LANE PARK(PPL PERMITTING)
SUMMARY OF CONSTRUCTION COSTS- DRAINAGE UTILITIES
Prepared By: Davidson Engineering, Inc. / KLW
Description
ADS High Performance Polypropylene Quantity Unit Cost
24" HPP 950 LF $38.00 = I $ 36,100.00
Mitered End Sections:
24" HPP MES 3 I EA I $1,000.00 I = I $ 3,000.00
Drainage Structures:
FDOT Type C 1 EA $1,200.00 = $ 1,200.00
FDOT Type D 1 EA $1,500.00 = $ 1,500.00
Junction Boxes:
5' Diameter 2 EA $2,200.00 I = $ 4,400.00
Frame and Grate:
Type D or F Curb Inlet 8 EA $4,200.00 I = I $ 33,600.00
Materials:
RIP RAP w/ Filter Fabric I 5 TON I $45.00 = I $ 225.00
Total of Construction Costs- Drainage Utilities = $ 80,025.00
This EOPCC is intended to provide estimates for permit fee generation only.
Packet Page -381-