Loading...
Agenda 02/09/2016 Item #16A 3 2/9/2016 16.A.3. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Hacienda Lakes of Naples Phase II, (Application Number PPL- PL20150002341) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners(Board) approve for recording the final plat of Hacienda Lakes of Naples Phase II, a subdivision of lands located in Section 14, Township 50 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division has completed the review of the construction drawings, specifications, and final plat of Hacienda Lakes of Naples Phase II. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Hacienda Lakes MPUD, Ord. 2011-41. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements,together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with the County Land Development Code-- Section 10.02.05 A.4.b. Staff recommends that the final plat of Hacienda Lakes of Naples Phase II be approved for recording. FISCAL IMPACT: The project cost is $1,234,380.05 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water& Sewer $261,827.00 b) Drainage, Paving,Grading $972,553.05 The Security amount,equal to 110% of the project cost,is$1,357,818.06 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 --Land Development Services Revenue generated by this project: Total: $38,081.40 Packet Page -206- 2/9/2016 16.A.3. The Fees are based on a construction estimate of$1,234,380.05 and were paid in September and October, 2013. Fees for clearing, grubbing and lake excavation are paid under the excavation permit. The breakdown is as follows: a) Plat Review Fee($1,000.00+$5./ac) $ 1,050.00 b) Construction Drawing Review Fee Water& Sewer(.75% const.est.) $ 1,963.70 c) Drainage, Paving,Grading(.75% const. est.) $ 7,294.15 d) Construction Inspection Fee Water& Sewer(2.25%const. est.) $ 5,891.11 e) Drainage,Paving, Grading(2.25%const.est.) $21,882.44 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. -SAS RECOMMENDATION: To endorse staffs recommendation to approve the final plat of Hacienda Lakes of Naples Phase II (Application Number PPL-PL20150002341) for recording with the following stipulations: 1. Approve the amount of$1,357,818.06 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Engineering Services Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or his designee, or his designee on behalf of the board pursuant to Section 10.02.05 A.4.b of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department Attachments: 1)Location Map 2)Plat Map 3) Opinion of Probable Cost Packet Page -207- 2/9/2016 16.A.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.3. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Hacienda Lakes of Naples Phase II, (Application Number PPL-PL20150002341) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 2/9/2016 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Development Review 1/5/2016 1:52:22 PM Approved By Name: PuigJudy Title: Operations Analyst,Operations &Regulatory Management Date: 1/5/2016 3:31:43 PM Name: PuigJudy Title: Operations Analyst,Operations&Regulatory Management Date: 1/5/2016 3:33:15 PM Name: FrenchJames Title: Deputy Department Head-GMD, Growth Management Department Date: 1/12/2016 11:46:20 AM Name: McLeanMatthew Title: Project Manager,Principal, Development Review Date: 1/12/2016 1:55:15 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Administration Date: 1/12/2016 2:57:40 PM Name: StoneScott Packet Page-208- 2/9/2016 16.A.3. Title:Assistant County Attorney, CAO Land Use/Transportation Date: 1/19/2016 4:39:46 PM Name: IsacksonMark Title:Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Date: 1/22/2016 10:58:02 AM Name: KlatzkowJeff Title: County Attorney, Date: 1/28/2016 4:14:53 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 1/31/2016 11:55:16 AM Packet Page -209- 2/9/2016 16.A.3. _____.... .. - , 10-50-26 11-50-26 N W 1, F f : cLuB ESTATES M r*----1 ....- s rz ' C 't`0144: i' w I Li r ' : ....t o 73 50-26 c.cl, 14-50-26 CI '%. L.THE LORDS WA'' 13-50-26 73 C-,1, CI 1 U BETTER WAY 1 , .Ve sr\ , ' I '1 ,. Ism RATTLESNAKE HAMMOCY Li ---- , PROJECT t LOCATION ...JOHNS RD „ re. 23-50-26 i 22-50-26 c:1 ,AMITY RD 1 2450-26 4 \ ki .•:.-i. r" ct z SABAL PALM -- . ------- VICINITY MAP NOT TO SCALE 1.. Packet Page -210- HACIENDA LAKES OF NAPLES — PHASE II PLAT BOOK PAGE A REPLAT OF A PORTION OF TRACT FD-1, HACIENDA LAKES OF NAPLES AS RECORDED IN PLAT BOOK 55, PAGES 10-21 SHEET I of 2 AND BEING A SUBDIVISION OF PART OF SECTIONS 14 & 23, TOWNSHIP 50 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA DEDICATIONS/RESERVATIONS NOTICE • THIS PLAT,AS RECORDED IN ES GRAPHIC FORM,N THE OFFOU,L DEPICTION OF THE SUBDIVIDED LANDS DESCRIBED HEREIN AND WILL IN NO CIRCUMSTANCES BE SUPPLANTED IN AUTHORITY BY ANY OTHER GRAPHIC OR DIGITAL FORM OF THIS _ 5 PLAT.THERE MAY BE ADDITIONAL RESTRICTIONS THAT ARE NOT RECORDED ON COUNTY APPROVALS) PUT oro xx• .ora w HERE. THIS PLAT THAT MAYBE FOUND IN THE PUBLIC RECORDS OF THIS COUNTY, A 012.72 M 2.101117 w¢COW..DEVELEM.T DM.: POUNtt DICKER I.TRACT R(OTTIES.ANanr ROW)As n PR.TE wen RAAATF-SST COW SUM.TTO ME 0. 000 on,wmw r.NON.AA.NDS P.U.A.eu.L.A x a ,veno. me n➢. nxncs,n,.r nlrna,,.r.ror wr��r.eox.r.r,ovm, FRES ED.E)FOR SITOWY ER W.W.I PURPOSES CORY II-50-26 rr-sazs 1 3.OWT CESS [xrs(.4 wm rvao..7.FOR EMEM ETET COLLAR COUNTY exewsee :.AU.ACC B.All MAT.uSTO.TS ORR.E)WI REJPONOMI.COR Nxxrv,AxcE. a TOIINTY SURVEYOR AVIID II DIA AV P.1. AU.DRAW �— WOW.ME..CEOOWI)nmaR 10.70.201........m."' an rEay.Rv161;1111 ` u sa-E6 ,xnsnvx A16.nnQ OL corn,,.SURVIVOR _O C.oEMME m WI.OW.WAVR-z Cr. `.'r er,t[P . COMM COUNTY su.M. I.ALL eST? Rau TS(HAL) 05 551551 THEREOF E_uw U 55555 Y (CALM C04NISSION APPROVAL AND EµONw (smog... P rox(z) EsxutE 7.H. {—� ru ox,xeorrc,or,xreue.ore—rcc111°'coo.or couu rnlwry rrewn U,xn„xrnnr¢ SURFACE MEOW NTA w rµa/� R „ AT„ ) OJECT CATION oCU 2.Wt..POIME RATER 5)ammwRTMw(z)�Mv2a NNSS unm SIMS ¢P 00 URN IN °rte=xJ-so-26 TR (Nroa-J.ASAS urMrcO ADOT BE " -sv-M ,T cxr,r LL 24-57-26 Uwcxr,.E.., eras h - Ura a TO mTIMIS.EXIM 5555 Ano/m w 22 13 COUNTY ATTORNEY orrnecw.r..rrom, WAIErr SExn I050S S,S.can a ^ri umoxuuRs uaur®rn TRC P,AT. s„ ...MEW(P.NE).70 ML LE..0 OR rRwcNISCO P.M _ l ,Ox 0ELI0 PRxA -- J R���� ._I ,Eava5.r. mon,.ArrxwlOe,On DonRvcoUN,Y mi..,x_O a wr..An. ED :,,vgr xrb„x,..armor.RrSASH SO,rNTPx:rnE:<x®�,s N VICINITY ,s:Nr.NT<aNNr..,raxxr, I.. BE WWI RESPONSELE FOR MIR OW..THIS SECTION MEL NOT APPLY TO RIM EHNRCOEC N w r21.ErICI P.ME worm ELECTRIME WEIT ME AS WO..BY ME.R. SAID DODIDIADST !AAA OR r.,mo DAV OF 2016 A D AND D.VICORDMNILATIXDOM1 t.LLESIroRs10.21.171111:EMIFS Of NAPLES,LEM,A FLORIDA 2117.0.2112.C.F..CS 1137.Mt M.WW2.OF EWER 0...EMT. MARITEROFT.2020.2.2.1-ER.....2FmkogslExcEos.AEFEeryoE ••0ro_IIIDOULPI___.NCI..Of IMF 11/ALICRECORDIS°ICI..DOIAIDIFICAIDA T.-MAT ro-1.10-2 RESER.FOR YEEMRE ITEE.OMEENT WM MS....FOR TERENCE MEN scowl rvr..FOR ADVANCE OF MAE FEET MENGE.2 REETIE7c2..17 A r,,s0EOICATE TO C.. rARExs, (.P�«oEz oJmTNE.rArrea MrA.,,rW,r x,wOroxcounxcouxrr.rroRroA € RrnMERAm FOR RSIONEo m TIE.PRESENTS To a o xrs_a,a n SURVEYOR'S CERTIFICATION Le ..,.„L... FLAO:117FELTat:LiW7,1,CET7Mereeeng;reCet=olr07A7Tor,o1Iof BY K.0.11:01 TM MEM.AS MOWED 11 MAWR 122.111CROE SWIM W WE MEM PRINTED NAPEwI7 PRINTED WE VAVIrc,WWIIrRT., Aa�TA.rsrs--'---ten: aT a>.Nex.,REQ,PwR,a DI,L SS MARE NE) CD vPCKNDWLEDGHENT FOR,COs1.1co%wxrorFa NTerorx,arxe.hasr...aro. rc r� rt�rtrsNT u�uM�DRAFT N my T`fT.C.OAERES OF MC n rs rcraO ar MEW RC rtrs ON KEA,OEiiiiPEPFON,ECE Cr rr,I,F:Er,OTFEO.uw.wuxo O,rxrr_ TA x w: :111 a nm. / a) naaN® m n`NT'T" THIS INSTRUMENT WAS PREPARED FORndz,.NEEOF,,,.«FEET,O,FaNTOF REV:x::LuwE THOMAS M MURPHY, P.S.M. //56;0) a_ �nRJr50 0gE155, aIOBMW. fiffRit,EliiiiiFtESiroRrxx0555(505 x,oA Ft�Vi 9ea:71 D 5505<n55 e.rxrto a ETA.. HOLE Moo. loidaCe . Fr.Toxrw,OFacamawSNwxn,cxuo55oxA ''''".aEMONTES rAuthorization No: s NaNNwx u. I R ERL.re .A.-., ,e--1 HACIENDA LAKES OF NAPLES — PHASE II PLAT BOOK PAGE A REP LAT OF A PORTION OF TRACT FD-1, HACIENDA LAKES OF NAPLES AS RECORDED IN PLAT BOOK 55, PAGES 10-21 SHEET 2 of 2 AND BEING A SUBDIVISION OF PART OF SECTIONS 14 & 23, TOWNSHIP 50 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA TRACT FD-2 -, i—(—',17xrautm7rcl „ -21 NGRAPHIC SCALE x err',[afn[• s[iwx —1. — NOTES n_"so'tCATIOX ate. LEI N e,eL7 N . 1,2,RmNPRLE sm a RE, sounswrn F PIE .51.IS FONG ,,O.wcasortr Tr' 70.5W147 50 ..NOL 26 C5 617.94 16.55 233.53 X 75.46 w 254.33' e.,.,R1,..I"i U..[ Oi UAW,PCME5 OF COWPOUND CURVANIX On 90841S 08 0 50.00 9,57 55 51.30 N 46.48 Yr 79.37 TRACT FD-1 9.A.B. MOVES ACCESS LASEWENT C9 949,00 4'31 O. 74 55 S 76'65 3.W 74 85 MCCIENDA LAX. ea.z acio-.i j OP, (MCC,NO.C5600002.3 15. fayr t, Ma , +x[WYO.WK.OF xNU ax a 0..zo.ec.zu TRAGI FD-t iT X. eE c cc. T^H 8 N POINT OF f R.xo„„„,,,, 280.4. a aiJ e0,.ae o. ea,a Z.I c«tR=CCU",CCM04 C,MC.s_E.CE.�C x eTJrJr[ BEGINNING °°°°,>n °°' NORTHEAST CORNER op z.z,.cc loss �1 SEi wo[nc NACIENpA LAKES OF NAPLES �„xs sw.ii+s,c .scc 1�-Ja-za NJ xu a M P.R.55.PGS.10-21 _.._..._......__. h 51.490 F.-..__-. _..__ I _ _ __ -_.. 3 'r = RATiLE9NR LHAMITOCN- $y ,__t ..................................... z,K"'•'- _____.— c e TRACT RI •. TRACT _ =u.Er w �[ _ 1 TRAGI F0-2E CC.Me,ea x,,,,u. y`S - —_cs u �TNACP"42” \��\ -____ -ve+iv..0,--__ Ey4b'RC,W.K`I turu� v n orl T. • J/ g c:muldfOck RDA, e I yk�S b u S y+•♦ N co c. 8 N G --,;P •.uw,w .sec - W;"euar,a o ne0) / / �.vJx �� THIS INSTRUMENT WAS PREPARED THOMAS M. MURPHY, P.S.M. #56;0) r.nov N,=risory or FL mcJ HOLE Phone:(239)254,• I REFERENCE NI '"'.. I MANN e. Mx_....I 0ttttttt1► 2/9/2016 16.A.3. . k ' 0f „.k.k..dNSOI } '1 : ,i. ,trltttrt ,l, Engineer's Opinion of Rrotratile,; t3141- 1 1'?` .': � CO le f C ''ter HACIENDA LAKES - RATTLES 7' 'rE H, MMPCK, Pli o ' k 1171 HM# 2013.011 Daelp 09/2014 0 i a * F Description Quantity : ,4,•. L°E hits ;•oy stK.. TVA a Q.' [_. ,Total. S Pls0 •*- ;`` to 1. X01 S.N �q •'y�'1'`• FORCE MAIN ♦ *`'•:. t it i�—f”- PLd •••'' 4" sheet# sheet# '////4411 t t �%::: ��yt; 4r9; � P ss Ik 67 6"PVC FM DR18 685 529 1,214 LF $14.00 $16,996.00 6"PVC FM DR14 20 130 150 LF— — $16.00 $2,400.00 6"PVC FM 45°Fittings 0 4 4 EA $700.00 --$2,800.00 4"PVC FM DR14 0 138 138 LF $16.00 $2,208.00 4"PVC FM 45'Fittings 0 4 4 EA $800.00 $3,200.00 14"steel casing 0 100 100 LF $95.00 $9,500.00 16"steel casing 0 94 94 LF $105.00 $9,870.00 6"Plug Valve 1 2 3 EA $1,750.00 $5,250.00 4"Plug Valve 0 2 2 EA $1,500.00 $3,000.00 Air Release Valve(sewage) 0 2 2 EA $4,300.00 $8,600.00 Connect to existing Force Main 1 0 1 EA $3,500.00 $3,500.00 Subtotal Force Main System $67,324.00 WATER DISTRIBUTION SYSTEM sheet# sheet it A Z 10"PVC Water Main DR18 682 485 1,167 LF $28.30 $33,026.10 10"PVC Water Main DR14 62 280 342 LF $29.95 $10,242.90 10"PVC Water Main 45`Fittings 4 0 4 EA $850.00 $3,400.00 20"steel casing 0 227 227 LF $130.00 $29,510.00 4"PVC Sleeve 450 450 900 I LF $5.00 $4,500.00 10"Gate Valve 1 5 6 EA $2,000.00 $12,000.00 Fire Hydrant Assembly 2 1 3 EA $3,000.00 $9,000.00 Air Release Valve 2 0 2 EA $1,250.00 $2,500.00 BSP(permanent) 1 0 1 EA $2,000.00 $2,000.00 Water Main Auto Flush Device(AFD) 0 3 3 EA $5,000.00 $15,000.00 Temp.Gap Configuration 1 0 1 EA $2,500.00 $2,500.00 Connect to existing Water Main 1 0 1 EA $3,500.00 $3,500.00 Subtotal Water Main System $127,179.00 Force Main and Water Dist.System Total $194,503.00 LANDSCAPE PLANTINGS&IRRIGATION Southern Live Oak 12'-14',45 Gal. 24 2.4 EA $350.00 $8,400.00 Cabbage Palms 12'-18'CT 13 13 EA $225.00 $2,925.00 Royal Palms 10'GW 5 5 EA $850.00 $4,250.00 Southern Magnolia 12'44' 6 6 EA $495.00 $2,970.00 Red Maple 10-12' 3 3 EA $295.00 $885.00 Royal Poinciana 12' 4 4 EA $350 00 $1,400.00 Eucalyptus Bark Mulch 2"depth/per tree/palm 110 110 BG $4.50 $495.00 irrigation-median-drip 30,300 SF $1.15 $34,845.00 irrigation-other- spray 115,000 SF $0.40 $46,000.00 Irrigation controller r 1 EA $2,000.00 $2,000.00 Sodding I 118,300 SF $0.30 $35,490.00 C:\Documents and Settings\TerryCole\Local Settings\Temporary Internet Files\Content.Outlook\XWJBB4J6\Eng Est 140109 RH Phase 2.xlsx Packet Page -213- 2/9/2016 16.A.3. Engineer's Opinion of Probable Cost HACIENDA LAKES - RATTLESNAKE HAMMOCK, PHASE 2 HM# 2013.011 Date: 1/09/2014 Description Quantity Units Unit Cost Total Painted Pavement Markings,Standard, White,Skip 6" 0.42 GM $325.00 $136.50 Painted Pavement Markings,Standard White, Message Only 11 EA $55.00 $605.00 Bike Only 6 EA $55.00 $330.00 Painted Pavement Markings,Standard, White,Arrows Standard Arrow 11 EA $30.00 $330.00 Bike Arrow 6 EA $30.00 $180.00 Painted Pavement Markings,Yellow,Solid 6" 0.53 NM $1,000.00 $530.00 Reflective Pavement Markers,Blue 6 EA $3.50 $21.00 Reflective Pavement Markers 90 EA $3.50 $315.00 Thermoplastic,Standard,White,Solid,6" 0.67 NM $4,250.00 $2,847.50 Thermoplastic,Standard,White,Solid,8" 365 LF $1.20 $438.00 Thermoplastic,Standard,White,Solid,18" 116 LF $3.25 $377.00 Thermoplastic,Standard,White,Solid,24" 72 LF $5.00 $360.00 Thermoplastic,Standard,White,Skip,6" 0.42 GM i $1,250.00 $525.00 Thermoplastic,Standard,White,Message Only 11 EA $140.00 $1,540.00 Bike Only 6 EA $100.00 $600.00 Thermoplastic,Standard,White,Arrow _ Standard Arrow 11 EA $65.00 $715.00 Bike Arrow 6 EA $50.00 $300.00 Thermoplastic,Standard,Yellow,Solid,6" 0.53 NM $4,250.00 $2,252.50 Thermoplastic,Standard,Yellow,Solid,18" 0 LF $3.00 $0.00 Subtotal Signage&Striping $18,169.45 SITE GRADING&EARTHWORK sheet# sheet# 12 Silt Fencing 4530 4,530 LF $1.50 $6,795.00 Turbidity Barrier 100 100 LF $7.50 $750.00 Rough Grading(+/-0.2'tolerance) 3 3 AC $650.00 $1,950.00 Right-Of-Way Grading 4 4 AC $2,500.00 $10,000.00 Import Fill 20000 20,000 CY $9.50 $190,000.00 6"-12"RipRap 22 22 CY $70.00 $1,540.00 Subtotal Site Grading&Earthwork $211,035.00 C:\Documents and Settings\TerryCole\Local Settings\Temporary Internet Files\Content.Outlook\XWJBB416\Eng Est 140109 RH Phase 2.xisx Packet Page -214- 2/9/2016 16.A.3. ^ Engineer's Opinion of Probable Cost _ _ _ HACIENDA OCK, PHASE 2 Units-- 1� -- -- | Unit�� Total SeedDescription �uanQuantityQuantity . 5eedand Mu|ch1 AC $1^600.00 $1,600.00 --- �����la��gs---- 2,2 SF $1.55 $3,069.90 Subtotal andscopin& _ $144,329.90 --- | DRAINAGE --___ sheet# _ _ 18''RCP,Class i 336 336 LF $38.00_ $12'768.00 36"RCP,Class| O1� 817 LF $87.50 g71A87.50 --- - ----- 18"Flare End 5ec,}onl 2 EA 51,800.00 $3,600.00 �6�� tInlet ---- - 7 7 EA $3,800.00 $26,600.00 Junction Box --------- 1 '-- EA g2.400.00 $2,400.00 Modify Existing Junction Box R- 2 1 1 EA $2'000.00 $2,000.00 Subtotal or;1nage System __ __ ____ $118,855.50 Total ROADWAY sheet# sheet# ____ 1"Asphalt Paving-Type FC-9.5(1st Lift) 10869 10,869 SY $6.46 $70,21374 2"Asphalt 10869 10,869 SY $92,277.81 ------- ---- ------------ LknenockBase Option 9 11103 14108 SY $8.60 $95,485.80 Prime Limerock Base 11103 11,103 SY $0.60__ $6,061.80 1Z"Stabilized Svbg,ade(LBR4O) 12403 SY $1.85 $22,945.55 Type F Curbing 6368 5,368 LF $10.00 $53,680.00 6'Sidewalk(6"co"oete) _ 16603 16,603 SF $3.25 $53,959.75 zZ"Compacted su 2075 2,075 SY $1.85 $3,838.75 Handicap(Mats6 6 EA $600.00 $3,600.00 L-4 L-5 $46,200.00!�,eetL�ht4UPole �8 8 16 EA $2,887.50 Street Light Service Point 1 1 _ EA $5,500.00 $5.500.00 Conduit(UG) 1250 1250 2,500 LF $2.50 $6,250.00 Conduit([xectinn�|Bom) 500 - 500 LF $14.50 $7,250.00 ---- ---- ---- Conductor 4900 5000 9,900 LF $1.00 $9'900.00 '-- ---' --'- ---- Pull Boxes 4 8 EA $300.00 $2'400.00 Subtotal Roadway Pavement $480,163.20 Pavement Markings/S __- 11 __ Single Pnm5i�n,|eothanz23F 7 EA S360.00 $2'620.00 ____ _____ End uf0oadK4urkeo 12 EA $2.100.00 _ ���` ���� ��� ���� ����__ �����`� Delineator 2 EA $85.00 $170.00 � _��_ _ PointcdPavemcntN1u,kinus,5tanda,d White,Solid 6^ Df7 NM $1,000.00 $670.00 _ _____ Painted Pavement Markings,Standard, White,Solid 8" ______ 365 LF $0.35 $127.75 Painted Pavemeot�Warking�5tandxrd, White,Solid 18" 1z6 LF $0.80 $92.80____'_ _.... ___- ____- Painted Pavement Markings,Standard, White,Solid 24" 72 LF $1.20 $86.40 cAnocumentsaodSeuinRs\TonyCn|e\Luca}Scnings\Temporary|nte/netFUes\[ontcnt0uUnnk\XmU8BU6\En& Est14OlU9RHPhnse 2.xlsx Packet Page -2lS- 2/9/2016 16.A.3. . Engineer's Opinion of Probable Cost HACIENDA LAKES RATTLESNAKE HAMMOCK, PHASE 2 HM# 2013.011 Date: 1/09/2014 Description Quantity ` Units j Unit Cost Total Landscaping,Paving,Grading& Drainage Total I 1 5972,553.05 Clearing&Grubbing a 8.15 8 AC $4,,000.00; $32,600.00 Lake Excavation - 5 13600 13,600 CY $2.75 $37,400.00 GRAND TOTAL I j $1,237,056.05 The Developer's intention is to complete all infrastructure improvements prior to recording the plat. The plat bonding amount is$1,237,056.05=$123,705.61. I_ H:\2013\2013011\SS\Eng. Est 140109 RH Phase 2,xlsx Packet Page -216-