Agenda 06/14/2016 Item #16G 1 6/14/2016 16.G.1 . EXECUTIVE SUMMARY Recommendation to approve the submittal of a grant application to the Federal Aviation Administration in the estimated amount of$514,975 for design, permitting, and bid of the aircraft apron expansion and terminal demolition piece of the terminal relocation project at the Marco Island Executive Airport. The estimated design cost for the entire project is $1,197,475, including an estimated$682,500 not eligible for FAA funding. OBJECTIVE: To submit a grant application to the Federal Aviation Administration (FAA) for the design, permitting, and bid of the aircraft parking apron expansion and demolition of the current general aviation terminal at the Marco Island Executive Airport(MKY). CONSIDERATIONS: This grant application is for the design phase of the demolition of the current general aviation terminal building and expansion of the aircraft parking apron at MKY, and is associated with the construction of a new terminal building and vehicle parking lot to be designed as a separate but concurrent program. A new general aviation terminal and vehicle parking lot will be constructed west of the current vehicle parking lot prior to demolition of the existing building. The design and construction of the new terminal building and vehicle parking lot is not eligible for FAA Airport Improvement Program (AIP) funding. The Airport Authority will seek eighty percent (80%) funding from the Florida Department of Transportation(FDOT) for design,permitting and construction costs of these items. The existing general aviation terminal building at MKY is located within an unsafe distance from the active runway, which deviates from current FAA design and safety standards. The building is located approximately 50 feet from the Runway Object Free Area. It is completely within the 14 CFR Part 77 Transitional Surface and future Parallel Taxiway Object Free Area. This project will alleviate safety concerns while also remediating ramp/parking capacity issues, which is extremely limited during the busy winter months. Based on a pre-grant application submitted in January 2016, the FAA determined that the design, permitting and bid of the aircraft apron expansion and demolition of the existing general aviation terminal at MKY is eligible for ninety percent (90%) funding from the FAA in Fiscal Year 2016. The FAA requested that a grant application for this project submitted by June 15,2016. Procurement of consulting services will be accomplished in accordance with federal, state and local laws. Request for Proposals (RFP) #16-6561 was issued by the Procurement Services Division on April 5, 2016, and responses were received on May 16,2016. Once an engineering consultant has been selected, a detailed scope of work and fee schedule will be prepared providing a more accurate cost.This may impact the current estimated amount of grant application. Before a third party agreement is executed for this project,the detailed scope of work and proposed fee schedule must be approved by the FAA and FDOT. The total estimated design cost for the entire project, including the new general aviation terminal and parking lot is $1,197,475. This includes an estimated $682,500 for the design and permitting of the new terminal building and parking lot, which is not eligible for FAA Funding. If the grant is awarded, staff will seek additional FDOT funding to cover five percent(5%) of the apron expansion and demolition, and eighty percent(80%)funding to cover the costs associated with the new terminal and vehicle parking lot. Packet Page-1983- 6/14/2016 16.G.1. Construction is anticipated to commence in late 2017. It is estimated that total construction costs will be approximately $10,000,000 with a required local match of approximately $1,400,000. Subsequent grant applications for construction phases will be submitted in FAA Fiscal Year 2017. This item will be brought back to the Board to accept the grant if offered to the Airport Authority. FISCAL IMPACT: There is no fiscal impact associated with this item at this time. Should the grant be awarded, the Airport Authority would receive FAA funding in the amount of approximately $463,477 with a required local match of ten percent (10%), approximately $51,498 to come from Airport Capital Fund (496) Reserves. The required local match may be offset by slightly less than 50% (preliminary expenses in the amount of $224 are not FDOT eligible) or approximately $25,535 with FDOT participation at approximately 5% of the FAA eligible expenses. It is anticipated that FDOT will participate at eighty percent (80%) or approximately $546,000 in those items that are not eligible for FAA funding. The required FDOT match of 20% for FAA ineligible items or approximately$136,500 will come from Airport Capital Fund(496)Reserves. Estimated Design Item Cost FAA FDOT Local FAA Eligible-Expand Apron&Demo.Terminal $514,975 $463,477 $25,525 $25,973 FAA Ineligible-New Terminal&Parking Lot $682,500 $546,000 $136,500 Total $1,197,475 $463,477 $571,525 $162,473 LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney,presents no legal issue at this time, and requires majority vote for approval. Should the grant be awarded, the Board will have the opportunity at such time to accept or reject the grant. -JAK GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with the Board's approval to submit this grant application. RECOMMENDATION: To approve submitting a grant application to the Federal Aviation Administration for the design, permitting, and bid of the aircraft apron expansion and demolition of the general aviation terminal at the Marco Island Executive Airport,and authorize the Airport Manager,Justin Lobb,to execute all documents necessary to submit the grant application. Prepared by: Justin Lobb,Airports Manager,Airport Authority Attachment: 1) FAA Grant Application for MKY http://apps3.colliergov.net/nenda/ftp/201.6B C CMeet ings/A gend aJ u n 1416/GrowthMgmt/6-14- 16 MKY Terminal Grant Application.pdf Packet Page-1984- 6/14/2016 16.G.1 . COLLIER COUNTY Board of County Commissioners Item Number: 16.16.G.16.G.1. Item Summary: Recommendation to approve the submittal of a grant application to the Federal Aviation Administration in the estimated amount of$514,975 for design, permitting, and bid of the aircraft apron expansion and terminal demolition piece of the terminal relocation project at the Marco Island Executive Airport.The estimated design cost for the entire project is $1,197,475, including an estimated $682,500 not eligible for FAA funding. Meeting Date: 6/14/2016 Prepared By Name: BrueggemanDebra Title: Operations Coordinator,Airport Authority 5/3/2016 9:30:07 AM Submitted by Title: Manager-Airport,Airport Authority Name: LobbJustin 5/3/2016 9:30:09 AM Approved By Name: LobbJustin Title: Manager-Airport,Airport Authority Date: 5/11/2016 9:10:43 PM Name: LynchDiane Title: Supervisor-Operations,Road Maintenance Date: 5/16/2016 4:52:34 PM Name: ShueGene Title:Division Director-Operations Support,Growth Management Department Date: 5/19/2016 4:12:15 PM Name: KearnsAllison Title: Manager-Financial&Operational Sprt,Capital Construction&Maintenance Budget/Fiscal Packet Page-1985- 6/14/2016 16.G.1 . Date: 5/19/2016 8:46:40 PM Name: Joshua Thomas Title: Grants Support Specialist,Grants Management Office Date: 5/20/2016 8:03:39 AM Name: WilkisonDavid Title:Department Head-Growth Management Dept,Growth Management Department Date: 5/20/2016 10:26:30 AM Name: BelpedioJennifer Title:Assistant County Attorney,CAO General Services Date: 5/20/2016 11:24:46 AM Name: KlatzkowJeff Title: County Attorney, Date: 5/25/2016 12:40:07 PM Name: StanleyTherese Title: Manager-Grants Compliance,Grants Management Office Date: 5/26/2016 12:58:17 PM Name: CasalanguidaNick Title:Deputy County Manager, County Managers Office Date: 6/1/2016 3:27:23 PM Packet Page-1986- �®J�tr AIRPpgfa` y a� A June 15, 2016 Ms. Krystal Ritchey FAA Airport District Office 5950 Hazeltine National Drive Suite 400 Orlando, FL 32822 COLLIER COUNTY AIRPORT AUTHORITY 2005 Mainsail Drive, Suite 1 Naples, Fl, 34114-8955 (239)642-7878 Fax(239)394-3515 nrm+w Cn l l i eravfaki Un.Ca11.7 Re: Project Grant Application Obstacle Remove & Apron Expansion — Design Phase Marco Island Executive Airport Dear Ms. Ritchey, Enclosed is a FY2016 grant application for the above referenced project. This application is for the design phase of the overall project, and includes only the Federal Aviation Administration eligible portion of: demolition of the existing general aviation terminal and aircraft apron expansion. A revised interim Airport Layout Plan (ALP), depicting a group II airport, was transmitted to the FAA on March 28, 2016, and is included in this application package. This application includes: • Federal Assistance Request Checklist • Revised Standard Form 424 — Application for Federal Assistance • Project Information Sheet • Project Cost Breakdown • Project Sketches • Airport Layout Plan — Updated in March 2016 • Environmental Determination Documentation/CatEx Checklist • Exhibit A — Property Map & Title Opinion • Exhibit B - DBE Program & Goals Proposal • Exhibit C - Solicitation for Design Services Marco Island Executive Airport Immokalee Regional Airport Everglades Park 2005 Mainsail Drive, Suite 1 165 Airpark Boulevard P.O. Box 689, 650 EC Airpark Blvd Naples, FL 34114-8955 Immokalee, FL 34142 Everglades City, FL 34139 239.394.3355 239.657.9003 239.695.2778 239.642.5427 Fax 239.657.9191 Fax 239.695.3558 Fax Ms. Krystal Ritchey Grant Pre -Application Package — MKY Obstacle Removal & Apron Expansion Page 2 of 2 We are requesting a Letter of Credit method of payment for this grant agreement. If you have any questions or need any additional information do not hesitate to contact us. Sincerely, Justin Lobb Airport Manager Copy to: Wendy Sands, FDOT Kristi Smith, FDOT APPLICATION CHECKLIST 1. AIRPORT: Marco Island Executive Airport (MKY) LOCATION: Naples, Collier County, FL DATE OF REQUEST FOR FEDERAL ASSISTANCE: June 15. 2016 Following items to be completed by sponsor or consultant (if No [N] to any item, explain the method of resolution on an attachment. 2. Front page SF 424 included? Yes 3. Cost breakdown included? Yes 4. Sketch included? Yes 5. Exhibit "A" (if airport property interests have changed since last grant)? See Attached 6. Are plans and specifications in accordance with approved environmental documents? Yes 7. Is construction cost based on bids or land cost based on appraisals or actual acquisition cost? N/A 8. Has the FAA approved the Disadvantaged Business Enterprise Program Yes 9. Is all work in the plans and specs requested to be included in the rant? Yes 10. Supporting documentation provided if project includes force account? N/A 11. Sponsor legally obligated to remove/relocate utility if included in project? Yes 12. Letter of Credit payment method requested? Yes MKY Obstruction Removal & Apron Expansion Application Page 1 of 2 APPLICATION CHECKLIST MARCO ISLAND EXECUTIVE AIRPORT Item 5. Exhibit A Airport Property Map Information Vacation of the Mainsail Drive Right -of -Way The Airport Authority is in the process vacating the Mainsail Drive Right -of -Way (ROW) under a separate project funded by the Florida Department of Transport. The ROW vacation requires one hearing before the Collier County Board of County Commissioners (BCC) to be approved via BCC resolution. It is anticipated that Vacation of the Mainsail Drive Right -of -Way will be presented to the Collier County BCC for final approval on July 12, 2016. MKY Obstruction Removal & Apron Expansion Application Page 2 of 2 OMB Number: 4040-0004 FKniration Date: 06/31/2016 Application for Federal Assistance SF -424 * 1. Type of Submission 2. Type of Application If Revision, select appropriate letten s): - Select One - FC Preapplication 0 New 7 Application E Continuation Other (Specify) 9 Chan ed/Corrected A lication � Revision * 3. Date Received: 4. Application Identifier: 6a. Federal Entity Identifier: 5b. Federal Award Identifier: state use Onl 6. Date Received b State: 7. State Application Identifier: 8. APPLICANT INFORMATION: * a. Legal Name: Collier County Board of County Commissioners * b. Employer/Taxpayer Identification Number (EIN/TIN): c. Organizational DUNS: 59-6000558 076997790 d. Address: * Street1: 2005 Mainsail Drive, Suite 1 Street 2: * City: Naples County: Collier * State: Florida Province: Country: USA Zip/ Postal Code: 34114 e. rganrcationa nix: epartment ame: UIVISIOn ame: Board of County Commissioners Airport Authority - Immokalee Regional Airport ame an contact information o person to De contacted on matters mvo vmg t is app ication: re ix: Mr. First ame: Justin Middle Name: * Last Name: Lobb Suffix: it e: Airport Manager Organizational Affiliation: * Telephone Number: (239) 642-7878 Fax Number: (239) 394-3515 mail: JustinLobb collier ov.net OMB Number. 4040-0004 Ex iraton Date: 08/31/2016 Application for Federal Assistance SF -424 "9. Type of Applicant 1: Select Applicant Type: B. County Government Type of Applicant 2: Select Applicant Type: - Select One - Type of Applicant 3: Select Applicant Type: - Select One - Other (specify): " 10. Name of Federal Agency: Federal Aviation Administratin (FAA) 11. Catalog of Federal Domestic Assistance Number: 20.106 CFDA Title: Airport Improvement Program "12. Funding Opportunity Number: Title: 13. Competition Identification Number: Title: 14. Areas Affected by Project (Cities, Counties, States, etc.): Marco Island Executive Airport, Naples, Collier County, Florida 15. Descriptive Title of Applicant's Project: Obstruction Removal and Apron Expansion. See Attached Project Description Attach supporting documents as specified in agency instructions. OMB Number: 4040-0004 Expiration Date: 08131/2016 Application for Federal Assistance SF -424 16. Congressional Districts Of: *a. Applicant: 19 *b. Program/Project: 19 Attach an additional list of Program/Project Congressional Districts if needed. 17. Proposed Project: *a. Start Date: 11/01/2016 *b. End Date: 12/31/2017 18. Estimated Funding ($): *a. Federal 463,477.00 *b. Applicant 26,098.00 *c. State 25,400.00 *d. Local *e. Other *f. Program Income *g. TOTAL 514,975.00 *19. Is Application Subject to Review By State Under Executive Order 12372 Process? ® a. This application was made available to the State under the Executive Order 12372 Process for review on 91 b. Program is subject to E.O. 12372 but has not been selected by the State for review. ® c. Program is not covered by E.O. 12372 *20. Is the Applicant Delinquent On Any Federal Debt? (If "Yes", provide explanation on next page.) ® Yes ® No 21. *By signing this application, I certify (1) to the statements contained in the list of certifications** and (2) that the statements herein are true, complete and accurate to the best of my knowledge. I also provide the required assurances** and agree to comply with any resulting terms if I accept an award. I am aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil, or administrative penalties. (U.S. Code, Title 218, Section 1001) El **I AGREE ** The list of certifications and assurances, or an internet site where you may obtain this list, is contained in the announcement or agency specific instructions. Authorized Representative: Prefix: Mr. *First Name: Justin Middle Name: *Last Name: Lobb Suffix: *Title: Airport Manager *Telephone Number: (239)642-7878 Fax Number. (239)394-3515 * Email: JustinLobb@oolliergov.net *Signature of Authorized Representative: *Date Signed: MARCO ISLAND EXECUTIVE AIRPORT OBSTRUCTION REMOVAL AND APRON EXPANSION (MKY TERMINAL) - DESIGN Grant Application — Description & Cost Breakdown I. Grant Description - Obstruction Removal & Apron Expansion Design This project application is for airport engineering services for the design, permitting, and bid phase of the expansion of the aircraft apron (approximate 30,400 SY) and demolition of the existing general aviation terminal building at the Marco Island Executive Airport. This project is associated with the construction of a new terminal building and vehicle parking lot to be designed as a separate program/phase. The existing general aviation terminal building at the Marco Island Executive Airport is located within an unsafe distance from the active runway, which deviates from current FAA design/safety standards. The building is located approximately 50 feet from the Runway Object Free Area. It is completely within the Part 77 Transitional Surface and future Parallel Taxiway Object Free Area, which is currently utilized an as aircraft parking area/taxilane. This project alleviates safety concerns while addressing ramp/parking capacity issues, which is extremely limited during the busy winter months. Prior to demolishing the terminal, a new terminal and vehicle parking area will be constructed west of the current vehicle parking. The Airport Authority will seek Florida Department of Transportation funding for the design, permitting, and bid of the new general aviation terminal and vehicle parking lot. A. Construction of New General Aviation Terminal/Vehicle Parking/Airport Entrance (FAA Ineligible) The Airport Authority will seek Florida Department of Transportation (FDOT) participation in this phase of the project, which includes constructing a new general aviation terminal, equipment building, and vehicle parking lot. These items are not eligible for FAA funding, and will be completed as a separate project. The new terminal will be constructed on an approximately 3.5 acre site northwest of the existing vehicle parking lot. It will be a two-story facility, between 12,500 and 15,000 square -foot. An approximately 3,200 square foot shelter for ground support equipment, and a 7,300 square -foot paved vehicle parking lot (115 spaces) and circulation roadway will also be constructed. Construction will include grading, drainage, lighting, signage, fencing and landscaping. Obstruction Removal & Apron Expansion Grant Pre -Application Description & Cost Estimate Page I of 3 The new terminal will replace the existing terminal that consists of approximately 4,543 square feet of usable floor space defined by four functional use areas: Airport administration/Collier County Airport Authority office space, customer/public space, FBO/airport operations, and building support areas. A preliminary terminal space program identified the existing floor space distribution and the desired space for each functional area of a new terminal. The building footprint for a new single -level terminal would be approximately 11,210 square feet. Because of limited space available, airport management expressed a desire to develop a two-level terminal. Based on the desired amount of space for each functional area, the footprint for a two- story terminal would be approximately 7,700 square feet. The first level would consist of customer service, public use space, including public seating/lounge area, restrooms, vending machines, and circulation (hallways, stairs, and elevator). In addition, Authority operated FSO offices, and FBO/flight line operations space, pilots lounge/ planning area, rental car space, equipment storage, fire protection, and mechanical/electrical equipment space would be accommodated on the first floor. The second level would provide space for airport administration, including offices, meeting/conference room, a visitor waiting area, file storage, work area, break room, general storage, circulation, and equipment. Following is a cost breakdown for the FAA ineligible project items, the design, bid and permitting of the new airport terminal and vehicle parking lot. DESCRIPTION (FAA Ineligible) Terminal & Vehicle Parking Lot COST ESTIMATE MOT (80%) Local (20%) Cost Estimate $2,500 $2,000 $500 -Independent Permit Fees $50,000 $40,000 $10,000 Plans and Bid Documents $625,000 $500,000 $125,000 -Design Administration $5,000 $4,000 $1,000 -Airport TOTAL $682,500 $546,000 $136,500 MKY Obstruction Removal & Apron Expansion Grant Pre -Application Description & Cost Estimate Page 2 of 3 B. Demolishing the Old General Aviation Terminal and Constructing Aircraft Apron (FAA Eligible) This phase includes demolishing the existing terminal and constructing/expanding the aircraft apron (approximately 30,400 +/- SY) on the old terminal site. The new apron will provide adequate parking space for five to six business jets. By expanding the apron, the aircraft movement areas and clearances will meet the ADG B -II criteria, thus enhancing safe and efficient operations. A Request for Proposal (RFP) for the entire project was advertised on April 14, 2016. Responses were received on May 16, 2016, and are currently being reviewed. A proposed scope of work, schedule, and cost for this project will be submitted to the grantors for approval once these proposals have been reviewed. II. Cost Breakdown Estimate for FAA Eligible Items— Obstruction Removal & Apron Expansion Design Permit & Bid DESCRIPTION COST ESTIMATE FAA (90%) FDOT (5%) Local (5%) Disadvantage Business Program (DBE) $4,475 $4,027 $448 Independent Cost Estimate (ICE) $2,500 $2,250 $250 Permit Fees $25,000 $22,500 $1,250 $1,250 Design Plans and Bid Documents $480,000 $432,000 $24,000 $24,000 Ai ort Administration $3,000 $2,700 $150 $150 TOTAL $514,975 $463,477 $25,400 $26,098 NOTE: Preliminary expenses (DBE and ICE) required for the submittal of an FAA grant application are considered reimbursable expenses once that grant agreement has been entered into. However, these expenses are not eligible for FDOT reimbursement if incurred prior to entering into an agreement with FDOT. 'Establishing a DBE program and goals is an eligible cost of a project that triggers the need. The cost to establish the program and goals for the Immokalee Regional Airport and the Marco Island Executive (approximately $8,950) is being divided equally between the two airports. MKY Obstruction Removal & Apron Expansion Grant Pre -Application Description & Cost Estimate Page 3 of 3 t 0 a r; Planning Consultants AVIATION • TRANSPORTATION • CONTRACT COMPLIANCE Debbie Brueggerman Operations Coordinator Collier County Airport Authority 2005 Mainsail Drive, Suite 1 Naples, FL 34114 February 29, 2016 Corporate Headquarters Phone: 910.762.6297 PO Box 3113 Fax: 910.762.5963 Wilmington NC 28406 Web: www.kwaplanning.com Invoice for Planning Services: No. 1 -(FINAL) Statement No. 012-16 KWA 132-1D-01 Work Dates: 11/24/15 to 3/1/16 4500164428 Collier County Airport Authority, Naples FL- FY 2016 -FY 2018 DBE Program Services; Project Review; Analysis of DBE potential, develop overall DBE goal, and Methodology and Small Business Participation Plan (SBPP) Program Services (49 CFR, Part 26). Ki: 3100-ILM Please make checks payable to: Ken Weeden & Associates, Inc. P.O. Box 3113 Wilmington, INC 28406 (910)762-6297 Wilmington NC e Raleigh NC e Atlanta GA Budjeted Pct. (%) Total Amount TOTAL DUE Project Costs Complete Earned to Previously THIS `. Balance Task/ Activity/ Phase to Date Date Billed INVOICE,...:. Task One: DBE GOAL DEVELOPMENT ASSISTANCE Task 1.1: FY 2016-2018 DBE Goal - Macro Executive Airport $3,224.00 100.0% $3,224.00 $0.00 $3,224.00 $0.00 Task 1.2: FY 2016-2018 DBE Goal - Immokalee Regional Airport $3,224.00 100.0% $3,224.00 $0.00 ,: $3,224.00 $0.00 Task Two: Update DBE Program Administrative: Documents Task 2.1: Update DBE Program Administrative Document $960.00 100.0% $960.00 $0.00 $960.00 $0.00 Task 2.2: Follow Up, Agency Coordination $290.00 100.0% $290.00 $0.00 $290.00 $0.00 Task Three: Fostering Small Business Participation Task 3.1: Develop Small Business Participation $960.00 100.0% $960.00 $0.00 $960.00 $0.00 Task 3.2: Follow Up, Agency Coordination $290.00 100.0% $290.00 $0.00 ..$290.00 $0.00 Totals: $8,948.00 100.0% $8,948.00 $0.00..::,:,.:$5,948.00. $0.00 Ki: 3100-ILM Please make checks payable to: Ken Weeden & Associates, Inc. P.O. Box 3113 Wilmington, INC 28406 (910)762-6297 Wilmington NC e Raleigh NC e Atlanta GA MARCO ISLAND EXEUCTIVE AIRPORT Obstruction Removal & Apron Expansion Cost Breakdown Estimates ITEM QUANTITY UNIT UNIT PRICE COST EST. CONSTRUCTION ESTIMATES OBSTRUCTION REMOVAL MISCELLANEOUS DEMO 1 LS $200,000.00 $200,000 GENERAL CONDITIONS(') 1 LS $10,000.00 $10,000 ADMINISTRATION (2%) $4,000 SUBTOTAL $214,000 AIRCRAFT APRON EXPANSION _ APRON STABILIZED SUBGRADE 30400 Sy $10.00 $304,000 _ .APRON LIMEROCK BASE 30400 Sy $15.00 $456,000 APRON ASPHALT PAVEMENT 7900 TONS $200.00 $1,580,000 SIGNAGE & MARKING 1 LS _ $50,000.00 $50,000 .DEWATERING 1 LS $50,000.00 $50,000 EROSION CONTROL MEASURE _ 1 LS $30,000.00 $30,000 UNCLASSIFIED EX. 200 Cy $10.00! $200,000 MILLING _ ! 3800 Sy $5.00 $19,000 _ DRAINGE PIPE 1000 LF ! $100.00 $100,000 !DRAINAGE INLETS 4 EA $4,000.00 $16,000 NEW HIGH MATS POLE LIGHTING 15 EA $40,000.00 $600,000 _ SODDING_ 8572 SY _ $7.00 $60,000 GE N ERAL CON DITIONSM LS $172,000.00 $172,000 ADMINISTRATION (2%) $73,000 SUBTOTAL _ $3,710,000 TOTAL CONSTRUCTION ESTIMATE $3,924,000 ITEM QUANTITY UNIT UNIT PRICE !, COST EST. ENGINEERING DURING DURING CONSTRUCTION/CONSTRUCTION OVERSIGHT [CEI) ESTIMATES OBSTRUCTION REMOVAL & APRON EXPANSION 1 LS $481,000.00, $481,000 TOTAL CEI ESTIMATE $481,000 DESIGN/BID COST ESTIMATES OBSTRUCTION REMOVAL 1 LS $50,000.00 $50,000 !,APRON EXPANSION 1 LS $430,000.00 $430,000 TOTAL DESIGN/BID ESTIMATE $480,000 TOTAL PROJECT ESTIMATE DESIGN/BID COST ESTIMATES $480,000 CONSTRUCTION OVERSIGHT (CEI) $481,000 CONSTRUCTION ESTIMATE $3,924,000 NOTAL PROJECT ESTIMATE $4,885,000 General conditions = additional contractor costs such as perparation, mobilization, permitting, etc. MARCO ISLAND EXEUCTIVE AIRPORT Terminal Relocation & Vehicle Parking Cost Breakdown Estimates ITEM QUANTITY UNIT UNIT PRICE COST EST. CONSTRUCTION ESTIMATES TERMINAL RELOCATION/NEW TERMINAL '.TERMINALBUILDING 13000 SF $275.00 $3,575,000 DEWATERING 1 LS $50,000.00 $50,000 EROSION CONTROL MEASURE 1 LS $20,000.00 $20,000 UNCLASSIFIED EX. 112 CY $10.001 $112,000 _ DRAINGE PIPE 200 LF $100.00 $20,000 DRAINAGE INLETS 2 EA $4,000.00 $8,000 UTILITY INFRASTRUCTURE 1 LS $100,000.00 $100,000 'SODDING 3429 SY $7.00 $24,000 GENERAL CONDITIONS"' 1 LS $210,000.00' $210,000 GSE SHELTER - NEW _ 3200 SF $100.00 $320,000 ADMINISTRATION (2%) $90,000 SUBTOTAL $4,529,000 ACCESS & VEHICLE PARKING .,ACCESS & PARKING STABILIZED SUBGRADE 7300 SY $10.00 $73,000 ACCESS & PARKING LIMEROCK BASE 7300 SY $15.00' $109,500 ACCESS & PARKING ASPHALT PAVEMNT 1700 TONS $200.00 $340,000 GENERAL CONDITIONS"' $26,000.00 $26,000 ADMINISTRATION (2%) $10,000 SUBTOTAL $558,500 TOTAL CONSTRUCTION ESTIMATE $5,087,500 ITEM QUANTITY UNIT UNIT PRICE COST EST. ENGINEERING DURING DURING CONSTRUCTION/CONSTRUCTION OVERSIGHT (CEI) ESTIMATES TERMINAL RELOCATION & VEHICLE PARKING 1 LS $625,000.00 $625,000 TOTAL CEI ESTIMATE $625,000 DESIGN/BID COST ESTIMATES TERMINAL RELOCATION/NEW TERMINAL 1 LS $555,000.00 $555,000 ACCESS & VEHICLE PARKING _ 1 LS $70,000.00' $70,000 TOTAL DESIGN/BID ESTIMATE $625,000 - - -.__.. TOTAL PROJECT, ESTIMATE DESIGN/BID COST ESTIMATES $625,000 CONSTRUCTION OVERSIGHT (CEI) $625,000 (CONSTRUCTION ESTIMATE $5,087,500 TOTAL PROJECT ESTIMATE $6,337,500 etc. General conditions = additional contractor costs such as perparation, mobilization, permitting, II II 11.1 II II 1 11,1 II II II 1 lanl 1 11 111111 11 1 ; II II II V.lull n 1 I— 1 11 11 111.1 1111 11 11 11 1 r.1 1111 11 11 11 I O 1111 1 1 V I I I i l I I I I I I I1 11 1 1 1 I .I 11 V I I I I l 1 I 1 y l l n II 1 III IUI It II II II 1111;,1 n II 1111 t1 I IIu1 Il I1 )l I 1 nI II II II III I I II II I III I I 1 I I .111 III 11 II I 1 1111'.1 II 1111'.1 11 1 1 1L .D I I 1 I II l 1, i 1'.1 I II II 11111 II II 111 11 ll�l ll 111 1.1. I:IL1 Il Il 111E 1L�1L 11 1111E 1L.1'. I I L It I' I I 1 II II. III 'III II II IL I'. I IIII 1L 11:1 IL 1 1L:1L�1 1 LI IIII1 1 'L'111 ; 1 1 1 ll I.1: 1 Il 1L'.1 II Il Il l 1 'IIu 11 — 11 11 II'III'.� 1 I .11111 11 11'�11'11 I I. '.11 IL IL�I'.I illi 1�11 I 1' I III .Inuuw a II n 1r.Inn I I n I n',li'aI I I I I u I1,1'.I I I Irn: 1 nl r.1 I I I ',I li li r.11 I II I Ir. I I 1 1.iu1 I I n.lclw n u u I I cu I I I I r.I 1,1,1 a sI I ti 1.1nnI 111'.Icun nl IL Llllllll n 1 9ru I I u Iif 1 111 1. P.I u I ii1 n1 lrinuul� JJ 11 litn n .)_i I u n u u l l l I p u I 11 1 1 1 u u n I 1 u 1 n n I I'. n n u I 1 .1 1 11 11 ll'd 6u Iuu nu nn II 1111 I.II'.11I II IL I:R I I 1 LLLLn IIi ,III II i1 li'I ii�UI " I I, InIr1L 1.w 1u 1 1: nnI uIr. I11u I rI I u 1^ l',1n n 1 uIn Il'Inu In r. I .. ynA.o1 nul IUIr,ln nl w lml I I u 11>m IIIi1 y1 I lr.'_u n1 I I �Iv I I oy u I Ir.1 `-� 11111111E 111111111. 1 ii111 I1I I ------------- � 1 � I I i i �� � ii I I 1 2 I, i h — r •'p>��d � I n 1I �I SAI IIi II �C��I I I --iT r: h� Im io I 111 nlll a r ,� r 1` I d ALI -1 /moi �� ii �r�� i I i e I � �, d^�1'�.�0 1 �,�fa•I � ,I �I I al I 4;,A _J PJa N,'••.'.•.•,'.'••.'.•.•.• i.. * p c t'a it IIF ":o. i!I L __ _ _ v 1, 1 I SGirl 1� 7 It ti A m d Iy a;a II'i ,1 ;I 1 ^�^A® •« BUILDING AREA PLAN l� 1, �" COLLIER COUNTY (FUTURE BUILD—OUT) AIRPORT AUTHORITY �p1 cermxn� consuLTnats gxpp,S MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND, FLORIDA I I c e o w o T I ----- Ln Os 0 TMC i1 FTI L ZA COUNTY AIRPORT AUTHORITY m• ClNIRAL CON LTAM URS 9 II AIRPORT LAYOUT PLAN MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND. FLORIDA SAT, H4 ZA COUNTY AIRPORT AUTHORITY m• ClNIRAL CON LTAM URS 9 II AIRPORT LAYOUT PLAN MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND. FLORIDA MKY AIRPORT LAYOUT PLAN "PEN AND INK' MODIFICATIONS/UPDATES March 2016 The following changes have been incorporated into the Marco Island Executive Airport Airport Layout Plan (ALP) and Building Area Plan (BAP) drawings previously dated May 2015. Modifications to these drawings amend and supersede the previous drawing sheets dated May 2015. Airport Layout Plan (Sheet 2 of 8) • Added depiction of partial removal of apron -edge pavement east of Civil Air Patrol lease and west of north end of Runway 17/25 to preclude direct taxiway between apron and runway. • Removed future grassed island near the T -Hangars. • Modified airport property boundary lines to reflect abandonment of Right -of -Way. • Modified delineation of ultimate extent of apron expansion. • Added depiction of future demolition and associated relocation of taxiway connector to preclude direct taxiway between apron and runway. • Expanded stormwater detention area west of the apron. • Modified Revisions Block to reflect Note 3 dated 2/2016. • Added note "wooden Dock Platform (To be Removed). Building Area Plan Drawing Sheet 6 of 8 • Added depiction of partial removal of apron -edge pavement east of Civil Air Patrol lease and west of north end of Runway 17/25 to preclude direct taxiway between apron and runway. • Removed future grassed island near the T -Hangars. • Modified airport property boundary lines to reflect abandonment of Right -of -Way. • Modified delineation of ultimate extent of apron expansion. • Modification of apron taxilane markings limited to ADG-II Taxiway and Taxilane Object Free Area geometrics. • Added depiction of future demolition and associated relocation of taxiway connector to preclude direct taxiway between apron and runway. • Expanded stormwater detention area west of the apron. • Modified Revisions Block to reflect Note 2 dated 2/2016. • Added note "Wooden Dock Platform (To be Removed). • Revised future Terminal Area fence line. • Added depiction and location of future taxiway and runway informational signs. In response to the May 2015 update of the ALP, comments were noted regarding the AWOS clearance as required by Order 6550.20b. It has been determined that the AWOS tower was raised to an elevation of at least ten (10) feet above the highest obstruction (hangar) in the area. The exact height will be determined by a survey to be conducted during the next formal ALP update. FAA ORLANDO AIRPORTS DISTRICT OFFICE — CATEGORICAL EXCLUSION (CATEX) SHORT FORM Airport: MARCO ISLAND EXECUTIVE AIRPORT Project Title: OBSTRUCTION REMOVAL AND APRON EXPANSION DESIGN Use this CATEX Short Form if the Proposed Action is a federal action subject to NEPA and normally would not individually or cumulatively have a significant effect on the human environment. Identify the applicable action(s) from FAA Order 1050. IF, paragraphs 5-6.1 through 5-6.6. List all components of the Proposed Action and Connected Actions (if any) on a separate sheet. A CATEX should not be used for a segment or an interdependent part of a larger proposed action. Include a summary of existing conditions at the Proposed Action site. Attach a site map identifying the Proposed Action area on the airport's current ALP and a recent aerial of the Proposed Action area. Certify that the Proposed Action and Connected Actions are NOT likely to have extraordinary circumstances or significant impacts. Significance thresholds and factors to consider are in FAA Order 1050.1F Exhibit 4-1. Extraordinary circumstances are listed in FAA Order 1050.1F paragraph 5-2, and summarized below: -An adverse effect on cultural resources protected under the National Historic Preservation Act of1966. as amended, 54 U.S.C. §300101 et seq.: -An impact on properties protected under Section 4(f): -An impact on natural, ecological, or scenic resources of Federal, state, tribal, or local significance (e.g., federally listed or proposed endangered. threatened, or candidate species. or designated or proposed critical habitat under the Endangered Species Act, 16 U.S.C. §§ 1531-1544); -An impact on the following resources: resources protected by the Fish and Wildlife Coordination Act, 16 U.S.C. §§ 661- 667d: wetlands: floodplain; coastal zones; national marine sanctuaries; wilderness areas: National Resource Conservation Service designated prime and unique farmlands; energy supply and natural resources: resources protected under the Wild and Scenic Rivers Act, 16 U.S.C. §§ 1271-1387, and rivers or river segments listed on the Nationwide Rivers Inventory (NRI): and solid waste management; -A division or disruption of an established community, or a disruption of orderly, planned development, or an inconsistency with plans or goals that have been adopted by the community in which the project is located: An increase in c=estion from surface transportation (by causing decrease in level of service below acceptable levels determined by appropriate transportation agency, such as a highway agency); -An impact on noise levels of noise sensitive areas: -An impact on air quality or violation of Federal, state, tribal, or local air quality standards under the Clean Air Act, 42 U.S.C.§§ 7401-7671q: -An impact on water quality, sole source aquifers, a public water supply system, or state or tribal water quality standards established under the Clean Water Act, 33 U.S.C. §§ 1251-1387, and the Safe Drinking Water Act, 42 U.S.C. §§ 300f -300j- 26; -Impacts on the quality of the human environment that are likely to be highly controversial on environmental grounds. The term "highly controversial on environmental grounds" means there is a substantial dispute involving reasonable disagreement over the degree, extent, or nature of a proposed action's environmental impacts or over the action's risks of causing environmental harm. -Likelihood to be inconsistent with any Federal, state, tribal, or local law relating to the environmental aspects of the proposed action: or -Likelihood to directly, indirectly, or cumulatively create a significant impact on the human environment, including, but not limited to, actions likely to cause a significant lighting impact on residential areas or commercial use of business properties, likely to cause a si,nificant impact on the visual nature of surrounding land uses, likely to cause environmental contamination by hazardous materials. or likely to disturb an existing hazardous material contamination site such that new environmental contamination risks are created. Based on the information in this Short Form CATEX and supporting information, I certify that the Proposed Action and Connected Actions meet(s) all requirements for a CATEX in accordance with FAA Order 1050.F and do not have any extraordinary circumstances or significant impacts. Signature of Authorized Airport Representative Date FAA Determination (signature of Program Manager): Categorically Excluded: Date: Requires further environmental analysis: Date: Final 8-20-2015 CATEGORICAL EXCLUSION ENVIRONMENTAL DETERMINATION CHECKLIST Airport: MARCO ISLAND EXECUTIVE AIRPORT Prepared and certified by: Date: ** Attach detailed explanations or analysis for all `yes" answers on a separate sheet that supports a Categorical Exclusion determination. Final 8-20-2015 YES** NO COMMENTS THE PROPOSED ACTION MUST BE LISTED IN FAA ORDER 1050.1F PARAS. 5-6.1-5-6.6 AS AN ACTION THAT WOULD NORMALLY BE CATEGORICALLY EXCLUDED X Per paragraph 5-6.4a, e, f, h, i, 1, and p See attached THE PROPOSED ACTION CONSISTS OF: Helicopter facilities oroperations X Land acquisition X New airport serving general aviation X Access or service road construction X New airport location X New runway X Runway extension, strengthening, reconstruction, resurfacing or widening X Converting prime or unique farmland X Runway Safety Area (RSA) improvements X ILS or ALS installation X Airport development (hangars, terminal expansion) X On -airport aboveground or underground fuel storage tanks X Construction, reconstruction, or relocation of an ATCT X THE PROPOSED ACTION WILL AFFECT: Historic/Archeological/Cultural Resources X Section 4(f) or 6(f) resources X Federally listed, endangered, threatened , or candidate species, or designated/proposed critical habitat X Federal, state, tribal, or local natural, ecological, or scenic resources X Wetlands, floodplains, waterways X Energy supply or natural resources X Protected rivers or river segments X Established community(s), planned development, or plans/goals adopted by the local community X Surface vehicular traffic (reduce LOS) X Air quality or violate Federal, state, tribal or local standards X Water quality, a sole source aquifer, public water supply system, or federal, state, or tribal water quality standards X THE PROPOSED ACTION IS LIKELY TO: Be Highly Controversial on Environmental Grounds X Be Inconsistent with Federal, state, tribal, or local law relating to environmental aspects X Cause residential or business relocations X Increase noise levels over Noise Sensitive Land Uses within the 65 dBA noise contour or newly include Noise Sensitive Land Uses within the 65 dBA noise contour. X Cause Environmental Justice Impacts X Contain Hazardous Materials or Affect Hazardous Materials/Sites X Create a Wildlife Hazard per AC 150/5200-33 X Increase lighting impacts on residential communities or impact the visual nature of surrounding land uses X ** Attach detailed explanations or analysis for all `yes" answers on a separate sheet that supports a Categorical Exclusion determination. Final 8-20-2015 MARCO ISLAND EXECUTIVE AIRPORT SUPPLEMENTAL INFORMATION FOR CATEGORICAL EXCLUSION CHECKLIST March, 2016 Project Overview This project includes building a new general aviation terminal and ground equipment storage shelter, demolishing the old terminal, constructing aircraft parking/ramp, and extending the taxiway. Construction of the new terminal will include will include grading, drainage, lighting, signage, fencing landscaping, and constructing a 115 -space vehicle parking lot and access road. Page 1 of 1 PROJECT: OBSTRUCTION REMOVAL AND APRON EXPANSION DESIGN AIRPORT: MARCO ISLAND EXECUTIVE AIRPORT 1. Objectives: Prepare design plans, specifications, and bid documents, and bid and permit construction/expansion of an aircraft apron and demolition of the old general aviation terminal. 2. Anticipated Benefits: Significantly enhance safety by removing an obstruction (terminal building) from the Part 77 Transitional Surface and future Parallel Taxiway Object Free Area, relocating it a safer distance from the Runway Object Free Area, and by providing sufficient aircraft operation and movement area during the busy winter month. The expanded apron will also provide additional aircraft parking and tie -down area ultimately allowing the Airport Authority to manage increasing aircraft traffic at the Airport. 3. Approach: Consultants' and contractors' means and methods using standard design. 4. Geographic Location: This project is for the Marco Island Executive Airport, located at 2005 Mainsail Drive, Naples, Collier County, Florida 34114. Phone: (239) 642-7878. Fax: (239) 394-3515 5. Sponsor's Representative: Justin Lobb, Airport Manager, Collier County Airport Authority MKY Obstruction Removal & Apron Expansion Grant Application Pale 1 of 1 Exhibit A— Property May & Title Opinion OBSTRUCTION REMOVAL & APRON EXPANSION Grant Application MARCO ISLAND EXECUTIVE AIRPORT Exhibit A — Property Map 'T� 4 A ,W: Q J;. 9 low 10 011 q py IS f slits 8 Qq 16, 6 f i 0 0;; j jil glow lit I IN POOra ah >i I, i h 'Us. VISION Ulm; 2111 to R; as E: aJAR Pip I NY 0111 call: alff in 11 1 1 pro IN I 11 ill M M 00 1 ff am 1111H 5� i A; 5o, U W ROE q 0 4 Hy will Sp 2011 IN, I oil MINH 11 1W a up v 51 19 lop RIiQPgRm FOR R COUNTY COLLIER AIRPORT AUTHORITY AIRPORT P ROPERTY MAP MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND, FLORIDA��fj p AL CONSULTAN UPS VIM .. j 19 lop RIiQPgRm FOR R COUNTY COLLIER AIRPORT AUTHORITY AIRPORT P ROPERTY MAP MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND, FLORIDA��fj p AL CONSULTAN UPS Airport Property Map Information Vacation of the Mainsail Drive Right -of -Way The Airport Authority is in the process vacating the Mainsail Drive Right -of -Way (ROW) under a separate project funded by the Florida Department of Transport. The ROW vacation requires one hearing before the Collier County Board of County Commissioners (BCC), and then can be approved via BCC resolution. To date, vacation of the ROW has been approved by Collier County Zoning, Public Utilities, Fire, and Engineering Subdivision. Letters have been sent to the utility companies, adjacent property owners, and local Home Owners Associations requesting a "Letter of No Objection" to vacation of the ROW. In response to a request from Marco Island Utilities, the Airport Authority is completing a survey showing the proposed location of new terminal in relation to the underground utilities owned the utility company. Vacation of the Mainsail Drive Right -of -Way is expected to go before the Collier County BCC for approval on July f 2, 2016. °oulv'�'t Office of the County Attorney Jeffrey A. Klatzkow Deputy County Attorney • Scott R. Teach Managing Assistant County Attorney, Heidi F.Ashton-Cicko" -Board an;rod ay, County and tom Govmmw Ln Assistant County Attorneys • Colleen M. Greene Emily R. Pepin Jennifer B. White Jeff E. Wright` July 16, 2012 Mrs. Krystal Ritchey, P.E. Program Manager Federal Aviation Administration Orlando Airports District Office 5950 Hazeltine National Dr., Ste. 400 Orlando, FL 32822-5024 Re: Collier County Board of County Commissioners Grant application requirement: Exhibit "C" Title Opinion Dear Ms. Ritchey: Attached please find the Title Commitments from Collier County's three airports: (1) Marco Island Executive Airport, (2) Everglades City Airport, and (3) the Immokalee Regional Airport. This submission and certification is made in compliance with grant conditions to provide satisfactory title evidence. Collier County owns all three airports listed above in FEE SIMPLE. Collier County ("Sponsor"), pursuant to Section 47105(d) of the Federal Aviation Administration Authorization Act of 1994 (and amendments), hereby certifies that satisfactory property interest to the land indicated herein is vested in the Sponsor, as required by obligations of the referenced Grant Agreement with the Federal Aviation Administration. I have made title examination and issue this Preliminary Opinion based upon my review of the attached three Title Commitments. This Preliminary Opinion is issued expressly for the benefit of the above named applicant for title examination and for the FAA in providing this Grant. Sincerely, Colleen M. Greene Assistant County Attorney cc: Chris Curry, Director, Collier County Airport Authority Attachments 04 -APA -01096/3870 3299 East Tamiami Trail, Suite Boo • Naples Florida 34112-5749 • (239) 252-8400 • FAX: (239) 252-6300 INVOICE Stewart Title Company 3936 Tamiami Trail N., Suite A; Naples, FL 34103-3592 239)262-2163 . ,».am �.:HiIFw,.�iV'i rnly.�,� ��. .figi unanrnairor.:a A: v',iin..t�r n:; r:q;.��.�,r...I r.i i.m,.-,:,a :...onca...i,�;, BILL TO: Collierlo��p�(/�;�G'Uo�sumenIt6d�:I;iN�,'�i�1 �9�n',ril�I' InvoiceDate:;•dill' r,'tJtlf"�3'by2 ".��a5i�T�Yiil�ulrtl rl Y'dlj�Fc�S�S.t$II'�'14 �d� elf�!,hiY}j. i, Ilk' �sl„I a hl - Invoice Number 1209255 M�t2)�s,La?<x2P ,: ;131:.1rif,11°�1a ti 1,3FP� G"�y: fl'VI,.: ty!�arpVrv$linl9R,l ATTN: iI IhWdi!SUa.�Y�`h111, 11:1,1x11; i�:i d:7l i'Igui9:fklidri!I161tNi{ sl�a:llii :%dlllr' File No: 1209255 Loan Amount: Sale Amount: Buyer: ,' 'Collier County, a Political Subdivision of the State of Florida Seller: Collier Cnty (Marco Airport)' PROPERTY LOCATION: of Section 26, Township 51 South, Range 26'E a§t, Collier County, Florida; of " Section 26, Township 51 South, Range 26 East, Collier County, Florida; of Section 26; Township 51 South; Range 26 East, Collier County, Florida; of Section 26, Township , PLEASE MAKE CHECKS PAYABLE TO ST.EWARTTITLE COMPANY (1301) ALTA Commitment for Title Insurance (6/17/06) WITH FLORIDA MODIFICATIONS ALTA. Commitment Form COMMITMENT FOR TITLE INSURANCE Issued by. . Stewart title guaranty company STEWART TITLE,GUARANTY COMPANY, a Texas Corporation (the "Company), for a valuable consideration, commits to issue its policy or policies of title Insurance, as Identified in Schedule'A, in favor of the proposed. Insured named in, Schedule A, as owner or mortgagee of'the estate or interest in the Land described or referred to in Schedule .A., upon payment of the premiums and charges and compliance with the Requlrements; all subject to the provisions of Schedules A and Band. to the Conditions of this Commitment. This Commitment shall be effective only when the identity of the proposed Insured and.the'amount of the policy,or policies committed for have been Inserted in Schedule A hereof by the Company. All liability and obligation under this Commitment shall cease and terminate six (6) months after the Effective Date or when the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue the policy or policies is not the fault of the Company. , The. Company will provide a sample of the'policy form upon request. This. Commitment shall not be valid or binding until Countersigned by an. authorized offcer of the Company or an agent of the Company. IN WITNESS WHEREOF, Stewart Title Guaranty Company has caused its corporate name and seal.to be affixed by its duly authorized officers on the Effective Date shown in Schedule A.. Countersigned by: CW. SStewart guwonty company u Senior Chairman of t e Board Authorized Countersignature I µ 1 *Ch the B Stewart Title Company Company 3936 Tamiami Trail N., Suite A C!�'/!// Napl,es Florida 34103-3592 President CityState serial No. C=12092'35 -1301 Copyright 2006.2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. nAtar All other uses are prohibited. Reprinted under license from the American Land Title Association: ,µ, yr!,� wNu'nttcnnc • stet/ li �.45VpAT�ON. V,�,. n�MIW RRW,w'M S+:rnr's*v/ TA Cnmmltmam inr rm i—,..,...,., rc r. erne. ,. � —..... Commitment No.: 1209255. 1301 COMMITMENT SCHEDULE A Inquiries should be directed to: Betty A. Huff Stewart Title Company. 3936 Tamiami Trail. N., Suite A Naples, Florida 34103-3592 1. Effective Date: July 2, 2012 at 8:00 AM 2., Policy or Policies to be Issued: a. ALTA Owner's Policy (6/17/06) with Florida Modifications Proposed insured: Collier County, a Political Subdivision of the State of Florida' File No.: 1209255 -1301 Proposed Amount of Insurance To Be Determined Premium: 3. The estate or interest in the land described or referred to in this Commitment is: Fee Simple. 4. Title to the Fee Simple estate or interest in the land is at the Effective Date vested in: . Board of County Commissioners of Collier County, Florida, by virtue of that certain deed recorded in Book 2034, Page 1261 (as to Parcel 1) AND Collier. County, a politicai subdivision of the -State of Florida, on behalf of the Airport Authority for the Marco. Island,Executiv&Airport, by virtue of those certain deeds recorded in Book 4434, Page 3380 and Book 4454, Page 2452 5. The land referred to in this Commitment is described as follows: Parcel 1 That certain land parcel lying in and being part of Sections 26 and 35, Township 51 South, Range 26 East, Collier County, Florida, being more'particularly described as follows: Commence at the Northeast corner of said. Section. 26; thence run North 88' degrees 44 minutes 06 seconds West along the North line thereof,, a distance of 1569.50 feet; thence leaving said North section line run South 12 degrees 00 minutes 00 seconds East a distance of 1230.00 feet to the POINT OF. BEGINNING of.the parcel of land hereinafter described; thence North 78 degrees 00 minutes 05 seconds East a distance of 150.00,feet; thence'South 12 degrees 00 minutes 00 seconds East a distance of 70.00 feet; thence South 46 degrees 01 minutes 10 seconds Easta distance of 241.30 feet; thence South 12 degrees' 00 minutes 00 seconds' East a distance of ' 5250.00 feet; thence South 41 degrees 28 minutes 16 seconds West a distance of 168.00 feet;. thence South 78 degrees, 00 minutes 00 seconds West a distance of 300.00 feet; thence North 12 degrees 00 minutes 00 seconds West a distance of 250.00 feet; thence South 78 degrees 00 minutes 00 seconds West a distance of 175;00 feet; thence North 12 degrees 00 minutes 00 Authorized Countersignature Copyright 2006.2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use, nMs® All other uses are prohibited. Reprinted under license from the American Land Title Associatlon.. i No T1YU File No. 1 -1 a ,wsyu ALTA Commitment for or7itle Insurance(6/17/06) 1of7 ' '. inannaxw�glX4mr�!rAP�,¢gRy Commitment No.: 1209255.- 1301 COMMITMENT File No.: 1209255 -1301 seconds West a distance of 350.00 feet; thence North 56 degrees 11 minutes 55 seconds East a distance of 188.48 feet; thence•North 12 degrees 00 minutes 00 seconds West a distance of 3560.00 feet; thence South 78 degrees 00 minutes 00 seconds West a distance of 350.00 feet; thence North 12 degrees 00 minutes 00 seconds West a distance of 1170.00 feet; thence North 77 degrees 59 ininutes 56 seconds East a distance of 350.00 feet; thence North 12 degrees 00 minutes 00 seconds West a distance of 220.00 feet; thence North 78 degrees 00 minutes 05 seconds. East a distance''of 150.00 feet to the POINT OF BEGINNING. Parcel 2, That portion of Tract Q, MARCO SHORES UNIT ONE, a subdivision according to the Plat thereof, as recorded in Plat Book 14; Pages 33 through 38, inclusive, of the Public Records of Collier County; Florida, more particularly described as follows: . . BEGINNING at the Northeast corner of..Tract "Q"; thence along the East line of said Tract "Q", South 11 degrees 59 minutes 55 seconds East, 332.93 feet to a point on the North right-of-way line of Mainsail Drive according to the plat of said MARCO SHORES UNIT ONE; thence along said right-of-way line South 77 degrees 54 minutes .10 seconds. West 131.94 feet; thence leaving said right-of-way line'North 12 degrees 00 minutes 24 seconds West 307.62 feet to.,a pointon the, boundary of said Tract''Q' ; thence along said boundary in ;the following two (2) described courses; 1) North 24 degrees 45 minutes 16 seconds East 7.32 feet; (2) North 69 degrees 14 minutes 17 seconds East 129.11 feet to'the POINT OF BEGINNING of the parcel herein described. Bearings are based on the East line of said Tract"Q" being South 11 degrees 59.minutes 55' seconds East. Parcel 3 Tract Q, MARCO SHORES UNIT ONE; a subdivision according to the Plat 'the reof, as recorded in Plat Book 14, Pages 33 through 38, inclusive; of the Public Records of Collier County, Florida, LESS AND EXCEPT that certain property described below: BEGINNING at the Northeast comer of Tract "Q"; thence along the East line of said Tract ".Q", South *I 1 degrees 59 minutes 55 seconds'East, 332.93'feet to a pointon the North right-of-way line of Mainsail Drive according'to the plat of said MARCO SHORES UNIT ONE; thence along said right-of-way line South 77 degrees 54 minutes 19 seconds West 131.94 feet; thence leaving said right-of-way line North 12 degrees 00 minutes 24 seconds West 307.62 feet to a point on the boundary of said Tract "Q'; thence along said boundary in the following two (2) described courses: 1). North 24 degrees 45 minutes 16 seconds East 7.32 feet; (2) North 69 degrees 14 minutes 17 seconds East 129.11 feet to the POINT.OF BEGINNING of the parcel herein described. Bearings are based on the East line of said Tract "Q" being South 11 degrees 59 minutes 55 seconds East. Copyright 2006.2009 American Land Title Association. All rights reserved. .The use of this Form is restricted to ALTA It and ALTA members in good standing as of the date of use, AmenrcnN All other uses are prohibited. Reprinted under license from the American Land Title Association. LAND nns File No. 1209255 - 1301 �y� �.+ 'LAND TIT ALTA Commitment for Title insurance (6/17/06) 2 of 7 I" ��+�11 t .. .. ,�,raun aw/'Txb'uwnM1"rq' Commitment No.: 1209255 -1301 COMMITMENT SCHEDULE B -I . Requirements: File No.: 1209255 -1301 A. Instruments necessary to create the estate or interest to be insured must be properly executed, delivered.and duly filed for record... 1. Warranty Deed from Board of. County Commissioners of Collier. County,. Florida to Collier County, a Political Subdivision of the State of Florida conveying the land described in Schedule A. NOTE: As to Parcel 1 2. Warranty Deed from Collier County, a 'Political Subdivision of the State of Florida, on behalf of the Airport Authority forthe'Marco Island Executive Airport to Collier County, a Political Subdivision of the State of Florida conveying the land described in Schedule A. NOTE: As to Parcel 2 and 3 3. Obtain for file a Corporate Resolution showing the authority of appropriate officers of a corporation to execute conveyance instrument(s) and attesting that the property to be conveyed is not all or substantially all of the. assets of the corporation. NOTE: As to ALL'Parcels . 4. Obtain for file a .statement,from'.the Secretary of State's office in the State of corporation's charter that corporation is in good standing with names of current officers and 'showing .actual date of incorporation to be,prior to date of acquisition of subject property. NOTE: As to ALL Parcels 5. Obtain tax proration agreement from record title owner and .'proposed insured owner for payment of 2012 taxes, or full proration of the same upon closing, 6. Closing Media to. ascertain' that there are no outstariding..assessments due to. City of Naples and Collier County. 7. Proof satisfactory to the . Company that all improvements on subject property have been completed more than 90 days. 8. Obtain for file a Non -Foreign Affidavit'and Solicitation for seller's taxpayer identification number, in compliance with I.R.S. Code 1445 and 6045(e) requirements.' NOTE: A JudgmentSearch has been done and there are no outstanding 'judgments or Tax Liens recorded against proposed insured owner as of the date of this commitment. . Copyright 2006-2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees. and ALTA members in good standing as of the date of use. wmwe RICAN All other uses are prohibited. Reprinted under license from the American Land Title Association. LANo TIM File Co. ommitment r �,SsyC9 ALTA Commitment for Title Insurance (6117/06) � � 3 of 7 „���,���%1hFu EN�n.M�V7�rn pvv Commitment No.: 1209255 -1301 File No.: 1209255 -1301 COMMITMENT B. Affidavit from the seller and.borrower stating: .1. That there are no matters pending against them that could give rise to a lien that would attach to the subject property between the effective date of the Commitment and the, recording of instruments'giving rise to the interest to be insured. 2. That the affiants have riot executed and will not execute any instruments that would adversely affect the title to the subject property or the lien of any mortgage to be insured pursuant to the .Commitment. C. The closing funds pertaining to the transaction must be disbursed by or at the direction of the insuror or its agent. D. An updated title examination, commencing, as of the effective date of this'Commitment, which shall be performed at or shortly prior to the closing of the transaction, should not reveal any title defects or . other adverse matters appearing shouldbe disposed.of prior to closing to the satisfaction of the insuror or its.agent. END OF SCHEDULE B-1' Copyright 2006-2009 American Land Title Association. All rights reserved. The use of this Form Is restricted to ALTA licensees and ALTA members in good standing as of the date of use, AmsxrcAR All other uses are prohibited. Reprinted under license from the American Land'rdle Association. LARD nrLe File No. 1209255. 1301 "SOM710q ALTA commitment for Title Insurance (6/17/06) 4 of 7 �yy+�y Lny� e1�xMA��1�11' Commitment No.: 1209255 -1301 COMMITMENT File No.: 1209255 -1301 SCHEDULE B -II Schedule B of the policy or policies to be issued will contain exceptions to the following matters unless the same are'disposed of to the satisfaction of the Company: 1. Defects, liens; encumbrances, adverse claims or other matters; if any, created, first appearing in the Public Records or attaching subsequent to the Effective Date but prior to the date the proposed Insured acquires for value of record the estate or interest or mortgage thereon covered by this Commitment. 2. Standard Exceptions: a.. Rights or claims of parties in possession not shown by the public records. b. Easements, or claims of easements, not shown by the public records: c, Encroachments, overlaps, boundary line disputes, or.other matters which would be disclosed by an accurate survey and inspection of the premises. d. Any lien, or right to, a lien, for services, labor, or material hereto or hereafter furnished, imposed by law and not shown by the public records. e. Any adverse ownership claim by the State of Florida by right of sovereignty to any portion of the lands insured hereunder, including submerged, filled, and artificially exposed lands and.lands accreted to such'lands. Special Exceptions: S. Taxes for.the year 2012 became a lien on the land on January 1, 2012 although not due and payable until on or after November 1, 2012 for folio number'00744080001. Taxes for 2011 are less than $5.00 and waived by the BCC. NOTE: As to Parcel 1 4. Taxes for the year 2012 became a lien on the land on January 1, 2012 although not due and payable until on or after November 1,'2012 for folio number 00744200001. Taxes for 2011 are less than $5.00 and waived by the.BCC. NOTE: As to Parcel 1 5. Taxes for the yeat 2012 became a lien on the land on January 1, 2012 although not due and. payable until on or after November l,'2012 for folio number 59430620001. Taxes'for 2011 are less than $5.00 and waived by the BCC. NOTE: As to Parcel 2 6. Taxes for the year 2012 became a lien on the land on January 1, 2012 although not due and payable until on or after November 1,2012 for folio number 59430600005. Taxes fol -201 I*are less than $5.00 and waived by the BCC. NOTE: As.to.Parcel3 Easements and other.matters affecting the land referred herein as shown on the Plat as recorded in Plat Book 14, Pace(s) 33 through* 38, inclusive, of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 and 3 Copyright 2006-2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use, AMD® All other uses are prohibited. Reprinted under license from the American Land Title Association. LAND TITLE File No. 1209255 -1301 AssPcunoa . ALTA Commltment for Title Insurance (6/17/06) 5. of 7 (j�� Commitment No.: 1209255 -1301 File No.: 1209255 -1301 COMMITMENT S. Easement in favor of Florida Power & Light Company,as recorded in Official Records Book 661, Pace 1564, of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 and 3 9. Covenants, conditions, easements and restrictions recorded in Official Records Book 888, *Page 1805; Assignment of Authority as recorded in Official Records Book -2106, Pade.1631 and Official Records Book 2979, Page 680 and re-recorded in Official Records Book 3018: Page 2869, as amended in Official Records Book 4647, Page 1137, as amended in Official Records Book 4647.. Page 1156, of the Public Records of Collier County, Florida, together with all amendments thereto, which may provide for association dues, fees and/or assessments; in addition to any easements, reservations; covenants, building setback requirements, option.to purchase, right of first refusal and any special assessments which may come due but omitting any such covenant or restriction based on race, color, religion, sex, familial status or national origin. NOTE: As to Parcel 2 and 3' 10. Memorandum of Airport Lease as recorded in Official Records Book 1149. Page 1776, of the Public Records of Collier County; Florida. " NOTE: As to Parcel 1 11. Easement in favor'bf Deltona Utilities, Inc., a Florida corporation as recorded in Official Records Book 1483, Page 500,'Assignment of Easements as recorded in Official Records Book 3448, Page 2398, of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 and 3 12. Easement in favor of Florida Power& Light'Company'as recorded in Official Records Book 1598, Page 1311, of the Public Records of Collier County; Florida.` NOTE: As to Parcel 1 13. Corrective Deed of Non -Exclusive Easement as recorded in Official Records Book 1760,Page 948, of the Public Records of Collier County, Florida, NOTE: As to Parcel 2 and 3 . 14. Memorandum of Agreement as recordedin Official Records Book 2034, Page 1257, of the Public Records of Collier County, Florida. NOTE: As to Parcel 1 15. Rights and Reservations:as recorded in Quit Claim Deed recorded in Official Records Book 2034. Page 1261, of the Public Records of Collier County, Florida: NOTE: Said Rights include a Right of Reverter and Oil, Gas and other Mineral Reservations. NOTE: As to Parcel 1 16. 'Water and Sewer Service Agreement as recorded in Official Records.Book 2624, Page 924, of the Public Records of Collier County, Florida. NOTE: As to Parcel 1 Copyright 2006-2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. AMERICAN All other uses are prohlbited. Reprinted under license from the American 'Land Title Association. TANo TITLE File No. 1209255:1301 nssocinztoN ALTA Commitment for Title Insurance (6/17/06) 6 of 7 Stem t nn+.....tl'lM'1�leIKYrv71 rA.NT'r+�+'d Commitment No.: 1209255 -1301 COMMITMENT File No.: 1209255 -1301 17. Water and Wastewater Utility Facilities Easement as recorded in, Official Records Book 2716, Page 2507, of the Public Records of Collier County, Florida. NOTE: As to Parcel 1. 18. Resolution No. 2003-296 as recorded in Official Records Book 3398, Page 1081; of the Public Records of Collier County, Florida. NOTE: As to ALL Parcels 19. Deed of Utility Easement.in favor of City of Marco Island as recorded in Official Records Book 4183, Page 2016, of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 20. Deed of Utility Easement in favor of City of Marco Island as recorded in Official Records Book 4573, Page 2283, of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 and 3 21. Utility Facilities Warranty Deed and Bill.of Sale as. recorded in Official Records Book 4573, Pace 2286;,of the Public Records of Collier County, Florida. NOTE: As to Parcel 2 22. Utility Facilities Bill of Sale as recorded in Records of Collier County, Florida. NOTE: as to Parcel.2 Official Records Book 4573. Page 2290, of the Public 23. Underground Easement in favor of Florida Power & Light Company as recorded in Official Records Book 4721. Page 950, of the Public Records of Collier County, Florida. ' NOTE: As to Parcel 1 ' 24. Resolution No. 2011-150.as recorded in Official Records Book 4721, Page 1527, of the Public Records of Collier County, Florida. NOTE: As to ALL Parcels Copyright 2006-2009 American Land Title. Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. AMERICAN All other uses are prohibited. Reprinted under license from the American Land Title Association. LAND TITLE File No. 1209255-1301 ngsocvaioN ALTA No., for Title Insurance (6117106) 7 of 7' I.. P71Ua �N%nfrt�'tuxwixxry CONDITIONS The term mortgage, when used herein, shall include deed of trust, trust deed, or other security instrument. 2. If the proposed Insured has or acquired actual knowledge of any defect, lien, encumbrance, adverse claim or other matter affecting the estate or interest or mortgage thereon covered by, this Commitment other than those shown.in Schedule S hereof, and shall fail to disclose such knowledge to,the Company, In writing, the Company shall be relieved from liability for any loss or damage resulting from any act of,reliance hereon to the extent the Company is prejudiced by failure to so disclose such knowledge. If the proposed Insured shall disclose such knowledge to the Company, or If the Company otherwise acquires actual knowledge, of any such defect, lien; encumbrance, adverse claim or other matter, the Company at its option may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve the Company from liability previouslyincurred pursuant to paragraph 3 of these Conditions. 3. Liability of the Company under this Commitment shall be only to the. named proposed Insured and such parties included under the definition of Insured in the form of policy or policies committed for and only for actual loss incurred in reliance, hereon in undertaking in good faith (a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate, or Interest or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount stated in Schedule A for the policy or policies committed for and such liability is subject to.the insuring provisions and Conditions and the Exclusions from Coverage of the form of'policy or policies committed for in favor of the proposed Insured which are hereby incorporated *by reference and are made a part of this Commitment except as expressly modified herein. 4. This Commitment is, a contract to Issue one or more title insurance policies and is not an abstract of title or a report of the condition of title. Any action or actions or rights of action that the proposed Insured may. have or may bring against the Company whether or not based on negligence arising out of the,status of the title to the estate or interest or the status of the mortgage thereon covered by, this Commitment must be based on and are subject to the provisions of this Commitment. 5. The policy to be issued will contain the following arbitration clause: Unless prohibited by applicable law, arbitration pursuant to the Title Insurance Arbitration Rules of the American Arbitration Association may be demanded if agreed to by both the Company and the Insured at the time of the controversy or claim. Arbitrable matters may include, but are not limited to, any controversy or claim between the Company and the Insured arising out of or relating to this policy, and service of.the Company in connection with its issuance or the breach' of, a policy provision or other obligation. Arbitration pursuant to this policy and under the Rules In effect on the date the demand for arbitration is made or, at the option of the Insured, the Rules in effect at Date of Policy shall be binding upon the parties. The award may include attorneys' fees only if the laws of the state in which the land is located permit a court to award attorneys' fees to a prevailing party. Judgment upon the award rendered by the Arbitrator(s) may be entered in any court having jurisdiction thereof. The law of the situs of the land shall apply to an arbitration under the Title Insurance' Arbitration Rules. A copy of the Rules may be obtain from the Company upon request. �.te'wart title guaranty company All notices required to be given the Company and any statement in writing required to be furnished the Company shall be addressed to it at P.O. Box 2029, Houston, Texas 77252. Copyright 2006-2009 American Land Title Association. All rights reserved. I� The use of this Form Is restricted to ALTA Ilcensees and ALTA members in good standing as of the dateof use. AMERICAN All other uses are prohibited. Reprinted under license from the American Land•Title Association. LARD Tree File No, 1209255 .1301'^"OFWAO" ,�w�. ALTA Commitment for Title Insurance (6/17/06) WITH FLORIDA MODIFICATIONS It +c,'"�Ley�+atLn aiwre.+p+c�rr.+y Exhibit B — Disadvantaged Business Enterprise (DBE) Program & Goals Proposal OBSTRUCTION REMOVAL & APRON EXPANSION Grant Application MARCO ISLAND EXECUTIVE AIRPORT DBE CONSULTING SERVICES - COLLIER COUNTY AIRPORT AUTHORITY for MARCO ISLAND EXECUTIVE AIRPORT IMMOKALEE REGIONAL AIRPORT A PROPOSED AGREEMENT Submitted by rf Ken Weeden & Associates, Inc. - Planning Consultants WILMINGTON- RALEIGH -ATLANTA October 13, 2015 DBE PLANNING SERVICES AGREEMENT BETWEEN COLLIER COUNTY AIRPORT AUTHORITY AND KEN WEEDEN &ASSOCIATES, INC. This will serve as an Agreement between Collier County Airport Authority and Ken Weeden and Associates, Inc. (hereinafter referred to as KWA) and will remain in effect until it is terminated according to the terms and conditions stated herein. The tasks to be undertaken as part of this agreement are as follows: KWA perceives the requested services to be part of three (3) primary tasks. These tasks are as follows: Task 1: DBE Goal Development Assistance • Task 1.1 -FY 2016-2018 DBE Goal -Marco Executive Airport • Task 1.2 - FY 2016-2018 DBE Goal - Immokalee Regional Airport Task 2: Update DBE Program Administrative Document • Task 2.1 -Update DBE Program Administrative Document • Task 2.2 - Follow-up, Agency Coordination Task 3: Fostering Small Business Participation • Task 3.1 -Develop Small Business Participation Plan • Task 3.2 - Follow-up, Agency Coordination More details of our approach to each task are presented below. Task 1 DBE Project Goal and Three -Year DBE Goal (Part 26) Includes Fiscal Years 2016, 2017, and 2018 KWA proposes to prepare the required three-year Disadvantaged Business Enterprise (DBE) overall goal and methodology for AIP-assisted projects at the two of the County's airports. The three-year goals (fiscal years 2016, 2017, and 2018) will meet all of the requirements of 49 CFR Part 26 and recently adopted amendments. Goal Setting Process The Goals will be developed based on the two-step process of: 1. Developing a DBE Base Figure for the relative availability of ready, willing and able DBEs, using an FAA -acceptable methodology for the agreed upon market area, or Project Service Area. This process includes consultation with the designated staff, or Engineer in considering realistic subcontracting possibilities for each project for goal development, considering opportunities in both construction and in professional services and, 2. Making appropriate adjustments to the Base figure, using methods acceptable to FAA and consistent with the regulation. KWA will also provide assistance in fulfilling public participation requirements of the regulation, i.e. consultation with representative minority and/or women contractor organizations, and publication of a notice announcing the proposed overall goal methodology and its availability for the 30 -day public comment period. Narrative Document & Follow -Uro Develop the appropriate narrative text documenting the updated DBE methodology, to be typed and submitted to County Staff. KWA will forward the report to the FAA Civil Rights office after review and input by the designated staff, or Engineer. The DBE methodology shall conform to the requirements of 49 CFR Part 26. KWA will coordinate with the FAA concerning review and approval of the methodology, including follow-up. Required information: The County and/or the designated staff, or Engineer will provide the following information, services, and/or data to KWA: 1. Available historic information on bidders and DBEs for the Projects Service Area. The identification of previous successful and unsuccessful bidders on similar projects is necessary in order to help determine the County's market area. This can be found usually on bid tabulation sheets from previous years. 2. Copy of a recent Disparity Study, Availability study or similar document if any has been completed and is available. 3. Description of the FY 2016—FY 2018 proposed projects and preliminary engineering cost estimates of the major work elements. This is necessary in order to evaluate the relative comparative costs of the major activities. 4. Review of proposed DBE overall goal and methodology prior to submittal to the FAA. Task 2 Update DBE Program Administrative Document KWA proposes to prepare an update of the FAA -required Disadvantaged Business Enterprise (DBE) Program for the County, according to the USDOT DBE program requirements of 49 CFR Part 26. KWA proposes to develop the appropriate narrative text documenting the new DBE program, to be typed and submitted to the FAA Civil Rights office on behalf of the County, after review and input by the County. The DBE Program shall conform to the requirements of 49 CFR Part 26. KWA will coordinate with the FAA concerning review and approval of the Program, including follow-up. Task 3: Fostering Small Business Participation KWA proposes to assist the County in developing an element in its DBE Program to foster small business participation. This element will structure contracting requirements to facilitate competition by small business concerns. This element will conform to the USDOT DBE program requirements of 49 CFR Part 26. 1. KWA will conduct an analysis of current practices that foster small business participation at the County. 2. KWA will document current strategies and identify new strategies that the County will use to foster small business participation. Strategies include but are not limited to: a. Establishing a race -neutral small business set-aside for prime contracts under a stated amount (e.g., $1 million). b. In multi-year design -build contracts or other large contracts ( e.g., for "megaprojects") requiring bidders on the prime contract to specify elements of the contract or specific subcontracts that are of a size that small businesses, including DBEs, can reasonably perform. c. On prime contracts not having DBE contract goals, requiring the prime contractor to provide subcontracting opportunities of a size that small businesses, including DBEs, can reasonably perform, rather than self -performing all the work involved. d. Identifying alternative acquisition strategies and structuring procurements to facilitate the ability of consortia or joint ventures consisting of small businesses, including DBEs, to compete for and perform prime contracts. e. To meet the portion of your overall goal you project to meet through race - neutral measures, ensuring that a reasonable number of prime contracts are of a size that small businesses, including DBEs, can reasonably perform. 3. KWA proposes to develop the appropriate narrative text documenting the new Fostering Small Business Participation Plan, to be typed and submitted to the FAA Civil Rights office on behalf of the County, after review and input by the County. The Plan shall conform to the requirements of 49 CFR Part 26. KWA will coordinate with the FAA concerning review and approval of the Plan, including follow-up. 4 FEE PROPOSAL/COMPENSATION KWA proposes to provide the services described above based on the fee scheduled contained in the attached spreadsheet (ATTACHMENT 1). Please note that the compensation for Tasks 1 through 3 are basically lump -sum -not -to -exceed projections. Invoices will be submitted upon the completion of each work item(s). This agreement is valid and effective as indicated by the signatures below: Collier County Airport Authority Ken Weeden and Associates, Inc. (Name/Title) Date Attest President Date Attest ATTACHMENT 1: FEE PROPOSAL COLLIER COUNTY AIRPORT AUTHORITY DBE PROGRAM SERVICES 0 F Q N N Q Ol N y ti p N H 6 o F 2 F V u U•G0 v� O L` W .,O C 2�, cc N N „ i N n�U O O o WmW Fx m A D R' Qom `p p0 g Np .o rz 7w 5 � � �w � � ;✓ r tE U O Q y � M p O O Ti W ✓' � Vf H fes. W cn r Ci N H 6 o m 2 F V u U•G0 v� O L` W .,O C 2�, cc bo�.o N n�U o WmW OU'C U om m A D R' Qom C rz 7w 5 � � �w � � ;✓ r r Exhibit C — Solicitations for Design Services OBSTRUCTION REMOVAL & APRON EXPANSION Grant Application MARCO ISLAND EXECUTIVE AIRPORT Sales Rep: Ivonne Gori (N9103) Date: 04/12/16 Account Number. 538025 / N029507 Company Name: COLLIER COUNTY AIRPORT AUTH. Contact Name: Email: Debm3ruerogeman@oollieraov.net Address: 2005 NIAINSAIL DR STE #1, NAPLES, FL, 34114 Phone: (239)642-7878 Fac (239)394-3515 Phone: (239) 262-3161 Email: ivonne.gori@naplesnews.com i 8 P Ad Id: 1039459 Ad Class: 16260 Publications: ND -Naples Daily News, ND-Internet-naplesnews.com Start Date: 04/14/16 Stop Date: 04/14/16 No. of Inserts: 1 Total Cost: $84.07 Columns Wide: 2 No. of Lines: 14 Total Cost: $84.07 INVITATION TO BID REQUEST FOR PROPOSALS In accordance with Florida Statute 287.055, Consultants' Competitive Negotiation Act. o rev �zuvt�g� Adminispa4ve Sema DepaNnont Prcca:ement Services rJlvision COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS CCNA Solicitation RFP 16-6561 Design Services for Marco Executive Airport Terminal Brenda Brilhart, Procurement Strategist (239) 252-8446 (Telephone) (239) 252-6697 (Fax) BrendaBrilhart@colliergov.net (Email) This proposal solicitation document is prepared in a Microsoft Word format. Any alterations to this document made by the Consultant may be grounds for rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government. 'ruxum i� mec rnrac� aa1 rm i.�a , , icn:bJ 11-1,-01 .YAi2DU! ,.vmls7po tp yr-.,. io�hw CCNA (Revision 01202016) Table of Contents LEGALNOTICE......................................................................................................................... 3 EXHIBIT I: SCOPE OF WORK, SPECIFICATIONS AND RESPONSE FORMAT ...................... 4 EXHIBIT II: GENERAL RFP INSTRUCTIONS............................................................................ 9 EXHIBIT III: COLLIER COUNTY PURCHASE ORDER TERMS AND CONDITIONS................13 EXHIBIT IV: ADDITIONAL TERMS AND CONDITIONS FOR RFP...........................................16 ATTACHMENT 1: CONSULTANT'S NON -RESPONSE STATEMENT......................................22 ATTACHMENT 2: CONSULTANT CHECK LIST.......................................................................24 ATTACHMENT 3: CONFLICT OF INTEREST AFFIDAVIT........................................................25 ATTACHMENT 4: CONSULTANT DECLARATION STATEMENT............................................26 ATTACHMENT 5: IMMIGRATION AFFIDAVIT CERTIFICATION..............................................28 ATTACHMENT 6: CONSULTANT SUBSTITUTE W— 9............................................................29 ATTACHMENT 7: INSURANCE AND BONDING REQUIREMENTS........................................30 ATTACHMENT 8: REFERENCE QUESTIONNAIRE.................................................................32 EXHIBIT A— SCOPE OF SERVICES.........................................................................32 EXHIBIT B — Floor Plan EXHIBIT C — Concept Site Plan EXHIBIT D -- GRANTING AGENCY PROVISIONS EXHIBIT E — GRANT FORMS RFP 16£561 Marco Airport Terminal 2 Cao aer- �%ataaaCy AdmintsTmton Services Dopa trot promvement servV^,es G�,uio� Legal Notice Pursuant to approval by the County Manager, Sealed Proposals to provide professional design services for Marco Executive Airport Terminal will be received until 3:00 PM, Naples local time, on at the Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. CCNA Solicitation RFP 16-6561 - Design Services for Marco Executive Airport Terminal Services to be provided may include, but not be limited to the following: The Collier County Airport Authority is seeking proposals from qualified firms to provide professional design, permitting and project oversight services for a new terminal and GSE facility, expanded aircraft parking apron, new vehicle parking, building demolition and pavement removal at the Marco Island Executive Airport The proposal must identify architectural, MEP, structural, civil and landscape architecture for the complete design and required permits. A pre -proposal conference is not applicable for this solicitation. All statements should be made upon the official proposal form which must be obtained only on the Collier County Purchasing Department Online Bidding System website: www.colliergov.net/bid. Collier County does not discriminate based on age, race, color, sex, religion, national origin, disability or marital status. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA, BY: /S/ Joanne Markiewicz Director. Procurement Services Division This Public Notice was posted on the Collier County Purchasing Department website: wvw.colliergay.net/purchasing and in the Lobby of Purchasing Building "G, Collier County Government Center on RFP 16-6561 Marco Airport Terminal Exhibit I: Scope of Work, Specifications and Response Format As requested by the Airport Authority (hereinafter, the "Division or Department"), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, "County") has issued this Request for Proposal (hereinafter, "RFP") with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and specifications stated or attached. The Consultant, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. The results of this solicitation may be used by other County departments once awarded according to the Board of County Commissioners Purchasing Policy. Brief Description of Purchase The Collier County Airport Authority is seeking proposals from qualified firms to provide professional design, permitting and project oversight services for a new terminal and GSE facility, expanded aircraft parking apron, new vehicle parking, building demolition and pavement removal at the Marco Island Executive Airport. Construction budget (if funded) is approximately ten (10) million dollars. Detailed Scope of Work — See Exhibit A Term of Contract The contract term, if an award(s) is/are made is intended to be for the design phase through project close-out with the appropriate grant agencies. Prices shall remain firm for the entire term of the design, bidding and awarded construction contract. Surcharges will not be accepted in conjunction with this contract, and such charges should be incorporated into the pricing structure. Projected Solicitation Timetable The following projected timetable should be used as a working guide for planning purposes only. The County reserves the right to adjust this timetable as required during the course of the RFP process. Event Date Issue Solicitation Notice Date Last Date for Receipt of Written Questions Date, Time, Pre -solicitation meeting N/A Addendum Issued Date Solicitation Deadline Date and Time Date, Time, Anticipated Evaluation of Submittals Date Range Consultant Presentations if Required Date Range Anticipated Completion of Contract Negotiations Date Range Anticipated Board of County Commissioner's Contract Approval I Date Range RFP 16-6561 Marco Airport Terminal Response Format The Consultant understands and agrees to abide by all of the RFP specifications, provisions, terms and conditions of same, and all ordinances and policies of Collier County. The Consultant further agrees that if the contract is awarded the work will be performed in accordance with the provisions, terms and conditions of the contract. To facilitate the fair evaluation and comparison of proposals, all proposals must conform to the guidelines set forth in this RFP. Any portions of the proposal that do not comply with these guidelines must be so noted and explained in the Acceptance of Conditions section of the proposal. However, any proposal that contains such variances may be considered non- responsive. Proposals should be prepared simply and economically, providing a straightforward concise description of the Consultant's approach and ability to meet the County's needs, as stated in the RFP. All proposals should be presented as described in the RFP in PDF or Microsoft Word format with Tabs clearly marked. If applicable, the utilization of recycled paper for proposal submission is strongly encouraged. The items listed below are to be submitted with each proposal and submitted in the order shown. Each section should be clearly labeled, with pages numbered and separated by tabs. Failure by a Consultant to include all listed items may result in the rejection of its proposal. Cover Letter / Management Summary Include: Provide a cover letter, signed by an authorized officer of the firm, indicating the underlying philosophy of the firm in providing the services stated herein. Include the name(s), telephone number(s) and email(s) of the authorized contact person(s) concerning proposal. Submission of a signed Proposal is Consultant's certification that the Consultant will accept any awards as a result of this RFP. Site Inspection: if services to be provided involve or are related to a physicalsite(s), including, but not limited to: design services for construction, physical monitoring, environmentalstudies, inspections or other similar activities, prior to; submission of proposal, proposers may visit the site(s) to become familiar with local conditions that may; in any manner affect performance of the Work. This site visit shall be documented in writing by the proposer; this documentation shall be submitted with the proposal. The proposal may be deemed non-responsive if the site visit 'documentation is not presented to the; County in the proposer's submitted proposal materials. Upon award `of the contract, subsequent site visits' shall be at intervals appropriate to the stage of the project, as determined by the County project' manager. No plea of ignorance of conditions or difficulties that may exist or conditions or difficulties that may be encountered in the execution of the Work pursuant to this Agreement as a result of failure to make the necessary examinations and investigations shall be accepted as an excuse for any failure or omission on the part of the awarded: proposer, nor shall they be accepted as basis for any claims whatsoever for extra compensation orfor an extension of time. Cover Memo Cover Letter Provide a cover letter, signed by an authorized officer of the firm, indicating the underlying philosophy of the firm in providing the services stated herein. Include the name(s), telephone number(s) and email(s) of the authorized contact person(s) concerning proposal. Submission of RFP 16-6561 Marco Airport Terminal a signed Proposal is Contractor's certification that the Contractor will accept any awards as a result of this RFP. Submit proposed subcontractors if applicable. Tab I: Project Approach. (25 points, 10 pages maximum; note: Only 2 of the 10 pages can be in 11 X 17 formats) The proposal will be assessed -1 point for each additional page over the prescribed limit. The proposer shall include a description of how the design of the project will be approached. It will include options to be considered and the issues to be resolved. It will specifically address project permitting and methods to be used to minimize the project footprint and will demonstrate the consultant's innovation in providing cost effective solutions meeting the project objectives. Tab II: Schedule and Quality Control. (20 points, 4 pages maximum; note: Only 1 page of the 4 pages can be in a 11 X 17 format) The proposal will be assessed -1 point for each additional page over the prescribed limit. The Proposer shall include a project schedule to demonstrate their ability to deliver this project on a fast track schedule. The schedule will show the Design Team that is proposed for assignment to this project. It will provide the names of key team members, so that it ties to the expertise listed under TAB IV, and the strength of the Design Team can be analyzed. The schedule will follow the outline in the Statement of Work, demonstrating the consultant's ability to secure all required permits at the time of 100% plan submittal one year from being given Notice to Proceed. Tab III: Experience of the Firm. (25 points, 5 pages maximum) The proposal will be assessed - 1 point for each additional page over the prescribed limit. The Proposer shall have a minimum of five (5) years acceptable Design experience with airport runway projects of similar size and scope. The Proposer shall describe experience, including tasks performed, and furnish at least five (5) similar project references for correction facility projects only with contacts, title, telephone numbers, and mailing addresses. The Proposer shall furnish the names of three (3) public entities within the contiguous United States with whom the Consultant has acceptably contracted for correctional facility projects within the past five (5) years. The Proposer shall furnish a list of references, contacts and titles, telephone nunbers, name of agency, and mailing addresses. Provide information that documents your firm's and subcontractors' qualifications to produce the required deliverables, including abilities, capacity, skill, and financial strength, and number of years of experience in providing the required services. Also describe the various team members' successful experience in working with one another on previous projects. List Current Correctional Facility Projects in the Format Identified Below Project Original Final Numberof Description Start Date En Enid Date Budget Project Change Cost Orders Tab IV: Proposed Staff Experience and Availability. (20 points, 10 pages maximum) The proposal will be assessed -1 point for each additional page over the prescribed limit. Provide a narrative describing the role of and introducing key individuals in your firm's organization who will be assigned to the County Project. The Proposer shall demonstrate working relationships among key personnel on the proposed team. Resumes of proposed staff; each resume cannot exceed one (1) page in length. Furthermore, all individuals identified as Key Personnel in the proposal shall remain on the Consultant's Team for the Technical Proposal and for the duration of the procurement process and the contract. If extraordinary circumstances require a personnel change, it must be RFP 16-6561 Marco Airport Terminal submitted in writing to the County's Project Manager, who will determine whether to authorize the change. Unauthorized changes to the Consultant's Team at any time during the procurement process may result in elimination of the Consultant's Team from further consideration. Of particular interest to the selection committee will be prior experience with similar airport projects and experience in securing permits of a similar nature in Collier County. The Proposer shall show the capability to provide all the necessary equipment and material for project support and execution. Attach resumes of all managers, supervisors, and other contract team members who will be involved in the management of the total package of services, as well as the delivery of specific services. The same should be done for any sub -consultants. If sub - consultants are being utilized, letters of intent from stated sub -consultants must be included with proposal submission. (Letters of Intent do not count in the total number of pages.) Tab V: References— 5 Completed and Returned (10 points) In order for the contractor to be awarded any points for this tab, the County requests that the contractor submits five (5) completed reference forms (See Attachment 8) from clients whose projects are of a similar nature to this solicitation as a part of their proposal. In order for the Consultant to be awarded any points for this tab, the County requests that the Consultant submits five (5) completed reference forms from clients whose projects are of a similar nature to this solicitation as a part of their proposal. The County will only use the methodology calculations for the first five (5) references (only) submitted by the Consultant in their proposal. Prior to the Selection Committee reviewing proposals, the following methodology will be applied to each Consultant's information provided in this area: • The County will total each of the Consultant's five reference questionnaires and create a ranking from highest number of points to lowest number of points. References marked with an N/A (or similar notation will be given the score of zero (0)). Consultants who do not turn in reference forms will be counted as zero (0). • The greatest number of points allowed in this criterion will be awarded to the Consultant who has the highest score. • The next highest Consultant's number of points will be divided by the highest Consultant's points which will then be multiplied by criteria points to determine the Consultant's points awarded. Each subsequent Consultant's point score will be calculated in the same manner. • Points awarded will be extended to the whole number per Microsoft Excel. For illustrative purposes only, see chart for an example of how these points would be distributed among the five proposers. Consultant Name Consultant Total Reference Score Points Awarded Consultant ABC 445 10 Consultant DEF 425 9.6 Consultant GHI 388 8.7 Consultant JKL 365 8.2 Consultant MNO 325 7.3 Note: Sample chart reflects a 10 point reference criterion. RFP 16-6561 Marco Airport Terminal The points awarded by Consultant will be distributed to the Selection Committee prior to their evaluation of the proposals. The Selection Committee will review the Consultant's proposal to ensure consistency and completion of all tasks in the RFP, and review the Points Awarded per Consultant. The Selection Committee may, at their sole discretion, contact references, and/or modify the reference points assigned after a thorough review of the proposal and prior to final ranking by the final Selection Committee. Tab VI: Acceptance of Conditions Indicate any exceptions to the general terms and conditions of the RFP, and to insurance requirements or any other requirements listed in the RFP. If no exceptions are indicated in this tabbed section, it will be understood that no exceptions to these documents will be considered after the award, or if applicable, during negotiations. Exceptions taken by a Contractor may result in evaluation point deduction(s) and/or exclusion of proposal for Selection Committee consideration, depending on the extent of the exception(s). Such determination shall be at the sole discretion of the County and Selection Committee. Tab VII, Required Form Submittals • Attachment 2: Contractor Checklist • Attachment 3: Conflict of Interest Affidavit • Attachment 4: Contractor Declaration Form' • Attachment 5: Immigration Affidavit and company's E -Verify profile page or Memorandum of Understanding • Attachment 6: Contractor Substitute 9 • Attachment 7: Insurance Requirements • Attachment 8: Reference Questionnaire • Grant Forms See Exhibit "C" • Conflict of Interest • Debarment / Suspension • DBE Form • Grant Acknowledgment • Lobbying RFP 16-6561 Marco Airport Terminal Exhibit 11: General RFP Instructions 1. Questions Direct questions related to this RFP to the Collier County Purchasing Department Online Bidding System website: wA .colliergov.net/bid. Consultants must clearly understand that the only official answer or position of the County will be the one stated on the Collier County Purchasing Department Online Bidding System website. For general questions, please call the referenced Procurement Strategist noted on the cover page. 2. Pre -Proposal Conference The purpose of the pre -proposal conference is to allow an open forum for discussion and questioning with County staff regarding the RFP with all prospective Consultants having an equal opportunity to hear and participate. Oral questions will receive oral responses, neither of which will be official, nor become part of the RFP. Only written responses to written questions will be considered official, and will be included as part of the RFP as an addendum. All prospective Consultants are strongly encouraged to attend, as, this will usually be the only pre -proposal conference for this solicitation. If this pre -proposal conference is denoted as "mandatory", prospective Consultants must be present in order to submit a proposal response. 3. Compliance with the RFP Proposals must be in strict compliance with this RFP. Failure to comply with all provisions of the RFP may result in disqualification. 4. Ambiguity, Conflict, or Other Errors in the RFP It is the sole responsibility of the Consultant if the Consultant discovers any ambiguity, conflict, discrepancy, omission or other error in the RFP, to immediately notify the Procurement Strategist, noted herein, of such error in writing and request modification or clarification of the document prior to submitting the proposal. The Procurement Strategist will make modifications by issuing a written revision and will give written notice to all parties who have received this RFP from the Purchasing Department. 5. Proposal, Presentation, and Protest Costs The County will not be liable in any way for any costs incurred by any Consultant in the preparation of its proposal in response to this RFP, nor for the presentation of its proposal and/or participation in any discussions, negotiations, or, if applicable, any protest procedures. 6. Delivery of Proposals All proposals are to be delivered before 3:00 PM, Naples local time, on or before Date to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Brenda Brilhart, Procurement Strategist RFP 16-6561 Marco Airport Terminal The County does not bear the responsibility for proposals delivered to the Purchasing Department past the stated date and/or time indicated, or to an incorrect address by Consultants personnel or by the Consultant's outside carrier. However, the Procurement Director, or designee, reserves the right to accept proposals received after the posted close time under the following conditions: • The tardy submission of the proposal is due to the following circumstances, which may include but not be limited to: late delivery by commercial carrier such as Fed Ex, UPS or courier where delivery was scheduled before the deadline. • The acceptance of said proposal does not afford any competing firm an unfair advantage in the selection process. Consultants may submit proposals electronically on www.colliergov.net/bid or submit one proposal (in Word, Excel or PDF). List the Solicitation Number and Title on the box or envelope. 7. Validity of Proposals No proposal can be withdrawn after it is filed unless the Consultant makes their request in writing to the County prior to the time set for the closing of Proposals. All proposals shall be valid for a period of one hundred eighty (180) days from the submission date to accommodate evaluation and selection process. 8. Method of Source Selection The County is using the Competitive Sealed Proposals methodology of source selection for this procurement, as authorized by Ordinance Number 2013-69 establishing and adopting the Collier County Purchasing Policy. If the County receives proposals from less than three (3) firms, the Procurement Director shall review all the facts and determine if it is in the best interest of the County to solicit additional proposals or request that the Selection Committee rank order the received proposals. The County may, as it deems necessary, conduct discussions with qualified Consultants determined to be in contention for being selected for award for the purpose of clarification to assure full understanding of, and responsiveness to solicitation requirements. 9. Evaluation of Proposals Collier County will evaluate and select these Services in accordance with Florida Statute 287.055, Consultants' Competitive Negotiation Act. The County's procedure for selecting is as follows: a) The County Manager or designee shall appoint a selection committee to review all proposals submitted. 2) The Request for Proposal is issued. 3) Subsequent to the receipt closing date for the proposals, the Procurement professional will review the proposals received and verify each proposal to determine if it minimally responds to the requirements of the published RFP. a) Selection committee meetings will be open to the public and the Procurement professional will publicly post prior notice of such meeting(s) in the lobby of the Purchasing Building and on the County's Procurement Services Internet site. RFP 16-6561 Marco Airport Terminal 10 s) Prior to the first meeting (Organization Meeting) of the selection committee, the Procurement professional will post a notice announcing the date, time and place of the meeting at least three (3) working days prior to the meeting. At the initial organization meeting, the selection committee members will receive instructions, the submitted proposals, and establish the next selection committee meeting date and time. After the first meeting, the Procurement professional will publically announce all subsequent committee meeting dates and times. The subsequent meeting dates and times will be posted with at least one (1) day advanced notice. 6) Selection committee members will independently review and score each proposal based on the evaluation criteria stated in the request for proposal using the Individual Selection Committee Score and Rank Form and prepare comments for discussion at the next meeting. The Individual Selection Committee Score and Rank Form is merely a tool to assist the selection committee member in their review of the proposals. 7) At the scheduled selection meeting, the members will present their independent findings / conclusions / comments based on their reading and interpretation of the materials presented to each other, and may ask questions of one another. At the conclusion of that discussion, members of the public will be offered an opportunity (not to exceed three (3) minutes) to provide comments. s) At the conclusion of public comments (provided for in number 7), the selection committee members will individually rank order each proposer. Collier County selection committee members may consider all the material submitted by the Proposer and other information Collier County may obtain to determine whether the Proposer is capable of and has a history of successfully completing projects of this type, including, without limitation, additional information Collier County may request, clarification of proposer information, public comments, and/or additional credit information. s) Once the individual ranking has been completed, the Procurement professional will direct selection committee members to read their individual ranking publically. The Procurement professional will record individual rankings on the Final Ranking Sheet which will mathematically compile into an overall selection committee rank of proposers. io) In any of the selection committee meeting deliberations, by consensus, members may request to invite proposers in to clarify their proposals, ask for additional information, present materials, interview, ask questions, etc. The members may consider any and all information obtained through this method in formulating their individual ranking and subsequent selection committee overall ranking and final ranking. 11) The selection committee's overall rank of firms in order of preference (from highest beginning with a rank of one (1) to the lowest) will be discussed and reviewed by the Procurement Strategist. By final consensus, and having used all information presented (proposal, presentation, references, etc.), the selection committee members will create a final ranking and staff will subsequently enter into negotiations. Award of the contract is dependent upon the successful and full execution of a mutually agreed contract, pending the final approval by the Board of County Commissioners. The County reserves the right to withdraw this RFP at any time and for any reason, and to issue such clarifications, modifications, addendums, and/or amendments as it may deem appropriate, including, but not limited, to requesting supplemental proposal information. Receipt of a proposal by the County or a submission of a proposal to the County offers no rights upon the Consultant nor obligates the County in any manner. Acceptance of the proposal does not guarantee issuance of any other governmental approvals. Proposals which include provisions requiring the granting of zoning variances may not be considered. RFP 16-6561 Marco Airport Tenninal 11 10. References The County reserves the right to contact any and all references submitted as a result of this solicitation. 11. Proposal Selection Committee and Evaluation Factors The County Manager or designee will appoint a Selection Committee to review all proposals submitted. The factors to be considered in the evaluation of proposal responses are listed below. Tab I, Project Approach 25 Tab II, Schedule & Quality Control 20 Tab III, Experience and Capacity of the Firm 25 Tab IV, Staff Experience & Availability 20 Tab V, References 10 TOTAL POINTS 100 Tie Breaker: In the event of a tie, both in individual scoring and in final ranking, the firm with the lowest paid dollars by Collier County to the Consultant (as obtained from the County's financial system) within the last five (5) years will receive the higher individual ranking. This information will be based on information provided by the Consultant, subject to verification at the County's option. If there is a multiple firm tie in either individual scoring or final ranking, the firm with the lowest volume of work shall receive the higher ranking, the firm with the next lowest volume of work shall receive the next highest ranking and so on. 12. Acceptance or Rejection of Proposals The right is reserved by the County to waive any irregularities in any proposal, to reject any or all proposals, to re -solicit for proposals, if desired, and upon recommendation and justification by Collier County to accept the proposal which in the judgment of the County is deemed the most advantageous for the public and Collier County. Any proposal which is incomplete, conditional, obscure or which contains irregularities of any kind, may be cause for rejection. In the event of default of the successful Consultant, or their refusal to enter into the Collier County contract, the County reserves the right to accept the proposal of any other Consultant or to re -advertise using the same or revised documentation, at its sole discretion. RFP 16-6561 Marco Airport Terminal 12 Exhibit III: Collier County Purchase Order Terms and Conditions 1. Offer specifically stated in this Purchase Order. This offer is subject to cancellation by the Unless otherwise provided in Purchase COUNTY without notice if not accepted by Order, no invoices shall be issued nor VENDOR within fourteen (14) days of issuance. payments made prior to delivery. Unless freight and other charges are itemized, any 2. Acceptance and Confirmation discount will be taken on the full amount of This Purchase Order (including all documents invoice. attached to or referenced therein) constitutes c) All shipments of goods scheduled on the the entire agreement between the parties, unless same day via the same route must be otherwise specifically noted by the COUNTY on consolidated. Each shipping container must the face of this Purchase Order. Each delivery of be consecutively numbered and marked to goods and/or services received by the COUNTY show this Purchase Order number. The from VENDOR shall be deemed to be upon the container and Purchase Order numbers must terms and conditions contained in this Purchase be indicated on bill of lading. Packing slips Order. must show Purchase Order number and must be included on each package of less than No additional terms may be added and Purchase container load (LCL) shipments and/or with Order may not be changed except by written each car load of equipment. The COUNTY instrument executed by the COUNTY. VENDOR reserves the right to refuse or return any is deemed to be on notice that the COUNTY shipment or equipment at VENDOR'S objects to any additional or different terms and expense that is not marked with Purchase conditions contained in any acknowledgment, Order numbers. VENDOR agrees to declare invoice or other communication from VENDOR, to the carrier the value of any shipment made notwithstanding the COUNTY'S acceptance or under this Purchase Order and the full payment for any delivery of goods and/or invoice value of such shipment. services, or any similar act by VENDOR. d) All invoices must contain the Purchase Order number and any other specific information as 3. Inspection identified on the Purchase Order. Discounts All goods and/or services delivered hereunder of prompt payment will be computed from the shall be received subject to the COUNTY'S date of receipt of goods or from date of inspection and approval and payment therefore receipt of invoices, whichever is later. shall not constitute acceptance. All payments are Payment will be made upon receipt of a subject to adjustment for shortage or rejection. proper invoice and in compliance with All defective or nonconforming goods will be Chapter 218, Fla. Stats., otherwise known as returned pursuant to VENDOR'S instruction at the "Local Government Prompt Payment Act," VENDOR'S expense, and, pursuant to the Board of County Commissioners Purchasing Policy. To the extent that a purchase order requires a series of performances by VENDOR, the COUNTY prospectively reserves the right to cancel the entire remainder of the Purchase Order if goods and/or services provided early in the term of the Purchase Order are non -conforming or otherwise rejected by the COUNTY. 4. Shipping and Invoices a) All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remain with VENDOR. b) No charges will be paid by the COUNTY for packing, crating or cartage unless otherwise RFP 16-6561 Marco Airport Tenninal 5. Time Is Of the Essence Time for delivery of goods or performance of services under this Purchase Order is of the essence. Failure of VENDOR to meet delivery schedules or deliver within a reasonable time, as interpreted by the COUNTY in its sole judgment, shall entitle the COUNTY to seek all remedies available to it at law or in equity. VENDOR agrees to reimburse the COUNTY for any expenses incurred in enforcing its rights. VENDOR further agrees that undiscovered delivery of nonconforming goods and/or services is not a waiver of the COUNTY'S right to insist upon further compliance with all specifications. 6. Changes The COUNTY may at any time and by written notice make changes to drawings and specifications, shipping instructions, quantities 13 and delivery schedules within the general scope of this Purchase Order. Should any such change increase or decrease the cost of, or the time required for performance of the Purchase Order, an equitable adjustment in the price and/or delivery schedule will be negotiated by the COUNTY and VENDOR. Notwithstanding the foregoing, VENDOR has an affirmative obligation to give notice if the changes will decrease costs. Any claims for adjustment by VENDOR must be made within thirty (30) days from the date the change is ordered or within such additional period of time as may be agreed upon by the parties. Warranties VENDOR expressly warrants that the goods and/or services covered by this Purchase Order will conform to the specifications, drawings, samples or other descriptions furnished or specified by the COUNTY, and will be of satisfactory material and quality production, free from defects and sufficient for the purpose intended. Goods shall be delivered free from any security interest or other lien, encumbrance or claim of any third party. These warranties shall survive inspection, acceptance, passage of title and payment by the COUNTY. 8. Statutory Conformity Goods and services provided pursuant to this Purchase Order, and their production and transportation shall conform to all applicable laws, including but not limited to the Occupational Health and Safety Act, the Federal Transportation Act and the Fair Labor Standards Act, as well as any law or regulation noted on the face of the Purchase Order. Advertising No VENDOR providing goods and services to the COUNTY shall advertise the fact that it has contracted with the COUNTY for goods and/or services, or appropriate or make use of the COUNTY'S name or other identifying marks or property without the prior written consent of the COUNTY'S Purchasing Department. 10. Indemnification VENDOR shall indemnify and hold harmless the COUNTY from any and all claims, including claims of negligence, costs and expenses, including but not limited to attorneys' fees, arising from, caused by or related to the injury or death of any person (including but not limited to employees and agents of VENDOR in the performance of their duties or otherwise), or RFP 16-6561 Marco Airport Terminal damage to property (including property of the COUNTY or other persons), which arise out of or are incident to the goods and/or services to be provided hereunder. 11. Warranty of Non -Infringement VENDOR represents and warrants that all goods sold or services performed under this Purchase Order are: a) in compliance with applicable laws; b) do not infringe any patent, trademark, copyright or trade secret; and c) do not constitute unfair competition. VENDOR shall indemnify and hold harmless the COUNTY from and against any and all claims, including claims of negligence, costs and expense, including but not limited to attorneys' fees, which arise from any claim, suit or proceeding alleging that the COUNTY'S use of the goods and/or services provided under this Purchase Order are inconsistent with VENDOR'S representations and warranties in section 11 (a). If any claim which arises from VENDOR'S breach of section 11 (a) has occurred, or is likely to occur, VENDOR may, at the COUNTY'S option, procure for the COUNTY the right to continue using the goods or services, or replace or modify the goods or services so that they become non -infringing, (without any material degradation in performance, quality, functionality or additional cost to the COUNTY). 12. Insurance Requirements The VENDOR, at its sole expense, shall provide commercial insurance of such type and with such terms and limits as may be reasonably associated with the Purchase Order. Providing and maintaining adequate insurance coverage is a material obligation of the VENDOR. All insurance policies shall be executed through insurers authorized or eligible to write policies in the State of Florida. 13. Compliance with Laws In fulfilling the terms of this Purchase Order, VENDOR agrees that it will comply with all federal, state, and local laws, rules, codes, and ordinances that are applicable to the conduct of its business. By way of non -exhaustive example, this shall include the American with Disabilities Act and all prohibitions against discrimination on the basis of race, religion, sex creed, national origin, handicap, marital status, or veterans' status. Further, VENDOR acknowledges and without exception or stipulation shall be fully 14 responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the awarded firm(s) to comply with the laws referenced herein shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. Any breach of this provision may be regarded by the COUNTY as a material and substantial breach of the contract arising from this Purchase Order. 14. Force Majeure Neither the COUNTY nor VENDOR shall be responsible for any delay or failure in performance resulting from any cause beyond their control, including, but without limitation to war, strikes, civil disturbances and acts of nature. When VENDOR has knowledge of any actual or potential force majeure or other conditions which will delay or threatens to delay timely performance of this Purchase Order, VENDOR shall immediately give notice thereof, including all relevant information with respects to what steps VENDOR is taking to complete delivery of the goods and/or services to the COUNTY. 15. Assignment VENDOR may not assign this Purchase Order, nor any money due or to become due without the prior written consent of the COUNTY. Any assignment made without such consent shall be deemed void. 16. Taxes Goods and services procured subject to this Purchase Order are exempt from Florida sales and use tax on real property, transient rental property rented, tangible personal purchased or rented, or services purchased (Florida Statutes, Chapter 212), and from federal excise tax. 17. Annual Appropriations The COUNTY'S performance and obligation to pay under this Purchase Order shall be contingent upon an annual appropriation of funds. 18. Termination This Purchase Order may be terminated at any time by the COUNTY upon 30 days prior written notice to the VENDOR. This Purchase Order may RFP 16-6561 Marco Airport Terminal be terminated immediately by the COUNTY for breach by VENDOR of the terms and conditions of this Purchase Order, provided that COUNTY has provided VENDOR with notice of such breach and VENDOR has failed to cure within 10 days of receipt of such notice. 19. General a) This Purchase Order shall be governed by the laws of the State of Florida. The venue for any action brought to specifically enforce any of the terms and conditions of this Purchase Order shall be the Twentieth Judicial Circuit in and for Collier County, Florida b) Failure of the COUNTY to act immediately in response to a breach of this Purchase Order by VENDOR shall not constitute a waiver of breach. Waiver of the COUNTY by any default by VENDOR hereunder shall not be deemed a waiver of any subsequent default by VENDOR. c) All notices under this Purchase Order shall be sent to the respective addresses on the face page by certified mail, return receipt requested, by overnight courier service, or by personal delivery and will be deemed effective upon receipt. Postage, delivery and other charges shall be paid by the sender. A party may change its address for notice by written notice complying with the requirements of this section. d) The Vendor agrees to reimbursement of any travel expenses that may be associated with this Purchase Order in accordance with Florida Statute Chapter 112.061, Per Diem and Travel Expenses for Public Officers, employees and authorized persons. e) In the event of any conflict between or among the terms of any Contract Documents related to this Purchase Order, the terms of the Contract Documents shall take precedence over the terms of the Purchase Order. To the extent any terms and /or conditions of this Purchase Order duplicate or overlap the Terms and Conditions of the Contract Documents, the provisions of the Terms and/or Conditions that are most favorable to the County and/or provide the greatest protection to the County shall govern. 15 Exhibit IV: Additional Terms and Conditions for RFP 1. Insurance and Bonding Requirements The Consultant shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in the Insurance and Bonding attachment of this solicitation. The Consultant shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Consultant waive against each other and the County's separate Consultants, Contractors, Design Consultant, Subcontractors agents and employees of each and all of them, all damages covered by properly insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Consultant and County shall, where appropriate, require similar waivers of subrogation from the County's separate Consultants, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining, its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County." The General Liability Policy provided by Consultant to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Consultant under this solicitation and shall contain a severability of interests provisions. Collier County Board of County Commissioners shall be named as the Certificate Holder. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. The "Certificate Holder" should read as follows: Collier County Board of County Commissioners Naples, Florida The amounts and types of insurance coverage shall conform to the minimum requirements set forth in Insurance and Bonding attachment, with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Consultant has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Consultant must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Consultant's sole responsibility. Coverage(s) shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Consultant and/or its insurance carrier shall provide 30 days written notice to the County of policy cancellation or non -renewal on the part of the insurance carrier or the Consultant. The Consultant shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non -renewal or material change in coverage or limits received by Consultant from its insurer and nothing contained herein shall relieve Consultant of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Consultant hereunder, Consultant shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. RFP 16-6561 Marco Airport Tenninal 16 Should at any time the Consultant not maintain the insurance coverage(s) required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Consultant for such coverage(s) purchased. If Consultant fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Consultant under this Agreement or any other agreement between the County and Consultant. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Consultant shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Consultant to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. 2. Offer Extended to Other Governmental Entities Collier County encourages and agrees to the successful Consultant extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful Consultant. 3. Additional Items and/or Services Additional items and/or services may be added to the resultant contract, or purchase order, in compliance with the Purchasing Policy. 4. County's Right to Inspect The County or its authorized Agent shall have the right to inspect the Consultants facilities/project site during and after each work assignment the Consultant is performing. 5. Contractor Performance Evaluation The County has implemented a Contractor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, contractors will be evaluated on their performance upon completion/termination of this Agreement 6. Additional Terms and Conditions of Contract Collier County has developed standard contracts/agreements, approved by the Board of County Commissioners (BCC). The selected Consultant shall be required to sign a standard Collier County contract within twenty one (21) days of Notice of Selection for Award. The resultant contract(s) may include purchase or work orders issued under one, or any combination of price methodologies by the County's project manager: Lump Sum (Fixed Price): a firm fixed total price offering for a project; the risks are transferred from the County to the contractor; and, as a business practice there are no hourly or material invoices presented, rather, the contractor must perform to the satisfaction of the County's project manager before payment for the fixed price contract is authorized. Time and Materials: the County agrees to pay the contractor for the amount of labor time spent by the contractor's employees and subcontractors to perform the work (number of hours times hourly rate), and for materials and equipment used in the project (cost of materials plus the contractor's RFP 16-6561 Marco Airport Terminal 17 mark up). This methodology is generally used in projects in which it is not possible to accurately estimate the size of the project, or when it is expected that the project requirements would most likely change. As a general business practice, these contracts include back-up documentation of costs; invoices would include number of hours worked and billing rate by position (and not company (or subcontractor) timekeeping or payroll records), material or equipment invoices, and other reimbursable documentation for the project. The County reserves the right to include in any contract document such terms and conditions, as it deems necessary for the proper protection of the rights of Collier County. A sample copy of this contract is available upon request. The County will not be obligated to sign any contracts, maintenance and/or service agreements or other documents provided by the Consultant. The County's project manager shall coordinate with the Contractor the return of any surplus assets, including materials, supplies, and equipment associated with the scope or work. 7. Public Records Compliance The Contractor agrees to comply with the Florida Public Records Law Chapter 119 (including specifically those contractual requirements at F.S. § 119.0701(2) (a) -(d) and (3)), ordinances, codes, rules, regulations and requirements of any governmental agencies. 8. Payment Method Payments are made in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes. Contractor's invoices must include: • Purchase Order Number • Description and quantities of the goods or services provided per instructions on the County's purchase order or contract. Invoices shall be sent to: Board of County Commissioners Clerk's Finance Department ATTN: Accounts Payable 3299 Tamiami Trail E Ste 700 Naples FL 34112 Or emailed to: bccaoclerk�a collierele k cam. Collier County, in its sole discretion, will determine the method of payment for goods and/or services as part of this agreement. Payment methods include: • Traditional — payment by check, wire transfer or other cash equivalent. • Standard — payment by purchasing card. Collier County's Purchasing Card Program is supported by standard bank credit suppliers (i.e. VISA and MasterCard), and as such, is cognizant of the Rules for VISA Merchants and MasterCard Merchant Rules. The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County's credit card for transactions relating to this solicitation. The County will entertain bids clearly stating pricing for standard payment methods. An additional separate discounted price for traditional payments may be provided at the initial bid submittal if it is clearly marked as an "Additional Cash Discount." Upon execution of the Contract and completion of each month's work, payment requests may be submitted to the Project Manager on a monthly basis by the Contractor for services rendered for that prior month. Services beyond sixty (60) days from current monthly invoice will not be considered for payment without prior approval from the Project manager. All invoices should be submitted within the fiscal year the work was performed. (County's fiscal year is October 1 - September 30.) Invoices RFP 16-6561 Marco Airport Teminal 18 submitted after the close of the fiscal year will not be accepted (or processed for payment) unless specifically authorized by the Project Manager. Payments will be made for articles and/or services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any..untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off -set the amount owed to the County by applying the amount owed to the contractor or contractor for services performed of for materials delivered in association with a contract. Invoices shall not reflect sales tax. After review and approval, the invoice will be transmitted to the Finance Division for payment. Payment will be made upon receipt of proper invoice and in compliance with Chapter 218 Florida Statutes, otherwise known as the "Local Government Prompt Payment Act." Collier County reserves the right to withhold and/or reduce an appropriate amount of any payment for work not performed or for unsatisfactory performance of Contractual requirements. 9. Environmental Health and Safety All Consultants and Sub Consultants performing service for Collier County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Consultants and Sub Consultants shall be responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site. All firewall penetrations must be protected in order to meet Fire Codes. Collier County Government has authorized OSHA representatives to enter any Collier County facility, property and/or right-of-way for the purpose of inspection of any Consultants work operations. This provision is non-negotiable by any department and/or Consultant. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 10. Licenses The Consultant is required to possess the correct Business Tax Receipt, professional license, and any other authorizations necessary to carry out and perform the work required by the project pursuant to all applicable Federal, State and Local Law, Statute, Ordinances, and rules and regulations of any kind. Additionally, copies of the required licenses must be submitted with the proposal response indicating that the entity proposing, as well as the team assigned to the County account, is properly licensed to perform the activities or work included in the contract documents. Failure on the part of any Consultant to submit the required documentation may be grounds to deem Consultant non-responsive. A Consultant, with an office within Collier County is also required to have an occupational license. All State Certified contractors who may need to pull Collier County permits or call in inspections must complete a Collier County Contractor License registration form and submit the required fee. After registering the license/registration will need to be renewed thereafter to remain "active" in Collier County. If you have questions regarding professional licenses contact the Contractor Licensing, Community RFP 16-6561 Marco Airport Terminal 19 Development and Environmental Services at (239) 252-2431, 252-2432 or 252-2909. Questions regarding required occupational licenses, please contact the Tax Collector's Office at (239) 252-2477. 11. Survivability The Consultant agrees that any Purchase Order that extends beyond the expiration date of the original Solicitation 16-6561 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Purchase Order. 12. Principals/Collusion By submission of this Proposal the undersigned, as Consultant, does declare that the only person or persons interested in this Proposal as principal or principals is/are named therein and that no person other than therein mentioned has any interest in this Proposal or in the contract to be entered into; that this Proposal is made without connection with any person, company or parties making a Proposal, and that it is in all respects fair and in good faith without collusion or fraud. 13. Relation of County It is the intent of the parties hereto that the Consultant shall be legally considered an independent Consultant, and that neither the Consultant nor their employees shall, under any circumstances, be considered employees or agents of the County, and that the County shall be at no time legally responsible for any negligence on the part of said Consultant, their employees or agents, resulting in either bodily or personal injury or property damage to any individual, firm, or corporation. 14. Termination Should the Consultant be found to have failed to perform his services in a manner satisfactory to the County, the County may terminate this Agreement immediately for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non-performance. 15. Lobbying All firms are hereby placed on NOTICE that the Board of County Commissioners does not wish to be lobbied, either individually or collectively about a project for which a firm has submitted a Proposal. Firms and their agents are not to contact members of the County Commission for such purposes as meeting or introduction, luncheons, dinners, etc. During the process, from Proposal closing to final Board approval, no firm or their agent shall contact any other employee of Collier County in reference to this Proposal, with the exception of the Procurement Director or his designee(s). Failure to abide by this provision may serve as grounds for disqualification for award of this contract to the firm. 16. Certificate of Authority to Conduct Business in the State of Florida (Florida Statute 607.1501) In order to be considered for award, firms must be registered with the Florida Department of State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501 and provide a certificate of authority (www_sunbiz.orolsearch htmp prior to execution of a contract. A copy of the document may be submitted with the solicitation response and the document number shall be identified. Firms who do not provide the certificate of authority at the time of response shall be required to provide same within five (5) days upon notification of selection for award. If the firm cannot provide the document within the referenced timeframe, the County reserves the right to award to anotherfirm. 17. Single Proposal RFP 16-6561 Marco Airport Tenninal 20 Each Consultant must submit, with their proposal, the required forms included in this RFP. Only one proposal from a legal entity as a primary will be considered. A legal entity that submits a proposal as a primary or as part of a partnership or joint venture submitting as primary may not then act as a sub - consultant to any other firm submitting under the same RFP. If a legal entity is not submitting as a primary or as part of a partnership or joint venture as a primary, that legal entity may act as a sub - consultant to any other firm or firms submitting under the same RFP. All submittals in violation of this requirement will be deemed non-responsive and rejected from further consideration. In addition, consultants that have participated and/or will participate in the development of scope, background information or oversight functions on this project are precluded from submitting a Proposal as either a prime or sub- consultant. 18. Protest Procedures Any prospective proposer who desires to protest any aspect(s) or provision(s) of the solicitation (including the form of the solicitation documents or procedures) shall file their protest with the Procurement Director prior to the time of the bid opening strictly in accordance with the County's then current purchasing ordinance and policies. The Board of County Commissioners will make award of contract in public session. Award recommendations will be posted outside the offices of the Purchasing Department on Wednesdays and Thursdays. Any actual or prospective respondent who desires to formally protest the recommended contract award must file a notice of intent to protest with the Procurement Director within two (2) calendar days (excluding weekends and County holidays) of the date that the recommended award is posted. Upon filing of said notice, the protesting party will have five (5) days to file a formal protest and will be given instructions as to the form and content requirements of the formal protest. A copy of the "Protest Policy" is available atthe office of the Procurement Director. 19. Public Entity Crime A person or affiliate who has been placed on the convicted Consultant list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months following the date of being plaoed on the convicted Consultant list. 20. Security and Background Checks If required, Consultant shall be responsible for the costs of providing background checks by the Collier County Facilities Management Department, and drug testing for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four (4) years. 21. Conflict of Interest Consultant shall complete the Conflict of Interest Affidavit included as an attachment to this RFP document. Disclosure of any potential or actual conflict of interest is subject to County staff review and does not in and of itself disqualify a firm from consideration. These disclosures are intended to identify and or preclude conflict of interest situations during contract selection and execution. 22. Prohibition of Gifts to County Employees RFP 16-6561 Marco Airport Terminal 21 No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, the current Collier County Ethics Ordinance and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. 23. Immigration Law Affidavit Certification Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States, The Employment Eligibility Verification System (E -Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet -based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Consultants are required to enroll in the E -Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Consultant's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E -Verify Company Profile page or a copy of the fully executed E -Verify Memorandum of Understanding for the company. Consultants are also required to provide the Collier County Purchasing Department an executed affidavit certifying they shall comply with the E -Verify Program. The affidavit is attached to the solicitation documents. If the Consultant does Additionally, Consultants shall require all subcontracted Consultants to use the E -Verify system for all purchases not covered under the "Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E -Verify) program visit the following website: http /lwww.dhs.gov/E-Vffify. It shall be the Consultant's responsibility to familiarize themselves with all rules and regulations governing this program. Consultant acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. a Bev 1414ty Admnistrane Services Department Rou,r� Fiwrt Se�mccs Dmsion Attachment 1: Consultant's Non -Response Statement RFP 16-6561 Marco Airport Terminal 22 The sole intent of the Collier County Purchasing Department is to issue solicitations that are clear, concise and openly competitive. Therefore, we are interested in ascertaining reasons for prospective Consultants not wishing to respond to this solicitation. If your firm is not responding to this RFP, please indicate the reason(s) by checking the item(s) listed below and return this form via email or fax, noted on the cover page, or mail to Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. We are not responding to CCNA Solicitation RFP 16-6561 - Design Services for Marco Executive Airport Terminal for the following reason(s): ❑ Services requested not available through our company. ❑ Our firm could not meet specifications/scope of work. ❑ Specificationstscope of work not clearly understood or applicable (too vague, rigid, etc.) ❑ Project is too small. ❑ Insufficient time allowed for preparation of response. ❑ Incorrect address used. Please correct mailing address: ❑ Other reason(s): Name of Firm: Address: City, State, Zip: Telephone: Email: Representative Signature: Representative Name: RFP 16-6561 Marco Airport Terminal 23 COIT 014"ItY Adnvnisoatve Services Department Vmurtemant Se�w's ;Ji+rasion Attachment 2: Consultant Check List IMPORTANT: THIS SHEET MUST BE SIGNED. Please read carefully, sign in the spaces indicated and return with your Proposal. Consultant should check off each of the following items as the necessary action is completed: ❑ The Proposal has been signed. ❑ All applicable forms (including grant forms) have been signed and included, along with licenses to complete the requirements of the project. ❑ Any addenda have been signed and included. ❑ The mailing envelope has been addressed to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Brenda Brilhart, Procurement Strategist RFP 16-6561 - Design Services for Marco Executive Airport Terminal ❑ The mailing envelope must be sealed and marked with Proposal Number, Proposal Title and Due Date. ❑ The Proposal will be mailed or delivered in time to be received no later than the specified due date and time. (Otherwise Proposal cannot be considered.) ❑ If submitting a manual bid, include any addenda (initialed and dated noting understanding and receipt). If submitting bid electronically, bidder will need to download ell related documents on www.colliergov.net/bid. The system will date and time stamp when the addendum files were downloaded. ALL COURIER -DELIVERED PROPOSALS MUST HAVE THE RFP NUMBER AND TITLE ON THE OUTSIDE OF THE COURIER PACKET Name of Firm: Address: City, State, Zip: Telephone: Email: Representative Signature: Representative Name: RFP 16-6561 Marco Airport Terminal Date 24 Adminisntive Services Depadment Prowxeinent Sarsinxs imson Attachment 3: Conflict of Interest Affidavit By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the firm (employees, officers and/or agents) has a possible conflict have been fully disclosed. Additionally, the firm (employees, officers and/or agents) agrees to immediately notify in writing the Procurement Director, or designee, if any actual or potential conflict of interest arises during the contract and/or project duration. Firm: Signature and Date: Print Name Title of Signatory State of _ County of _ SUBSCRIBED AND SWORN to before me this Notary Public day of 1 20_, by who is personally known to me to be the for the Firm, OR who produced the following identification My Commission Expires RFP 16-6561 Marco Airport Terminal 25 COAL (Z 014 cty Administmrve Scm�Dopartmont Pmeuremeni Sewices ❑rc�:en Attachment 4: Consultant Declaration Statement BOARD OF COUNTY COMMISSIONERS Collier County Government Complex Naples, Florida 34112 RE: CCNA Solicitation: RFP 16-6561 - Design Services for Marco Executive Airport Terminal Dear Commissioners The undersigned, as Consultant declares that this proposal is made without connection or arrangement with any other person and this proposal is in every respect fair and made in good faith, without collusion or fraud. The Consultant agrees, if this proposal is accepted, to execute a Collier County document for the purpose of establishing a formal contractual relationship between the firm and Collier County, for the performance of all requirements to which the proposal pertains. The Consultant states that the proposal is based upon the proposal documents listed by the above referenced CCNA Solicitation. IN WITNESS WHEREOF, WE have hereunto subscribed our names on this day of 20_ in the County of , in the State of Firm's Legal Name: Address: City, State, Zip Code Florida Certificate of Authority Document Number Federal Tax Identification Number CCR # or CAGE Code Telephone: FAX: Signature by: (Typed and written) Title: RFP 16-6561 Marco Airport Terminal 26 Additional Contact Information Send payments to: (required if different from Company name used as payee above) Contact name: Title: Address: City, State, ZIP Telephone: FAX: Email: Office servicing Collier County to place orders (required if different from above) Contact name: Title: Address: City, State, ZIP Telephone: Email: RFP 16-6561 Marco Airport Terminal 27 Adminis4 vjc Serdces Department Prucurein?nl Sewit'e,G icon Attachment 5: Immigration Affidavit Certification CCNA Solicitation: RFP 16-6561 - Design Services for Marco Executive Airport Terminal This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with formal Invitations to Bid (ITB's) and Request for Proposals (RFP) submittals. Further, Consultants / Bidders are required to enroll in the E -Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Consultant's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E - Verify Company Profile page or a copy of the fully executed E -Verify Memorandum of Understanding for the company. Collier County will not intentionally award County contracts to any Consultant who knowingly employs unauthorized alien workers, constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e) Section 274A(e) of the Immigration and Nationality Act ("INA"). Collier County may consider the employment by any Consultant of unauthorized aliens a violation of Section 274A (e) of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA shall be grounds for unilateral termination of the contract by Collier County. Consultant attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and subsequent Amendment(s)) and agrees to comply with the provisions of the Memorandum of Understanding with E -Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E -Verify), operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Consultant's / Bidder's proposal. Company Name Name State of Date County of The foregoing instrument was signed and acknowledged before me this day of 20_, by who has produced as identification. (Print or Type Name) (Type of Identification and Number) Notary Public Signature Printed Name of Notary Public Notary Commission Number/Expiration The signee of this Affidavit guarantees, as evidenced by the sworn affidavit required herein, the truth and accuracy of this affidavit to interrogatories hereinafter made. RFP 16-6561 Marco Airport Terminal 28 Coffer m.. -w 3 Mminat�nw Scracos Dop„ Nnan� Attachment 6: Consultant Substitute W - 9 Request for Taxpayer Identification Number and Certification In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information for tax reporting purposes from individuals and companies who do business with the County (including social security numbers if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5) require that the county notify you in writing of the reason for collecting this information, which will be used for no other purpose than herein stated. Please complete all information that applies to your business and return with your quote or proposal. 1. General Information (provide all information) Taxpayer Name (as shown on income tax return) Business Name (if different from taxpayer name) Address City State Telephone Order Information MKI Email Remit/ Payment Information Address I Address City State Zip Email 2. Company Status (check only one) City State FAX Email Individual / Sole Proprietor Corporation Partnership _Tax Exempt (Federal income tax-exempt entity _ Limited Liability Company under Internal Revenue Service guidelines IRC 501 (c) 3) Enter the tax classification D = Disregarded Entity, C = Corporation, P = Partnership) 3. Taxpayer Identification Number (for tax reporting purposes only) Federal Tax Identification Number (TIN) (Consultants who do not have a TIN, will be required to provide a social security number prior to an award), 4. Sign and Date Form: Certification: Under penalties of perjury, I certify that the information shown on this form is correct to my knowledge. Signature Date Title Phone Number RFP 16-6561 Marco Airport Terminal 29 Adminis=vo Services Dopar cnt Prxamm�nr y^emroes Dinsien Attachment 7: Insurance and Bonding Requirements Insurance / Bond Type Required Limits 1. ® Worker's Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Compensation Statutory Limits and Requirements 2. ® Employer's Liability $100.000 single limit per occurrence 3. ® Commercial General Bodily Injury and Property Damage Liability (Occurrence Form) $1,000.000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury patterned after the current Liability and Property Damage Liability. This shall include Premises and ISO form Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. ® Indemnification To the maximum extent permitted by Florida law, the Contractor/ Consultant shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/Consultant or anyone employed or utilized by the Contractor/Consultant in the performance of this Agreement. 4. ® Automobile Liability $ 1.000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 5. ® Other insurance as ❑ Watercraft $ Per Occurrence noted: ❑ United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑ Pollution $ Per Occurrence ® Professional Liability $1,000,000 per claim and in the aggregate • $1,000,000 per claim and in the aggregate • $2,000,000 per claim and in the aggregate ❑ Project Professional Liability $ Per Occurrence ❑ Valuable Papers Insurance $ Per Occurrence ❑ Employee Dishonesty / Crime $ Per Occurrence Including Employee Theft, Funds Transfer Fraud, Include a Joint Loss Payee endorsement naming Collier County. RFP 16-6561 Marco Airport Terminal 30 6. ❑ Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 7. ❑ Performance and For projects in excess of $200,000, bonds shall be submitted with the Payment Bonds executed contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as "A-" or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders' surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 8. ® Consultant shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Consultant shall provide County with certificates of insurance meeting the required insurance provisions. 9. ® Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. 10. ® The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or speck Project description, or must read: For any and all work performed on behalf of Collier County. 11. ® Thirty (30) Days Cancellation Notice required. Consultant's Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm Date Consultant Signature Print Name Insurance Agency Agent Name Telephone Number RFP 16-6561 Marco Airport Tenninal 31 o 'Pea" conuty Administmtive Services Department P*.....ment Sm .es 11',"" Attachment 8: Reference Questionnaire Reference Questionnaire for: (Name of Company Requesting Reference Information) (Name of Individuals Requesting Reference Information) Name: Company: (Evaluator completing reference questionnaire) Email: FAX: Executive Airport Terminal (Evaluator's Company completing reference) Telephone: Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firmfindividual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdival again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored "0." Project Description: Project Budget: Completion Date: Project Number of Days: Item Citeria Score 1 Ability to manage the project costs (minimize change orders to scope). 2 Ability to maintain project schedule (complete on-time or early). 3 Quality of work. 4 Quality of consultative advice provided on the project. 5 Professionalism and ability to manage personnel. 6 Project administration (completed documents, final invoice, final product turnover; invoices; manuals or going forward documentation, etc.) 7 Ability to verbally communicate and document information clearly and succinctly. 8 Abiltity to manage risks and unexpected project circumstances. 9 Ability to follow contract documents, policies, procedures, rules, regulations, etc. 10 Overall comfort level with hiring the company in the future (customer satisfaction). TOTAL SCORE OF ALL ITEMS Please FAX this completed survey to: RFP 16-6561 Marco Airport Terminal By BPA EXHIBIT A Scope of Work, Specifications and Response Format As requested by the Collier County Airport Authority (hereinafter, the "Division or Department'), the Collier County Board of County Commissioners Purchasing Department (hereinafter, "County") has issued this Request for Proposal (hereinafter, `RFP") with the intent of obtaining proposals from interested and qualified firms in accordance with the terms, conditions and specifications stated or attached. The Contractor, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated herein. Brief Description of Purchase The Collier County Airport Authority is seeking proposals from qualified firms to provide professional design, permitting and project oversight services for a new terminal and GSE facility, expanded aircraft parking apron, new vehicle parking, building demolition and pavement removal at the Marco Island Executive Airport. The proposal must identify architectural, MEP, structural, civil and landscape architecture for the complete design and required permits. This is expected to be a three (3) to four (4) year design and construction program due to annual funding constraints and intense seasonal traffic activity and is dependent upon the level of grant funding available through FAA and FDOT. See draft floor and conceptual site plans in Exhibit "B" and "C. See attached Exhibit "D", Granting Agency Documents and Exhibit "E", Granting Agency Forms, incorporated herein by reference. Background The Marco Island Executive airport is served by one 5,000 ft. x 100 ft runway and an existing terminal building of approximately 8,000 square feet. This project includes preparing design plans and bid documents required to relocate the airport terminal to the west, construct a shelter for ground support equipment, demolish the old terminal and construct aircraft apron where the terminal previously existed, and extend the taxiway to the north. The existing general aviation terminal building at the Marco Island Executive Airport is located within an unsafe distance from the active runway, which deviates from current FAA design/safety standards. The building is located approximately 50 feet from the Runway Object Free Area. It is completely within the Part 77 Transitional Surface and future Parallel Taxiway Object Free Area, which is currently utilized an as aircraft parking area/taxilane. This project alleviates safety concerns while addressing ramp/parking capacity issues, which is extremely limited during the busy winter months. The new terminal will be relocated west of the current vehicle parking on land acquired by the Airport Authority between 2006 and 2008. This project includes the preparation of design plans and specifications, bid documents, permitting and construction administration services throughout the life of the project. Detailed Scope of Work The overall project will include two major components and associated breakdown of funding sources. It is anticipated that all design and construction aspects associated with the apron expansion, terminal (obstruction) demolition, and taxiway extension will be primarily funded with Federal (FAA) AIP dollars, while all design and construction aspects associated with the new terminal, GSE and auto parking facilities will be primarily funded with State (FDOT) and local (County) dollars, as depicted in the concept drawing provided in separate attachment. Therefore, services associated with each funding source shall be clearly identified and delineated throughout the lite of the project. Phase I -- Design Phase Services: The terminal design shall include, but not be limited to all architectural, civil, structural, and electrical engineering typically required for building construction. This will consist of a 13,000-15,000 square RFP 16-6561 Marco Airport Tenninal 33 foot building(s) to be used as the FBO and Authority Administrative Offices. The design must incorporate all utilities, site development and parking. Services shall consist of all phases of design, including but not limited to: programming, schematic design, design development, construction documents, all permitting and services during construction. The structure will incorporate in its design, Collier County's Vertical Standards, a copy which may be obtained from the Department of Facilities Management. The consultant shall provide the Authority with various building design concepts and options for incorporation in the overall facility layout. The first level floor space allocation as shown on Exhibit B, would consist of customer service, public use space such as public seating/lounge area, restrooms, vending machines, and circulation (hallways, stairs, and elevator). In addition, Authority Operated FBO offices and FBO/Flight line operations space, pilots loungelplanning area, rental car space, equipment storage, fire protection, and mechanical/electrical equipment space would be accommodated on the first floor. The second level as shown in Exhibit B would provide space for Collier County Airport Authority board/conference room and airport management administration including: offices, meeting room, visitor waiting area, file storage, work area, break room, general storage, circulation, and equipment space. The apron expansion, terminal demolition, and pavement removal design shall include (as depicted in Exhibit C), but not be limited to all civil, structural, and electrical engineering typically required for airfield pavement projects on active airports in accordance to FAA requirements and in accordance to FAA Advisory Circulars 150/5300-13, 16, 17 & 18 as well as all supporting services such as surveying (including AGIS) and geotechnical services. The selected firm shall be responsible for knowledge of and compliance with all relative local, state and federal codesand regulations. In addition, ability to provide affidavits of no conflict of interest orto provide services separate from private sector clients shall be required. The consultant should be prepared to assist with grant preparation and may or may not be requested to perform administration for FAA and FDOT grant programs. The County's intent is to set up the contract in Phases. The Design Phase services will be negotiated first and if post bid award and construction services are required, these subsequent phases will be negotiated when funding available. Phase II -- Construction Phase services may include: The Consultant may be required to coordinate the overall Construction Phase Program Management, construction observation, grant management and miscellaneous support services. Each of these services shall be provided by the Consultant, working in concert with the County, the County's design Professionals and Contractors. The Consultant shall provide the overall construction administration and possibly construction oversight to verify that all elements of construction are being complied with and that the general intent of the contract document is being met. Also, if construction oversight is required, the Consultant will hire a sub consultant to perform all required testing quality control in the field and on the asphalt to comply with the Contract Documents. Task 1- Construction Administration • Coordination with FAAfFDOT/County and other agencies • FAA safety plans • Coordinate and attend pre -construction conferences with representative • Overall Contract Management • Coordinate and attend construction progress meetings • FAA/FDOT Grant Management (Quarterly Construction compliance with all grant terms, conditions, and assurances. • DBE monitoring and compliance RFP 16-6561 Marco Airport Tenninal each A/E and applicable County Reports) to include ensuring 34 • Review/Track/Monitor status of o construction progress o shop drawing submittals o contract document clarification and interpretations (RFIs) o respond or coordinate responses to RFIs o requests for changes to construction cost and or schedule • Review of contractor's schedule • Provide contractor with schedule comments • Processing of Progress Payments • Verify that the work has progressed to the point indicated • Verify that the work is in substantial accordance with the contract documents • Verify that the contractor is entitled to the payment in the recommended amount • Verify that the A/E has properly Certified the Request for Payment • Verify that all required backup documentation such as the appropriate subcontractor and contractor Releases of Lien have and the Bonding Company's Consent of Payment are included • Recommend payment Task 2 - Construction Inspection • Construction Observation Services • Conduct on-site observations of work in progress to assist in determining if the provisions of the contract documents and permitting conditions are being fulfilled • Resident Project Representative o Report , in writing, whenever it is believed that work is unsatisfactory faulty or defective o Report, in writing, whenever itis believed that a hazardous condition exists o Maintain log of the work performed to include • When the contractor is on the job site • Weather conditions • Changed conditions • List of visitors • Drilling and testing activities • General observations • Specific observations • Observed testing procedures o Verify that tests, equipment, and systems start up are conducted in the presence of appropriate personnel o Verify that the contractor maintains adequate records o Provide photographic record of construction o Observe materials and workmanship o Report, in writing, any deviation from the contract document o Coordinate the sampling and testing of materials to be performed by independent testing laboratories o Monitor that record drawing mark-ups are properly maintained Task 3 - Miscellaneous • Confirm project completion with appropriate agencies • Coordinate and attend Substantial Completion Walk through • Assist the A/E with development of a "punch list" of items needing completion prior to Final Acceptance • Confinn that punch list items are completed RFP 16-6561 Marco Airport Terminal 35 • Coordinate a final review of finished items • Provide recommendation of acceptance of the project • Collect all necessary documentation to close the project/contract o Lien waivers o Contractor's Final Affidavit o Close-out change orders o Surety's Final Consent o Process Final Payment • Assist the County with coordination of warranty work (not to exceed the completion date of the agreement) • Transmit all Project/Program related files to the County • Substantial completion • Project closeout • Testing Quality Control The firm shall be required to provide complete services as outlined in the contract or assist the Airport Authority, as a minimum, with the following tasks. 1. Provide final calculations, construction documents and specifications in consultation with the Owner. 2. Prepare and file all applications, data, and documents required to obtain approval of all authorities having jurisdiction over the project. 3. Prepare the necessary bidding technical specifications, and bid schedule(s). 4. Prepare a written cost estimate, engineering and functionality recommendations. 5. Process, review, approve, and distribute sop drawings, product data, samples, substitutions and other submittals required by the Construction Documents. 6. Construction field observation services consisting of visits to the project site as frequently as necessary. 7. Review and approval of invoices for payments to the Contractor prior to submission to the Project Manager, including verification of compliance with Davis Bacon requirements. 8. Review all change order requests and/or time extension requests by the Contractor. 9. Conduct final inspections and assist Owner in final acceptance of the project. 10. Additional services as may be necessary and appropriate. RFP 16-6561 Marco Airport Terminal 36 EXHIBIT B FLOOR PLAN RFP 16.6561 Marco Airport Terminal 37 eiBPdn UBId MARI ;JOd+!tl NVId HOOId 13A31 1SL k ld30NO0 Maims NOI1V81SINIWOV/1VNIW831 laodan 3AunO3xa aNVISI 00avw JYS13A31 Z M3N - ONINNVId kHVNlWll3Hd bjhbs�t)o b�alb; m�;lo a w g o $ ig� ¢:o� a�ax/mRo u+rz'r ou\wwn\w•in sam aieaan ueid MOAVI voc„y NVId 8001j 13A31 ONZ ld30N00 Maim NOI1Vd1SINIWOV/IVNIWSgi " 1dOd8lV 3AI.no3x3 GNVISI ooavw� 'V'9 13A31 Z M3N - 9NINNVId A!lVNIWIl3ad LL — — — - - — — — — — — — Jv ( z �Zm e 6�U O I I I K:o, a,wa, = EXHIBIT C CONCEPT SITE PLAN RFP 16-6561 Marco Airport Terminal 38 1 L ',III 11 I: l It:l t' 1 Ill ��1� I� L:I L:II LI Il:IL 1 11�IL ILII: 111 II I lLll:ll Il l II IL 1I11'�111L 111 Illi 11:111 L L ,Il:'L 1 III 111L', L ILI II I 1111'.11 IL L I�. 11 11 1 1L11:11 II II till :ll IL II 1111 11 LI t,l l' 1 llll .I I:I 111:I11L LII 1 1 1 II'.11 I III III IL 111 II II II 1 L11 'I I 11It II L LII I 11 1111 I'Il I1 1111 11 I I 11 111E 1 1L IL IL Illl 11 It 1 IL 11 1 I 1 11 1 11 ll 1L ll II 1111 : II II ILII 1.11 II 11 1 IIIL 1,11 Il 11 III 1 1 1 11 l ILII II II I 111 I 11 I 111 I I 1 1L Il I II L11 1 Il .I II 1 1 Il 1 I II 11 11L:1 111111 1 1 111.1111 1 1 `.I I l 111 111, L 1. I IIII II', 1 111 1 II I'�II 1 III I I I '.I 1 I 1 I II I I I HIM 11 11 I I II'.I; 11 Il;ll 11 ll 1 1 11',1 1 ILII I1 11'. 11 1 L1 II I1 1 II II'. II 1 I 1 I1 1 II. 1 11 11 1 I'.Il 1 Ill 1 11',1 1 1 �I 1 III .11 1L1 II'. 11 1 1 II L 1 1 I1 1 II I IIli11 1 I 11: 11 1L 1 111 . it 1,1L 11 1 1L1 11 1 1111 1 1'.11 I1 11 1 ' II 1 111 II .III 11111E 1111'.11 II Il 111` L 1L1 II I 1 1 1'. 1L1 I 11 It I I ; 111 LI'.I Il' L1L IL r V II1,11 11 II I Ill;ll 1 L 1 I 111' I L I'.I 11 L1 I II: I L I1 11 1 1 I :11 II II 11 11 11 I M1J:II 11 II 11 11 IIII 1L1 111111'.II'I Il ll Lll .11',1111 Il 1'.11 .-Lll',11111111 ...II Ill I1J1 1111 :l `.11 11 III 1 1111111 1 yll 11 11'11 1 1'.I1�1 11 1I 1 1 11 11 II 11'.11 ll.l 'lI1L I`l.11', 11 lil LLI 111' �I'.I ll 11 III 11 .11;11 I1 I IIII I L II11�1',11 11 1,11M I I it 11 ylll.11'.II 1L '.1111 .V 11 111 1 11.11'.L �tl 1111E �' �11� �1, III Tit I _—— vl 1 Im PREPARED FOR ��? � � ➢ �i �����{^�,Vt COLLIER COUNTY AIRPORT AUTHORITY � Cf' ODlN1AE CONSLLTANl3 "f l� Y 1 6 RY��r rA e q9 H IIIJaI +:vuxcaT J i.bvn'c c.w +1 1 _ I - I t ars wLYn � E 191 S N a I tuR w C BUILDING AREA PLAN (FUTURE BUILD -OUT) MARCO ISLAND EXECUTIVE AIRPORT MARCO ISLAND, FLORIDA I IIII 1 II" II ; II II I I ' I .IIII II I II 1111 1 T C1� I LI I' 11.1 � 1 1;11 ILI 1 I I l it 1 Ili) f 1 t I �Il l A O EXHIBIT D GRANT AGENCY PROVISIONS RFP 16-6561 Marco Airport Terminal 39 Exhibit D Federal Aviation Administration Provisions CFDA 20.106 The services performed by the awarded Contractor shall be in compliance with all applicable FAA regulations/requirements, and additional requirements specified in this document. It shall be the awarded Contractor's responsibility to acquire and utilize the necessary manuals and guidelines that apply to the work required to complete this project. In general, 1) The contractor (including all subcontractors) must insert these contract provisions in each lower tier contracts ( e.g. subcontract or sub -agreement): 2) The contractor (or subcontractor) must incorporate the applicable requirements of these contract provisions by reference for work done under any purchase orders, rental agreements and other agreements for supplies or services; 3) The prime contractor is responsible for compliance with these contract provisions by any subcontractor, lower -tier subcontractor or service provider 1. ACCESS TO RECORDS AND REPORTS (Applies to subcontracts) 2 CFR § 200.333, 2 CFR § 200.336, FAA Order 5100.38 The Contractor must maintain an acceptable cost accounting system. The Contractor agrees to provide the sponsor, the Federal Aviation Administration, and the Comptroller General of the United States or any of their duly authorized representatives, access to any books, documents, papers, and records of the contractor which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and transcriptions. The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed. 2. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION to ENSURE EQUAL EMPLOYMENT OPPORTUNITY (Applies to subcontracts in excess of $10,000) 41 CFR part 60-4, Executive Order 11246 I. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade: 17.1% Goals for female participation in each trade: 6.9% These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally -assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non -federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals Required Contact Provisions Issued on January 29, 2016 Page 1 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor. employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is Florida, Collier County, Marco Island. 3. BREACH OF CONTRACT TERMS 2 CFR § 200 Appendix II(A) Any violation or breach of terms of this contract on the part of the contractor or its subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. The County will provide the Contractor or Consultant written notice that describes the nature of the breach and corrective actions the Contractor or Consultant must undertake in order to avoid termination of the contract. County reserves the right to withhold payments to Contractor until such time the Contractor corrects the breach or the County elects to terminate the contract. The County's notice will identify a specific date by which the Contractor or Consultant must correct the breach. County may proceed with termination of the contract if the Contractor or Consultant fails to correct the breach by deadline indicated in the County's notice. The duties and obligations imposed by the Contract Documents and the rights and remedies available there under are in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law. 4. BUY AMERICAN PREFERENCE Title 49 USC § 50101 The contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must complete and submit the Buy America certification included herein with their bid or offer. The County will reject as nonresponsive any bid or offer that does not include a completed Certificate of Buy American Compliance. 5. GENERAL CIVIL RIGHTS PROVISIONS 49 USC § 47123 The contractor agrees to comply with pertinent statutes, Executive Orders and such rules as are promulgated to ensure that no person shall, on the grounds of race, creed, color, national origin, sex, age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision binds the contractor and subtier contractors from the bid solicitation period through the completion of the contract. This provision is in addition to that required of Title VI of the Civil Rights Act of 1964. Required Contact Provisions Issued on January 29, 2016 Page 2 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 6. Title VI CIVIL RIGHTS PROVISIONS Solicitation Notice: Collier County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 251 42 U.S.C. §§ 2000d to 200od-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Compliance with Nondiscrimination Requirements: During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Acts And Authorities, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Nondiscrimination Acts and Authorities, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21. 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Nondiscrimination Acts And Authorities on the grounds of race, color, or national origin. 4. Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Nondiscrimination Acts And Authorities and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the sponsor or the Federal Aviation Administration, as appropriate, and will set forth what efforts it has made to obtain the information. S. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non- discrimination provisions of this contract, the sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to: a. Withholding payments to the contractor under the contract until the contractor complies; and/or b. Cancelling, terminating, or suspending a contract, in whole or in part. 6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with Required Contact Provisions Issued on January 29, 2016 Page 3 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 respect to any subcontract or procurement as the sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the sponsor to enter into any litigation to protect the interests of the sponsor. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. Title VI List of Pertinent Nondiscrimination Acts and Authorities: During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seg., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 CFR part 21 (Non-discrimination In Federally -Assisted Programs of The Department of Transportation— Effectuation of Title VI of The Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired b ecause of Federal or Federal -aid programs and projects); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seg.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR part 27: • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seg.), (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex): • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal -aid recipients, sub -recipients and contractors, whether such programs or activities are Federally funded or not): • Titles Il and III of the Americans with Disabilities Act of 1990, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 —12189) as implemented by Department of Transportation regulations at 49 CFR parts 37 and 38: • The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex): • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low - Income Populations, which ensures non-discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations: • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972. as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). Required Contact Provisions Issued on January 29, 2016 Page 4 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 7. CLEAN AIR AND WATER POLLUTION CONTROL 2 CFR § 200, Appendix II(G) (Applies to subcontracts in excess of $150,000) Contractor agrees to comply with all applicable standards, orders, and regulations issued pursuant to the Clean Air Act (42 U.S.C. § 740-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. § 1251-1387). The Contractor agrees to report any violation to the County immediately upon discovery. The County assumes responsibility for notifying the Environmental Protection Agency (EPA) and the Federal Aviation Administration. 8. CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS (Applies to subcontracts) 2 CFR § 200, Appendix II(E) 1. Overtime Requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic, including watchmen and guards, in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any violation of the clause set forth in paragraph (1) of this clause, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this clause, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this clause. 3. Withholding for Unpaid Wages and Liquidated Damages. The Federal Aviation Administration (FAA) or the County shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other Federally - assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 2 of this clause. 4. Subcontractors. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs (1) through (4) and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1) through (4) of this clause. Required Contact Provisions Issued on January 29, 2016 Page 5 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 109. DEBARMENT AND SUSPENSION (Applies to subcontracts of $25,000 or more) 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 Bidder or Offeror Certification By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction. Lower Tier Contract Certification The successful bidder, by administering each lower tier subcontract that exceeds $25,000 as a "covered transaction", must verify each lower tier participant of a "covered transaction" under the project is not presently debarred or otherwise disqualified from participation in this federally assisted project. The successful bidder will accomplish this by: 1. Checking the System for Award Management at website: http://www.sam.gov 2. Collecting a certification statement similar to the Certificate Regarding Debarment and Suspension (Bidder or Offeror), above. 3. Inserting a clause or condition in the covered transaction with the lower tier contract If the FAA later determines that a lower tier participant failed to disclose to a higher tier participant that it was excluded or disqualified at the time it entered the covered transaction, the FAA may pursue any available remedies, including suspension and debarment of the non-compliant participant. 10. DISADVANTAGED BUSINESS ENTERPRISES (Applies to subcontracts) 49 CFR part 26 The requirements of 49 CFR Part 26, Regulations of the U.S. Department of Transportation, apply to this contract. It is the policy of the Collier County Airport Authority, as owner of the Collier County General Aviation Airports, to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this bid specification. These requirements apply to all bidders, including those who qualify as a DBE. A DBE contract goal of 5.6 percent has been established for this contract. The bidder shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to meet the contract goal for DBE participation in the performance of this contract. The bidder will be required to submit the following information with their proposal on the forms provided herein: (1) The names and addresses of DBE firms that will participate in the contract; (2) A description of the work that each DBE firm will perform; (3) The dollar amount of the participation of each DBE firm participating; (4) Written documentation of the bidder's commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; (5) Written confirmation from the DBE that it is participating in the contract as provided in the commitment made under (4); (6) If the contract goal is not met, evidence of good faith efforts. Contract Assurance (§ 26.13) - The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate. Required Contact Provisions Issued on January 29, 2016 Page 6 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 Prompt Payment Mechanisms (§26.29) - The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than thirty (30) days from the receipt of each payment the prime contract receives from the Authority. The prime contractor agrees further to return retainage payments to each subcontractor within thirty (30) days after the subcontractors work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the Authority. This clause applies to both DBE and non -DBE subcontracts. Directory (§26.31) The Authority uses the Florida Unified Certification Program (FL UCP) DBE Directory, maintained by the Florida Department of Transportation (FDOT). The Directory lists the firm's name, address, phone number, date of the most recent certification, and the type of work the firm has been certified to perform as a DBE. In addition, the Directory lists each type of work for which a firm is eligible to be certified by using the most specific NAICS code available to describe each type of work The Florida Department of Transportation updates the Directory at least annually, and periodically, as necessary. The Directory is available for review by contacting: Justin Lobb, Airport Manager, Collier County Airport Authority, 2005 Mainsail Drive, Suite 1, Naples, FL 34114, 239-642-7878. The Directory may be found at htry� //rmi�ti dotstatc R ❑�/�aloJ7p��i�unittio{ cai Certification Process (§ 26.61— 26.73) The Authority will refer all matters pertaining to certification to the Florida Department of Transportation in accordance with the Florida UCP program. The Florida Department of Transportation will use the certification standards of Subpart D of Part 26 to determine the eligibility of firms to participate as DBEs in USDOT-assisted contracts. To be certified as a DBE, a firm must meet all certification eligibility standards. The Florida Department of Transportation will make all certification decisions based on the facts as a whole. For information about the certification process or to apply for certification, firms should contact: Florida Department of Transportation (FDOT) Equal Opportunity Office 605 Suwannee St. MS 65 Tallahassee, Florida 32399-0450 (850)414-4747 Equal Opportunity Office N w.dot state.fl, o>icqjai opportanli�ofhcc/ Administrative reconsideration (§26.53(d)) Within ten (10) days of being informed by the Authority that it is not responsive because it has not documented sufficient good faith efforts, a bidder may request administrative reconsideration. Bidders should make this request in writing to the following reconsideration official: Gene Shue, Operations Support Director, Collier County Airport Authority, 2885 S. Horseshoe Drive, Naples, FL 34104, 239-252-5169. The reconsideration official will not have played any role in the original determination that the bidder did not document sufficient good faith efforts. As part of this reconsideration, the bidder will have the opportunity to provide written documentation or argument concerning the issue of whether it met the goal or made adequate good faith efforts to do so. The bidder will have the opportunity to meet in person with the Authority's administrative reconsideration official to discuss the issue of whether it met the goal or made adequate good faith Required Contact Provisions Issued on January 29, 2016 Page 7 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 efforts to do. The Authority will send the bidder a written decision on reconsideration, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. The result of the reconsideration process is not administratively appealable to the US Department of Transportation. 11. TEXTING WHEN DRIVING (Applies to subcontracts exceeding 53,500) Executive Order 13513, DOT Order 3902.10 In accordance with Executive Order 13513, "Federal Leadership on Reducing Text Messaging While Driving" (10/1/2009) and DOT Order 3902.10 "Text Messaging While Driving" (12/30/2009), the FAA encourages recipients of Federal grant funds to adopt and enforce safety policies that decrease crashes by distracted drivers, including policies to ban text messaging while driving when performing work related to a grant or sub -grant. In support of this initiative, the County encourages the Contractor to promote policies and initiatives for its employees and other work personnel that decrease crashes by distracted drivers, including policies that ban text messaging while driving motor vehicles while performing work activities associated with the project. The Contractor must include the substance of this clause in all sub -tier contracts exceeding $3,500 and involve driving a motor vehicle in performance of work activities associated with the project. 12. ENERGY CONSERVATION REQUIREMENTS (Applies to subcontracts) 2 CFR § 200, Appendix H(H) Contractor and Subcontractor agree to comply with mandatory standards and policies relating to energy efficiency as contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C. 620let seq). 13. EQUAL OPPORTUNITY 2 CFR 200, Appendix H(C), 41 CFR § 60-1.4, 41 CFR § 60-4.3, Executive Order 11246 During the performance of this contract, the contractor agrees as follows: (1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identify or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, or national origin. (3) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (4) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. Required Contact Provisions Issued on January 29, 2016 Page 8 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 (5) The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, That in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States. 14. FEDERAL FAIR LABOR STANDARDS ACT (FEDERAL MINIMUM WAGE) 29 U.S.C. § 201, et seq All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of 29 CFR part 201, the Federal Fair Labor Standards Act (FLSA), with the same force and effect as if given in full text. The FLSA sets minimum wage, overtime pay, recordkeeping, and child labor standards for full and part time workers. The Contractor or Consultant has full responsibility to monitor compliance to the referenced statute or regulation. The Contractor or Consultant must address any claims or disputes that arise from this requirement directly with the U.S. Department of Labor — Wage and Hour Division 15. LOBBYING AND INFLUENCING FEDERAL EMPLOYEES 31 U.S.C. § 1352 — Byrd Anti -Lobbying Amendment, 2 CFR part 200, Appendix II(J), 49 CFR part 20, Appendix A The bidder or offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the Bidder or Offeror, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned Required Contact Provisions Issued on January 29, 2016 Page 9 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 shall complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all sub -awards at all tiers (including subcontracts, sub -grants, and contracts under grants, loans, and cooperative agreements) and that all sub -recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 16. OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 (Applies to subcontracts) 20 CFR part 1910 All contracts and subcontracts that result from this solicitation incorporate by reference the requirements of 29 CFR Part 1910 with the same force and effect as if given in full text. Contractor must provide a work environment that is free from recognized hazards that may cause death or serious physical harm to the employee. The Contractor retains full responsibility to monitor its compliance and their subcontractor's compliance with the applicable requirements of the Occupational Safety and Health Act of 1970 (20 CFR Part 1910). Contractor must address any claims or disputes that pertain to a referenced requirement directly with the U.S. Department of Labor — Occupational Safety and Health Administration. 17. SEISMIC SAFETY 49 CFR part 41 Professional Service Agreements for Design - Seismic Safety In the performance of design services, the Consultant agrees to furnish a building design and associated construction specification that conform to a building code standard which provides a level of seismic safety substantially equivalent to standards as established by the National Earthquake Hazards Reduction Program (NEHRP). Local building codes that model their building code after the current version of the International Building Code (IBC) meet the NEHRP equivalency level for seismic safety. At the conclusion of the design services, the Consultant agrees to furnish the County a `certification of compliance" that attests conformance of the building design and the construction specifications with the seismic standards of NEHRP or an equivalent building code. 18. TERMINATION 2 CFR § 200 Appendix II(B), FAA Advisory Circular 150/5370-10, Section 80-09 Termination for Convenience (Professional Services) The County may, by written notice to the Consultant, terminate this Agreement for its convenience and without cause or default on the part of Consultant. Upon receipt of the notice of termination, except as explicitly directed by the County, the Contractor must immediately discontinue all services affected. Upon termination of the Agreement, the Consultant must deliver to the County all data surveys, models, drawings, specifications, reports, maps, photographs, estimates, summaries, and other documents and materials prepared by the Engineer under this contract, whether complete or partially complete. County agrees to make just and equitable compensation to the Consultant for satisfactory work completed up through the date the Consultant receives the termination notice. Compensation will not include anticipated profit on non -performed services. Kequired Contact Provisions Issued on January 29, 2016 Page 10 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 County further agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. Termination for Default (Professional Services) Either party may terminate this Agreement for cause if the other party fails to fulfill its obligations that are essential to the completion of the work per the terms and conditions of the Agreement. The party initiating the termination action must allow the breaching party an opportunity to dispute or cure the breach. The terminating party must provide the breaching party [7] days advance written notice of its intent to terminate the Agreement. The notice must specify the nature and extent of the breach, the conditions necessary to cure the breach, and the effective date of the termination action. The rights and remedies in this clause are in addition to any other rights and remedies provided by law or under this agreement. a) Termination by County: The County may terminate this Agreement in whole or in part, for the failure of the Consultant to: 1. Perform the services within the time specified in this contract or by County approved extension; 2. Make adequate progress so as to endanger satisfactory performance of the Project; 3. Fulfill the obligations of the Agreement that are essential to the completion of the Project. Upon receipt of the notice of termination, the Consultant must immediately discontinue all services affected unless the notice directs otherwise. Upon termination of the Agreement, the Consultant must deliver to the County all data, surveys, models, drawings, specifications, reports, maps, photographs, estimates, summaries, and other documents and materials prepared by the Engineer under this contract, whether complete or partially complete. County agrees to make just and equitable compensation to the Consultant for satisfactory work completed up through the date the Consultant receives the termination notice. Compensation will not include anticipated profit on non -performed services. County further agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. If, after finalization of the termination action, the County determines the Consultant was not in default of the Agreement, the rights and obligations of the parties shall be the same as if the County issued the termination for the convenience of the County. b) Termination by Consultant: The Consultant may terminate this Agreement in whole or in part, if the County: 1. Defaults on its obligations under this Agreement; 2. Fails to make payment to the Consultant in accordance with the terms of this Agreement; 3. Suspends the Project for more than [180] days due to reasons beyond the control of the Consultant. Upon receipt of a notice of termination from the Consultant, County agrees to cooperate with Consultant for the purpose of terminating the agreement or portion thereof, by mutual consent. If County and Consultant cannot reach mutual agreement on the termination settlement, the Consultant may, without prejudice to any rights and remedies it may have, proceed with terminating all or parts of this Agreement based upon the County's breach of the contract. In the event of termination due to County breach, the Engineer is entitled to invoice County and to receive full payment for all services performed or furnished in accordance with this Agreement and all justified reimbursable expenses incurred by the Consultant through the effective date of termination action. County agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. Required Contact Provisions Issued on January 29, 2016 Page 11 AIP Grants and Obligated Sponsors Airports (ARP) Exhibit D Federal Aviation Administration Provisions CFDA 20.106 19. TRADE RESTRICTION CERTIFICATION 49 USC § 50104, 49 CFR part 30 By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant contract, the Offeror - a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms as published by the Office of the United States Trade Representative (U.S.T.R.); b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country included on the list of countries that discriminate against U.S. firms as published by the U.S.T.R; and c. has not entered into any subcontract for any product to be used on the Federal on the project that is produced in a foreign country included on the list of countries that discriminate against U.S. firms published by the U.S.T.R. This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title IS. United States Code, Section 1001. The Offeror/Contractor must provide immediate written notice to the County if the Offeror/Contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The Contractor must require subcontractors provide immediate written notice to the Contractor if at any time it learns that its certification was erroneous by reason of changed circumstances. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR 30.17, no contract shall be awarded to an Offeror or subcontractor: (1) who is owned or controlled by one or more citizens or nationals of a foreign country included on the list of countries that discriminate against U.S. firms published by the U.S.T.R. or (2) whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign country on such U.S.T.R. list or (3) who incorporates in the public works project any product of a foreign country on such U.S.T.R. list; Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in in all lower tier subcontracts. The contractor may rely on the certification of a prospective subcontractor that it is not a firm from a foreign country included on the list of countries that discriminate against U.S. firms as published by U.S.T.R, unless the Offeror has knowledge that the certification is erroneous. This certification is a material representation of fact upon which reliance was placed when making an award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration may direct through the County cancellation of the contract or subcontract for default at no cost to the County or the FAA. 20. VETERAN'S PREFERENCE 49 USC § 47112(c) In the employment of labor (excluding executive, administrative, and supervisory positions), the contractor and all sub -tier contractors must give preference to covered veterans as defined within Title 49 United States Code Section 47112. Covered veterans include Vietnam -era veterans, Persian Gulf veterans, Afghanistan -Iraq war veterans, disabled veterans, and small business concerns (as defined by 15 U.S.C. 632) owned and controlled by disabled veterans. This preference only applies when there are covered veterans readily available and qualified to perform the work to which the employment relates. Required Contact Provisions Issued on January 29, 2016 Page 12 AIP Grants and Obligated Sponsors Airports (ARP) 1W4011=iY1� GRANTING AGENCY FORMS • Conflict of Interest • Debarment / Suspension • DBE Form • Grant Acknowledgment • Lobbying RFP 16-6561 Marco Airport Terminal 40 COLLIER COUNTY Vendor Submittal — Conflict of Interest Certification Collier County Solicitation No. I, , hereby certify that to the best of my knowledge, neither I nor my spouse, dependent child, general partner, or any organization for which I am serving as an officer, director, trustee, general partner or employee, or any person or organization with whom I am negotiating or have an arrangement concerning prospective employment has a financial interest in this matter. I further certify to the best of my knowledge that this matter will not affect the financial interests of any member of my household. Also, to the best of my knowledge, no member of my household; no relative with whom I have a close relationship; no one with whom my spouse, parent or dependent child has or seeks employment; and no organization with which I am seeking a business relationship nor which I now serve actively or have served within the last year are parties or represent a party to the matter. I also acknowledge my responsibility to disclose the acquisition of any financial or personal interest as described above that would be affected by the matter, and to disclose any interest I, or anyone noted above, has in any person or organization that does become involved in, or is affected at a later date by, the conduct of this matter. Name Signature Position Date Privacy Act Statement Title I of the Ethics in Government Act of 1978 (5 U.S.C. App.), Executive Order 12674 and 5 CFR Part 2634, Subpart I require the reporting of this information. The primary use of the information on this form is for review by officials of The Justice Department to determine compliance with applicable federal conflict of interest laws and regulations. Additional disclosures of the information on this report may be made: (1) to a federal, state or local law enforcement agency if the Justice Department becomes aware of a violation or potential violation of law or regulations; (2) to a court or party in a court or federal administrative proceeding if the government is a party or in order to comply with a judge -issued subpoena; (3) to a source when necessary to obtain information relevant to a conflict of interest investigation or decision; (4) to the National Archives and Records Administration or the General Services Administration in records management inspections; (5) to the Office of Management and Budget during legislative coordination on private relief legislation; and (6) in response to a request for discovery or for the appearance of a witness in a judicial or administrative proceeding, if the information is relevant to the subject matter. This confidential certification will not be disclosed to any requesting person unless authorized by law. See also the OGE/GOVT-2 executive branch -wide Privacy Act system of records. COLLIER COUNTY Certification Regarding Debarment, Suspension;and Other Responsibility Matters Primary Covered Transactions (1) The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and (d) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. (2) Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. Name Proiect Name Firm Street Address, City, State, Zip Signature Project Number Tax ID Number DUNS Number 03/04/2013-(2) 1 COLLIER COUNTY AIRPORT AUTHORITY Disadvantaged Business` Enterprise,(DBE) Utilization FORM 1 The undersigned bidder/offerer has satisfied the requirements of the bid specification in the following manner (please check the appropriate space): The bidder is committed to a minimum of _% DBE utilization on this contract. The bidder (if unable to meet the DBE goal of 5.6%) is committed to a minimum of % DBE utilization on this contract and has submitted documentation demonstrating good faith efforts. Name of bidder's firm: State Registration No. By Title (Signature) Disadvantaged Business Enterprise (DBE) Utilization LETTER OFINTENT -FORM 2 (Submit this page for each DBE subcontractor.) Name of bidder's firm: Address: City: State: _Zip: Name of DBE firm: Address: City: _Zip: Telephone: Description of work to be performed by DBE firm: -------------------------------------------------- ---------------------------------------------------- The bidder is committed to utilizing the above-named DBE firm for the work described above. The estimated dollar value of this work is $ Affirmation The above-named DBE firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above. By (Signature) (Title) If the bidder does not receive award of the prime contract, any and all representations in this Letter of Intent and Affirmation shall be null and void. Disadvantaged Business Enterprise (DBE) Utilization (MIWBE) GOOD FAITH EFFORTS FORM 3 Prior to an award, all bidders/proposers will be required to document a Good Faith Effort" to secure disadvantaged, minority/women-owned and/or businesses as subcontractors/sub- consultants/suppliers. In the case of some construction projects, this documentation may be submitted after award of the contract, for those subcontract areas occurring later in the construction process. Fulfillment of the "good faith effort' can be accomplished by: 1. Attendance of pre-bid/pre-proposal conference, as scheduled by the County. 2. Efforts to follow-up d ermine with certainty whether these firms ntaged/minority/women- are intcting erested. owned firms to3. Efforts made to select portions of the work proposed to be performed by disadvantaged/minority/wome approdriate, breakdown of subcontracts intofirms in order to increase the keconomically feasible of achieving participation (including, where app p units to facilitate participation). 4. Documenting each disadvantaged/minority/woman-owned firm contacted the conclusion or decision regarding inclusion and reasons for the conclusions. 5. Efforts to assist the disadvantaged/minority/women-owned firms contacted that needed assistance in obtaining bonding, lines of credit or insurance. 6. Efforts that demonstrate that the contractor effectively ely used federal al services rvice es, asmalbl I businesses, community organizations, contractor's groups, tract disadvantaged/minority/women business assistance offices and other organizations that provide assistance and placement of disadvantaged/minority/woman-owned businesses. Company Name: Printed Name: Title: Signed: Date: °Disadvantaged Business Enterprise (DBE) Utilization (MIWBE) OPPORTUNITY' LIST FORM 4 Disadvantaged businesses and minority vendors, as defined in the Federal Code of reaerai MUYUIaU11_ -• -••-- State Statutes must have the opportunity to participate on contracts with federal and/or state grant assistance.' ^m Acknowledgement of Terms, Conditions, and Grant Clauses Flow Down of Terms and Conditions from the Grant Agreement Subcontracts: If the vendor subcontracts any of the work required under this Agreement, The vendor' agrees signed subcontract must be available to the Department for review and approval. to include in the subcontract that (1) the subcontractor is bound by the terms of this Agreement, (ii) the subcontractor is bound by all applicable state and federal laws and regulations, and illthe subcontractor shall hold the Department and Recipient harmless against all claims of whatever nature arising out of the subcontractor's performance of work under this Agreement, to the extent allowed and required by law. The recipient shall document in the quarterly report the subcontractor's progress in performing its work under this agreement. For each subcontract, the Recipient shall provide a written statement to the Department as to whether the subcontractor is a minority vendor as defined in Section 288.703, Fla. Stat. Certification On behalf of my firm, I acknowledge, and agree to perform all of the specifications and gran requirements identified in this solicitation document(s). Vendor/Contractor Name Date Authorized Signature Address Solicitation/Contract # o2/u R3 COLLIER COUNTY Certification Regarding Lobbying The undersigned (Vendor/ Contractor) certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a. Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form --LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq.)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C. § 1352(c)(1) -(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Vendor/Contractor, , certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and disclosure, if any. of Authorized Official Signature of Vendor/Contractor's Authorized Official Title 02/15 Ri