Agenda 06/14/2016 Item #16C 3 6/14/2016 16.C.3. EXECUTIVE SUMMARY Recommendation to approve a $268,600 work order to Quality Enterprises USA, Inc., under Request for Quotation 14-6213-61,for the SRO Wellfield Improvements,Project Number 70030. OBJECTIVE: To maintain a reliable raw water supply for the reverse osmosis treatment system at the South County Regional Water Treatment Plant (SCRWTP), which serves customers throughout the Collier County water service area. CONSIDERATIONS: The proposed scope of work under Project Number 70030, "South Reverse Osmosis (SRO) Wellfield Rehabilitation," is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan approved by the Board of County Commissioners (Board) on November 10, 2015, as Agenda Item 9C, as Appendix III of the 2015 AUIRICIE. Funding for Project Number 70030 is available in,and is consistent with,the FY2016 CIP Budget. The SCRWTP reverse osmosis system is supplied with raw water from a flowing artesian brackish water wellfield with withdrawal from the Hawthorn aquifer system. The wellfield was constructed in 2004 and expanded in 2009. The current wellhead piping configuration does not allow individual wellheads to be isolated from artesian flow for maintenance or repair. Artesian flow occurs when the natural pressure of the aquifer causes the flow of groundwater to a level at or above land surface. Presently, artesian flow from the SRO wells is suppressed with a density(salt)plug to allow staff to conduct any type of work that includes maintenance and disassembly of the wellhead piping. This project includes the installation of stainless steel isolation valves at 20 well sites to allow staff to work on the wells without suppressing artesian flow. These changes will improve the functionality of the wellhead piping, and facilitate maintenance of the wells. SRO well density plugging, performed by a contractor, costs approximately $96,000 annually for all 20 wells in the SRO well field; this expense will be eliminated by this project. The savings of$96,000 per year will result in a payback period of approximately three years. Request for Quotation 14-6213-61, "SRO Wellfield Improvements," was posted on April 4, 2016, and distributed to the six vendors under the Fixed-Term Underground Utilities Contract 14-6213, via the county's electronic quote process. Four vendors submitted quotations (summarized below) by the April 18,2016,deadline. VENDOR Quote Quality Enterprises,USA,Inc. $268,600 Mitchell&Stark Construction Company $292,300 Haskins,Inc. $359,000 Douglas N Higgins,Inc. $591,992 Staff and Schlumberger Water Services, the project's design professional, determined the lowest quote is fair and reasonable, and recommend awarding the work order to Quality Enterprises USA, Inc. The quote is approximately 31 percent below the engineer's cost estimate of $390,000. The cost estimate was based on similar work performed on two wells, but the economy of scale may have resulted in the lower cost. The Procurement Services Division concluded that the quote was competitive and representative of market conditions. The quote Packet Page-761- e. 6/14/2016 16.C.3. tabulation, analysis graph, engineer's letter of recommendation, and work order are attached (Attachments 1, 2, 3, and 4, respectively). There may be unforeseen conditions associated with the project. Accordingly, the solicitation incorporated an allowance of$28,000 that included, but was not limited to, unanticipated piping repairs or equipment replacement which may be encountered during construction. The price for any additional work that would utilize this allowance shall be negotiated prior to commencement in accordance with the county's Procurement Ordinance and the terms of the agreement. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2016 Capital Budget approved by the Board on September 24, 2015. The source of funding is the Water User Fee Fund (412). The project is expected to be completed by January 2017. T he estimated operating budget impact is reflected in the table below. The operating budget impacted funding source will be user fees. Elements FY 2016 FY 2017 FY 2018 - FY2026 Capital Outlay $268,600 $0 $0 Operating Cost Change * $0 $96,000/yr Savings $96,000/yr Savings *This reflects the approximate cost savings in the annual operating budget for each fiscal year over the life of the asset. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves a $268,600 work order to Quality Enterprises USA, Inc., under Request For Quotation 14-6213-61; and, authorizes the Chair to sign and execute the work order after final review by the County Attorney's Office. Prepared By: Alicia Abbott, E.I., Project Manager, Public Utilities Planning and Project Management Division Attachments: Attachment 1- Quote tabulation Attachment 2-PPMD Quote Analysis Graph Attachment 3-Recommendation Letter Attachment 4-Work Order Packet Page -762- 6/14/2016 16.C.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.3. Item Summary: Recommendation to approve a $268,600 work order to Quality Enterprises USA, Inc., under Request for Quotation 14-6213-61,for the SRO Wellfield Improvements, Project Number 70030. Meeting Date: 6/14/2016 Prepared By Name: AbbottAlicia Title: Project Manager,Public Utilities Engineering 5/6/2016 9:54:41 AM Submitted by Title: Project Manager,Public Utilities Engineering Name: AbbottAlicia 5/6/2016 9:54:43 AM Approved By Name: HapkeMargie Title:Recycling Coordinator, Solid&Hazardous Waste Management Date: 5/6/2016 10:38:57 AM Name: Pam Libby Title:Manager-Distribution,Water Date: 5/6/2016 10:40:30 AM Name: Oscar Martinez Title:Project Manager,Principal,Public Utilities Engineering Date: 5/6/2016 1:45:17 PM Name: MarkiewiczJoanne Title: Division Director-Procurement Services,Procurement Services Date: 5/6/2016 2:44:38 PM Packet Page-763- 6/14/2016 16.C.3. Name: Steve Messner Title: Division Director-Water,Water Date: 5/9/2016 11:08:21 AM Name: HallSwainson Title: Procurement Specialist,Procurement Services Date: 5/10/2016 9:50:25 AM Name: ChmelikTom Title: Division Director-Public Utilities Eng,Public Utilities Engineering Date: 5/11/2016 3:28:52 PM Name: Joseph Bellone Title:Division Director-Operations Support,Utilities Finance Operations Date: 5/11/2016 4:31:20 PM Name: JohnsonScott Title: Manager-Procurement,Procurement Services Date: 5/17/2016 3:09:28 PM Name: TeachScott Title:Deputy County Attorney, County Attorney Date: 5/24/2016 2:04:56 PM Name: YilmazGeorge Title: Department Head-Public Utilities,Public Utilities Department Date: 5/24/2016 8:54:59 PM Name: KlatzkowJeff Title: County Attorney, Date: 5/25/2016 12:37:23 PM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Management&Budget Date: 6/6/2016 11:54:26 AM Name: CasalanguidaNick Title: Deputy County Manager,County Managers Office Date: 6/6/2016 12:22:30 PM Packet Page -764- 6/14/2016 16.C.3. " ,_ N O O O O O N r� w;a ¢." n0 tOD n O O 00f 4 GN Fa- a0 M O �0 00 .•1 $ e4 ' P M '^-I fT N N VN N NH Oyc OOO co O 0O b O 04 U N .0N m '1 C O VO N N„ mQH M / a. Z 0 VIZin ' N N 0 g O O O O O Q O O o O O O O g. O M O N N O N f N M N N in VT N V�.. O O O O O O W 0. U a g N co.. g t+01 O V O N W H ,•-, N • z sr $ N N N 'A. N .�e•�+`{' y g OgOO OI O D N Nti n 'D 'O f to to of to to an N O OO O O gF O gWNeI O briIIii: ce t. N {n N N o O O O O O O C W •UI O' g N N Ovi 0 `E- N caN H L'& 7 N N N N 4,4 to U N f0 to 1 F N L t .c 7 It z0 Z o ¢ E0W W 0 W _ 0 c J] N V `iE. 4 a WCK . O O -1 J Z N O OLLUO U L c, J O NO V ,y N �. _ 90 6 Yffi ' A W t `4,' � tti .. 'AOYY C O -q y 0 Ea mm Z'' • v •OD • • C 1 t°liT COr L 15 1-411V, , Evtoc 2 > > 3 o ? o dEb v ' u °z `'o" `o ' L v c,, QY 2V.O o c >' +m a ' 3 v Y o ao' aZ ° vv c = auoY� w wNc > cyr o u E ' ,, u v a2uw E E w ' m a E ` '�oc� a s E v 3m ' con:, "6 o Y t Ti 43 3o af « v o cu. „ os. . .v � , o c. 15 ' z}e v 0-1v atoa 6 ,2 Y2 •cmw ,, o LLo - c va -a N -9 u v = - e w to, .o S' 5 a v o c c cu « o, ` c m 2 W m 8 dLU .,--2,'ONy c ii 2 133, lo Ic ”' d ° ¢ G C T U L C �' ` ` O. y g yp 3 _ H y e.; E L O aA N3 O > L O EvcE. W N H o 2 > ? av -4 tA v v v, a 2 . z m e N M -J. N x444S` H .r Packet Page -765- 6/14/2016 16.C.3. N Y > ci c w W CO " O W6 0.)'a w- O O v O N 2 ' 00 O 51 H LY c ,--i > +I.+ ON .� vl . co 0 Q 0 + O 0 + OJ t Ou w C .m 2 H m 17 D W Ei IIIIIIIIIIIIIIIIIIMIIIIIII I O E 1 I m IA -0 • I Y CD CO I I eaH s I . c..) Q 1 I r 03 a4.1 OCC I v C ri I II t0 I I w ell i Nco tC I I a i d' CC w 00 c w oo o 0 o 0 o 0 o+i. 0 0 0 0 0 0 0 o o 0 0 0 0 0 N CD Vl• v ii"). 4.4 vvi. Packet Page -766- 6/14/2016 16.C.3. Schlumberger Water Services USA Inc. Schlumberger 1567 Hayley Lane,Suite 202 Fort Myers,FL 33907 Phone 1 239 481 6494 Water SerVICBS Fax 1 239 481 6393 May 11, 2016 Ms.Alicia Abbott Senior Project Manager Public Utilities Planning &Project Management 3339 Tamiami Trail East, Suite 303 Naples, FL 34112 Re: RFQ 14-6213-61 SRO Wellfield Improvements—Letter of Recommendation for Award Dear Ms. Abbott: The bids due on April 18, 2016 for the above referenced project were reviewed by Schlumberger Water Services USA Inc. (SWS). Each of the four responsive bidders appears to be qualified and properly equipped to complete the wellfield improvements project. The low bid of$268,600 (including owner's allowance of$28,000)was received from Quality Enterprises USA, Inc. The bid tabulation provided by Quality Enterprises was reviewed by SWS and found to be accurate. The next lowest bid was received from Mitchell &Stark Construction Company, Inc. Their bid total was$292,300 or$23,700 higher than the low bid. An estimated project cost of$390,000 (including the owner's allowance)was developed based on the cost to conduct similar work on two wells (#16 and#17)in the south RO wellfield last year. It appears that some economy of scale helped to reduce the per well cost as the low bidder was approximately 31% below the estimated project cost. The average of the bids received was roughly 3% lower than the estimated project cost. The high bid of$591,992 was significantly greater than the estimated project cost and over double the low bid. The low bid received appears reasonable based on market conditions. Quality Enterprises is the apparent low bidder for the project. It is recommended that Quality Enterprises be awarded the project based on their previous experience with the County, their pre-approved contractor status, and by virtue of the fact they are the low bidder on the project. Please let us know if you have any questions or comments. Very truly yours, 61),t Wm. Scott Manahan, P.E. Operations Manager Packet Page -767- 6/14/2016 16.C.3. WORK ORDER/PURCHASE ORDER Contract 14-6213/Underground Utility Contracting" Contract Expiration Date: July 7,2016/ This Work Order is for professional Underground Utility Contracting services for work known as: Project Name: SRO Wellfield Improvements RFQ 14-6213-61 Project No: 70030.4 The work is specified in the proposal dated April 18, 2016 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation # 14-6213-61/and Addendum 1, this Work Order/Purchase Order is assigned to: Quality Enterprises USA, Inc./ Scope of Work: As detailed in the attached proposal and the following: Task I: Perform all work as described in the request for quote(RFQ 14-6213-61),Addendum 1, and as listed on the attached quote form. Task II: Allowance. Schedule of Work: Complete work within 210 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement # 14-6213/will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following metho4(s): ®Negofiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs (LS+RC) Time &Material (T&M) (established hourly rate— Schedule A) ❑ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task I $ 240,600.00 NLS" Task II $ 28,000.00 T&MJ TOTAL FEE $ 268,600.00 NLS &T&M PREPARED BY: � ., t 4i. tilo`, _ t\ Alicia Abbott, Project Manager Date Planni &Project Management Department APPROVED BY: •- .• Q//‘, Oscar Martinez,P.E.,P . •'pal Project Manager Date Planning&Project Management Departmentfriii Page 1 of 3 Packet Page -768- 6/14/2016 16.C.3. APPROVED BY: 67a.,vei .j 5_ l all 6 P. ibby,Water t ►ution Manager Date APPROVED BY: \.,._ q / Steve M�essnerAater Director Da - BY: 5 l t G, APPROVED Tom C :1°,7L l , P. ., Direc' or Date Pl. -1 s g roje�ct Management Department APP ROVED BY: _ ..,_!! '�� c/.3//4, Jo-/:e1'?Te, ti ' -s Operations Support Director Date APPROVED BY: 1I ' 4. ‘1,3,1/6 y S, ain n Hal ,Procurement Strategist to APPROVED BY: C-...::::::------1,,....2 (:T"...__ _____4 ' -I r /ft, George Yilmaz, Public Utilities Administrator sate By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Q < 'j y .ri es USA, Inc. //4 Na' r;Title .f Authorized Officer Date How:rd J. Murrell, President '''''') (JC:\ (Remainder of page intentionally left blank) 0 Page 2 of 3 Packet Page -769- 6/14/2016 16.C.3. IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Donna Fiala, Chairman Dated: (SEAL) Name of Firm: Quality Enterprises USA, Inc. JCkBy: Y First Witness •1 ,. Ire H. . J 4 a " Marcie Cohen TType/print signature and titleT TType/print witness nameT Second Witness Larry Benjamin TType/print witness nameT •1.jt ved as to Form and Legality: I AIN" 4C- 1 County Attorney SC a IF /2 1Z4c- L1 Print Name Page 3 of 3 Packet Page-770- 6/14/2016 16.C.3. N trc},'�b:,•.y�am'5�k, OO OO OO O O OO pr) G � Q O g N OO =4: ~ M Nm O tico V N VVVT .A N VT OOOOO O • V eV O 0 O O 8 NNOgp0OO1M ;94 K 10 Lin O. O 0• 0_ W W V O N aF M N 7 N N .A N N N OOOOO O OOqOO p O Q O OOOO O F- N O DO O W „O M VI N N N � N N N N N N 1 W O O O O O O o0000 od 0 LA CO 0 un o M ry act N N Z N AA V! 1R N OOOOO O po ON N p c • NbN `" pr N M —. ON N N N N VT N N N A� Oz p O O <IO O O O O O co . . to - N O > nUK d' 08 m at pt. ZF a . N CI Jp W LT. O O O O q O 8 W _ , Q a O a a V O 3: 3 ;;-: H D N V N CO- a p OF• N .ti N S N y� N O 4 "V In tn. N VF VF ',/, N OOOOO O A Ti d E. 4 C W6. NK Na C 0N n .' U. a Nrn C$ Ce J t 4- Z 7 N N N N N 10 CO Z rtr, 6,1 Z 2 ' 'g E w w w w F n IW Wn. :,0v ... L N ., m o trat O N. '1 L W 0 G 9 I- ry D N `w z w a.0 1- ).:',i',1.4.. .n , zu 1 c Z 'a m -0 I= d « Ot? 5* , d .0 N a 0 " A •OG 2 ,.:., .fir T. - a c > A ` 0 E O N ' Z 3 E, ..7, :c,o 0Eotj Ny mO o c un ' Y ¢ Oc caEim O E at y, E i. u_ R o .°: E o 4'iw E E 'sg O O 0 .10'^. E m 0 'f' Q v on` ,,.0 v, ._ n 2 m m m .?. c E 0 o to Y o ai N O O• N 46 3 m _ - m c o = c ` o. 2 Rk C g L 0 N 0 V Q C O = j C N U ked„ a ,. v .0 N v 3 o 0 0 o m o = •u N O c c :°29- c 5 c LLgc '- 5 a 2 r:: r.% . c " O m $ ' m m w m ° u « m 3 o m a E .c c . N c u c c 0 U .c c d = U >., 0 4 m 0 0 0 z 0 ° z O O a o m g O -0 N t r Nfitt 0 3 y O ° . E a a u c f•0mwN , ° c t y .ti ri .- w � a x � � ate ` 3a 3 c0 h ; rr „ O - n z o 2 m . N M v 1n 10 2 Packet Page -771- 6/14/2016 16.C.3. Co'.L" ger County Administrative Services Department Procurement Services Division REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT #14-6213 "Annual Contract for Underground Utilities &General Contractors" Date: April 4, 2016 From: Swainson Hall,Procurement.Strategist 239-252-8935,Telephone Number 239-252-6597, Fax Number swainsonhali(7a,collieroov.net To: Potential Quoters Subject: RFQ 14-6213-61 SRO Wellfield Improvements As provided in the referenced contract, the Collier County Procurement Services Division is !� soliciting quotes for the referenced project. RFQ Due Date: Monday,April 18,2016 at 3:00 PM f Q&A Deadline: Thursday,April 14, 2016 at 5:00 PM Non-Mandatory Thursday,April 7, 2016 at 1:30 PM Pre-Quote Meeting SCRWTP- 3851 City Gate Drive, Naples, FL 34117 Number of Days to Final Completion: 180 days to substantial+30 days final=210 days total Scope Provided Yes (included on the plans) Plans and Specs: Yes Liquidated Damages: $412.00 Payment& Performance Bonds If over$200,000.00 Your quotation response for this project is due no later than the dateand time specified above.We will not accept any quotation responses later than the noted time and date: If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Quality Enterprises USA, Inc. Firm's Complete Legal Name 239-435-7200 239-435-7202 Telep 11/i l.: /Fax Number Signat e President Title Howard J. Murrell 4/18/16 Print Name Date C: Alicia Abbott/Project Manager RFQ 14-6213-61 Packet Page -772- 6/14/2016 16.C.3. o 0 0 0 0 0 to.1i ¢ o o \,•;.', coo `,<'`` ( e-1 „., 4 " 0 0 0 0 0 0 v 0 0 0 0 0 0 0 o n N N O Ck; Ct. lD N P4. iI N ' .. in. U} in. in. in. in. lLY . tl' 4",, e 'hhLktY t',;`,,,k1/4,:zis?.t..;1 ,,,,,,..,,,,, ,,,-,100, 0 --1 Z` o. tut % altt c lQi c W W W W III1 N N N N v �#4 LT. CS H C . W V,: (IsO LO VI OJ > CO -C 3 4,, \ \`. OA L To c re) > o 'Q c a tc. cc t` 3 5 Y C 3 U vi to 4 m +S v y o O m z v u c o Y t CU 'ci tz 4J C 4-. C i :�'' d' > � ;. Cut a >- a C6 E CU O 0 co O U.1,4 1i",' +.C+ 'O u of C `, t.t C 2 CO "0 11 t0 ``�. (7 -71 u. b: 0 tt i h w R O . CC M '4i4 C 41 N O-1 c d4 ' u _c E ca o s ° o u m z - ca '5 to 0 a) ,_ `� D c u u o ^ lt� r- i — cCO > a w u Z O v- O d tU i v.) u v- J 1^ E i i LI a) ,, \N ct fL E \, c v �- .+ tL f C C u Z. ._ \ i:. kC Q a, o +, i_ > MO V1 4_Iili cn v tO 0N 'n ,,` ° t ,,a 0 L V a .0 0 ._ +0 T Z 0 6, "i 0 >_ C C) o C C C D W t ti , A 0 U 0 c .� JD — ° v CO -0 +.• W 0 0 0- i, E 0 0 0 °i e >. c c ca u 3 c >• , '., CD +-1 Y 0 a s m o z tt l�` += -' o -o V- 'a+ v ' to Q c • \° — N a, o a, = c a, o o < , it in - i- op 'B e►- ' o ct \�4 y = o cr C is O N v OJ =7'5 N — V\ ut — C i +_ J 'a N 'i a O Y O iJI Q CO 4, .0 + \: c-I N M ct 1.11 Lc) S Packet Page -773-