Agenda 06/14/2016 Item #16A24 6/14/2016 16.A.24. EXECUTIVE SUMMARY Recommendation to seek Board approval for the submission of the County Incentive Grant Program (CIGP) Application with the Florida Department of Transportation to fund design and construction of the widening of Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road. OBJECTIVE: To receive approval from the Board of County Commissioners (Board) to submit a County Incentive Grant Program(CIGP)application to the Florida Department of Transportation(FDOT) for the widening of Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road. CONSIDERATION: In December of 2015, Collier County was informed that FDOT was requesting projects for CIGP priorities for fiscal year 2021/22. FDOT will consider projects submitted before July 1, 2016 for CIGP funding. CIGP funds are awarded to projects that relieve congestion on the State Highway System and are consistent with established plans in the area. The Airport-Pulling Road improvements from Vanderbilt Beach Road to Immokalee Road for a distance of approximately 2 miles, is eligible for CIGP funding. Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road is being proposed as a six-lane divided urban roadway with 11 feet wide traffic lanes, a 22 feet wide raised median, concrete curb & gutter and sidewalk on both sides, a closed pipe stormwater system and street lighting with minor traffic signal adjustments. The road will continue draining into the C-31 canal with some quality treatment provided by stormceptor type devices. Airport-Pulling Road is an arterial roadway that parallels both US 41 and 175. By adding capacity with this project, Collier County will relieve congestion on both State highway systems. In addition,there will also be a reduced need for road maintenance and enhanced safety by providing sidewalks for bicyclists and pedestrians,improving overall traffic operations. The Airport-Pulling Road Project is in the Collier MPO's 2040 Long Range Transportation Plan as a cost feasible project for Preliminary Engineering and Construction Phases in FY2021-2025. FISCAL IMPACT: The projected costs are estimated at$15,887,778 ($13,815,459 for construction and $2,072,319 for design). The Project is not currently in the County's FY2016/2020 5 Year Work Program because it falls outside the timeframe of that program. The grant amount requested is up to 50% of the project costs. If awarded, sources of available match funds are anticipated to be one or more of the following: impact fees, gas taxes and/or general fund revenues. Source of funds will be determined at the time of the award and budget amendments will be brought to the Board for approval. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project is consistent with the County's Growth Management Plan and the MPO's Long Range Transportation Plan. RECOMMENDATION: To approve the County Incentive Grant Program grant submittal. Prepared By: Lorraine Lantz, Project Manager, Capital Project Planning, Impact Fees and Program Management Division, Growth Management Department Attachments: 1) Letter of Application to FDOT 2) Airport CIGP Application Packet Page-493- 6/14/2016 16.A.24. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.24. Item Summary: Recommendation to seek Board approval for the submission of the County Incentive Grant Program (CIGP)Application with the Florida Department of Transportation to fund design and construction of the widening of Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road. Meeting Date: 6/14/2016 Prepared By Name: LantzLorraine Title:Project Manager,Transportation Planning 5/10/2016 10:57:30 AM Submitted by Title:Project Manager,Transportation Planning Name: LantzLorraine 5/10/2016 10:57:31 AM Approved By Name: Tara Castillo Title:Management/Budget Analyst,Capital Construction&Maintenance Budget/Fiscal Date: 5/10/2016 1:02:38 PM Name: ScottTrinity Title:Manager-Planning,Transportation Planning Date: 5/10/2016 1:48:54 PM Name: ShueGene Title:Division Director-Operations Support,Growth Management Department Date: 5/12/2016 4:24:57 PM Name:PuigJudy Title: Operations Analyst,Operations&Regulatory Management Date: 5/13/2016 3:40:09 PM Packet Page -494- 6/14/2016 16.A.24. Name: KearnsAllison Title:Manager-Financial&Operational Sprt, Capital Construction&Maintenance Budget/Fiscal Date: 5/19/2016 4:29:59 PM Name: PattersonAmy Title:Division Director-IF,CPP&PM,Capital Project Planning,Impact Fees and Program Management Date: 5/24/2016 10:57:13 AM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 5/24/2016 11:29:39 AM Name: OberrathKaren Title:Accountant, Senior,Grants Management Office Date: 5/24/2016 11:32:41 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Administration Date: 5/25/2016 11:36:39 AM Name: KlatzkowJeff Title: County Attorney, Date: 5/25/2016 12:09:37 PM Name: StanleyTherese Title:Manager-Grants Compliance, Grants Management Office Date: 5/27/2016 2:18:31 PM Name: KlatzkowJeff Title: County Attorney, Date: 5/31/2016 11:19:55 AM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 6/5/2016 10:09:10 AM Packet Page-495- 6/14/2016 16.A.24. Co ger County Growth Management Division June 17, 2016 Via Email and U.S. Mail Laura Lockwood Community Liaison Administrator Florida Department of Transportation,District One 801 N. Broadway Ave. P.O. Box 1249 Bartow, FL 33831-1249 RE: Response to Request for County Incentive Grant Program Priorities for Fiscal Years 2021/2022 Dear Ms. Lockwood: This letter is in response to the request for Collier County CIGP priorities for fiscal years 2021/2022. We believe that the Airport-Pulling Road improvements from Vanderbilt Beach Road to Immokalee Road, a distance of approximately 2 miles, is an excellent candidate for CIGP funding. 1. Name and contact information of the applicant: Collier County Board of County Commissioners Staff Representative: David Wilkison, Growth Management Department Head 2885 S. Horseshoe Drive Naples,FL 34104 239-252-6064 2. Complete description of the project,including a location map Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road is currently a four- lane divided rural roadway with 12 feet traffic lanes, 40 feet depressed median, asphalt sidewalk and swale along the west side only. The road drains into the C-31 canal that runs parallel to the road. Both road and canalGa`•, -of-way (ROW) are 100 feet each, owned by xi: oUIO Growth Management Division•2885 South Horseshoe Drive•Naples,Florida 34104.239-252-8192•FAX 239-252-2726 Packet Page-496- 6/14/2016 16.A.24. Collier County. The northbound traffic lanes are located within the west half of the canal ROW. The C-31 canal is operated by the South Florida Water Management District (SFWMD)Big Cypress Basin(BCB). See attachments. Airport-Pulling Road from Vanderbilt Beach Road (VBR) to Immokalee Road is being proposed as a six-lane divided urban roadway with 11 feet traffic lanes, 22 feet raised median, concrete curb & gutter and sidewalk on both sides, a closed pipe stormwater system and street lighting with minor traffic signal adjustments. The road will continue draining into the C-31 canal with some quality treatment provided by stormceptor type devices. Additional pedestrian facilities will be included in the project to improve in.termodalism and safety. The corridor currently is a bus route for CAT and the project will provide enhancements and upgrades to the current bus stops and amenities. The project will meet all federal, state and local requirements, including ADA requirements. Figure 1: Regional Location Map ltY p 8 y f $ 'y. } y}x s C e b w ,lMr.Qxiirw . `s .r Y te) 44 j /YY!!rvwxG� F et) LCwta 3C}. rf hX Page 2 of 11 Packet Page-497- 6/14/2016 16.A.24. Fi l ure 2: Pro'ect Location Ma I 63 iia il • _ 7 ... 9 li z. 7. ATTA:FNMT-A ' b 't `.. n G Figure 3: Conceptual cross section. The feasibility of the bike lane and location of the sidewalk on the east side of the road may be revised when the project is designed. ,r u44., amu" y • a , t � fs Yf -r '44* g �y yFM41c' q 'We rt YI�IM"', SIAY µ '�'E`iv►�.� 14A'4's a Page 3 of 11 Packet Page-498- 6/14/2016 16.A.24. 3. Detailed description of how the project would reduce congestion on the state highway system: Airport-Pulling Road is a parallel facility to both US 41 and I-75; additional capacity on this arterial roadway will relieve congestion on both state highway system facilities. Currently, Airport-Pulling Road merges from 6 lanes to 4 north of VBR. This has the potential to create confusion and cause accidents as the lanes merge. The improved road layout will reduce travel time and delays by decrease speeding and reduce crash rates. This project will provide safety benefits to all modes of transportation by increasing access to transit, creating sidewalks, and reducing traffic congestion. Creating better alternatives to cars will help encourage a mode shift. Reducing the number of cars on the road not only lowers road maintenance, it also constructs a more safe intermodal transportation system. The addition of more modal opportunities within the existing right-of-way minimizes the network lifecycle costs and environmental impact. Besides the added capacity by reducing delays, there will also be a reduced need for road maintenance and a reduction in injuries by providing sidewalk for bicyclists and pedestrians, improving overall traffic operations. Since 2005, there have been 1,365 crashes in the project area. This includes 15 incidents involving bicyclists and 4 involving pedestrians. During the same time period, there have been 2,021 crashes on 1-75 between Immokalee Road (Exit 111) and VBR and an additional 1,424 crashes on 1-75 between VBR and Pine Ridge Road (Exit 107). There have been 2,122 crashes on US41 between Immokalee Road and VBR and an additional 1,105 crashes on US41 between VBR and Pine Ridge Road. The proposed project will improve the multimodal connection inside the County's urbanized area. The corridor will relieve traffic congestion on the State's designated SIS facility (I-75) and SHS (US41) and provide for the efficient movement of people, goods and services. The additional capacity will provide for a more efficient connection between many community assets including existing neighborhoods, schools and commercial businesses. Without State assistance, the County will be required to wait until enough local funding is collected to fund the project in full. This would further delay the traffic congestion relief of I-75 and US41. The project will include multimodal components including transit system improvements as well as sidewalks to encourage non-auto modes of transportation. Stormwater treatment improvements for the corridor will be an element of the project. Page 4 of 11 Packet Page -499- 6/14/2016 16.A.24. Figure 4: Collier Area Transit Route 12—showing 8 stops in the project area ` .' r r".,J,.•. * 'fin§,i`xd n�`'�����_,�{ ..�_ .,.�. ...;�E`s:.����.��[t ._..��'.:"'�.i�.�s����.,..�'"� u-��5�a.,�. � .._ .,.F',n�.�. .. :? __.carr e 40p-A$ ! Ar ne aFinao imr..I ttF.;134 sartpttEZ;; Craw .W,na r �w ( c5,oria, Pima tit?, rvv ro I xnt�`{ L>Mp_ 1_,;(51:4.1d I rr991l1+1 j ul tv5 33FIN I f3l Ak 3 &saiu r a3evat rwxAt awesas_ »arse dw" j �nxae � rmkx ( massa l 4 22241M i;*MAK .lava 2422,42K2422,42KABs:031.11i14 T nt �� WONT IT Mai*I.1 uAd4 92337115¢ Rigid : rra 7 5vB& nous arstner tiNtivs 11:256At -;ttnaw� 71991,11 Sia,P1 IliIP1 tY]7Wn1 9 wwj ]131pm Croom loom r,iGRN tRarM. i usim ! Seq,.y.,.at N-+t'eei; imp* Fpe;..t rZP9ac ;cn2:31::477,11 xgne xa9ms S�58e�5, farm ice, .L xrw +tiind,,,( fru acme''. + a rt, seavaa sat rw :ataµ, .=dna. s3arm, smrw 69 PM ttean 421n/ I CarlAt LSInt Tu/V: 1 79 no 1 r2araa Smut sw14KistbsdAim.9 dailanp,rnacxn arttu. „ .n . flit � •, A t-t Project • Location *a !';'4' ; Fin itligrettl �,. Old alt .7 T d: y 7 .11 � z ,SM.AU.: 4- .. r1:dr.Sjnann Olvd nyw.. A`trj;t S 7ESluy A'r� �l rad .;x1 Daezl:ri �re i ar � r Page 5 of 11 Packet Page -500- 6/14/2016 16.A.24. Figure 5: Crash data for the corridor � ,�( j ,.'-',1' ' ` ,-,:.,4, _ 1 i1S4I, � tb � 'I �� T ii t Switch Basemap 't)Measure { ,5iit' ft ' Y 5 ei.---,,;,-.71—, a ' ' tR88I , "- � ; .^` ' '� P.u 1 div.$ �f '4 I 1 # 1 � _, CRNW ."Nixnad ` CR f"►, �� ---4—'-- �—•- d�rtoa�eRan� ' Asn F�� iII, i _< �" - , n ='III ', , {0547 � c 3 ' f � � . ".' " 'I % I rz ' Leta l' pt - �,�! �"` vanueeitt8eoa+ ,den s6F ,..biit,Bef m�'d --- t ' i CR3i%l'.'4„,� 4 17 ,-u54s, ij A. 3 C s '' !� 4 ; 9r .,,04,-,-::;., 3 p 1 k �',�,�c I e669a666 CR89G W2668tWud Rn.Rd0 Wed CR098,BaNIMW ""'"Pma P "7('� 4 Fes}l 9 h ,, 1. 5 ik? : _ g r g w IQ7' =e�: 11 i .. u5541 a '1' i '„_.„ +�., \tap data Open5treetMap"cantnbutars.;CC-BY-SA ,J,„,-,-,14.).. y. 4. Certification from the County's chief financial officer that sufficient matching funds are available: A signed certificate of project funding is available upon request. 5. Details of project phases included in the request: This grant request is for the design and construction phases of the project. The Airport-Pulling Road Project is in the Collier MPO's 2040 Long Range Transportation Plan as a cost feasible project for PE and Construction Phases in FY2021-2025. Page 6 of 11 Packet Page -501- 6/14/2016 16.A.24. Figure 6: Collier MPO's 2040 Long Range Transportation Plan (Cost Feasible Plan) Table 5-2040 Cost Feasible Plan Summary of Funded Projects Grouped by Funding Source with Costs Shown in Future Year of Expenditure(YOE)in Millions of Dollars <, - _... � ..5°rsr!4 a x -p ++.: as 4 zu7o s'wp7mT pwp27488 , ., , t hy, 2 123.. a � ,1R9* - 7 kdPT '` PlyJest' 43 SR 29 tiorthdSR 82 2 14 �.Coki&Hen* bldne Roadwayto4 Limes wit,Paved Shoulders jlndbdesmining and $1.1192 y Lile resurfacing Mezltdolt pavement) -... 2.4One ROadweyto4 Lanes Wilt Pend Sttxdlden f ind odes end 60 51129 475(5893) °Men Rd. 2 19.2 ria ..4843 $X.63 49.82 resvfedna ot existing pavement Collier 87ed 108 '1,, 4 175 9511 Imerd ge,Single Point Urban $44.4(1 51187 TWA Bpi(2075)8045x8 nia �,$4.8„„ 5466 4934 $14.85 7858sox(40(9a 4ysl8Bke1Ped) rda •$8.93 ,,6932. '$99.2'7 $3781 TTM BOX(40N.)OAP nia 59.32 518.67 $3731 2 GeN.eGace Parkway 17$ INew12.Isne Ramp $100 `$0.99 $234 $Sit 3 P4611/144 Rd 175 Intersection Traffic Signatintion $5.31,'5819. #r.35 37.15 7 Inunnk8142Rd .7 94entitiete Inteeseca45Tra&Stnalira8on 3275 `$4,31 ,r.,$8. $aa Lee/Collier blame Ro4dway104 lrmswlut Sdewaiks,Sam Lanes,and Cat+8Gutter 12 Old 1S 41 7141{)1145) - 7 35 $L5.a3 $272 '.-;73'..56. $25.27 CooOgUne Iindodes mtiOngond resurfecng of exlssteg twemerR) 5lrparL Putin, Sam.mrbaa 4140 Roaiwayto 6Wits wlih Sldewaiks,Me1a504.aael Curb&Gutter 18 5884104.1%Yv4) Rd. 61 4 3 with Mside Pared Sho1lderpndudes trains-ant}murtetinseiexisting .$33.11 'x$485 $7766 $34.51 vd 40rement) Critical Needs 1Oteneeto4(Randall Pamektlee 8th Street Inta6ma4•Grade hmersexion Inprovements,ledodlrng 44aningW 8th194 $4.08 3138 Sim Bisd 4t lmmnkalee Road) ROA Street. 21 LIS 41 Goodlette Rd8/8 Into...aim. 32.00.,.$0.37 1"50 3291 G 111941(Cdlter 811811sass el Noft8 Of 41518 Roadway 616lpnes wit35lde59153,MP lenes,am C.b&Getter 4 1 $139.5 $2fl2 $2403'. 52205 Manatee Rd Tower Rd Ow:lod sPitingend resudaeng et exls6Agpaxment) blanc R4adwey'44 tames with Outside Paved Shoulders(includes 15 11541156WI 4T1m1401Tr83 East) Greenway Rd 64 farm Rd 2 2.6 521.83 ,3601 $25.59 541:70 57132 881110end resat',en',e.g.of existing pave_mesdl Cotler Ned(38 9. U541(5585(TlelMllhid 8.003) Shia Point Urban iratKrimgc;SlM)•MOMne OverOasvoad $49.14 `51.9.34 41952 GnideO Gate 4Lsn8 Roadway/4 6 Lynes with Sldewelk161ke lanes,and Curb&Girder 5 CR9$t(Cdllerelvd) Green etvd 4 2 53309. $3.66 Su-ii 541.7E Gnat (inticides milling end 5151100N of existing Pavement)Ish 2484dNeeds iOten44604 040401503053944 8t1,2reet Ultimate irteasecton lm Bledatl,1,0,0 dee Road) Road prwremem $31.03 3448 61,YR $58.16 01959(Collier Expend from 0&2 lanes tobilding 3larks of a six bre footprint tram ,�s+�-,r, 4 31p YaederWlt Beach Rd �M) 8th4 082 6 Colliere1vd to YSiskn Blvd end2Ienes horn N,IsOnto861St 53996 '!72 3$ 58)9.1 43 5irpe0t Putting Rd Venda/tiltItnm8Bdee Rd 4 2 4iMe Roadway W 6 Lanes with 51805941.Bike lades.and Orb,&Gutter 35 03 s 6`1,72 14343 $7.57 Bradt Rd (Ind odes 001118gand resurfx+l%of 85130104 peremenl( Oilwell btanrt Paadway to 4 lanes with Outside Paved Shoat den(ln6udes E 04 welt 847CR 853 Everglades Blvd 2 3.9 433.00 Mar Stain Grade Rd eriiiIng me resuttaeng 01 extrieg aavemenc) The Airport-Pulling Road Project is not currently in the County's FY16-FY20 5 Year Work Program which is tied to the County's Capital Improvement Element (CIE). Should the project be awarded the CIGP grant,the CIE can be amended or updated, as appropriate. Figure 7: Collier County's FY16-FY20 5 Year Work Program Page 7 of 11 Packet Page -502- 6/14/2016 16.A.24. FY18_FY20 6 YEAR W0RR PROGRAMME(TIED TO Frit ADOPTED BUDGET) (Deirc alwwn In Thousands) Project Name FY14 FY07 FT'18 FYMB. F120 Muted:8G8a88ARYOF PROJECTS Amount Amount Amount M,omd Arnot Amount 63144 041vhll(8+r17wdecto CS WM Graciat3737 A 2,757 60119 Vanderbilt Bomb Rg cl11 r BMO-iWsoo 3,760 MD 2,440 RIMED 2,009 R88S 2,840 RIND 1.404 mum 18,288 60146 Belden Nate Wed Seat St 6o Esergiodeo 3,660 R 5,10 RMPA 4,108 RdBla 7,380 RPA 2,048 A 24,268 60010 neaten oats Bbd Mixon In 20tdt 1,000 R 1,000 61001 Tripe FrnwNoodreet 1,882 C 1,882 60132 atuWCR eel Broken Bank Ytatraedton 3,760 C 2,764 621.28 Wn6On Bennett Exam:in 2278 SR 2,278 60133 O1neonatiarnMe 250 0 200.. 60147 Ranstalilramokalas Road kderoeeton to Bid Street 600 0B 280 600 60143 Airport Road.Dae5;Bird Intersection 3,642 ROC 3642 TBD Vabaienzl8ernwfel 180 a 100 TBD 0fd,18th,and 47(11 maga 1,382 0 6,188 C 8666 TED Losianaminit to Bonita Beaelrl. C80 - TED Pine RldgoT7241 kdreeo(on C80 TBD Raitrawalbe Hammodi Ededlen CBO Coatngem or 4,086 1.173 1,432 378 1,273 11,087 Tote 20,0117 17,341 4,873 10,273 10,473 77,077 SYORanona knarayar_____ka0sarrl6 66066 Bridge Flopairanmproveinents 8.137 4,440 SAN Oen Maga 86,437 60215 intessecalco SaliebiCeparetlyEntianoements 100 2.000 2,000 2.084 2024 5,160 60146 TMC Reim:Masn mammal 30e 300 53172 Tral0o Ops BndrwametMBfanele 711 740 740 744 748 WI 60133 01812 Rei oreneolhRy Re®udemrert 200 200 60 60 6a 660 60130 W,aiMarrler Replaoerneot 450 460 460 460 460 2,250 61153 Tren0o Studies 100 100 102 100 100 600 61110 Cotmdywide Pdtheayst2kbaann Ron PILLa7 260 260 250 250 260 1,264 69081 PathwoQv+Bidewenrc Bike LarmiRel5ts Trandt EnkainaMikioniblins(Tranctarto CAM 1,834 2,040 2,100 2,004 2,086 8.834 60106 Lire nokRowd Connsndan 300 310 366 327 300 1,600.. 60131 Road Resorikatigt11 2,800 3,880 2,260 3360 2,600 15300 61077 Road RaturldG140(Makatea str6l10) 160 800 M4 304 2,660.. 60170 uaderd1t Drive lewrarealrrts 200 200 8agebokalOperatioonsknpriramenimProOrams 10,872 16.127 19,740- 10.740 76.414 81,832. 60023 Marta MerediAaset 160ndtPlarsdn0 1,750 1,760 750 760 727 3760 63171 Mull Protest 60 60 60 64 200 Transfers to otter hands(31S 2,113 3,M0 3,000 4,146 3,600 16,113 Impaot Fee Refunds 200 440 40a 4410 440 1,800 Debt Saralee PaYnerd s 15,143 12,137 13,137 13187 13,137 05061 Total Funding.Request Al Funds 60,876 51,438 43680 44,250 43614 248.103 REVENUES, !menet Feec,VOAReaanue 5,006 0,340 1,600 8,140 10.100 47,804 Unloreeaated Impart has kcal FY 14 - DCA 800 B00 Gas Tax Rennin 18,600 13,600 18,603 16.800 13.600 15600 Granirltearbtasam ants.. 1,488 3,148 - (670 Transfer in - Interest Fund ant Gas Tax.. 121 200 200 200 227 023 Interest Maned Fran 210 200 200 200 227 1,010 Transfer In from Fund 111 2,437 3„240 3,863 2.660 2,310 15127 Omani Find 17300e3 001 14,580 12,000 12,050 12'000 15900 42,680 General Rand Transfer TMC Carder 300 300. Revenue Reduction(Loss 8%Required by LewJ., 11,4431 (1,443f Tata16 Year Ravenuee 48,070 41,038 43,560 44..360 41,344228,363 BeolRnmq Cam Forward. 17.106 17,806. IFladal Year ienpluo73doattanl - - - - - Meal Yam Cany Forward - - lOs nulattee Flip8YDet:Balsam 4SiumbisiBlisarralM,Seisma..vits to- ,1fs. .t- '„2,4 k` , a '...- --,,°4-',,,..,r„,,. +s16 ..'-..:,1 n, , .. BRANT FUNDING SUMMARY 88044 B4ltpes ECM ECIE 1.842 88 7376 2712 Tatar Giants 1,342 8,228 0 a a Expend:um:9ased en ahead oast estimates_ a=Study A=Adwoamed Corodluobon 2)nevemnei:Bandanmled adopted impact FeeSdea50 projected fps tax revenues, 0=Da618n 1=InspeoRml i budgeted general fund l water,and amassed grant%and deaetapercontribution M=MINOattn AM=Ana=Maraa0emelat G= aa struodort LPO S1B lam RtSD abate ROW1 agreements_ R= CBO=Cancm4 Da1.2ed By Ofbrs I L=Lttotot 0130=DestOrod ByOtdre 6. Cost estimate: Page 8 of 11 Packet Page-503- 6/14/2016 16.A.24. The projected costs are estimated at$15,887,778 ($13,815,459 for construction and $2,072,319 for design); see Preliminary Cost Estimate below,with an estimated completion time of 48 months (24 months design&24 months construction). Page 9 of 11 Packet Page -504- 6/14/2016 16.A.24. AIRPORT-PULLING ROAD(C.R.31) FROM VANDERBILT BEACH ROAD TO IMMOKALEE ROAD 60016.00 PRELIMINARY COST ESTIMATE SIX LANE IMPROVEMENTS-URBAN SECTION(11-FOOT LANES) ITEM No. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT 101-1 MOBILIZATION LS 1 $1,000,000.00 $1,000,000.00 102-1 MAINTENANCE OF TRAFFIC LS 1 $650,000.00 $650,000.00 104-13-1 STAKED SILT FENCE LF 21,120 $1.00 $21,120.00 110-1-1 STANDARD CLEARING&GRUBBING LS 1 $500,000.00 $500,000.00 120-1 EXCAVATION CY 4,889 $15.00 $73,333.33 120-6 EMBANKMENT CY 58,178 $15.00 $872,666.67 121-70 FLOWABLE FILL CY 800 $150.00 $120,000.00 285-709 OPTIONAL BASE GROUP 9 SY 49,280 $15.00 $739,200.00 327-70-1 MILLING EXISTING ASPHALT PAVEMENT(1"AVG.DEPTH) SY 61,600 $3.00 $184,800.00 334-1-13-1 SUPERPAVE ASPH.CONC.TYPE SP 9.5(TRAFFIC C,1"THICK,RESURF.) TN 3,388 $140.00 $474,320.00 334-1-13-2 SUPERPAVE ASPH.CONC.TYPE SP 9.5(TRAFFIC C,1"THICK,OVERBUILT TN 20,328 $140.00 $2,845,920.00 334-1-13-3 SUPERPAVE ASPH.CONC.TYPE SP 9.5(TRAFFIC C,1"THICK,WIDEN.) TN 2,710 $140.00 $379,456.00 334-1-13-4 SUPERPAVE ASPH.CONC.TYPE SP 12.5(TRAFFIC C,2.5"THICK,WIDEN.) TN 5,421 $140.00 $758,912.00 425-1-351 CURB INLETS TYPE P-5 EA 18 $4,500.00 $81,000.00 425-1-351 CURB INLETS TYPE P-6 EA 18 $5,000.00 $90,000.00 425-1-351 CURB INLETS TYPE J-5 EA 8 $7,000.00 $56,000.00 425-1-351 CURB INLETS TYPE J-6 EA 8 $8,000.00 $64,000.00 425-1-351 BOTTOM INLETS TYPE D EA 2 $4,500.00 $9,000.00 425-2-61 MANHOLES TYPE P-8 EA 8 $5,000.00 $40,000.00 425-2-91 MANHOLES TYPE J-8 EA 6 $7,000.00 $42,000.00 425-6 ADJUST VALVE BOXES(WATER&SEWER) EA 25 $500.00 $12,500.00 425-11 MODIFY EXIST.DRAINAGE STRUCTURE(INLET TOPS ONLY) EA 10 $2,000.00 $20,000.00 425-99 CONTECH CDS STORMWATER TREATMENT DEVICE(PSWC56_53) EA 6 $75,000.00 $450,000.00 430-175-115 PIPE CULVERT(15"RCP) LF 3,000 $90.00 $270,000.00 430-175-118 PIPE CULVERT(18"RCP) LF 3,000 $95.00 $285,000.00 430-175-124 PIPE CULVERT(24"RCP) LF 1,800 $110.00 $198,000.00 430-175-130 PIPE CULVERT(30"RCP) LF 1,200 $130.00 $156,000.00 430-175-136 PIPE CULVERT(36"RCP) LF 500 $180.00 $90,000.00 430-94-1 DESILT PIPE(0 TO 24"DIAMETER) LF 500 $10.00 $5,000.00 430-94-1 DESILT PIPE(0 TO 24"DIAMETER) LF 300 $30.00 $9,000.00 515 ALLUMINUM HANDRAIL LF 3,000 $90.00 $270,000.00 520-1-10 CONCRETE CURB&GUTTER TYPE"F" LF 42,240 $12.00 $506,880.00 522-2 CONCRETE SIDEWALK(6"THICK) SY 14,080 $40.00 $563,200.00 536-1-1 GUARDRAIL(ROADWAY) LF 3,000 $20.00 $60,000.00 536-7 SPECIAL GUARDRAIL POSTS(ROADWAY) EA 10 $150.00 $1,500.00 536-85-22 END ANCHORAGE ASSEMBLY(FLARED) EA 5 $1,500.00 $7,500.00 536-85-24 END ANCHORAGE ASSEMBLY(PARALLEL) EA 5 $2,500.00 $12,500.00 570-1-2 PERFORMANCE TURF,SOD SY 29,333 $3.00 $88,000.00 650 SIGNALIZATION ADJUSTMENTS LS 1 $50,000.00 $50,000.00 700-20-11 SIGN,SINGLE POST EA 60 $300.00 $18,000.00 700-21-11 SIGN,DOUBLE POST(F&I) EA 12 $5,000.00 $60,000.00 706-3 REFLECTIVE PAVEMENT MARKERS EA 3,000 $5.00 $15,000.00 711-11-121 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(6"WHITE) NM 5 $4,000.00 $20,000.00 711-11-122 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(8"WHITE) NM 2 $4,000.00 $6,000.00 711-11-123 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(12"WHITE) LF 2,000 $4.00 $8,000.00 711-11-124 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(18"WHITE) LF 1,200 $5.00 $6,000.00 711-11-125 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(24"WHITE) LF 1,000 $6.00 $6,000.00 711-11-131 TRAFFIC STRIPE,SKIP,THERMOPLASTIC(6"WHITE) LF 18,000 $1.00 $18,000.00 711-11-160 PAVEMENT MESSAGES EA 50 $100.00 $5,000.00 711-11-170 DIRECTIONAL ARROWS EA 250 $60.00 $15,000.00 711-11-221 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(6"YELLOW) NM 5 $4,000.00 $20,000.00 711-11-224 TRAFFIC STRIPE,SOLID,THERMOPLASTIC(18"YELLOW) LF 800 $4.00 $3,200.00 711-17 REMOVE EXISTING PAVEMENT MARKINGS LS 1 $5,000.00 $5,000.00 715 STRET LIGHTING LS 1 $20,000.00 $20,000.00 737-70-1 UTILITY LOCATE,UNDERGROUND EA 50 $250.00 $12,500.00 1000-8 ROADWAY ALLOWANCE LS 1 $25,000.00 $25,000.00 TRANSIT ALLOWANCE 8 $30,000.00 $240,000.00 I SUB-TOTAL: $12,559,508.00 10%CONTINGENCY: $1,255,950.80 I TOTAL: $13,815,458.80 15%DESIGN FEE: $2,072,318.82 Page 10 of 11 Packet Page -505- 6/14/2016 16.A.24. For these improvements to Airport-Pulling Road we are requesting funding in any amount up to the 50% match of$7,943,889. Thank you for your assistance and we appreciate your cooperation. Please contact me for any additional information you may need. Sincerely, David Wilkison,Department Head Collier County Growth Management Division Attachments CC: Leo Ochs, County Manager Commissioner Donna Fiala Commissioner Georgia Hiller Page 11 of 11 Packet Page -506- 6/14/2016 16.A.24. Collier CIGP Project Submission Application / Checklist 1. Description of the project, including project limits,project costs and completion time. Project Description: Airport-Pulling Road Widening—widen the current four-lanes Airport-Pulling Road from Vanderbilt Beach Road to Immokalee Road to a six-lane roadway with curb and gutter. Project Limits: Vanderbilt Beach Road to Immokalee Road(Length=2.0 miles) Project Costs: $15,887,778 ($13,815,459 for construction and$2,072,319 for design Completion time: 48 months(24 months design&24 months construction) 2. Does this project CHECK ALL THAT APPLY AND EXPLAIN HOW IT APPLIES: ❑ improve road maintenance ® reduce injuries or fatalities—removal of the merge lane Airport-Pulling Road at Vanderbilt Beach Road intersection would ultimately reduce number of crashes ® reduce delay—enhance traffic flow with additional lanes O reduce distance travelled ® improve alternate modes of transportation—provides improved and additional sidewalks for bicyclists and pedestrians,with a shared use pathway on the west side 0 use a transportation demand management(TDM) strategy ® improve traffic operations—increases capacity ❑ improve travel affordability ® other—it provides for more capacity for traffic for northern of Collier County area and a safer corridor by the implementation of a street light system 3. Can the success or failure of implementation of this project be evaluated?If yes,please explain how? Yes-by reducing the number of crashes per year and increased capacity. 4. Does the result of the performance measure further the CMS/ITS Goals? If yes, please explain what goals and explain how it furthers them? Yes — reducing road maintenance needs, reducing injuries or fatalities, reducing delays by the added capacity, providing sidewalk for bicyclists and pedestrians, improving overall traffic operations and improving overall transportation network in southwest Florida. Packet Page-507-