Loading...
Bayshore Beautification MSTU Minutes 04/06/2016 & zv , -fr,1, Seo Bayshore Gateway Triangle CRA.Bayshore Beautification MSTU Haldeman Creek MSTU BAYSHORE BEAUTIFICATION MSTU ADVISORY COMMITTEE MINUTES OF THE APRIL 6,2016 MEETING The meeting of the Bayshore Beautification MSTU Advisory Committee was called to order by Maurice Gutierrez at 5:01 p.m. at the MSTU Office 3570 Bayshore Drive, Unit 102. I. Roll Call: Maurice Gutierrez, George Douglas, Robert Messmer, Sheila Dugan, and Sandra Arafet were present. Victoria Nicklos was excused. MSTU Staff Present: Jean Jourdan, CRA Operations Manager; Elly McKuen, Project Manager and Shirley Garcia, Operations Coordinator. NOTE: Since three of the committee members had not been re-confirmed by the Board of County Commission, there was not a quorum for the meeting. Staff instructed committee members to provide a general consensus on agenda items and to place any action items on the May meeting for formal disposition. II. Adoption of Agenda: The Chair requested an item be added to the agenda under new business. The request was to discuss the possible addition of blinds/shades for the CRA Office. Motion to approve the amended agenda made by: Robert Messmer, 2nd by: Sandra Arafet. There was a general consensus to approve the adoption of the agenda as presented. III. Approval of Minutes: Sandra Arafet made a motion to approve the March 2, 2016 minutes, 2nd by: Sheila Dugan. There was a general consensus to approve the adoption of the minutes as presented. IV. Projects Report: A. Beautification MSTU Update: 1. Landscape Maintenance Update: Robert Kindelan with CLM updated the committee on landscaping along Bayshore Drive. There continues to be controller and pump issues in the north irrigation area. CLM, the County's Road and Bridge Division has been working on the issue and has determined it to be a wiring issue perhaps in the controller box. In addition, Contemporary Controls (Motorola representative) has begun work to connect the Motorola radios in the controller to the County's main frame for irrigation settings. CLM continues to do weekly maintenance and was going to start re-mulching but will wait to mulch the area until after Hannula Landscaping has completed the plant replacement project. The Chair requested, with the general consensus of the committee, to have CLM provide a recommendation for what will work better than the current radio-controller system. CLM Offices: 3570 Bayshore Drive Unit 102 Naples,Florida 34112 Phone: 239-643-1115 Online: www.BGTCRA.com Bayshore Gateway Triangle CRA•Bayshore Beautification MSTU Haldeman Creek MSTU will inventory the existing number of zones in the system and provide a recommendation to provide a substitution. CLM cited the re-vamped Radio Road irrigation system as a workable solution. 2. Marina on Bayview Street Right-of-Way Improvements: Staff was notified from Quality Enterprise they did not want to proceed with the paving improvements. Residents along the street have approached staff to explain/complain that large boat delivery trucks are causing ruts and damaging sidewalks and sewer grates along both sides of the street. Staff has been working with various County departments to determine next steps. Staff continues to work with County Road & Bridge and the Engineering Division to look at the entire street to determine overall repairs. B. CRA Update: The CRA updates were given at the 6pm April 5th CRA meeting and are very lengthy but were in the packets for review. The Chairman provided an update on Mattamy Homes. C. Haldeman Creek MSTU Update: The obstruction in Haldeman Creek was removed by Garland and Garland. The marker that was down was returned to the City of Naples. V. New Business: Staff had requested and received a proposal from Trebilcock Consulting Solutions (TCS) to design the Sugden Park Pathway project. The proposal was reviewed by the committee. There was a general consensus to proceed with hiring TCS. The Chair asks staff to bring the item back at the next meeting for formal approval by the committee. The Chair's amended item to discuss the installation of blinds/shades on the windows at the CRA Office. The general consensus by the committee was to move forward and allow staff to shade the windows. VI. Old Business A. Thomasson Drive/Hamilton Avenue Streetscape Update: RWA continues to develop alternatives roadway improvements. They will provide the alternatives at the May 4 meeting. B. Request for Payment of Services: None other than routine operational VI. Committee Communications: There was a general consensus to reappoint the following committee members: • Maurice Gutierrez • Sandra Arafet • Victoria Nicklos Offices: 3570 Bayshore Drive Unit 102 Naples,Florida 34112 Phone: 239-643-1115 Online: www.BGTCRA.com B40714, Bayshore Gateway Triangle CRA.Bayshore Beautification MSTU Haldeman Creek MSTU VII. Public Comments: Corporal Mike Nelson, Collier County Sheriff's Office, suggested holding the meeting at 6:00pm instead of 5:00pm in order for others in the community to attend. Staff indicated they can begin holding the meeting at 6:00pm at the May meeting. Staff brought up one last minute project that had been brought up the afternoon of the meeting — property located at 5049 Bayshore Drive has a water retention problem. Staff's recommendation was to have the County's representative from the Stormwater Section to review whether the sidewalk is causing the water problem. The general consensus of the committee was to have the County's stormwater representative review the situation before having an outside engineer review. IX.Next Meeting: May 4, 2016. X. Adjournment: The meeting adjourned at 6:11pm. Approved by Maurice Gutierrez, Chairman MSTU Advisory Committee Offices: 3570 Bayshore Drive Unit 102 Naples,Florida 34112 Phone: 239-643-1115 Online: www.BGTCRA.com