Backup Documents 02/23/2016 Item #16A 3 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERSdOFFICE FOR rSIG d to �11e C. nntttey OfficePrint on pink paper. Attach to original document. The completed routing slip andgr
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed, If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office 3/ . //(
4. BCC Office Board of County
Commissioners VW-5i 3129\'3
5. Minutes and Records Clerk of Court's Office 3���`�
PRIMARY CONTACT INFORMATION AO"
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact informiation is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff John Houldsworth Phone Number x-5757
Contact/ Department
Agenda Date Item was February 23,2016 Agenda Item Number 16-A3
Approved by the BCC
Type of Document Plat - Raffia Preserve Phase 4 Number of Original One
Attached Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? JH
2. Does the document need to be sent to another agency for additional signatures? If yes, JH
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on February 23,2016 and all changes made
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the
BCC,all changes directed by the BCC have been made,and the document is ready for the
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNA$U n
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to ty o Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office 3 l
4. BCC Office Board of County
Commissioners /j Zyt��,
5. Minutes.and Records Clerk of Court's Office `
3W/1 lip 4AgytYvt
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff John Houldsworth Phone Number x-5757
Contact/ Department
Agenda Date Item was February 23,2016 Agenda Item Number 16-A3
Approved by the BCC
Type of Document Construction&Maintenance Agreement Number of Original Two
Attached and Performance Bond- Raffia Preserve Documents Attached
Phase 4
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? JH
2. Does the document need to be sent to another agency for additional signatures? If yes, JH
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JR
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's Sf
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on February 23,2016 and all changes made -r. ,
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the 1
BCC,all changes directed by the BCC have been made,and the document is ready for the ,
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16A3
MEMORANDUM
Date: March 29, 2016
To: John Houldsworth, Senior Site Plan Reviewer
Growth Management Department
From: Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re a: Raffia Preserve Phase 4 Plat: Construction & Maintenance
Agreement and Performance Bond No. 0196812
Attached for your records are copies of the agreement and bond referenced above,
(Item #16A3) approved by the Board of County Commissioners on February 23, 2016.
The originals will be held by the Minutes and Records Department in the Official
Records of the Board.
If you have any questions, please contact me at 252-8406.
Thank you.
Attachment
16A3
•
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTIO ND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this ''r ay of , 20 f( between
WCICommur es,LLC hereinafter referred to as "Developer," andrd of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: Raffia Preserve Phase 4
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby cc
1. Developer will cause to be constructed: Roadway, drainage, water& sewer improvements
within i D months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of$1,027,428.60 - which amount represents 10% of
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete such improvements
within the time required by the Land Development Code, Collier may call upon the subdivision
performance security to insure satisfactory completion of the required improvements.
4. The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier
County Land Development Code.
5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements; or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period
by the Developer has terminated, the Developer shall petition the County Manager or his designee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as reflected by
final approval by the Board, the Board shall release the remaining 10% of the subdivision
performance security. The Developer's responsibility for maintenance of the required improvements
shall continue unless or until the Board accepts maintenance responsibility for and by the County.
16A3
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or his designee may call upon the subdivision
performance security to secure satisfactory completion, repair and maintenance of the required
improvements. The Board shall have the right to construct and maintain, or cause to be constructed
or maintained, pursuant to public advertisement and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct or consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all of the provisions of this Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by
their duly authorized representatives this i ''1/6 day of 12
& . / 1, , 20414,_.
SIGNED IN THE PRESENCE OF: (Na • Entity)WCI Communities, LLC
f �O,N ,2) 15 -.1 14 By:
Printed Name
720rJN 4 ,I hn L\ j2 t
Printed Name/Title Paul Erhardt, Senior Vice President
(President,VP, or CEO)
(Provide Proper Evidence of Authority)
Printed Name M;Llt ...r -be r`4-
ATTEST:
DWIGHT E. BROCK,.CLERK BO, " 1. OF COUNT, CQMMISSIONERS
OF �•' LIER U , F RIDA
By: I •
, > t• _: " I By: ■
Deputy Cle �",,. t1,S C DONNA FIALA, CHAIRMAN
Approv - , • j /ti legality: ...�a,,, • (
glir Item# IgaY-}-J
Scott A. Stone,Assistant County Attorney ' Agenda n
1_ DA � �,Y
Date 'J� i
Rec'd
i ty CI Lam,
16A3
PERFORMANCE BOND
BOND NO. 0196812
KNOW ALL PERSONS BY THESE PRESENTS:that
WCI Communities, LLC (Name of Owner)
24301 Walden Center Drive (Address of Owner)
Bonita Springs, FL 34134 (Address of Owner)
(Hereinafter referred to as"Owner")and
Berkley Insurance Company (Name of Surety)
475 Steamboat Road (Address of Surety)
Greenwich, CT 06830 (Address of Surety)
203-542-3800 (Telephone Number)
(hereinafter referred to as "Surety")are held and firmly bound unto Collier County,Florida,(hereinafter
referred to as "County") in the total aggregate sum of tweonenr eth:wry
rs s eavned n stihb ou cseanntds fourhundred
Dollars
($ 1,027,428.60 ) in lawful money of the United States,for the payment of which sum well and truly
to be made,we bind ourselves,our heirs, executors,administrators,successors and assigns,jointly and
severally, firmly by these presents. Owner and Surety are used for singular or plural, as the context
requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
the Board of a certain subdivision plat named Raffia Preserve-Phase 4 and that
certain subdivision shall include specific improvements which are required by Collier County Ordinances
and Resolutions (hereinafter "Land Development Regulations"). This obligation of the Surety shall
commence on the date this Bond is executed and shall continue until the date of final acceptance by the
Board of County Commissioners of the specific improvements described in the Land Development
Regulations(hereinafter the"Guaranty Period").
NOW THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties
in accordance with the Land Development Regulations during the guaranty period established by the
County,and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save
harmless the County from and against all costs and damages which it may suffer by reason of owner's
failure to do so,and shall reimburse and repay the County all outlay and expense which the County may
incur in making good any default,then this obligation shall be void,otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety,for value received hereby,stipulates and agrees that
no change, extension of time, alteration, addition or deletion to the proposed specific improvements
shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time,alteration,addition or deletion to the proposed specific improvements.
PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the
16A3
Owner and the Surety to the full and faithful performance in accordance with the Land Development
Regulations. The term "Amendment", wherever used in this Bond, and whether referring to this Bond,
or other documents shall include any alteration,addition or modification of any character whatsoever.
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be
executed this 03rd day of March /2016 __/
WITNESSES: (Owner Name and Title if Corporation) WCI Communities, LLC
Printed Name Printed Name/Title Shed& SC=I fit ,V c e�Re.sld en t_
' 4t�1,_ (Provide Proper Evidence of Authority)
Printed Name
ACKNOWLEDGEMENT
STATE OF /''�D IQ I Q1
�-� ,0._
COUNTY OF ,Gee:
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS DAY OF
.— /_ i i k / tack , 20 ale' , by Shelia. 1-6I (NAME
OF ACKNOWLEDGER)AS 1(2 ReSicIf(TITLE) OF Wei COMMGtJ 4,' " (NAME OF
COMPANY)tVUHO IS PERSONALLY KNOW TO MEOR HAS PRODUCED
AS IDENTIFICATION.
Notary Public—State of 1 �ikfd _
(SEAL)
;;0 °L � RUTH J. MARIANETTI
Fa i.= Notary Public,State of Florida
�� as.' '>7';'::,(:- My comm. expires June 15, 2018
Pri Nam (�,
''',;`1,f„\ '' Commission Number Fr 106307
, %, a r1/. . ' a�ewne //
16A3
WITNESSES: (Surety Name and Title if Corporation) Berkley Insurance Company
6,11“2.1._) al") By: /.5:17-75-sj—ei )6/fli
• • -
mUy Ash .• 0,
rinted Name Printed Name/Title Evondia H.Woessner,Attorney-in-Fact
(Provide Proper Evidence of Authority)
4
Donna J.Austin
Printed Na e
ACKNOWLEDGEMENT
STATE OF Alabama
COUNTY OF Jefferson
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS DAY OF
03rd 1 March / , 20 16 , by Evondia H. Woessner (NAME
OF ACKNOWLEDGER)AS Attorney-in-Fact _(TITLE) OF Berkley Insurance Company (NAME OF
COMPANY) WHO IS PERSONALLY KNOW TO ME, OR HAS PRODUCED n/a _
AS IDENTIFICATION.
Notary Public—State of_Alabama
(SEAL)
Qrrc OCCinfAiLALOISeil.
Printed Name Anna h Ch
My CoKeitmmission ildress expires:10/03/2019
No.BI-337a
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY 16 A 3
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted
and appointed, and does by these presents make, constitute and appoint: Mark W. Edwards, II; Jeffrey M. Wilson; William M.
Smith; Evondia H. Woessner;Ronald B. Giadrosich;Robert R. Free!or Alisa B. Ferris of McGriff,Seibels& Williams, Inc. of
Birmingham, AL its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance,providing that
no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars(U.S.S50,000,000.00),to the same extent as if such bonds
had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted;and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
N WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this / day of i1,(q!— ,2014.
Attest: Berkley Insurance Company
(Seal) By_ ■ i1, liJi
Ira Si. Lederman ! e 1 M.Hafte
Senior Vice President&Secretary '-rl'ior ice President
WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER.
STATE OF CONNECTICUT)
) ss:
COUNTY OF FAIRFIELD ) ll
Sworn to before me, a Notary Public in the State of Connecticut, this /7 day of (°�(O r CA) , 2014, by Ira S. Lederman and
Jeffrey M.Hafter who are sworn to me to be the Senior Vice President and Secretary, and the Seni r Vice President,respectively, of
Berkley Insurance Company. l
'Notary Public, State of •,nnecticut IOT PU"
2:17EN:EfCTorljoTClin7:7 CERTIFICATE '�I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY
true, correci.aiid complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
and that the authority cf.the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorrey'is attacled,is in full force and effect as of this date.
G}v n under my hand and seal of the Company,this CZza day of o( ,
Vrekler
{Seat).;
A dew
. .
1 6 A 3
Q. GRADY MINOR & ASSOCIATES, P.A.
CrYTI, E'■TGEN:EERS LAND SURVEYORS PLANNERS LANDSCAPE ARCHITECTS_
RAFFIA PRESERVE - PHASE 4
ENGINEER'S OPINION OF PROBABLE COST FOR PLAT BONDING
December 3, 2015
SCHEDULE DESCRIPTION Phase 4
A Earthwork Part of Phase 1
B Paving $262,600.00
C Wastewater Collection $301,747.00
D Potable Water Distribution $166,170.00
____ E Storm Drainage $203,509.00
F Landscape and Irrigation . Part of Phase 1
TOTAL $934,026.00
10 % of TOTAL $93,402.60
• 110% of TOTAL $1,027,428.60
Site has been cleared and filled,lakes have been excavated and sodded and the exotics have been
cleared from the Preserves,all under previous phase approvals.
Water and Wastwwater Subtotal = $467.,9 17.00
Earthwork,Paving,Drainage, Street Lights ‘,00111111/1/4,
& Code Minimum Landscaping Subtotal = $466,109.00
•:`,z,,rtsx- ------- 0 /
„,z„ ,... /...4,0c184,-,, <c• ..:.-
..`•:741:-* ts,<7..A, ..,,,,
49442 \
..z...,-*.'
...,OF •i., •
•,,,.,'""-
(;'.1-< • ..'4 OR 1 0 0:,..,.''' -;
GAEngineering\PROJ-ENGWV\WCIRPPPL\06Dp-Phase 4.103PPLIOPC\OPC-R1_PPL Bond-Ph4_12-03-2015 1 of 5
1 6 A 3
RAFFIA PRESERVE - PHASE 4
ENGINEER'S OPINION OF PROBABLE COST FOR PLAT BONDING
SCHEDULE "B"
PAVING
Roadway construction complete per the plans and County specifications including stabilized subgrade,
stabilized shoulder, limerock base, tack coat, asphaltic concrete, required testing by an independent
laboratory, roadside fill and grading for full width of right-of-way and easements, finish grading, seeding and
mulch.
UNIT TOTAL
ITEM DESCRIPTION UNIT PRICE _QUANTITY PRICE
B-1 12" Stabilized Subgrade SY $2,00 9,250 $18,500.00
. ,
B-2 6"Lirnerock Base(Compacted and Primed) SY $6.50 7,120 $46,280.00
13-3 3/4"Aphaltic Concrete Type S-III(1st Lift) SY $4.00 7,120 $28.480.00
13-4 3/4"Aphaltic Concrete Type S-III(2nd Lift) SY $5.00 7,120 $35,600.00
B-5 Valley Gutter LF $7.00 6,050 $42,350.00
13-6 Type F Curb&Gutter LF $10.00 360 $3,600.00
13-7 Type A Curb&Gutter LE $10.00 314 _ $3,140.00
13-8 5'Concrete Sidewalk 4"Thick-Common Areas SY $21.00 2,200 $46,200.00
B-9 Handicap Curb Ramps-All Types EA $600.00 4 $2,400.00
13-10 Sodding(Back of Curb) SY $2.00 1,425 $2,850.00
B-11 Signing&Pavement Markings LS $2,500.00 1 $2,500.00.
B-12 Street Lights-FPL Provide and Install EA $1,000.00 20 $20,000.00
B-13 Set PRM's LS $3,000.00 I $3,000.00,
13-14 Set PCPs LS $4,000.00 _ I $4,000.00
B-I5 Erosion Control Silt Fence 1ff $1.00 3,700 $3,700,00
TOTAL $262,600.00
Q.Grady Minor&Associates
2 of 5
G:\EngineeringSPROJ-ENGWAWCIRPPPL1060P-Phase 4103PPL1OPCIOPC-R1_PPL Bond-Ph4_12-03-2015
1 6 A 3
RAFFIA PRESERVE - PHASE 4
ENGINEER'S OPINION OF PROBABLE COST FOR PLAT BONDING
•SCHEDULE "C"
WASTEWATER COLLECTION
Includes furnishing and handling of all required materials,joint restraint, thrust blocks,connections to
other pipelines, all excavation(including rock and over-excavation if necessary), dewatering, bedding
material (if necessary), pipeline installation, back tilling (imported fill if necessary), compaction,
compaction testing in roadway areas, pressure testing, flushing, clean-up including resodding areas
previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings
and other items necessary to complete the system and provide the Owner, FDEP and County with a
complete working wastewater collection system as shown on the drawings and specified in these
contract documents. Cut ranges are measured from profile grade line to invert of the pipe or manhole.
UNIT TOTAL
ITEM DESCRIPTION UNIT PRICE QUANTITY PRICE
C-1 8"Gravity PVC-SDR 26(0-6'Cut) LF $40.00 673 $26,920.00
C-2 8"Gravity PVC-SDR 26(6-8 Cut) LF $70.00 620 $43,400.00
C-3 8"Gravity PVC-SDR 26(8-10'Cut) LF $80.00 1,142 $91,360.00
C-4 8"Gravity PVC-SDR 26(l0'-12'Cut) $95.00 419 $39,805.00
C-5 Television Inspection LF $3.00 2,854 $8,562.00
C-6 Manhole 4'Diameter(0-6') EA $4,800.00 5 $24,000.00
C-7 Manhole 4'Diameter(6-8') EA $5,200.00 $10,400.00
C-8 Manhole 4'Diameter(8-10') EA $6,500.00 3 $19,500.00
C-9 Manhole 4'Diameter(10-12") EA $7,500.00 1 $7,500.00
C-10 Manhole Drop Connection EA $2,000.00 1 $2,000.00
C-11 6" Single Sewer Service EA $650.00 8 $5,200.00
C-12 6"Double Sewer Service EA $700.00 33 $23,100.00
$0.00
TOTAL $301,747.00
Q.Grady Minor&Associates
3 of 5
G,\Engineering1PROj-ENGWOWCIRPPPLiO6DP-Phase 4 SO3PPL 10FOOPC-R l_PPL Bond-Ph4_12-03-2015
1 6 A 3
RAFFIA PRESERVE - PHASE 4
ENGINEER'S OPINION OF PROBABLE COST FOR PLAT BONDING
SCI.-IEDULE "D"
POTABLE WATER DISTRIBUTION
Includes furnishing and handling of all required materials, joint restraint, thrust blocks,
connections to other pipelines, all excavation(including rock and over-excavation if necessary),
dewatering, bedding material (if necessary), pipeline installation, back filling (imported fill if
necessary), compaction, compaction testing in roadway areas, pressure testing, disinfecting
pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas
disturbed by construction, providing complete as-built drawings and other items necessary to
complete the system and provide the Owner, FDEP and County with a complete working water
distribution system as shown on the drawings and specified in these contract documents. Lineal
foot price of the pipe is to include the cost of all required fittings.
UNIT TOTAL
ITEM DESCRIPTION UNIT PRICE QUANTITY PRICE
-
D-1 8" PVC Main(C-900,DR 18) LF $19.00 2,490 $47,310.00
D-2 8"PVC Main(C-900.DR 14) LF $21.00 90 $1,890.00
D-3 10"PVC Main(C-900,DR 18) LF $29.00 650 $18,850.00
D-4 8"Gate Valve with Box EA $1,550.00 6 $9,300.00
D-5 10"Gate Valve with Box EA $2,100.00 3 $6,300.00
D-6 Fire Hydrant Assembly Complete EA $4,500.00 7 $31,500.00
D-7 Single Water Service EA $710.00 8 $5,680.00
D-8 Double Water Service EA $920.00 32 $29,440.00
D-9 Automatic Flushing Device EA $4,950.00 2 $9,900.00
D-10 Permanent Bacterial Sample Point EA $1,600.00 0 $0.00
D-11 Connect to Exist Main EA $3,000.00 2 $6,000.00
TOTAL $166,170.00
Q.Grady Minor&Associates
4 Of 5
GAEngineering\PROJ-ENGWAWCIRPPPL106DP-Phase 4103PPLUDPCNOPC-R1_PPL Bond-Ph4_12-03-2015
. ,
. . •
. . : , 1 6 A 3
RAFFIA PRESERVE - PHASE 4
ENGINEER'S OPINION OF PROBABLE COST FOR PLAT BONDING
SCHEDULE "E"
STORM DRAINAGE
Includes furnishing and handling of all required materials, dewatering, bedding material (if
necessary),rock removal and disposal off-site(if necessary), installation, backfilling,compaction,
compaction testing in road-way areas, final grading, coordinating with other contractors and
utility companies, flushing, clean-up, seeding, sodding of all areas disturbed by construction,
repair of any damage caused by construction and other items necessary to complete the system
and provide the Owner,County and/or FDOT with a complete working drainage system as shown
on the drawings and specified on these contract documents. Pipe measurement is to the center of
the structures.
•
UNIT TOTAL
ITEM DESCRIPTION UNIT PRICE QUANTITY PRICE
E-1 15"RCP LF $31.00 136 $4,216.00
E-2 18"RCP — —LF $40.00 338 $13,520.00
E-3 24"RCP . LF $83.00 535 $44,405.00
E-4 30"RCP LF $105.00 497 $52,185.00
E-5 Valley Gutter Inlet EA $3,650.00 10 $36,500.00,
E-6 Throat Inlet EA $2,900.00 2 $5,800.00
E-7 Type C-J Inlet EA $4,000.00 3 $12,000.00
E-8 15"FES EA . $1,350.00 1 $1,350.00.
E-9 18"FES EA $1,750.00 2 53,500.00
E-10 24''FES EA $2,150.00 3 56,450.00
E-11 30"FES EA 52,700.00 I ' 52,700.00
E-12 8"HDPE Yard Drain Pipe LF $17.00 111 $1,887.00,
E-I3 10"HDPE Yard Drain Pipe LF $21.00 161 $3,381.00
E-14 12"HDPE Yard Drain Pipe LF $25.00 411 , $10,275.00
E-I5 Yard Drain Inlet EA $620.00 7 $4,340.00
E-16 10"HDPE FES with Rip-Rap EA $500.00 2 $1,000.00
$0.00
TOTAL $203,509.00,
Q.Grady Minor&Associates
5
atEngineeringtPRoJ-ENGwvvciRpppuosop-Phase 4103PPLAOPOOPC-R1 PPL Bond-Ph412-03-20 Is 5 of
1
M GradyMinor
16A3
LETTER OF TRANSMITTAL
Collier County Growth Management DATE: March 24,2016 JOB CODE R'CIRPP4
2800 North Horseshoe Drive Arr`r:TioN John Houldsworth
RE: Raffia Preserve Phase4
Naples, FL 34104 PL20150002153
Sent by: E Courier: ❑ Morning ❑Afternoon ❑ Rush ❑ US Mail
❑Pick-Up ❑ Hand—Delivery
❑Federal Express: ❑ Morning ❑Afternoon
WE ARE SENDING: ❑Prints ❑Plans(velum) ❑ Disk ❑ Shop drawings
❑Specifications ❑Copy of letter ❑Permit Application Other
Copies Description
I Original Performance Bond,Revised as Requested
I
THESE ARE TRANSMITTED as checked below:
❑ Approved as submitted ❑Approved as noted ❑Returned for corrections
❑For your use/records ❑For approval ❑ For review and comment
0 As requested ❑For Signature and Return
REMARKS:
COPY TO: SIGNED:
Kim Scher,Senior Project Administrator
i
Q. Grady Minor & Associates, P.A.
3800 Via Del Rey 11940 Fairway Lakes Dr.,Ste.#6 2562 Commerce Parkway
Bonita Springs,FL 34134 Fort Myers,FL 33913 North Port,FL 34289
239-947-1144 239-690-4380 941-426-5858
239-947-0375(fax) 239-768-0291(fax) 941-426-5844(fax) 1
j
If enclosures are not as noted,kindly notify us at once.
G:'EngineecingaPROJ-ENG\W\WCIRPPPL\OY:DP-Phase 4`-03PPL\T-COA Pees.doh