Loading...
Backup Documents 11/10/2015 Item #11B ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO i THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. • 2. 3. County Attorney Office County Attorney Office '')1 1 4. BCC Office Board of County Commissioners \IV k&-k\\`; 5. Minutes and Records 1., Clerk of Court's Office P j 0-C. Q., t.1..fi C--cc^� b% C710 ,r r\L/f C� PRIMARY CONTACT INFORMATION Normally the primary contac is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to c t ct staff for additional or missing information. Name of Primary Staff „ (+ Phone Number Contact/ Department �%k ,,(, ko..r- J i(Jr\ Agenda Date Item wasAgenda Item Number l 1 Approved by the BCC 110/ 15J I I Type of Document .� Number of Original Attached W o!` O r r- Documents Attached I PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A” in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Appli able) I. Does the document require the chairman's original signature? < ))<____, 2. Does the document need to be sent to another agency for additional signa es? If yes, provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signedQ by the Office of the County Attorney. � ta `" fr 4. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on It j; (enter date)and all changes made during the meeting have been incorporated in the attached document. The County j Attorney's Office has reviewed the changes,if applicable. tl 9. Initials of attorney verifying that the attached document is the version approved by the BCC, all changes directed by the BCC have been made, and the document is ready for the ' A'S Chairman's signature. �, A I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 1 1 B MEMORANDUM Date: November 18, 2015 To: Wayne Karlovich, Senior Project Manager Public Utilities Engineering From: Martha Vergara, Deputy Clerk Minutes & Records Department Re: Work Order for Contract #14-6345 "Construction, Engineering and Inspection Services for the Wastewater Basin Program" Hole Montes, Inc. Attached for your records is a copy of the document referenced above (Item #11B) approved by the Board of County Commissioners on Tuesday, November 10, 2015. The original document has been held for the Official Record in the Board's Minutes and Records Department. If you have any questions, please feel free to contact me at 252-7240. Thank you. Attachment 1 1 6 WORK ORDER/PURCHAn ORDER Contract 14-6345 "Construction, Engineering, and Inspection Services for the Wastewater Basin Program" Contract Expiration Date: July 7, 2035 / This Purchase Order is for professional Construction Engineering and Inspection (CEI) services for work known as: // Project Name: CEI Services for MPS 303 acid 304 Rehabilitation Project No: 70050.14.1, 70050.14.2/ The work is specified in the proposal dated September 21, 2015 which is attached hereto and made a part of this Purchase Order. In accordance with Terms and Conditions of the Agreement referenced above, this Purchase Order is assigned to: Hole Montes, Inc: Scope of Work: As detailed in the attached proposal and the following: * Task I Preconstruction Services/ * Task II Construction Services/ * Task III Additional Services * Task IV Reimbursable Expenses/ Schedule of Work: Complete work within 750 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): [Negotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs (LS+RC) //Time & Marial (T&M) (established hourly rate — Schedule A) ❑ Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I $3,853.00 T&M/ Task II $292,982.00 T&M/ Task III $38,532.00 T&M/ Task IV $1,633.00 T&Mf TOTAL FEE $337,000.00./ PREPARED BY: ID) i Wayne wlovich, Senior Project Manager Date APPROVED BY: to /7116- _ Craig Paje s: 1 18 APPRO fED BY: /Yr 6- r-13-- Steve /Steve Nagy, Collections System Manager Date A 'PROVES I • / //// Bet Johnsse Wastewater Director Date 0KS) yAPPROVED BY: p — Dr. G=• :e Yil az, Public Utilities Administrator Date APPROVED BY: S .. #. /0/87//5 ainson Hall, Procurement Strategist Date By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Purchase Order and/or project duration. ACCEPTED BY: Hole Montes, Inc. Name & Title of Authorized Company Officer Date 60 e 6-e115,971 $". Sr V A'‘"Owl Page 2 of 3 • 118 IN WITNESS WHEREOF,the parties hereto, have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brggk, perk of Courts COLLIER COUNTY, FLORIDA By: s. By: I ei,/.446e.._ Tim Nance, Chairman Dated: ?Z' i1 4" 2c,is (SEAL Attest as to Chaman's signature only. Hole Montes, Inc. 0 'v , BY irst Witness Signature TType/print witness namet TType/print signature and titleT fa.4,e Second Witness TType/print witness namet •prov-,• as • o and Legality: A - • ty Attorney \SI♦ 1T rk. ��c Print Name Page 3 of 3 118 HOLE MONTES ttit>M tk',•4q AWIE££5• dJf2VEC}F{i 950 Encore Way•Naples,Florida 34110•Phone 239.254.2000•Fax,239.254.2090 September 21, 2015 Craig Pajer, P.E.,Principal Project Manager • Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples,FL 34112 RE: CONSTRUCTION ENGINEERING AND INSPECTION SERVICES BAYSHORE MPS 306 WASTEWATER BASIN REHABILITATION OF MASTER PUMP STATIONS 303 AND 304 HM File No.: 8200A Dear Craig: We are pleased to submit this revised proposal for professional construction engineering and inspection services (CEI) related to the Rehabilitation of Master Pump Stations 303 and 304 project. The construction documents for this project were prepared by AECOM, Engineer of Record (EOR). The description of the professional services to be provided for this specific project is outlined below. Project Background The Rehabilitation of Master Pump Stations 303 and 304 project is part of a multi-project CEI contract for the MPS 306 Wastewater Basin. This project consists of the construction of the complete rehabilitation of MPS 303 and 304. MPS 303 is located off Bayshore Drive and MPS 304 is located adjacent to Thomasson Drive. This proposal is based on the rehabilitation of both the pump stations at the same time under one construction contract. The estimated construction period, based upon the construction contract documents, is 540 calendar days. The anticipated construction Notice to Proceed is late fall 2015. A contract duration of 750 days is proposed for the CEI services to allow preconstruction, construction and post construction services. This proposal does not include (a) engineering design, (b) preparation of permit applications, (c) review of shop drawings, initial Schedule of Values, monthly Applications for Payment, initial Construction Schedule and month updates (to be provided by EOR), (d) coordination or responses to Contractor RFIs (to be provided by EOR), (e) preparation of Work Directives and Change Orders and final reconciliation at closeout (to be provided by EOR), (f) construction survey and stakeout, (g) Record Survey, (h) preparation of Record Drawings (to be provided by EORs), (i) execution of Final Completion Certificate to permit agencies and Collier County, (j) laboratory testing and (k) investigation of hazardous materials and historic artifacts. H:\8200\A-Marketing\15\DWS\MPS 306\20150320 CP MPS 303&304 REV2 ktt DWS,docx Naples•Fort Myers .• 1 1 B Craig Pajer,P.E.,Principal Project Manager Collier County Wastewater Department September 21,2015 Page 2 Scope of Services We proposed to provide the following Scope of Services. Task No. 1 —Preconstruction Services Receive conformed specifications and drawings (including addenda and any published questions and answers from bidding) and executed construction contract from the County and EOR. Review these documents and become familiar with the proposed project. Meet with Collier County and Engineer of Record to discuss the project and obtain clarification as needed. Task No. 2—Construction Services Provide onsite observation of construction and testing activities on the project. When possible, observations will be performed concurrently with other projects. being constructed in the immediate area of this-project. Specific services include the following. (a) The CEI will inform the County and the onsite construction superintendent of any concerns related to conformance of the work with the Contract Documents in an attempt to resolve any concern or issue on site. If the concern or issue is not promptly resolved in the field, the CEI shall inform the EOR and the County in writing about the unresolved concern or issue within eight business hours, but not more than one business day after the discovery of any concern or issue. The EOR will be responsible for investigating the concern or issue and resolving the same through a written directive to,the construction contractor and so inform the County and the CEI in writing. This protocol will be initiated any time the CEI becomes aware of any construction that_is unsatisfactory, faulty or defective, does not conform to the Contract Documents, does not meet the requirements of any inspections, tests or approval required to be made, or has been damaged before final payment. The EOR will maintain an Issue Resolution Log documenting any issue or concern that is conveyed in writing to the EOR, including the written directive resolving the issue or concern. (b) The CEI will prepare a daily log with pictures recording activities and details related to the work on a form approved in advance by the County. Information will be recorded in the log when at the Project Site. Log entries will record all relevant aspects of the construction observed while on site including construction crew (labor) details, equipment used, materials used, compliance testing and inspection performed, weather, temperature, site conditions, trench conditions, backfill material used, dewatering methods, compaction methods, location of the work and all other details related to the work. The log will reference the digital photographs and/or video taken with appropriate file names and file locations. In addition to the construction details, the daily log will contain information related to time and hours on the job site, weather conditions, data pertaining to questions of quantities of materials used, extras or deductions, list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors, observations in general and specific observations in more detail as in observing test procedures, conformance inspection of materials and fittings, name plate data for equipment and material installed and any related issues. Logs, photograph files and other construction documentation will be provided to the County by the CEI on a daily basis in an electronic file via Email, on a permission based website, on a digital CD only if requested by the County and a printed copy to H:182001A-Marketing1151DWS\MPS 306\20150820 CP MPS 303&304 REV2 ltr_DWS.docx 1 1 B Craig Pajer, P.E.,Principal Project Manager Collier County Wastewater Department September 21,2015 Page 3 be maintained at the Consultant's project office. All daily reports shall be prepared in the field, reviewed by the CEI's Project Manager and issued by 7:00PM daily. (c) The CEI will provide a comprehensive digital photographic record of all construction • activities related to the project. The digital file names will be referenced in the log along with a brief description of the photograph, the date and time of the photograph and the name of the photographer. The digital files will be transferred to a permission based website, and to a digital CD if requested by the County. If requested by the County, pictures will be printed in high resolution color,two captioned photos per 8 1/2"x 11" sheet,printed one side only. The prints, if requested, will be provided to the County when needed. If requested by the County, video will be provided in digital format on DVD bi-weekly. (d) The CEI will accompany visiting inspectors representing any regulatory agencies having jurisdiction over the project and will record discussions and the outcome of these regulatory inspections in the daily logs. The CEI will notify the County prior to any scheduled inspections. These may include inspections by the FDEP, FDOT, SFWMD, County Building Department, County Right-of-Way Department and County Pollution Prevention Control. (e) The CEI will coordinate bi-weekly progress meetings chaired by the CEI Project Manager, attended by the construction contractor and EOR, to review project status and identify issues that may affect the project. The CEI will prepare a DRAFT Agenda,at least two business days in advance of each meeting and issue written meeting notes identifying a summary of the discussion, conclusions and any risks that have been encountered or are expected within three business days after the meeting to the County, EOR and the construction contractor. As necessary, the CEI will coordinate special meetings. The EOR shall provide updated Issue Resolution, Submittal,RFI and Work Directive Logs at the progress meetings. (f) The CEI shall meet with the construction contractor in the field to review their preliminary Application for Payment (pencil copy) based upon the EOR approved Schedule of Values. The EOR shall be responsible for receiving, verification and approval of all Applications for Payment. Note: This delegation of responsibility to the EOR for approval of payment applications has been requested by the County. No review of Construction Progress Schedule updates shall be made by the CEI. (g) The CEI will accompany and assist in the Substantial Completion inspection when requested by the construction contractor and the EOR recommends that the work is sufficiently complete to warrant a substantial completion inspection. During the Substantial Completion inspection the EOR will prepare a List of Uncompleted or Corrective Work Items requiring completion or correction to the satisfaction of the EOR and the County. The EOR shall issue the Certificate of Substantial Completion. The CEI will be responsible for the monitoring list and issuing updates to the list on a weekly basis. The CEI will assist in the final walk through to ensure that the listed items are completed to the satisfaction of the EOR and the County. The EOR shall be responsible for the issuance of the Notice of Final Acceptance and Construction Certification and permit 11:182001A-Marketing1151DWS\MPS 306\20150820 CP MPS 303&304 REV2 ltr_DWS.docx 11B Craig Pajer, P.E.,Principal Project Manager Collier County Wastewater Department September 21,2015 Page 4 closeout with FDEP, SFWMP and Collier County. It is anticipated that two Substantial and Final Completion inspections will be conducted. (h) The CEI will observe field testing to assist in verification that all materials, equipment and supplies installed or utilized on the project are in general accordance with the Contract Documents and approved Shop Drawings provided by the EOR. All material testing services are to be provided by an independent testing firm supplied by the construction contractor. All equipment testing will be conducted by the construction contractor and equipment representatives.The equipment testing will also be observed by the County and EOR. (i) The CEI shall maintain red pencil "markup" notations and sketches on full size construction plans that reflect the details of constructed facilities. The CEI will review the "markup"with the construction contractor on a weekly basis. The CEI will notify the County, EOR and the construction contractor of any differences in the documents maintained by the general contractor and the CEI on a weekly basis for resolution. These "markup" drawings will be turned over to the County and EOR at Final Completion to assist the EOR in preparation of the Record Drawings. Task No. 3—Additional Services (a) The CEI shall provide limited assistance with resolution of reported resident concerns during construction. The CEI shall receive resident concerns in the field as they occur and, when possible, seek to resolve the concern. The CEI shall also receive resident concerns from the County's Wastewater Basin Website "Hot Line". The CEI shall make an initial response.to the concern in the field and, when possible, seek to resolve the concern. A written report shall be made to the EORs and County on the concern and its resolution. When an immediate resolution cannot be achieved in the field or if the issue is complex, the concern shall be reported to the County and EORs for their logging with a status of any corrective action required. The County and EORs shall provide the log at all progress meetings. (b) The CEI shall provide limited assistance to the County with obtaining Rights of Entry from individual property owners during construction. When construction may require temporary access on private property, the CEI, through the subconsultant (Quest Corporation of America, Inc. — QCA), will prepare and provide a listing of all property owners in the construction area. Collier County shall make initial contact with the property owners to obtain Right of Entry. The CEI will be available to contact the property owners in the field for execution of a Right of Entry. The County shall maintain the log of all Rights of Entry. (c) The CEI, in conjunction with QCA, shall provide Public Information Website services during construction. QCA is also the consultant establishing and providing an overall website far the three Basin Area projects (Basins 101, 305 &306). The overall website shall provide information on the current status of individual 'projects, detailed information on anticipated road closures, planned water outage and contact information. The CEI, in conjunction with QCA, shall provide weekly updates to allow posting on the website. QCA H:\8200\A-Marketing\15\DWS\MPS 306\20150820 CP MPS 303&304 REV2 Itr_DWS.docx 11B Craig Pajer, P.E.,Principal Project Manager Collier County Wastewater Department September 21,2015 Page 5 shall forward to CEI any reported resident concerns and issues to attempt to resolve in the field. The CEI will contact the resident through their field representative to resolve the concern in accordance with Task 3(a). (d) The CEI, in conjunction with QCA, shall assist with Public Relations during the preconstiuction and construction phases. It is anticipated that two Neighborhood Public Information Meetings (one for each MPS location) will be held prior to the overall start of construction. The County shall coordinate and obtain the meeting locations. The County and EORs shall conduct the meetings with the CEI and QCA providing assistance. Fee for Professional Services The professional engineering and construction services associated with the Rehabilitation of Master Pump Stations 303 and 304 project shall be performed on a time and material basis. The CEI services are estimated to be $335,367.00. The total fee, including Reimbursable Expenses is $337,000.00. Please refer to the enclosed spreadsheet for a description of the proposed services and estimates of fees for the various tasks. We have assumed a single inspector for an average of 6 hours per day over the 18 month construction period(360 work days). We look forward to working closely with Collier County and AECOM (Engineer of Record) to • provide another successful construction project. If you have any questions about this proposal, please give me or David Schmitt a call at your convenience. Thank you for this opportunity to be of service to Collier County. Sincerely yours, HOLE MONTES,INC. Ronald E. Benson, Ph.D.,P.E. Senior Vice President/Principal REB:dbb Enclosures cc: Corinne Trtan, Collier County Clifford Pepper, Hole Montes David Schmitt,Hole Montes t-1:\8200\A-Marketing1151DWS\MPS 306120'150820 CP MPS 303&304 REV21tr DWS.docx . . . 1 1 6 HOLE MONTES PROPOSAL FOR PROFESSIONAL SERVICES September 17,2015 MASTER PUMP STATION 306 BASIN CEI MASTER PUMP STATION 303/304(365 DAY CONSTRUCTION) COLLIER COUNTY PUBLIC UTILITIES DIVISION Refer to Hole Montes Proposal dated September 17,2015 / V Sr.Prof Project Senior Cleriiccal/ Principal Manager Manager Inspector Admin Total Subconsutlant TOTAL Task Activity Description $206 $172 $147 $96 $62 Hours Other COST 1. Preconstruction/Bid Services Meeting with County/Engineer of Record 1 2 2 5 $844 Project Review 5 5 4 2 16 $2,103 Clarification Meeting 1 2 2 1 6 $906 2 9 9 4 3 27 $3,853 2. Construction Services. Preconstruction Meeting 1 4 4 4 2 15 $1,990 Biweekly Progress Meeting(MAX 22) 2 88 88 40 218 $30,964 Onsite Construction Observation 2,160 2,160 $207,360 Log/Construction Documents 50 50 40 140 $18,430 General Coordination 15 15 30 $4,785 Submittal Management 40 40 $2,480 Miscellaneous Testing 8 8 2 18 $2,676 Construction Field Drawings 25 25 2 52 $8,099 Startup/Commissioning 30 30 2 62 $9,694 Project Closeout 20 20 2 42 $6,504 3 240 240 2,164 130 2,777 $292,982 3. Additional Services Preconstruction/Neighborhood Meeting 10 10 10 30 $3,810 Special Coordination 12 12 4 28 $4,076 Public Information $30,646 $30,646 I 0 22 22 0 14 58 $30,646 $38,532 5 271 271 2,168 147 2,862 $30,646 $335,367 4. Reimbursable Expenses 1 Allowance:Copies,UPS,Postage,Misc $1,633 $1,633 TOTAL ALL TASK(TIME&MATERIAL) $337,000 H:182001A-Marketing\151DWS1MPS 306120150820 MPS 303 304 REDUCED SCHEDULE REV2.xlsx