Village Walk - Phase 6DATE: TO: FROM: RE: MEMORANDUM January 20, 1998 Maureen Kenyon, Supervisor, Clerk to Board Shirley Nix, Engineering Technician II~ Project Plan Review Village Walk, Phase Six Water and Sewer Facilities Acceptance . ~ c ~, ~ ~ , ~ ~ , The Board of County Commissioners granted final acceptance of the water and sewer facilities within the above-referenced project. Attached, please find the following recorded documents, in order: 1. Utilities Facilities Subordination, Consent and Joinder with UCC-3 form 2. Bill of Sale 3. Utilities Facilities Warranty Deed Also, please find attached the following documents for your files. o 10. 11. Owner's Affidavit Attorney's Affidavit Copy of preliminary approval letter(s) from Engineering Review Certification of pressure testing of water lines by Engineer of Record Bacteriological clearances (DER certification) for water facilities DER Placement-in-Service letter for sewer facilities Contractor's Final Release of Lien Lab results on bacteriological test for water lines Memorandum to Maureen Kenyon, Supervisor, Clerk to Board January 20, 1998 Page Two 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Certification concerning contributions-in-aid of any construction Verification of final cost (Detailed: quantities, sizes, unit cost, total cost, etc.) Letter by Engineer certifying that all water and/or sewer facilities are located within the public right-of-way or dedicated easements Engineer's final payment confirmation Contractual Guarantee for material and workmanship for a period of at least one year after the Board of County Commissioners' acceptance for both water and sewer facilities Payment of water usage, laboratory and administrative charges for filling, flushing and bacteriologically certifying water lines from invoice prepared by the Utilities Division Letter from fire district regarding ownership and maintenance of fire hydrants and certification of field fire flow capacity testing Certification of the inflow/infiltration test for the sewer lines by Engineer of Record Electrical Contractor's certification on Pump Station electric service wire sizing and voltage drop, pursuant to National Electrical Code specification Coating certification from the manufacturer or a professional testing laboratory for the manholes, wetwells and dry wells 22. Copy of video tape test report Memorandum to Maureen Kenyon, Supervisor, Clerk to Board January 20, 1998 Page Three 23. Letter from Compliance Services section certifying that the final inspection reveals that the Utility facilities have been constructed in accordance with County ordinances and regulations 24. One copy of the recorded plat 25. One set of record drawings, signed and sealed by the Engineer of Record If you have any questions, please call and advise accordingly. /sn attachments doc:2094-2 Dwight E. Brock Clerk County of Collier CLERK OF THE CIRCUIT COURT COLLIER COUNTY COURTHOUSE 3301 TAMIAMI TRAIL EAST P.O. BOX 413044 NAPLES, FLORIDA 34101-3044 BRANCH OFFICES: GOLDEN GATE 4839 GOLDEN GATE PARKWAY GREENTREE SHOPPING CENTER 2388 IMMOKALEE ROAD IMMOKALEE 101 S. FIRST STREET MARCO ISLAND 1040 WlNTERBERRY DRIVE BY: DEPUTY CLERK ~'~ OFFICIAL RECEIPT When ValidatedV~: 1645~06 O! / ~. 4-1 98 .7 BILLED: 65.20 TS AHT PAID: . O0 RECEIPT: 2582'921 PAYOR: BCC 113-138312-649030 REF: ENGINEERING REVIEW DESCRIPTION CHECK AMT RECORDING OF LEGAL INSTRUMEN 56.00 P.R.M.T.F. RECORDING FEE 8.._(.)~' DOCUMENTARY STAMFS - 70 .70 KS: 4 DOCUMENTS DOC TYP FILE ID SUBORD 2268629 UCC 2268628 B SALE 2268629 DEED 226863(i) BOOK PAGE 2379 3124, 2379 3128 2379 3131 2379 3134 DEPT: RECORDING TOTAL DUE: 65.20 MEMORANDUM DATE: January 13, 1998 TO: Recording FROM: Shirley Nix, Engineering Technician II/ Project Plan Review RE: Village Walk, Phase Six Water and Sewer Facilities Acceptance Recording Fee Number 113-138312-649030 A preliminary approval was given by Engineering Review Services on above mentioned project on December 17, 1997. Attached, please find the following documents that need to be recorded, in order: 1. Utilities Facilities Subordination, Consent and Joinder 2. UCC-3 Form 3. Bill of Sale 4. Utilities Facilities Warranty Deed Once the documents are recorded, please send the originals back to me. Also, please forward the recording fee bill so we can collect from the developer. Thanks for your assistance. If you have any questions, please call and advise accordingly. /sm attachments Prepared By/Return To: William E. Shannon, Esq, 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, Florida 33418 2268627 OR: 2379 PG: 3124 RBCORDBD 1~ OFFICIAL ~BCORDS of COLLIBR COUN?T, FL 01/11/98 et 10:SIAH DWIGHT B. BROC[, CLRRi RBC ~B 19.50 Retn: BNGINBBRING ~IBU SIBVICIS SHIRLBY BIT 5586 UTILITY FACILITIES SUBORDINATION, CONSENT, AND JOINDER THIS SUBORDINATION, CONSENT, AND JOINDER, given this %~ day of OdY~%~q-- 1997, by SunBank/South Florida, National Association, n/k/a SunTrust Bank, South Florida, National Association , whose principal address is 222 Lakeview Avenue, Suite 300, West Palm Beach, Florida 33401 ("Mortgagee"), in favor of the BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AS THE GOVERNING BODY OF COLLIER COUNTY, AND AS EX-OFFICIO THE GOVERNING BOARD OF COLLIER COUNTY WATER-SEWER DISTRICT, its successors and assigns ("County"). RECITALS WHEREAS, Mortgagee is the owner and holder of that certain Mortgage, Security Agreement and Assignment of Contracts dated September 7, 1994, and recorded September 27, 1994 in OR Book 1988, Page 2040 of the Public Records of Collier County, Florida; Notice of Future Advances dated December 20, 1994, and recorded January 23, 1995 in OR Book 2023, Page 424 of the Public Records of Collier County, Florida; Mortgage Spreader and Fifth Loan Modification Agreement dated June 16, 1995 and recorded June 22, 1995 in OR Book 2071, Page 2058 of the Public Records of Collier County, Florida, and, that certain Notice of Future Advances recorded September 15, 1995 in OR Book 2100, Page 375 of the Public Records of Collier County, Florida, and, that certain Mortgage and Seventh Loan Modification Agreement dated March 12, 1996 and recorded April 4, 1996 in OR Book 2166, Page 1847, of the Public Records of Collier County, Florida, and that certain Notice of Future Advances (and Mortgage and Eighth Loan Modification Agreement) dated March 31, 1997 and recorded April 15, 1997 in OR Book 2304, Page 2161, of the Public Records of Collier County, Florida, and that certain Notice of Ninth Loan Modification Agreement dated July 15, 1997 and recorded September 16, 1997 in OR Book 2332,Page 2054 of the Public Records of Collier County, Florida; OR: 2379 PG: 3125 WHEREAS, Mortgagee is also the owner and holder of that certain UCC-1 Financing Statement recorded January 23, 1995 in OR Book 2023, Page 430; amended by UCC-3 Financing Statement recorded on June 22, 1995 in OR Book 2071, Page 2076 of the Public Records of Collier County, Florida, amended by UCC-3 Financing Statement recorded on March 1, 1996 in OR Book 2154, Page 423 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on July 11, 1996 in OR Book 2205, Pages 974 and 975 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded January 17, 1997 in OR Book 2273, Page 297 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on April 14, 1997 in OR Book 2304, Page 110 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on July 10, 1997 in OR Book 2330, Page 712 of the Public Records of Collier County, Florida; and that certain UCC-1 Financing Statement recorded January 20, 1995 under number 950000013312 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded June 26, 1995 under number 950000126536 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded March 4, 1996 under number 960000052229 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded September 5, 1996 under number 960000186492 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded February 4, 1997 under number 970000025616-0 with the Florida Secretary of State; amended by UCC-3 Financing Statement recorded March 27, 1997 under number 970000063919-1 with the Florida Secretary of State; WHEREAS, the County has requested and received from the fee simple holder of the property encumbered by the Mortgage, a non- exclusive easement for the installation or maintenance of utility facilities over and across a portion of the encumbered property legally described below ("Easement Property"), County Utility Easements located on that certain real property more specifically described on Exhibit "A" attached hereto and made a part hereof, which real property is a portion of the Plat of Village Walk, PHASE SIX, as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County, Florida. WHEREAS, the County has requested that Mortgagee consent to, join in, and subordinate the mortgage and other loan documents described herein above to the interest that the County has in the Easement Property, and to which request Mortgagee has agreed, 2 OR: 23?9 PG: 3126 NOW THEREFORE, for and in consideration of Ten Dollars ($10.00) and other good and valuable consideration, the receipt of which is hereby acknowledged, the Mortgagee does hereby consent to, join in, and subordinate the lien of its mortgage and financing statements described herein above to the grant of that certain easement described herein over, under, and across the Easement Property, and any interest of the County in any utility facilities located therein or affixed thereto. Except as subordinated to the easement described herein over, under, and across the easement, Easement Property, or any utility facilities located therein or affixed thereto, the Mortgage and the Financing Statements shall remain otherwise in full force and effect. IN WITNESS WHEREOF, the Mortgagee has caused these presents to be executed the date and year first above written. Witnesses: SUNTRUST BANK/SOUTH FLORIDA, Nat i°nal/sl .~i~n. State of Florida County of Palm Beach The foregoing instrument was acknowledged before me this ~ day of (~6~_~o~i~z~C , 1997 by ~C(~e~-~. ~\f~c~A , the as personally known identification. to _~ or who has produced Notary Public My Commission Number is My Co~ission Expires: P: \COUNSEL\CS\VILGWALK\CONSJOIN. 6 COASTAL ENGINEERING CONSULTANTS INC 2379 PG: 3 ~:~?to'~eer,r~g Civil Engineering Survey Environmental 1Teal Estate Appraisal EXHIBIT "A" COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying within the platted rights-of-way of Village Walk, Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COAST. jSxI-, ENGINEERING CONSULTANTS, INC. NOT VAIJD WITHOUT THE SIGNATURE' THE ORIGINAL RAISED SEAL OF A FLORIDA"/:?~': LICENSED SURVEYOR AND MAPPER CEC FILE NO. 96.425 DATE SIGNED: /o-- f~ ~ 3106 S, HOiTSFSH©F IDPI\/F Seminole Form UCC-3 STATE OF FLORIDA UNIFORM COMMERCIAL CODE STATEMENT OF CHANGE FORM UCC-3 (REV. 1993) This Statement of Change is presented to a filing officer pursuant to the Uniform Commercial Code: 1. Debtor (Last Name First if an Individual) la. Date of Birth or FEI# VILLAGE WALK DEVELOPMENT CGHPANY, INC. 65-0472159 lb. Mailing Address 1 lc. City, State Id. Zip Code 4500 PGA Boulevard, Suite 400 I Palm Beach Gardens, Florida 33418 2. Additional Debtor or Trade Name (Last Name First if an Individual) ] 2a. Date of Birth or FEI# DIVOSTA AND COMPAMY, INC. / 59-0920753 2b. Mailing Address 12c. City, State [2d. Zip Code 4500 PGA Boulevard, Suite 400 t Palm Beach Gardens, Florida / 33418 3. Secured Party (Last Name First if an Individual) SunBank South Florida, N.A. n/k/a SunTrust Bank, South Florida, National Association 3a. Mailing Address 3b. City, State ] 3c. Zip Code 222 Lakeview Avenue, Suite 300 West Palm Beach, Florida I 33401 4. Additional Secured Party (Last Name First if an Individual) aa. Mailing Address 14b. City, Slate 4c. Zip Code / 5. This Statement refers to original Financing Statement bearing file number: see attache(:]. F.~Lhibit B filed on 6. A. ~ Continuation- B. ~ Release- C. [~ Full Assignment - D. [~l Partial Assignmenl- E. ~ Amendment- F. ~1 Termination- G. [~1 Other- The original Financing Statement belween the Debtor and Secured Party bearing the file number shown above is continued. The Secured Party releases the collateral described in Block 7 below from the Financing Statement bearing the file number shown above. RELEASE DOES NOT TERI~NA'fE LIEN AGAINST DEBTOR. All of Ihe Secured Party's rights under the Financing Statement have been assigned to the assignee whose name and address is shown in Block 7 below. Some of Secured Party's rights under the Financing Statement have been assigned to the asslgnee whose name and address is shown in Block 7. A description of the collateral subject to the assignment is also shown in Block 7. The Financing Statement bearing the file number shown above is amended as set forth in Block 7. (See instructions for signature requirements.) The Secured Party no longer claims an interest under the Financing Statement bearing the file number shown above. 7. Description of collateral released or assigned, Assignee name and address, or amendment. Use additional sheet(s) if necessary. The secured party does hereby consent to join in and subordinate the lien of its security interest in the utility facilities located in or fixed to the real property more particularly described as .- County Utility Easements located on that certain real property more specifically described on Exhibit "A" attached hereto and made a part hereof. 8. Signature(s) of Debtor(s): (only if amendment - see instructions) VIT;r~ ~ ~ ~ANY, :IN:./ D:t~E~I~ 7~[%D ~._(~lX]Y, :]~f~ Signature(s) of S~Cure~ ~t~f(/s): 1 SUNTRUS? ,]~NK~],~-,~,O~ FLORTDA, NA*TONAL ASSOCTA?ION ]3' / t , %..."'"~' ¥-,,~ / ! ~ I ' ~ ~ .-. 10. Number of Additional Sheets Presented 11. Retum Copy to: Name Address Address City, State, Zip William E. Shannon, Esq. 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, Florida 33418 FILING OFFICER COPY STANDARD FORM - FORM UCC-3 This space for use of Filing Officer 2268628 OR: 2379 PG: 3128 0i~ll) Ill OI~CBI, IICOIB~ of COl&Ill COII~, 'lt,/~8 at lO:53M! l)lKGa~ I. BROCI, CLBII[ IIC ~1 15.00 n: IIIBIIIIG IIVIIV SliVICIS ILIT 5586 Approved by Secretary of State, State of Florida COASTAL ENGINEERING CONSULTANTS INC OR: 2379 Civil Engineering Survey Environmental Real Estale Appraisal EXHIBIT "A" COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying within the platted rights-of-way of Village Walk, Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COASTAL ENGINEERING CONSULTANTS, INC. FLOR/ED~ BUSI~UTHORIZA~IION NO. ,[.,t~ ;2464 Professional Surveyor and Mapper ii THE ORIGINAL RAISED SEAL OF A FLORIDA ..... LICENSED SURVEYOR AND MAPPER CEC FILE NO. 96.425 DATE SIGNED: /o ~ 5~ m-~lr /4]_ ~,^~ / o~ / _~ 3106 S. HORSESHOE DRIVE - NAPLES, FLORIDA 34104 o (941) 643-2324 o FAX (941) 643-1143 OR: 2379 PG: 3130 EXHIBIT B That certain UCC-1 Financing Statement recorded January 23, 1995 in OR Book 2023, Page 430 of the .Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on June 22, 1995 in OR Book 2071, Page 2076 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on March 1, 1996 in OR Book 2154, Page 423 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on July 11, 1996 in OR Book 2205, Pages 974 and 975 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded January 17, 1997 in OR Book 2273, Page 297 of the Public Records of Collier County, Florida; amended by UCC-3 Finanacing Statement recorded April 15, 1997 in OR Book 2304, Page 110 of the Public Records of Collier County, Florida;amended by UCC-3 Financing Statement recorded on July 10, 1997 in OR Book 2330,Page 712 of the Public Records of Collier County, Florida. Prepared by/Return to: William E. Shannon, Esq. 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, F1 33418 2268629 OR: 2379 PG: 3131 RBCORDBD In OffiCIAL RICORDS of COLLIIR COUNTY, fL 01/N/98 a~ 10:52AK DW~ J. BitOCl, CLEitl ftc ~! 15.00 Re~n: IIIGIllJllll~ ~VIB# SJltVICB8 SHIRLIY Nil BIT 5586 BILL OF SALE THIS BILL OF SALE evidencing the sale and conveyance of the ware7 and sewer utility,facilities described herein is made this /{~'~ day of ~]~ ~<. ~d.¥~ 1997, by VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation (hereinafter referred to as "Seller"), and the BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AS THE GOVERNING BODY OF COLLIER COUNTY AND AS EX-OFFICIO THE GOVERNING BOARD OF THE COLLIER COUNTY WATER-SEWER DISTRICT, its successors and assigns, (hereinafter referred to as "Buyer"). W I TNE S SETH That said Seller, for and in consideration of the sum of Ten Dollars ($10.00) and other good and valuable consideration to the Seller in hand paid by the Buyer, the receipt whereof is hereby acknowledged, has granted, bargained, sold, transferred, set over and delivered, and by these presents does grant, bargain, sell, transfer, set over and deliver unto the Buyer, and the Buyer's heirs, successors and assigns forever, all those certain water and sewer utility facilities lying within the following described land, together with appurtenant easement rights for the operation, installation and maintenance of said facilities, situate, lying and being in Collier County, Florida, to wit: See attached Exhibit A The Seller, for itself and its successors, hereby covenants to and with the Buyer and its successors and assigns that it is the lawful owner of the said goods and chattels herein referred to as utility facilities; that said goods and chattels are free from all liens and encumbrances; that it has good right, title and authority to sell same, and that it will warrant and defend the same against the lawful claims and demands of all persons whomsoever. Seller and Buyer are used for singular or plural, as the context requires. OR: 2379 PG: 3132 IN WITNESS WHEREOF, Seller has caused these presen:~s:.'$'~J, be :i. executed the date and year first above written. Witnesses: VILLAGE WALK COMPANY, INC. , corpo/~on. /I DEVELOPMENT a Florida STATE OF FLORIDA COUNTY OF PALM BEACH The ~rego,ing instrument was acknowledged before me this day of ~,~/.F?~"</(~ 1997 by Robert S. Kairalla, the President of VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation. . /,7 ~:~. CHRiSTlikE ~CALA~&~I~;~E ' ~/ //~ ~' ~ / ~ ~ ~..~ ~ ~ .... ~4,,~:~:, Notary Public ..,, ~ V~"" ~ ~'e<~..~' ~' Personally known '~, OR Produced Ide~tificatio~ Type of Identification Produced P: \Counsel\CS\VILGWALK\BILLSALE. 6 COASTAL ENGINEERING CONSULTANTS INC EXHIBIT OR: Coastal Engineering Civ,I Engineering Survey Environmental Rea! Eslate Appraisal 2379 PG: 3133 *** COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying within the platted rights-of-way of Village Walk, Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COAST, ghxL ENGINEERING CONSULTANTS, INC. FLORIDA BUSI~UTHORIZATION NO. I~. 2464 Richard J. Ewing, ~SP. ~ ,: - '."-i" Professional Survey, or and Mapper i: 'i'. '"~. Florida Certificate No. 5295 ;i. :~ :~ NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF A FLORIDA' -;: ?'5': LICENSED SURVEYOR AND MAPPER .... '."'. CEC FILE NO. 96.425 DATE SIGNED: /o ~ ~ / 3106 S. HORSESHOE DRIVE o NAPLES, FLORIDA 34104 · (941) 643-2324 · FAX (941) 643-1143 Prepared By/Return to: William E. Shannon, Esq. 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, Florida 33418 2268630 OR: 2379 PG: 3134 llCOIDID in OFFICIAL UCOIID0 o! COLLIBII COU~Y, FL 01/14/98 a~ 10:53~ D~ i. B~K, CLJR[ ~C ~B Retn: · lOllllJlIIIO tIVIBW fllVIelS SHIRLBY #IZ 5586 15.00 .?0 UTILITY FACILITIES WARRANTY DEED THIS INDENTURE made this/.d/~..// /~/"~iic./~/6-~~ 1997, ~'~ day of ~ u~ . ~ between VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation (hereinafter referred to as "Grantor"), and the BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AS THE GOVERNING BODY OF COLLIER COUNTY AND AS EX-OFFICIO THE GOVERNING BOARD OF THE COLLIER COUNTY WATER-SEWER DISTRICT, its successors and assigns, (hereinafter referred to as "Grantee"). W I TN E S S E T H The Grantor, for and in consideration of the sum of Ten Dollars ($10.00) and other good and valuable consideration to the Grantor in hand paid by the Grantee, the receipt whereof is hereby acknowledged, has granted, bargained and sold, to the Grantee, and Grantee's heirs, successors and assigns forever, all water and sewer utility facilities lying within the following described land, together with appurtenant easement rights for the operation, installation and maintenance of said facilities, situate, lying and being in Collier County, Florida, to wit: See attached Exhibit A The Grantor does hereby fully warrant the title to the utility facilities, and will defend the same against the lawful claims of all persons whomsoever. For the purposes of this conveyance, the utility facilities conveyed herein shall not be deemed to convey any of the lands described in Exhibit "A". Grantor and Grantee are used for singular or plural, as the context requires. OR: PG: executed the date and year first above written. IN WITNESS WHEREOF, Grantor has caused these presents t© ~be Witnesses: .~'~. VILLAGE WALK DEV~$.~pM~T COMPANY, INC., a Florida corporation " Ka[ralla, Pres. (CORPOi~TE SEAL) State of Florida County of Palm Beach The foregoing Utility Facilities Warranty Deed was acknowledged before me this ,×~r~ day of ~' CQ~C ~.~ , 1997 by Robert S. Kairalla, as President of VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation. Notary Public Personally known ~ f~dz ~ OR Produced Identification Type of Identification Produced P: \Counsel\CS\VILGWALK\WARRDEED. 6 .wpd COASTAL ENGINEERING CONSULTANTS INC Coastal Engineering Civil Engineering Survey Environmental Real Estate Appraisal 2379 PG: 3136 EXHIBIT "A" COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying within the platted rights-of-way of Village Walk, Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COAST/~ ENGINEERING CONSULTANTS, INC. FLOR,/D~ BUSINES$xAUTHORIZATION NO. 1,It..2464 'chard J. Ewing, V~. "~'--~ :-',".- Professional Surveyor and Mapl~er ~: . · · · - :: ':, Florida Certificate No. 5295 ':. NOT VAI JD WITHOUT THE SIGNATUR~ ".~. D: THE ORIGINAL RAISED SEAL OF A LORIDA-' LICENSED SURVEYOR AND MAPPER CEC FILE NO. 96.425 DATE SIGNED: /o ~ 5~' 3106 S. HORSESHOE DRIVE · NAPLES, FLORIDA 34104 · (941) 643-2324 · FAX (941) 643-1143 OWNER' S AFFIDAVIT STATE OF FLORIDA COUNTY OF PALM BEACH BEFORE ME, the undersigned authority, personally appeared Robert S. Kairalla, as President of VILLAGE WALK DEVELOPMENT COMPANY, INC., who to me is well known, and having been duly sworn and under oath, deposes and states: 1. My name is Robert S. Kairalla, I am over the age of twenty-one (21) years, am sui juris, and have personal knowledge of the facts contained herein. 2. I am the owner of said real property located at Village Walk, and legally described on Exhibit "A". 3. Ail persons, firms, and corporations, including the general contractor and all subcontractors, who have furnished services, labor or materials according to plans and specifications, or extra items, used in the construction or repair of water and sewer utility facitlities on the real estate hereinafter described, have been paid in full and that such work has been fully completed and accepted by the owner. 4. No claims have been made to the Owner by, nor is any suit now pending on behalf of, any contractor, subcontractor, laborer or materialman, and further that no chattel mortgages or conditional bills of sale have been given or are now outstanding as to the subject utility facilities placed upon or installed in the aforesaid premises. 5. The utility facilities described herein are not included in, encumbered by, or subject to any real property mortgage, chattel mortgage, security agreement, Uniform Commercial Code financing statement, or any other encumbrance. 0 6. As and on behalf of the owner of the subject utility facilities, does for valuable consideration hereby agree and guarantee, to hold the Board Board of County Commissioners of Collier County, Florida, as the governing body of Collier County and as Ex-Officio the governing Board of the Collier County Water- Sewer District harmless against any lien, claim or suit by any general contractor, subcontractor, mechanic or materialman, and against chattel mortgages, security interests or repair of the subject utility facilities. Affiant is used as singular or plural, as the context requires. The utility facilities referred to herein are located within the real property described in the attached Exhibit "A". VILLAGE WALK DEVELOPMENT COMpANy, INC., a Florida corporation VRobert S. Kalralla, President AFFIANT State of Florida County of Palm Beach SUBSCRIBED AND SWORN to before me this day of ~ L)~-J~ 1997 by Robert S. Kairalla, as President of Village Walk Development Company, Inc., a Florida corporation. ,:,:~:~';~ ~. c:~::3:~ ~: Notary Public Personally known /~-~' OR Produced Identification Type of Identification Produced Prepared By: William E. Shannon, Esq. 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, Florida 33418 P: \Counsel\CS\VILGWALK\VWOWNAFF. 6 COASTAL ENGINEERING CONSULTANTS INC Coastal Engineering Civil Engineering Survey Environmental Real Estate Appraisal EXHIBIT COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying within the platted rights-of-way of Village Wall Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COAST~xL ENGINEERING CONSULTANTS, INC. Richard. J. Ewing, y/'P. "~-------~ :: Professional Surveyor and Mapper ~:: :-. ii: 7:! Florida Certificate No. 5295 i~ NOT VALID WITHOUT THE SIGNATURE .XND THE ORIGINAL RAISED SEAL OF A LORIDA-'i::¢:':- LICENSED SURVEYOR AND MAPPER '. ..... CEC FILE NO. 96.425 DATE SIGNED: /% ~ ~ ~ 3106 S. HORSESHOE DRIVE o NAPLES, FLORIDA 34104 · (941) 643-2324 · FAX (941) 643-1143 STATE OF FLORIDA COUNTY OF PALM BEACH ATTORNEY'S AFFIDAVIT .~BEFORE ME, the undersigned authority, personally on this / ~r~- day of OCTOPi(~- 1997, appeared WILLIAM E. SHANNON, who to me is well known, and having been sworn and under oath, deposes and states: 1. My name is WILLIAM E. SHANNON, I am over the age of twenty-one (21) years, am otherwise sui juris, and have personal knowledge of the facts contained herein. 2. I am a licensed attorney, Florida Bar %202363 authorized to practice law and am practicing law in the State of Florida. My business address is 4500 PGA Boulevard, Suite 400, Palm Beach Gardens, Florida 33418. My business telephone number is (561) 627-2112. My business mailing address is 4500 PGA Boulevard, Suite 400, Palm Beach Gardens, Florida 33418. 3. This Affidavit is given as an inducement to the Board of County Commissioners of Collier County, Florida, as the governing body of Collier County and as Ex-Officio the Governing Board of the Collier County Water-Sewer District to accept the dedication or conveyance of water and sewer utility facilities located within or upon the real property described in the attached Exhibit "A", which is incorporated herein by referencd, said land being located in Collier County, Florida. 4. The Affiant has examined record title information to both the real and personal property referenced in this affidavit, including but not limited to, information requested from the Florida Secretary of State relative to any Uniform Commercial Code financing statements. 5. The record owner of the real and personal property described herein is Village Walk Development Company, Inc., a Florida corporation, ("Owner") current and active and authorized to do business within the State of Florida. The Owner acquired record title to the subject real property by instrument recorded at Official Records Book 1975, at Page 948, of the Public Records of Collier County, Florida (copy attached hereto as Exhibit "B" incorporated herein by reference). Persons authorized to execute instruments on behalf of Village Walk Development Company, Inc. in conjunction with the conveyance of the subject property include but is not limited to; Robert S. Kairalla, President; Jack B. Owen, Jr., Vice President/Secretary/Treasurer; William E. Shannon, Vice President; and Michael D. Rosen, Agent. 6. Affiant has examined the Articles of Incorporation of the Owner and the Certificate of Incorporation issued by the Secretary of State for the State of Florida. The corporation is current and active within said State and is currently authorized to do business in the State of Florida. Robert S. Kairalla, as President of Village Walk Development Company, Inc., is authorized to execute the instruments on behalf of Village Walk Development Company, Inc., in conjunction with the conveyance of any interest in the subject real and personal property. 7. The subject real and personal property are encumbered by: (a) Mortgagee is the owner and holder of that certain Mortgage, Security Agreement and Assignment of Contracts dated September 7, 1994, and recorded September 27, 1994 in OR Book 1988, Page 2040 of the Public Records of Collier County, Florida; Notice of Future Advances dated December 20, 1994, and recorded January 23, 1995 in OR Book 2023, Page 424 of the Public Records of Collier County, Florida; Mortgage Spreader and Fifth Loan Modification Agreement dated June 16, 1995 and recorded June 22, 1995 in OR Book 2071, Page 2058 of the Public Records of Collier County, Florida, and, that certain Notice of Future Advances recorded September 15, 1995 in OR Book 2100, Page 375 of the Public Records of Collier County, Florida, and, that certain Mortgage and Seventh Loan Modification Agreement dated March 12, 1996 and recorded April 4, 1996 in OR Book 2166, Page 1847, of the Public Records of Collier County, Florida, and that certain Notice of Future Advances (and Mortgage and Eighth Loan Modification Agreement) dated March 31, 1997 and recorded April 15, 1997 in OR Book 2304, Page 2161, of the Public Records of Collier County, Florida, and that certain Notice of Ninth Loan Modification Agreement dated July 15, 1997 and recorded September 16, 1997 in OR Book 2332,Page 2054 of the Public Records of Collier County, Florida; (b) Mortgagee is also the owner and holder of that certain UCC-1 Financing Statement recorded January 23, 1995 in OR Book 2023, Page 430; amended by UCC-3 Financing Statement recorded on June 22, 1995 in OR Book 2071, Page 2076 of the Public Records of Collier County, Florida, amended by UCC-3 Financing Statement recorded on March 1, 1996 in OR Book 2154, Page 423 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on July 11, 1996 in OR Book 2205, Pages 974 and 975 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded January 17, 1997 in OR Book 2273, Page 297 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on April 14, 1997 in OR Book 2304, Page 110 of the Public Records of Collier County, Florida; amended by UCC-3 Financing Statement recorded on July 10, 1997 in OR Book 2330, Page 712 of the Public Records of Collier County, Florida; and that certain UCC-1 Financing Statement recorded January 20, 1995 under number 950000013312 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded June 26, 1995 under number 950000126536 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded March 4, 1996 under number 960000052229 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded September 5, 1996 under number 960000186492 with the Florida Secretary of State, amended by UCC-3 Financing Statement recorded February 4, 1997 under number 970000025616-0 with the Florida Secretary of State; amended by UCC-3 Financing Statement recorded March 27, 1997 under number 970000063919-1 with the Florida Secretary of State. except as specifically noted herein, all of the Public Records of Collier County, Florida. 8. Affiant further states that the information contained in this Affidavit is true, correct and current as of the date this Affidavit is given. FURTHER AFFIANT SAYETH NAUGHT. DATED this /~--day of Oc_q-O'~Tk_ , 1997. William E. Shannon SUBSCRIBED AND SWORN to before me this ~ :'¢~,'~,.~' 1997 by William E Shannon. Personally known k JO I?~, OR Produced Type of Identification Produced Identification " // / Notary Public Notary Printed Name Prepared By/Return To: William E. Shannon, Esq. 4500 PGA Boulevard, Suite 400 Palm Beach Gardens, Florida 33418 P: \COUNSEL\CS\VILGWALK\VWATTAFF. 6 COASTAL ENGINEERING CONSULTANTS INC Coastal Engineering Civil Engineering Survey Environmental Real Estate Appraisal EXHIBIT COLLIER COUNTY WATER AND SEWER UTILITIES ACCEPTANCE LEGAL DESCRIPTION All of those lands lying w/thin the platted rights-of-way of Village Walk, Phase Six as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County. Subject to easements, restrictions and reservations of record. COAST,,~L ENGINEERING CONSULTANTS, INC. Ricaard J. ~g, ~. ~ Professional Sumeyor an' ' ~ - ~ d Mapper Florida Certificate No. 5295 NOT VA~ JD ~O~ ~E SIGNA~ ~D: ~E ORIGIN~ ~SED SE~ OF A ~RIDA-'/~¢~ ~CENSED SUR~YOR ~D ~PER '. ..... CEC ~LE NO. 96.425 DA~ SIGNED: /o ~ ~ ~ ~ · / 3106 S. HORSESHOE DRIVE · NAPLES, FLORIDA 34104 · (941) 643-2324 · FAX (941) 643-1143 ,o,.,mc m Pn~p~ WitnesselJlth~4 u:c G P,,AJ4TOKs. for ~d tn co~ldcra~on ofr&c sun] of TEN AND NO/IO0'S ($ I 0.00)-__~ 30LL ~nd odncr goo~ ~qd v'Su~bl¢ co~idc.r,..aon to GRANTORS in b~nd pead by GI~-E, Lhc r~:~pl of wtncb~ ~s h ~3mowledgodk Mv¢ gr~nt, ock ':~od ~:nd zold to d~c folio~ing d~cn'b<xi land. ~ k't,t~_., lying ~d b<:ing in ~c com]a., of Co.er, S~tc of FJo~d& lo ,~lgncxt scalc<~ and d¢livcm.~d m COMJMON WI--./LI_. I'H OF PENNSYI VANIA CO[TNq~Y OF PHIl ADEI,Plfi/~ CE) ~,.~© 0 ~ r~,rl CZD ~_ OF ~ _ PAG'~ COLLIER COUNTY GOVERNMENT COMMUNITY DEVELOPMENT SERVICES DIVISION ENGINEERING REVIEW SECTION 2800 NORTH HORSESHOE DRIVE NAPLES, FL 35942 (941) 643-8400 A CERTIFIED BLUE CHIP COMMUNITY October 31, 1997 Mr. John Asher, P.E. Coastal Engineering Consultants, Inc. 3106 S. Horseshoe Drive Naples, FL. 34104 Re: Village Walk Phase Six Dear John: This is to inform you that the above referenced project has been granted preliminary approval by Engineering Review in compliance with Collier County Land Development Code, Section 3.2.6.5.2. All water and sewer facilities approved and accepted and required to be maintained by Collier County shall be conveyed to the County pursuant to the provisions set forth in Collier County Ordinance No. 97-17, as amended. You are reminded that it is your responsibility to petition the Development Services Director for final approval of the improvements upon the expiration of the minimum one (1) year maintenance period. After satisfactory completion of all final inspections, the Board of County Commissioners shall adopt a resolution giving final approval of the required improvements, acknowledging the dedication(s) of the final subdivision plat and establishing County responsibility for maintenance of the required improvements if it is the Board's desire to accept and maintain the facilities. If you should have any questions or if we may be of assistance, please advise. Very truly yours, John R. Houldsworth Senior Engineer cc: Shirley Nix COLLIER COUNTY GOVERNMENT COMMUNITY DEVELOPMENT AND ENVIRONMENTAL SERVICES DIVISION ENGINEERING REVIEW SECTION Mr. John P. Asher Coastal Engineering Consultants, Inc. 3106 South Horseshoe Drive Naples, Florida 34104 Re: Village Walk, Phase Six Dear John: 2800 NORTH HORSESHOE DRIVE NAPLES, FLORIDA 34104 December 22, 1997 This is to inform you that the above referenced project has been granted preliminary approval on December 17, 1997 by Engineering Review in compliance with Collier County Land Development Code, Section 3. All water and/or sewer facilities approved, accepted and required to be maintained by Collier County shall be conveyed to the County pursuant to the provisions set forth in Collier County Ordinance No. 97-17, as amended. You are reminded that it is your responsibility to petition the Development Services Director for final approval of the improvements upon the expiration of the minimum one (1) year maintenance period. After satisfactory completion of all final inspections., the Board of County Commissioners shall grant final approval of the required improvements establishing County responsibility for maintenance of the required improvements if it is the Board's desire to accept and maintain the facilities. If you should have any questions or if we may be of assistance, please advise. Very tml. g yours, Shirley Ni~c_~2 //" Engineering Technician II cc: Village Walk Development Company Tim Clemons, Wastewater Director Ed Finn, Interim Water Director Cindy Erb, Public Works Building Review & Permitting ,~-.~, -.v,,-,,~vu- Code Enforcement (941) 403-2440 Housing & Urban Improvement (941) 403-2330 Natural Resources Planning Services Pollution Control (941) 732-2505 (941) 403-2300 (941) 732-2502 ~o&s~al ~ngin~e~ing consul~n~s~ ~n~o HYDROSTAT'rC TEST'rN(~ FOR PRESSURE MA]~NS CEC ile Engineer of ~ecord.--~~ CEC Obse~er: ~ ~ ~ ~~~ Contra ct or Rep r~ eh tat ire~:~ D.scription of Lin. Tested: P.S.I. CALCULATION OF ALLOWABLE LEAKAGE PER ONE (1) HOUR: (Length of pipe) x (diameter of pipe) x ~ (test pressure) + 133,200 (IqOO) x ( I~~ ) x F ( ~ )+133,200= 1, /O Gallons ( ) x ( ) x ~r ( ) + 133,200 = Gallons Total = ~, ~ O Gallons RESULTS OF TEST: Length of Test: Start Time: Allowable Leakage: ~'~O,Gallons Pressure at Start of test: ]~D~ P.S.I. Pressure at End of test: !~ P.S.I. NOTE: Anytime the gauge pressure falls 5 P.S.I. from the initial starting pressure during the test, the test shall "FAIL". Amount of water required to bring pressure up to beginning pressure: Test Results: '~~ Passed Gallons Failed John ~.j Asher, P.E. Coaches Engineering Consultants, Inc. Date jpa\prestest Co~s~&~ Bngine~ing Consult&n~s~ ~no, HYD~STAT~C TESTING FOR PRBSSUI~ NA~N8 Proj eot: CEC File No.: Engineer of Record: Test Pressure: CXLCULATION OF ALLOFABLE LEAKAGE PER ONE ¢ 1 ) HOUR: (Length of pipe) x (diameter of pipe) x ~ (test pressure) + 133,200 (//~ ) X ( /~ ) X ~ ( /q? ) + 133,200 = ~V Gallons ( ) X ( ) X ~ ( ) + 133,200 = Gallons Total = i. 0~ Gallons RESULTS OF TEST: Length of Test: ~ ~.' 'AllowableLeakage: ~-~" Gallons Start Time: Z''ZD ~ Pressure at Start of test: 19~ P.S.I. End Time: JO:LO ~ Pressure at End of test: /~ P.S.I. Anytime the gauge pressure falls 5 P.S.I. from the initial starting pressure during the test, the test shall "FAIL". Amount of water required to bring pressure up to beginning pressure: / Test Results: ~ Passed Gallons Failed Asher, P.. E. C~al Engineering Consultants, Inc. Date /chh, coast&~ Engineering Consultants, ~a~. HYD~STATXC TBSTXNG FOR PRESSURE MAINE Description of L~ne ~es~ed: ~ ~ ~ ~ ~ ~/~ ~'/~ (~n~h oE pipe) x (d~ameker o~ p~pe) x ~ (~est pressure) + 133,200 ( )x( ) + '133,200 = Total = /. Gallons Gallons RESULTS OF TEST: Length of Test: ~ ~,~ . 'Allowable Leakage: Start Time: ~/:"[~ ~ ~ Pressure at Start of test: End Time: J ~', ~0 ~ ~ Pressure at End of test: Gallons P.S.I. ~.s.~. NOTE: Anytime the gauge pressure falls 5 P.S.I. from the initial starting pressure during the test, the test shall "FAIL". Amount of water required to bring pressure up to beginning pressure: / Test Results: ~ Passed Gallons Failed Jo h~E. CoaStal Engineering Consultants, Inc. Date jl~ratat Lawzon Chiles Governor Department of Environmental Protection South District 2295 Victoria Avenue, Suite 364 Fort Myers, Florida 33901-3881 Virginia B. Wetherell Secretary November 13, 1997 Michael D. Rosen, Development Coordinator SunCo Building Corporation 3600 Vanderbilt Beach Road Extension Naples, Florida 34109 RE: Collier County - PW Village Walk - Phase six (Collier County Regional WTP) 125858-001-DSGP Dear Mr. Rosen: This acknowledges receipt of certification that the subject water distribution system extension has been completed in accordance with the plans and related materials permitted by this agency under Permit Number 125858-001-DSGP dated August 8, 1997. Based on this certification and satisfactory bacteriological results, we are approving these facilities for service. Your continued cooperation in our water supply program is appreciated. Sincerely, Gary A. Maier Professional Engineer GAM/OJO/skw cc: John P. Asher, P.E. Michael R. Newman "Protect, Conserve and Manage Florida's Environment and Natural Resources" Printed on recycled paper. Department of . Environmental Protect o ,. South District Lawton Chiles 229S Victoria Avenue, Suite 364 Virginia B. WerJnerell Governor Fort Myers, Florida 33901-3881 Secretary (941)-332-6975 November 20, 1997 Michael D. Rosen Development Coordinator Sunco Building Corporation 3600 Vanderbilt Beach Road Extension Naples, FL 34109 Re: Collier County - DW/CS Certificate of Completion Permit No. 50581-006-DWC Village Walk - Phase Six Connected to: Collier County North Regional WWTP Dear Mr. Rosen: We have received a certificate of completion of construction as submitted on November 6, 1997 by John P. Asher, P.E. of Coastal Engineering Consultants, Inc. with additional information submitted November 17, 1997 for the project authorized by the above permit number. Accordingly, the wastewater collection/ transmission system may be placed into service. Sincerely, Harley W. ~ung, Ph.D., Water Facilities Section Manager PoE. HWY/RJE/dd cc: John P. Asher, P.E. Timothy L. Clemons "Protect, Conserve and Manage Florida's Environment and Natural Resources" Printed on recycled paper. FINAL RELEASE OF LIEN KNOW ALL MEN BY THESE PRESENTS: That the undersigned, for and in consideration of the payment of the sum of TEN DOLLARS (10.00) paid by SUNCO BUILDING CORP., receipt of which is hereby acknowledged, hereby releases and quit claims to the said VILLAGE WALK PHASE VI its successors and assigns, and the owner, all liens, lien rights, claims or demands of any kind whatsoever, which the undersigned now has or might have against the building on premises legally described as VILLAGE WALK PHASE VI SECTION 6, TOWNSHIP 49S, RANGE 26E COLLIER COUNTY, FLORIDA on account of labor performed and/or material furnished for the construction of any improvements thereon. That all labor and materials used by the undersigned in the erection of said improvements have been fully paid. ,/~N WITNESS WHEREOF, I have hereunto set my hand seal thi. s .~,~ day of ~L- ~'//-~,~7_/e'~ ,1997 ,/~ WITNESSES:/ FL .~// , /~/ , ORIDA S . ROUND, INC. STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was acknowledged before me this ~ day of October, 1997 by Thomas P. McKimm, on behalf of the company who is personally known to me and did not take a~ath Q ,/~/? /~/'/ My Commission Expires: State of FLorida Department of HeaLth Office of Laboratory Services JacksonviLLe, Miami, pensacola Tampa, West PaLm Beach DRINKING WATER BACTERIOLOGICAL ANALYSIS FOR LAB USE ONLY SYSTEM NAME: ADDRESS: Press hard, (5) copies SYSTEM I.D. NO: COUNTY: COLLECTOR: SAMPLE SITE (Locality or Subdivision): DATE AND TIME COLLECTED: TYPE OF SUPPLY(CircLe one): COl~m¥~i~w_~ersystem-~ Noncommunity water system Private we[l Swint~ing pool Bottled water SYSTEM PHONE #: DISTRICT: COLLECTOR PHONE #: Nontransient - nonconmnunity water system Limited Use system TYPE OF SAMPLECCircle one): Compliance Repeat Replacement Main clearance Well survey Other (Check Box) .... [ ] Distribution [ ] Check here if payment made [ ] Raw to county public health uni TO BE COMPLETED BY COLLECTOR OF SAMPLE TO BE COMPLETED BY LAB ANALYSIS METHOD: ' MF ~ MTF HMO-MUG PA COLL. SAMPLE POINT Ct NON CONFIRM CONFIRM NO. (Specific Address) RES'D pR COLIFORM *TOTAL TOTAL FECAL E. COLl SAMPLE NUMBER I * Results in this column are presun~otive. Total coliform and fecal coliform or E. co[i confirmation will follow in 24-48 hours. p - Co[iforms are present C - Confluent growth TA - Turbid, Absence of gas or acid A - CoLiforma are absent TNTC - Too numerous to count INVOICE ADDRESS (if different than address bo[ow): INTERPRETATIONS-REMARKS BY, PROGRAM REVIEWER N/U4E AND HAILING ADDRESS OF PERSON/FIRM TO RECEIVE REPORT REVIEWING OFFICIAL: TITLE: SATISFACTORY INCOt4PLETE COLLECTION INFORMATION REPEAT SAMPLES REPLACEMENT SAMPLES State of FLorida Department of HeaLth Office of Laboratory Services JacksonviLLe, #ia~i, Pensacola Tampa, gest Palm Beach DRINKING WATER BACTERIOLOGICAL ANALYSIS FOR LAB USE ONLY SYSTEM NAME: ADDRESS: Press hard, (5) copies SYSTEM I.D. NO: SYSTEM PHONE #: COUNTY: DISTRICT: COLLECTOR: , ,j COLLECTOR PHONE #: SAMPLE SITE (Locality or Subdivision): DATE AND TIME COLLECTED: TYPE OF SUPPLY(Circle one): ~ Ccxmmunity water syst6m Noncomrnunity water system Nontransient - noncommunity water system ~r~T~*f~'~W~Tt ...... SWT~i~ pool Bottled water Limited Use system TYPE OF SAMPLE(Circle one): Compliance Repeat Reptacement Main c[earanc~ gel[ survey Other (Check Box) [ ] Distribution [ ] Check here if payment made [ ] Raw to county public health uni TO BE COMPLETED BY COLLECTOR OF SAMPLE ~[,p.~q~ COMPLETED BY LAB ANALYSIS METHOD: ,, MF MTF HMO-MUG PA COLL. SAMPLE~POINT CL NON CON~"IRM CONFIRM NO. (Specific Address) RES'D pH COLIFORM *TOTAL TOTAL FECAL E. COLI SAMPLE NUMBER i I Results in this column are presumptive. Total coliform and fecal coliform or E. coLi confirmation will follow in 24-48 hours. p - Coliforms are present C - Confluent growth TA - Turbid, Absence of gas or acid A - CoLiforms are absent TNTC - Too numerous to count INVOICE ADDRESS (if different than address below): INTERPRETATIONS-REMARKS BY. PROGRAM REVIEgER NAME AND MAILING ADDRESS OF PERSON/FIRM TO RECEIVE REPORT REVIEglNG OFFICIAL: TITLE: ( ) ( ) SATISFACTORY ( ) INCOMPLETE COLLECTION INFORMATION ( ) REPEAT SAMPLES ( ) REPLACEMENT SAMPLES -- ~ State of FLorida Department of HeaLth Office of Laboratory Services JacksonviLLe, Miami, PensacoLa Tampa, Uest PaLm Beach DRINKING WATER BACTERIOLOGICAL ANALYSIS FOR LAB USE ONLY Press hard, (5) copies SYSTEM NAME: SYSTEM I.D. HO: ADDRESS: COUNTY: COLLECTOR: SYSTEM PHONE #: DISTRICT: SAMPLE SITE (Locality or Subdivision): COLLECTOR PHONE #: DATE AND TIME COLLECTED: : ~ TYPE OF SUPPLY(Circle one):~Communi~?_~at~r sYSCO.' Noncon~nity water system P~'~v~t~ well .... fwi~ing pool Bottled water Hontransient - noncommunity water system Limited Use system TYPE OF SAMPLE(Circle one): Compliance Repeat Replacement Uel[ survey Other (Check Box) [ ] Distribution [ ] Check here if payment made [ ] Raw to county public health unit TO BE COMPLETED BY COLLECTOR OF SAMPLE O_,.~_E COMPLETED BY LAB ANALYSIS METHC~):, ' ---- MMO-MUG PA COLL. SAMPLE POINT Cl NON ~"~ Fi~RM ~FIRM HO. (Specific Address) RES'D pH COLIFORM *TOTAL TOTAL FECAL E. COLI SAMPLE NUMBER ? ! I * Results in this column are prest~q3tive. Total coliform and fecal coliform or E. coli confirmation will follow in 24-48 hours. P - Coliform are present C - Confluent growth TA - Turbid, Absence of gas or acid A - Coliforms are absent TNTC - Too numerous to count INVOICE ADDRESS (if different than address below): INTERPRETATIONS-REMARKS BY. PROGRAM REVIEWER NAME AND MAILING ADDRESS OF PERSON/FIRM TO RECEIVE REPORT REVIEWING OFFICIAL= TITLE: SATISFACTORY INCOMPLETE COLLECT[OH INFORMATION REPEAT SNflPLES REPLACEMENT SAMPLES .~t,a~e of Florida ~ · D ~ Department of Health Office of Laboratory Services Jacksonville, Niemi, Pe~acola T~mpa, West Palm Beach DRINKING WATER BACTERIOLOGICAL ANALYSIS FOR LAB USE ONLY Press hard, (5) copies SYSTEM NAME: SYSTEM I.D. NO: SYSTEM PHONE #: I r COUNTY: DISTRICT: ADDRESS: COLLECTOR PHONE #: COLLECTOR: SAMPLE SITE (Locality or Subdivision): DATE AND TIME COLLECTED: TYPE OF SUPPLY(Circle one): ~nity water S~~ Noncorr~unity water system Nontransient - noncommunity water system Pri~a-~-~--we[~ .... ~mming pool Bottled water Limited Use system TYPE OF SAMPLE(Circle one): Compliance Repeat Replacement ~' Main c[earanC~ Well survey Other (Check Box) [ ] Distribution [ ] Check here if payment made [ ] Raw to county public health unit TO BE COMPLETED BY COLLECTOR OF SAMPLE TO: BE COMPLETED BY LAB ANALYSIS METHOD: ~ MF"' MTF HMO-MUG PA COLL. SAMPLE POINT Cl NON ~OR~ IRM CONFIRM NO. (Specific Address) RES'D pR COLIFORM *TOTAL TOTAL FECAL E. COL1 SAMPLE NUMBER l I * Results in this column are presun~otive. Total coliform and fecal coliform or E. coli confirmation will follow in 24-~8 hours. p - Coliforma are present C - Confluent growth TA - Turbid, Absence of gas or acid A - Co[iforms are absent TNTC - Too numerous to count INVOICE ADDRESS (if different than address below): INTERPRETATIONS-RE~La, RKS BY. PROGRAM REVIEWER NAME AND MAILING ADDRESS OF PERSON/FIRM TO RECEIVE REPORT SATISFACTORY INCOMPLETE COLLECTION INFORMATION REPEAT SAMPLES REPLACEMENT SAMPLES REVIEWING OFFICIAL: TITLE: CERTIFICATION REGARDING CONTRIBUTION IN AID OF CONSTRUCTION The undersigned, Robert S. Kairalla, (hereinafter "Affiant"), as President of VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation, which is the owner of property as described as: County Utility Easements located on that certain real property more specifically described on Exhibit "A" attached hereto and made a part hereof, which real property is a portion of the Plat of Village Walk, Phase SIX, as recorded in Plat Book 29, Pages 28 through 31 of the Public Records of Collier County, Florida. hereby certifies that VILLAGE WALK DEVELOPMENT COMPANY, INC., has not received any contributions in aid of construction in connection with the Property. Witnesses: VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation · K~'ralla, Pres. State of Florida County of Palm Beach The f.oregoing instrument was acknowledged before me this //~.< day of ~'-C.~fC~.~~,4 , 1997 by Robert S. Kairalla, the President of VILLAGE WALK DEVELOPMENT COMPANY, INC., a Florida corporation. :'Notary Public Personally known -~.J-' ~.~'~L~'. OR Produced Identification Type of Identification Produced P: \ COUNSEL \ CS \VI LGWALK\ CERTCONS . 6 FLORIDA STATE UNDERGROUND, INC. CONTRACTOR'S CERTIFIED LIST OF INSTALLED MATERIALS & COSTS SYSTEM NAME:_VILLAGE WALK PHASE VI DATE: OCTOBER 3, 1997 THIS IS A: WATER SYSTEM XX SEWER SYSTEM ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST 10" C-900 CL150 PVC 3553 LF 13.13 46,650.89 10" GATE VALVE 3 EA 897.40 2,692.20 FIRE HYDRANT 9 EA 1,683.00 15,147.00 FLUSHING HYDRANT 3 EA 1,560.10 4,680.30 4" SCH 40 PVC SLEEVE 1859 LF 5.59 10,391.81 WATER SERVICE DOUBLE 71 EA 355.61 25,248.31 WATER SERVICE SINGLE 4 EA 270.00 1,080.00 TOTAL 105,890.51 I DO HEREBY CERTIFY THE ABOVE DESCRIBED LIST OFMATERIALS, QUANTITIES OFMATERIALS, KINDS OF MATERIALS, INCLUDING INSTALLATION AND ALL COSTS AS L¥STALLED, TO BE COMPLETE, TRUE AND ACCURATE AS PER FINAL PAY ESTIMATE AND/OR ALL INVOICES OR STATEMENTS OF (BY OR FROM) THIS CERTIFYING CONTRACTOR AND AS PER THE PROJECT AND/OR DESIGN ENGINEERS Cff~rFIFIED RECORD DRAWINGS' OF THIS SYSTEM AS DESCRIBED BY NAME SHOWN,, AS OF THIS DATE// PERSONALLY KNOWN, SWORN TO CERTIFYING: /,,y~ ~ & SUBSCRIBED BE¥~ORE ME THIS : ~~/ y_~z~DaY ~DF-~I/c2f'2"~.,~'~'/' , ,1997 T~tO~~~PRESIDENT /~/---7~- / ~ -~ ~A~'E~UNDERGROUND, INC. C: \OI~ICEkWI~qIi~WPI)O FLORIDA STATE UNDERGROUND, INC. CONTRACTOR'S CERTIFIED LIST 0F INS IALLEE MATERIALS & COSTS SYSTEM NAME:_VILLAGE WALK PHASE VI DATE: OCTOBER 3, 1997 THIS IS A: WATER SYS I EM SEWER SYSTEM XX ITEM DESCRIPTION SIZE QUANTITY UNIT COST TOTAL COST PVC DR35 0-6 8" 2569 LF 17.96 46,139.24 PVC DR35 6-8 8" 553 LF 23.36 12,918.08 MANHOLE 0-6 11 EA 1,025.00 11,275.00 PVC DR35 LATERALS 6" 2731 LF 10.89 29,740.59 CLEANOUT SINGLE 6" 22 EA 90.00 1,980.00 CLEANOUT DOUBLE 6" 62 EA 130.00 8,060.00 TOTAL 110,112.91 I DO HEREBY CERTIFY THE ABOVE DESCRIBED LIST OFMATERIALS, QUANTITIES OFMATERIALS, KINDS OF MATERIALS, INCLUDING INSTALLA TION AND ALL COSTS AS INSTALLED, TO BE COMPLETE, TRUE AND ACCURATE AS PER FINAL PAY ESTIMATE AND/OR ALL INVOICES OR STATEMENTS OF (BY~R FROM) THIS CERTIFYING CONTRACTOR AND AS PER THE PROJECT AND/OR DESIGN ENGINEERS CE~IFIED RECORD DRAWINGSOFTHISSYSTEMASDESCRIBEDBYNAMESHOWN, ASOFTHISDATE. PERSONALLY KNOWN, SWORN TO CERTIFYING: C:~(NOTAR~jfiUBLIC NAME & SEAL) COASTAL ENGINEERING CONSULTANTS INC Coastal Engineering Civil Engineenng Survey Environmental Real Estate Appraisal October 15, 1997 Ms. Shirley Nix Collier County Community Devilment & Environment Services 2800 North Horseshoe Drive Naples, Florida 34104 Village Walk - Phase Six Preliminary Water and Sewer Acceptance Documents CEC File No. 96.425 Dear Ms. Nix: I hereby certify that to the best of my knowledge and belief that all of the water and sewer main facilities within Village Walk Phase Six are located within the platted rights-of-way or dedicated Collier County Utility Easements (C.U.E.). If you have any questions or require additional information, please contact our office. Sincerely, COASTAL ENGINEERING CONSULTANTS, INC. J P.E. 96425\pre\-util.doc 3106 S. HORSESHOE DRIVE · NAPLES, FLORIDA 34104 · (941) 643-2324 ° FAX (941) 643-1143 COASTAL ENGINEERING CONSULTANTS INC Coastal Engineering Civil Engineering Survey Environmental Real Estate Appraisal October 15, 1997 Mr. Thomas Kuck, P.E. Senior Project Manager Engineering Collier Review Services 2800 North Horseshoe Drive Naples, Florida 34104 Re.' Utility Dedication - Village Walk - Phase 6 Engineer's Payment Confirmation Collier County Conveyance Document Checklist, Legal Documents Item 16 CEC File No. 96.425 Dear Mr. Kuck: Coastal Engineering Consultants, Inc. confirms receiving payment for our services to date on the above referenced project. As of this date, no monies are outstanding from the owner (client). Sincerely, COASTAL ENGINEERING CONSULTANTS, INC. cc: Mike Rosen, Sunco Building Corporation 3106 S, HORSESHOE DRIVE · NAPLES, FLORIDA 34104 · (941) 643-2324 · FAX (941) 643-1143 October 3, 1997 Board of Collier County Commissioners 3301 Tamiami Trail East Naples, FL. 33964 SEWER DISTRIBUTION SYSTEM VILLAGE WALK PHASE VI COLLIER COUNTY NAPLES, FLORIDA Gentlemen: This letter is to certify the completion of the SEWER DISTRIBUTION SYSTEM located within VILLAGE WALK PHASE VI. Florida State Underground, Inc. furnishes at least a one (1) year guarantee of material and workmanship on the system, upon acceptance by the Collier County Board of Commissioners. Sincerely, President TPM/cvk C:\office\wpwin\wpdocs\ccwarr 73 COMMERCIAL BOULEVARD · NAPLES, FLORIDA 34104 · 643-6449 · FAX: 643-6891 October 3, 1997 Board of Collier County Commissioners 3301 Tamiami Trail East Naples, FL. 33964 WATER DISTRIBUTION SYSTEM VILLAGE WALK PHASE VI COLLIER COUNTY NAPLES, FLORIDA Gentlemen: This letter is to certify the completion of the WATER DISTRIBUTION SYSTEM located within VILLAGE WALK PHASE VI. Florida State Underground, Inc. furnishes at least a one (1) year guarantee of material and workmanship on the system, upon acceptance by the Collier County Board of Commissioners. Sincerely, TPM/cvk C :\office\wpwin\wpdocs~ccwarr 73 COMMERCIAL BOULEVARD · NAPLES, FLORIDA 34104 · 643-6449 · FAX: 643-6891 Official Receipt - Collier County Board of County Commissioners CDPR1103 - Official Receipt Trans Number Date Post Date Payment Slip Nbr i 51946 12/17/97 10:47:24 AM 12/17/97 UT 28804 j FLORIDA STATE UNDERGROUND 73 COMMERCIAL Payor · FL STATE UNDERGROUND tFee Code Description 42CYIN COUNTY INVOICES Fee Information GL Account 40800000011510000000 Total Amount Waived $825.9O $825.90 Payment Code CHECK 117552 I Account/Check Number Payments Total Cash Total Non-Cash Total Paid Memo: FULL BORE FLUSH AT VILLAGE WALK VI INVOICE # 28090 CK # 17552 Amount $825.90 $o.oo $825.90t $825.90] Cashier/location: FROLOFF E / 1 User: MOROCCO G Collier County Board of County Commissioners CD-Plus for Windows'95/NT Printed:12/17/97 10:48:00AM FIRE PREVENTION BUREAU 1441 PINE RIDGE ROAD * NAPLES. FLORIDA 34109 (941) 5B7-9227 FAX (941) 597-7062 December 11, 1997 Mike Rosen Sunco Builders Vanderbuilt Beach Rd. Naples, FL RE: Fire Hydrant Acceptance Village Walk - Phase 6 - 12 Hydrants Dear Mike, The North Naples Fire Control and Rescue District has inspected and received our fees for ownership and maintenance of the above hydrants. We will accept ownership and maintenance at this time. The following are the results of a flow test: Static 70 Residual 46 GPM 1210 Pitot 52 If you have any questions, please do not hesitate to give me a KKR:sc Sincerely, NORTH NAPLES FIRE DEPARTMENT Karl K. Reynolds Fire Marshal Fire Prevention Bureau 12-12-97 15:43 RECEIVED FROM:I9415947177 P.~2 coas~a~ ~nginee~ing ~onsul~an~s~ ~n~. CALCULATION OF ALLOWABLE INFILTRATION PER 24 HOURS: (Length of pipe) / 5280' (in feet) ~~ ) / 5280, x ( units (occupied) x x (diameter of pipe) x 50 gal/day !1 (in inches) ) x 50 gal/day =. gal/day = bldg. ( units) w/ Gallons Gallons Gallons = Gallons Total = Gallons RESULTS OF TEST: Length of Test: ~ hour(s), Allowable Infiltration:~gGallons Calculation of Actual Infiltration: Test meets project specifications: Engineer: John ~E. Coas~ Engineering Consultants, jpa\Jnf [tes~ YES NO Inc. Coastal Engineering Consultants, Inc. SANITARY SEWER INFILTRATION TESTIN~ Engineer of Record : ~O~ ~ ~'~(~ , Date of Test : 'O (~'~ ~ ~ SEC Obse~er: ~~ ~O~~.~- UtilityCo. Obse~er: ~A~~ C~~ Contractor Representative: Description of Line Tested: CALCULATION OF ALLOWABLE INFILTRATION PER 24 HOURS: (Length of pipe) / 5280' x (diameter of pipe) x 50 gal/day (in feet) (in inches) units (occupied) x bldg. ( units) w/ ) x 50 gal/day = gal/day = Gallons Gallons Total = Gallons = -~G, ~ Gallons RESULTS OF TEST: Length of Test: ~ hour(s), Allowable Infiltration:l~,O~Gallons Calculation of Actual Infiltration: Test meets project specifications: Engineer: John~'/ Asher, P.E. Coast. Engineering Consultants, jpe\inf [test Inc. YES NO Da te/~//3/~ ? Coastal Engineering Consultants, Inc. S]~NITARY SEWER INPILTR~TION TESTIN~ CECFileNo.: 9~,4q~ Date of Test: CEO Obse~er: ' O ~ f 140~~- Utility Co. Observer: , , con a= o ( Tested Description of Line ~[ ~ :~. ~~. CALCULATION OF ~%LLOWABLE INFILTRATION PER 24 _wOUR_~: (Length of pipe) / 5280' x (diameter of pipe) x 50 gal/day ~--~0(in feet) ~1 (in inches) ( ~ /I ) / 5280' x ( ~ ) x 50 gal/day = ~3~ units (occupied) x gal/day = Gallons Gallons bldg. ( units) w/ = Gallons = Gallons Total = ~1, I~ Gallons RESULTS OF TEST: Length of Test: ~4 hour(s), Allowable Infiltration:~',~ ~Gallons Calculation of Actual Infiltration: Test meets project specifications: Engineer: Joh.'.9/~.' Asher,~ P.E. Coa&al Engin,..ering Consultants, j pa\ f nf t tes~ Inc. YES NO Date FR,~M ~ FLDRIDA STATE UNDERGRO~""'' IHC. F~HDNE NO. : 941 643 6891 ~"~- Oct. 16 1997 09:05AM P~ fiX! WILSON UTILITY ~RVlCI~S :~0250 KEOLA LN. N. FT. MY~I~, FL. l~l'/ BOARD OF COLLIER COUNTY COMMISSIONERS 3301 TAMIAMI TRAIt, EAST NAPLES, FLORIDA 33964 RE: MANHOLE COATING CERTIFICATION 8ANtTAR¥ SEWER SYSTEM VILLAGE WAI. K PHASE VI COLLIER COUNTY NAPLES, FLORIDA GENTLEMEN: THIS LETTER IS TO CERTIFY THE COAT!NG ON THE MANHOLES LOCATED AT VILLAGE W&LK PHASE VI .TIM WILSON UTILITY SERVICES CERTIFIES THAT fi'HE COATING WAS BEEN APPLIED INA MINIMUM I'HICKNE$8 OF 18 MILS DFT. EXTEI~IOR SURFACE AND A MINIMUM OF 3~ MILS OFT., IN THREE COATS, ON THE INTERIOR SURFACE OF THE MANHOLES. TIM WILSON UTILITYSERVlCES CERTIFIES THAT THE PRODUC MOB[LIe PAINTS, MO-TAI~ C-20O , IS AN APPROVED EPOXY BITUMINOUS SEALANT. ' ' ~ "' SINCERELY, TiM WILSON /ART WILSON TOTAL P. 01 COLLIER COUNTY UTILITIES WASTEWATER DEPARTMENT PROJECT VIDEO REVIEW DATE OF REVIEW: 10/27/97 PROJECT NA2~E: Village Walk, Phase 6 ENGINEER OF KECORD: N/A CONSTRUCTION CONTRACTOR: Florida State Underground Sewer Viewer, Inc. VIDEO CONTraCTOR: COM24ENT. S: Lines and services are in good condition. RECCM/~.E~ATi ONS: [ XX~X?.-.CCEPTA~LE: [REVIEW NL?4BERED COMMENTS iN ONE YEAR: ' }VCM. BEREE iOMMENTS 5-NACCEPTABLE: ~' REPAiR/EEP".-ACE : ' 2THER RECTMMENIDAT!ONS: S f=-~hen L. DOC. 14 COLLIER COUNTY GOVERNMENT COMMUNITY DEVELOPMENT SERVICES DIVISION 2800 NORTH HORSESHOE DRIVE NAPLES, FL 55942 (941) 645-8400 A CERTIFIED BLUE CHIP COMMUNITY PLANNING SERVICES DEPARTMENT ENGINEERING REVIEW SECTION October 28, 1997 Mr. John Asher Coastal Engineering Consultants 3106 South Horseshoe Drive Naples, Florida 34104 RE: Village Walk Phase Six, Water & Sewer Dear Mr. Asher: A preliminary inspection of the referenced project was conducted by Randy Casey of the Engineering Review Section of the Planning Services Department on October 28, 1997. Conditions were found to be acceptable, and appear to meet County standards. If you should have any questions, please do not hesitate to call Randy Casey at (941) 403-2418 or Clyde Fugate at (941) 403-2417. Sincerely, Engineering Inspections Supervisor CF/rc/pd/f:Casey/Water Sewer Preliminary Approval (Village Walk Ph 6) 10-28-97 cc: Cindy Erb, Engineering Technician, Public Works Timothy L. Clemons, Wastewater Director, Utilities Mike Newman, Water Director, Utilities Evelyn Ferguson, D.O.R. Billing Supervisor Randy Casey, Engineering Inspector, Engineering Review Section Shirley Nix, Engineering Tech. II, Engineering Review Section File