Loading...
Backup Documents 04/22/2014 Item #16A 2 ux><c><1NA1, t)ucumEIN'I'S CHECKLIST & ROUTING SLIP 1 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO fay THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office 1/(Oct 4. BCC Office Board of County Commissioners \f /s/ '` 1z\AA 5. Minutes and Records Clerk of Court's Office (zt(14 3:32 fn, PRIMARY CONTACT INFORMATION Normally the primary contact is the person who cr ated/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additio al or missing infonnation. Name of Primary Staff John Houldswort Phone Number x-5757 Contact/ Department Agenda Date Item was April 22,2014 Agenda Item Number 16-A2 Approved by the BCC Type of Document Plat—Del Webb Naples Parcel 112C Number of Original One Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature? JH 2. Does the document need to be sent to another agency for additional signatures? If yes, JH provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on April 22,2014 and all changes made during the meeting have been incorporated in the attached document. The County ;a . Attorney's Office has reviewed the changes,if applicable. V, 9. Initials of attorney verifying that the attached document is the version approved by the _ BCC,all changes directed by the BCC have been made,and the document is ready for the • ; ��_ ."ev,�. Chairman's signature. l:Forms/County Forms/BCC Forms!Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 UKR IINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A O ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 2 THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office 1�/14/11-(4. BCC Office Board of County `- ,4 Commissioners \r\:1 (,``-Lx,..\\L-k 5. Minutes and Records Clerk of Court's Office t`(21(ry (( 332p., PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is nee ed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff John Houldswo/h Phone Number x-5757 Contact/ Department Agenda Date Item was April 22,2014 J Agenda Item Number 16-A2 Approved by the BCC Type of Document Construction&Maintenance Agreement Number of Original Two Attached and Performance Bond Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column, whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? JH 2. Does the document need to be sent to another agency for additional signatures? If yes, JH provide the Contact Information(Name; Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's XI{ signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on April 22,2014 and all changes made .o s during the meeting have been incorporated in the attached document. The County re �� ' Attorney's Office has reviewed the changes,if applicable. .4 t� 56; 9. Initials of attorney verifying that the attached document is the version approved by the 4 �e BCC,all changes directed by the BCC have been made,and the document is ready for the , J ,±:,qua Chairman's signature. A la$ I:Forms!County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16A2 2 MEMORANDUM Date: November 21, 2014 To: John Houldsworth, Senior Engineer Engineering Services Department From: Teresa Cannon, Deputy Clerk Minutes & Records Department Re: Plat, Construction and Maintenance Agreement & Performance Bond — Del Webb Naples Parcel 112C Attached for recording is the Plat and a copy of the Construction and Maintenance Agreement and Performance Bond referenced above, (Item #16A2) approved by the Board of County Commissioners on April 22, 2014. If you need anything further, please feel free to contact me at 252-8411. Thank you. Attachment 16A2 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this 19th day of June / / , 20 14 between Pu� hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board. RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of certain plat of a subdivision to be known as: Del Webb Parcel 112C B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: within t2 months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of$10,810.00 - which amount represents 10% of the total contract cost to complete the construction plus 100% of the estimated cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or his designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee. After the one year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or his designee to inspect the required improvements. The County Manager or his designee shall inspect the improvements and, if found to be still in compliance with the Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 16A2 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or his designee to reduce the dollar amount of the subdivision performance security on the basis of work complete. Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or his designee. The County Manager or his designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or his designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt of acceptance of bids, the improvements required herein. The Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential,which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are and shall be binding upon the Developer and the respective successors and assigns of the Developer. IN WITNESS WHEREOF,the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives this 'gk 'day of ci0n42.—,. ,2014. (Name of Entity) SIGNED IN THE PRESENCE OF Pulte Home Corporation ar ied ' By By:J Printed Name/Title: Michael Hueniken, Land Printed Name: VAIOA f5C4o4 Rot Development Manager By: 0, .1 (Provide Proper Evidence of Authority) Printed Name: ���'� ATTEST: BOARD OF COUNTY OMMISSIONERS DWIGHT E. BROCK,CLERK OF COLLIE'OUN FLORIDA FLORIDA -i'-rkrtr-,,,1 AV Deputy Clerk Attest as to Chair> ani s,, TOM RENNIN ' , CHAIRMAN signatltre only._ 2 of 3 16A2 ApprovecJ,as to form and legality: Scott A. Stone Assistant County Attorney 3 of 3