Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
#15-6457 (Douglas N. Higgins, Inc.)
t;o erC County Administrative Seances Department Procu€ement Services t7€viscn MPS 306 Force Main - Phase III COLLIER COUNTY BID NO. 15-6457 COLLIER COUNTY, FLORIDA Swainson Hall, Procurement Strategist Email: swainsonhall @colliergov.net Telephone: (239) 252 - 8935 FAX: (239) 252 - 6334 Design Professional: AECOM C)- 3327 Tania'r TraI East es,Ronda 341174%1.239 252-8407.wrew.ontkargn+.neVpn uremertunarcs 1 Construction Services Agreement for Public Utilities:Revised 04152015 TABLE OF CONTENTS PUBLIC NOTICE 3 PART B - INSTRUCTIONS TO BIDDERS 5 CONSTRUCTION BID 13 BID SCHEDULE 15 MATERIAL MANUFACTURERS 16 LIST OF MAJOR SUBCONTRACTORS 17 STATEMENT OF EXPERIENCE OF BIDDER 17 TRENCH SAFETY ACT 19 AFFIDAVIT FOR CLAIMING STATUS AS A LOCAL BUSINESS 20 IMMIGRATION LAW AFFIDAVIT CERTIFICATION 21 COLLIER COUNTY SOLICITATIONS SUBSTITUTE W-9 22 BID BOND 26 BIDDERS CHECK LIST 28 CONSTRUCTION AGREEMENT 29 EXHIBIT A: PUBLIC PAYMENT BOND 36 EXHIBIT A: PUBLIC PERFORMANCE BOND 39 EXHIBIT B: INSURANCE REQUIREMENTS 42 INSURANCE AND BONDING REQUIREMENTS 44 EXHIBIT C:RELEASE AND AFFIDAVIT FORM 46 EXHIBIT D: FORM OF CONTRACT APPLICATION FOR PAYMENT 47 EXHIBIT E: CHANGE ORDER 48 EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION 49 EXHIBIT G: FINAL PAYMENT CHECKLIST 51 EXHIBIT H: GENERAL TERMS AND CONDITIONS 53 EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS 81 EXHIBIT J: TECHNICAL SPECIFICATIONS 82 EXHIBIT K: PERMITS 83 EXHIBIT L: STANDARD DETAILS 84 EXHIBIT M: PLANS AND SPECIFICATIONS 85 EXHIBIT N: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT 86 2 Construction Services Agreement for Public Utilities:Revised 04152015 Co tier County Administrative Services Department Procurement Services Division PUBLIC NOTICE INVITATION TO BID COLLIER COUNTY, FLORIDA MPS 306 Force Main - Phase III COUNTY BID NO 15-6457 Separate sealed bids for the construction of MPS 306 Force Main - Phase III, addressed to Ms. Joanne Markiewicz, Director, Procurement Services, will be received at the Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112, until 3:00 P.M. LOCAL TIME, on the 15th day of June 2015, at which time all bids will be publicly opened and read aloud. Any bids received after the time and date specified will not be accepted and shall be returned unopened to the Bidder. A non-mandatory pre-bid conference shall be held at the Purchasing Department, Conference Room A, at 10:00 a.m. LOCAL TIME on the 20th day of May 2015, at which time all prospective Bidders may have questions answered regarding the Bidding Documents for this Project. All Bidders shall submit all questions via the OnLine Bidding System located at colliergov.net\bid. All questions will be answered in the OnLine Bidding System. The Engineer's Estimate for this project is $2,700,000.00 Dollars. Sealed envelopes containing bids shall be marked or endorsed "Bid for Collier County Government, Collier County, MPS 306 Force Main - Phase III Bid No. 15-6457 and Bid Date of Tuesday, June 15, 2015". No bid shall be considered unless it is made on an unaltered Bid form which is included in the Bidding Documents. The Bid Schedule shall be removed from the Bidding Documents prior to submittal. One contract will be awarded for all Work. Bidding Documents may be examined on the Collier County Purchasing Department Online Bidding System website: www.colliergov.net/bid. Copies of the Bidding Documents may be obtained only from the denoted website. Bidding Documents obtained from sources other than the Collier County Purchasing Department website may not be accurate or current. Each bid shall be accompanied by a certified or cashier's check or a Bid Bond in an amount not less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the Successful Bidder fails to execute the Agreement and file the required bonds and insurance within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Successful Bidder shall be required to furnish the necessary Payment and Performance Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be either be executed by or countersigned by a licensed resident agent of the surety or insurance company having its place of business in the State of Florida. Further, the said surety or insurance company shall be duly licensed and qualified to do business in the State of Florida. 3 Construction Services Agreement for Public Utilities: Revised 04152015 Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. In order to perform public work, the Successful Bidder shall, as applicable, hold or obtain such contractor's and business licenses, certifications and registrations as required by State statutes and County ordinances. Before a contract will be awarded for the Work contemplated herein, the Owner shall conduct such investigations as it deems necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of work specified in the Bidding Documents. Upon request, the Bidder shall submit such information as deemed necessary by the Owner to evaluate the Bidder's qualifications. The Successful Bidder shall be required to finally complete all Work within three hundred and sixty five (365) calendar days from and after the Commencement Date specified in the Notice to Proceed. The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, shall not extend beyond one hundred twenty (120) days from the bid opening date without the consent of the Successful Bidder. Dated this 1st day of May, 2015 BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: /s/Joanne Markiewicz Director, Procurement Services Division 4 Construction Services Agreement for Public Utilities: Revised 04152015 PART B -INSTRUCTIONS TO BIDDERS Section 1. Definitions 1 .1 The term "Owner" used herein refers to the Board of County Commissioners, or its duly authorized representative. 1 .2 The term "Project Manager" used herein refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. 1 .3 The term "Design Professional" refers to the licensed professional engineer or architect who is in privity with the Owner for the purpose of designing and/or monitoring the construction of the project. At the Owner's discretion, any or all duties of the Design Professional referenced in the Contract Documents may be assumed at any time by the Project Manager on behalf of the Owner. Conversely, at the Owner's discretion the Project Manager may formally assign any of his/her duties specified in the Contract Documents to the Design Professional. 1 .4 The term "Bidder" used herein means one who submits a bid directly to the Owner in response to this solicitation. 1.5 The term "Successful Bidder" means the lowest qualified, responsible and responsive Bidder who is awarded the contract by the Board of County Commissioners, on the basis of the Owner's evaluation. 1 .6 The term "Bidding Documents" includes the Legal Advertisement, these Instructions to Bidders, the Bid Schedule and the Contract Documents as defined in the Agreement. 1 .7 The term "Bid" shall mean a completed Bid Schedule, bound in the Bidding Documents, properly signed, providing the Owner a proposed cost for providing the services required in the Bidding Documents. Section 2. Preparation of Bids 2.1 The Bids must be submitted on the standard form herein furnished by the Owner (pages 15 - 28 as bound in these Bidding Documents). By submitting a Bid, Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Bidder shall complete the Bid in ink or by typewriter and shall sign the Bid correctly. Bid Schedules submitted on disk/CD shall be accompanied by a hard copy of the completed Bid Schedule which shall be signed and dated by the Bidder. The Bid may be rejected if it contains any omission, alteration of form, conditional bid or irregularities of any kind. Bids must be submitted in sealed envelopes, marked with the Bid Number, Project Name and Bid opening Date and Time, and shall be addressed to the Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another sealed envelope addressed as above. Bids received at the location specified herein after the time specified for bid opening will be returned to the bidder unopened and shall not be considered. 5 Construction Services Agreement for Public Utilities:Revised 04152015 Section 3. Bid Deposit Requirements 3.1 No Bid shall be considered or accepted unless at the time of Bid filing the same shall be accompanied by a cashier's check, a cash bond posted with the County Clerk, a certified check payable to Owner on some bank or trust company located in the State of Florida insured by the Federal Deposit Insurance Corporation, or Bid Bond, in an amount not less than 5% of the bidder's maximum possible award (base bid plus all add alternates) (collectively referred to herein as the "Bid Deposit"). The Bid Deposit shall be retained by Owner as liquidated damages if the Successful Bidder fails to execute and deliver to Owner the unaltered Agreement, or fails to deliver the required Performance and Payment Bonds or Certificates of Insurance, all within ten (10) calendar days after receipt of the Notice of Award. Bid Bonds shall be executed by a corporate surety licensed under the laws of the State of Florida to execute such bonds, with conditions that the surety will, upon demand, forthwith make payment to Owner upon said bond. Bid Deposits of the three (3) lowest Bidders shall be held until the Agreement has been executed by the Successful Bidder and same has been delivered to Owner together with the required bonds and insurance, after which all three (3) Bid Deposits shall be returned to the respective Bidders. All other Bid Deposits shall be released within ten (10) working days of the Bid Opening. No Bid including alternates, shall be withdrawn within one hundred and twenty (120) days after the public opening thereof. If a Bid is not accepted within said time period it shall be deemed rejected and the Bid Deposit shall be returned to Bidder. In the event that the Owner awards the contract prior to the expiration of the one hundred and twenty (120) day period without selecting any or all alternates, the Owner shall retain the right to subsequently award to the Successful Bidder said alternates at a later time but no later than one hundred and twenty (120) days from opening, unless otherwise agreed by the Procurement Director and the Successful Bidder. 3.2 The Successful Bidder shall execute five (5) copies of the Agreement in the form attached and deliver same to Owner within the time period noted above. The Owner shall execute all copies and return one fully executed copy of the Agreement to Successful Bidder within thirty (30) working days after receipt of the executed Agreement from Successful Bidder unless any governmental agency having funding control over the Project requires additional time, in which event the Owner shall have such additional time to execute the Agreement as may be reasonably necessary. Section 4. Right to Reject Bids 4.1 The Owner reserves the right to reject any and all Bids or to waive informalities and negotiate with the apparent lowest, qualified Bidder to such extent as may be necessary for budgetary reasons. Section 5. Signing of Bids 5.1 Bids submitted by a corporation must be executed in the corporate name by the president, a vice president, or duly authorized representative. The corporate address and state of incorporation must be shown below the signature. 5.2 Bids by a partnership must be executed in the partnership name and signed by a general partner whose title must appear under the signature and the official address of the partnership must be shown below said signature. 6 Construction Services Agreement for Public Utilities: Revised 04152015 5.3 If Bidder is an individual, his or her signature shall be inscribed. 5.4 If signature is by an agent or other than an officer of corporation or general partner of partnership, a properly notarized power of attorney must be submitted with the Bid. 5.5 All Bids shall have names typed or printed below all signatures. 5.6 All Bids shall state the Bidder's contractor license number. 5.7 Failure to follow the provisions of this section shall be grounds for rejecting the Bid as irregular or unauthorized. Section 6. Withdrawal of Bids Any Bid may be withdrawn at any time prior to the hour fixed in the Legal Advertisement for the opening of Bids, provided that the withdrawal is requested in writing, properly executed by the Bidder and received by Owner prior to Bid Opening. The withdrawal of a Bid will not prejudice the right of a Bidder to file a new Bid prior to the time specified for Bid opening. Section 7. Late Bids No Bid shall be accepted that fails to be submitted prior to the time specified in the Legal Advertisement. Section 8. Interpretation of Contract Documents 8.1 No interpretation of the meaning of the plans, specifications or other Bidding Documents shall be made to a Bidder orally. Any such oral or other interpretations or clarifications shall be without legal effect. All requests for interpretations or clarifications shall be in writing, addressed to the Purchasing Department, to be given consideration. All such requests for interpretations or clarification must be received at least ten (10) calendar days prior to the Bid opening date. Any and all such interpretations and supplemental instructions shall be in the form of written addendum which, if issued, shall be sent by mail or fax to all known Bidders at their respective addresses furnished for such purposes no later than three (3) working days prior to the date fixed for the opening of Bids. Such written addenda shall be binding on Bidder and shall become a part of the Bidding Documents. 8.2 It shall be the responsibility of each Bidder to ascertain, prior to submitting its Bid, that it has received all addenda issued and it shall acknowledge same in its Bid. 8.3 As noted in the Legal Advertisement, attendance by all bidders at the Pre-Bid Conference is non-mandatory. In instances where the Owner has deemed the pre-bid to be mandatory, the Bidder's failure to attend the pre-bid conference shall result in the rejection of his bid. Section 9. Examination of Site and Contract Documents 9.1 By executing and submitting its Bid, each Bidder certifies that it has: a. Examined all Bidding Documents thoroughly; 7 Construction Services Agreement for Public Utilities: Revised 04152015 b. Visited the site to become familiar with local conditions that may in any manner affect performance of the Work; c. Become familiar with all federal, state and local laws, ordinances, rules, and regulations affecting performance of the Work; and d. Correlated all of its observations with the requirements of Bidding documents. No plea of ignorance of conditions or difficulties that may exist or conditions or difficulties that may be encountered in the execution of the Work pursuant to these Bidding Documents as a result of failure to make the necessary examinations and investigations shall be accepted as an excuse for any failure or omission on the part of the Successful Bidder, nor shall they be accepted as a basis for any claims whatsoever for extra compensation or for an extension of time. 9.2 The Owner will make copies of surveys and reports performed in conjunction with this Project available to any Bidder requesting them at cost; provided, however, the Owner does not warrant or represent to any Bidder either the completeness or accuracy of any such surveys and reports. Before submitting its Bid, each Bidder shall, at its own expense, make such additional surveys and investigations as may be necessary to determine its Bid price for the performance of the Work within the terms of the Bidding Documents. This provision shall be subject to Section 2.3 of the General Conditions to the Agreement. Section 10. Material Requirements It is the intention of these Bidding Documents to identify standard materials. When space is provided on the Bid Schedule, Bidders shall specify the materials which they propose to use in the Project. The Owner may declare any Bid non-responsive or irregular if such materials are not specifically named by Bidder. Section 11. Bid Quantities 11.1 Quantities given in the Bid Schedule, while estimated from the best information available, are approximate only. Payment for unit price items shall be based on the actual number of units installed for the Work. Bids shall be compared on the basis of number of units stated in the Bid Schedule as set forth in the Bidding Documents. Said unit prices shall be multiplied by the bid quantities for the total Bid price. Any Bid not conforming to this requirement may be rejected. Special attention to all Bidders is called to this provision, because if conditions make it necessary or prudent to revise the unit quantities, the unit prices will be fixed for such increased or decreased quantities. Compensation for such additive or subtractive changes in the quantities shall be limited to the unit prices in the Bid. Subsequent to the issuance of a notice to proceed, the Project Manager and the Successful Bidder shall have the discretion to re-negotiate any unit price(s) where the actual quantity varies by more than 25% from the estimate at the time of bid. 8 Construction Services Agreement for Public Utilities: Revised 04152015 11.2 Alternate Bid Pricing: In the event that alternate pricing is requested, it is an expressed requirement of the bid invitation to provide pricing for all alternates as listed. The omission of a response or a no-bid or lack of a submitted price may be the basis for the rejection of the submitted bid response. Section 12. Award of Contract 12.1 Any prospective bidder who desires to protest any aspect(s) or provision(s) of the bid invitation (including the form of the bid documents or bid procedures) shall file their protest with the Procurement Director prior to the time of the bid opening strictly in accordance with Owner's then current purchasing ordinance. 12.2 Statement of Award: The Award of Contract shall be issued to the lowest, responsive and qualified Bidder determined by the base bid, and any, or all, selected alternates, and the Owner's investigations of the Bidder. In determining the lowest, responsive and qualified bidder, the Owner shall consider the capability of the Bidder to perform the contract in a timely and responsible manner. When the contract is awarded by Owner, such award shall be evidenced by a written Notice of Award, signed by a purchasing professional of the Owner's Purchasing Department or his or her designee and delivered to the intended awardee or mailed to awardee at the business address shown in the Bid. 12.3 Award recommendations will be posted outside the offices of the Purchasing Department generally on Wednesdays or Thursdays prior to the presentation to the Board of County Commissioners. Award of Contract will be made by the Board of County Commissioners in public session. Any actual or prospective bidder who desires to formally protest the recommended contract award must file a notice of intent to protest with the Procurement Director within two (2) calendar days (excluding weekends and holidays) of the date that the recommended award is posted. Upon filing of said notice, the protesting party will have five (5) days to file a formal protest, said protest to strictly comply with Owner's then current purchasing ordinance. A copy of the purchasing ordinance is available at http://www.col l ierg ov.net/I ndex.aspx?paqe=762. 12.4 For Bidders who may wish to receive copies of Bids after the Bid opening, The Owner reserves the right to recover all costs associated with the printing and distribution of such copies. 12.5 For Bidders who may wish to receive copies of Bids after the Bid opening, The Owner reserves the right to recover all costs associated with the printing and distribution of such copies. 12.6 Certificate of Authority to Conduct Business in the State of Florida (Florida Statute 607.1501) In order to be considered for award, firms must be registered with the Florida Department of State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501 and provide a certificate of authority (www.sunbiz.orq/search.html) prior to execution of a contract. A copy of the document may be submitted with the solicitation response and the document number shall be identified. Firms who do not provide the certificate of authority at the time of response shall be required to provide same within five (5) days upon notification of selection for award. If the firm cannot provide the document within the referenced timeframe, the County reserves the right to award to another firm. 9 Construction Services Agreement for Public Utilities: Revised 04152015 12.7 Local Vendor Preference: The Collier County Board of County Commissioners has adopted a Local Preference "Right to Match" policy to enhance the opportunities of local businesses to receive awards of Collier County contracts. Local business means the vendor has a current Business Tax Receipt issued by the Collier County Tax Collector for at least one year prior to bid or proposal submission to do business within Collier County, and that identifies the business with a permanent physical business address located within the limits of Collier County from which the vendor's staff operates and performs business in an area zoned for the conduct of such business. A Post Office Box or a facility that receives mail, or a non-permanent structure such as a construction trailer, storage shed, or other non-permanent structure shall not be used for the purpose of establishing said physical address. In addition to the foregoing, a vendor shall not be considered a "local business" unless it contributes to the economic development and well-being of Collier County in a verifiable and measurable way. This may include, but not be limited to, the retention and expansion of employment opportunities, support and increase to the County's tax base, and residency of employees and principals of the business within Collier County. Vendors shall affirm in writing their compliance with the foregoing at the time of submitting their bid or proposal to be eligible for consideration as a "local business" under this section. A vendor who misrepresents the Local Preference status of its firm in a proposal or bid submitted to the County will lose the privilege to claim Local Preference status for a period of up to one year. Under this solicitation, bidders desiring to receive local preference will be invited and required to affirmatively state and provide documentation as set forth in the solicitation in support of their status as a local business. Any bidder who fails to submit sufficient documentation with their bid offer shall not be granted local preference consideration for the purposes of that specific contract award. Except where federal or state law, or any other funding source, mandates to the contrary, Collier County and its agencies and instrumentalities, will give preference to local businesses in the following manner. Competitive bid (local price match option). Each formal competitive bid solicitation shall clearly identify how the price order of the bids received will be evaluated and determined. When a qualified and responsive, non-local business submits the lowest price bid, and the bid submitted by one or more qualified and responsive local businesses is within ten percent of the price submitted by the non-local business, then the local business with the apparent lowest bid offer (i.e., the lowest local bidder) shall have the opportunity to submit an offer to match the price(s), less one (1) dollar, offered by the overall lowest, qualified and responsive bidder. In such instances, staff shall first verify if the lowest non-local bidder and the lowest local bidder are in fact qualified and responsive bidders. Next, the Purchasing Department shall determine if the lowest local bidder meets the requirements of Fla. Stat. Sec.287.087 (Preferences to businesses with drug-free workplace programs). If the lowest local bidder meets the requirements of Fla. Stat. Sec. 287.087, the Purchasing Department shall invite the lowest local bidder to submit a matching offer, less one (1) dollar, within five (5) business days thereafter. If the lowest local bidder submits an offer that fully matches the lowest bid, less one (1) dollar, from the lowest non-local bidder tendered previously, then award shall be made to the local bidder. If the lowest local bidder declines or is unable to match the lowest non-local bid price(s), then award will be made to the lowest overall qualified and responsive bidder. If the lowest local bidder does not meet the requirement of Fla. Stat. Sec 287.087, and the lowest non-local bidder does, award will be made to the bidder that meets the requirements of the reference state law. 10 Construction Services Agreement for Public Utilities:Revised 04152015 Bidder must complete and submit with their bid response the Affidavit for Claiming Status as a Local Business which is included as part of this solicitation. Failure on the part of a Bidder to submit this Affidavit with their bid response will preclude said Bidder from being considered for local preference on this solicitation. A Bidder who misrepresents the Local Preference status of its firm in a bid submitted to the County will lose the privilege to claim Local Preference status for a period of up to one (1) year. The County may, as it deems necessary, conduct discussions with responsible bidders determined to be in contention for being selected for award for the purpose of clarification to assure full understanding of, and responsiveness to solicitation requirements. Section 13. Sales Tax 13.1 The Successful Bidder acknowledges and agrees that Owner may utilize a sales tax savings program and the Successful Bidder agrees to fully comply, at no additional cost to Owner, with such sales tax savings program implemented by the Owner as set forth in the Agreement and in accordance with Owner's policies and procedures. Section 14. Exclusion of County Permits in Bid Prices 14.1 To ensure compliance with Section 218.80, F.S., otherwise known as "The Public Bid Disclosure Act", Collier County will pay the Contractor for all Collier County permits and fees applicable to the Project, including license fees, permit fees, impact fees or inspection fees applicable to this Work through an internal budget transfer(s). Hence, bidders shall not include these permit/fee amounts in their bid offer. However, the Successful Bidder shall retain the responsibility to initiate and complete all necessary and appropriate actions to obtain the required permits other than payment for the items identified in this section. Owner will not be obligated to pay for any permits obtained by Subcontractors. 14.2 The Successful Bidder shall be responsible for procuring and paying for all necessary permits not issued by Collier County pursuant to the prosecution of the work. Section 15. Use of Subcontractors 15.1 To ensure the Work contemplated by the Contract Documents is performed in a professional and timely manner, all Subcontractors performing any portion of the work on this Project shall be "qualified" as defined in Collier County Ordinance 2013.69, meaning a person or entity that has the capability in all respects to perform fully the Agreement requirements and has the integrity and reliability to assure good faith performance. A Subcontractor's disqualification from bidding by the Owner, or other public contracting entity within the past twelve months shall be considered by the Owner when determining whether the Subcontractors are "qualified." 15.2 The Owner may consider the past performance and capability of a Subcontractor when evaluating the ability, capacity and skill of the Bidder and its ability to perform the Agreement within the time required. Owner reserves the right to disqualify a Bidder who includes Subcontractors in its bid offer which are not "qualified" or who do not meet the legal requirements applicable to and necessitated by this Agreement. 11 Construction Services Agreement for Public Utilities:Revised 04152015 15.3 The Owner may reject all bids proposing the use of any subcontractors who have been disqualified from submitting bids to the Owner, disqualified or de-certified for bidding purposes by any public contracting entity, or who has exhibited an inability to perform through any other means. 15.4 Notwithstanding anything in the Contract Documents to the contrary, the Bidders shall identify the subcontractor(s) it intends to use for the categories of work as set forth in the List of Subcontracts attached hereto, said list to be submitted with its bid. Bidders acknowledge and agree that the subcontractors identified on the list is not a complete list of the subcontractors to be used on the Project, but rather only the major subcontractors for each category of Work as established by Owner. Bidders further acknowledge that once there is an Award of Contract, the Successful Bidder shall identify, subject to Owner's review and approval, all the subcontractors it intends to use on the Project. Once approved by Owner, no subcontractor shall be removed or replaced without Owner's prior written approval. Section 16. Prohibition of Gifts No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part Ill, Florida Statutes, Collier County Ethics Ordinance No. 2004-05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. Section 17. Lobbying All firms are hereby placed on NOTICE that the Board of County Commissioners does not wish to be lobbied, either individually or collectively about a project for which a firm has submitted a response. Firms and their agents are not to contact members of the County Commission for such purposes as meeting or introduction, luncheons, dinners, etc. During the process, from solicitation closing to final Board approval, no firm or their agent shall contact any other employee of Collier County in reference to this solicitation, or the vendor's response, with the exception of the Procurement Director or his designee(s). Failure to abide by this provision may serve as grounds for disqualification for award of this contract to the firm. Section 18. Public Entity Crimes By its submitting a Bid, Bidder acknowledges and agrees to and represents it is in compliance with the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, 12 Construction Services Agreement for Public Utilities:Revised 04152015 proposals, or replies on leases of real property to a public entity'; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." 13 Construction Services Agreement for Public Utilities: Revised 04152015 CONSTRUCTION BID BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA MPS 306 Force Main - Phase III BID NO. 15-6457 Full Name of Bidder Douglas N. Higgins, Inc. Main Business Address 3390 Travis Pointe Rd., Ste. A, Ann Arbor, MI 48108 Place of Business 4485 Enterprise Ave., Naples, FL 34104 Telephone No. 239-774-3130 Fax No. 239-774-4266 State Contractor's License# CGC060189 State of Florida Certificate of Authority Document Number 830666 Federal Tax Identification Number 38-1807765 DUNS# 01-722-2183 CCR# Cage Code OVD82 To: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA (hereinafter called the Owner) The undersigned, as Bidder declares that the only person or parties interested in this Bid as principals are those named herein, that this Bid is submitted without collusion with any other person, firm or corporation; that it has carefully examined the location of the proposed Work, the proposed form of Agreement and all other Contract Documents and Bonds, and the Contract Drawings and Specifications, including Addenda issued thereto and acknowledges receipt below: Bidder proposes, and agrees if this Bid is accepted, Bidder will execute the Agreement included in the Bidding Documents, to provide all necessary machinery, tools, apparatus and other means of construction, including utility and transportation services necessary to do all the Work, and furnish all the materials and equipment specified or referred to in the Contract Documents in the manner and time herein prescribed and according to the requirements of the Owner as therein set forth, furnish the Contractor's Bonds and Insurance specified in the General Conditions of the Contract, and to do all other things required of the Contractor by the Contract Documents, and that it will take full payment the sums set forth in the following Bid Schedule: Unit prices shall be provided in no more than two decimal points, and in the case where further decimal points are inadvertently provided, rounding to two decimal points will be conducted by Purchasing staff. NOTE: If you choose to bid, please submit an ORIGINAL and ONE COPY of your bid pages. 14 Construction Services Agreement for Public Utilities: Revised 04152015 _Wier County Email: SwainsonHall @cofliergov.net Telephone: (239)252-8935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM #1 Memorandum Date: June 8, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #1 — 15-6457 MPS 306 Force Main - Phase The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: 1. Addendum 1 Attachment and Materials List If you require additional information please contact me using the above contact information. c: Wayne Karlovich, Project Manager 1 ier Cfounty Email: SwainsonHall @colliergov.net Telephone: (239) 252-8935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM#2 Memorandum Date: June 10, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #2— 15-6457 MPS 306 Force Main - Phase III The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: 1. Addendum to replace Sheet#20 of the plans to meet the Collier County Land Development Code, Section 6.06.02.F.1.a. If you require additional information please contact me using the above contact information. c: Wayne Karlovich, Project Manager 1 BID SCHEDULE MPS 306 Force Main - Phase HI Bid No. 15-6457 15 Construction Services Agreement for Public Utilities: Revised 04152015 Ca ��mss.'•. r eT County Naples Manor Water Main Replacement Phase No.2/MPS 306 Force main-Phase III BID FORM 6/15/2015 Note: 1.All materials supplied to meet Collier County Specifications/Standards and approved construction documents. A. COMMON ITEMS Item Description Quantity Unit Unit Price Amount 1 Mobilization/Demobilization/Pre-construction video/C 1 LS $138,000.00 $138,000.00 2 Maintenance of Traffic 1 LS $38,000.00 $38,000.00 3 Project Sign 6 EA $700.00 $4,200.00 4 Stormwater Pollution Plan 1 LS $9,000.00 $9,000.00 5 Record Survey/Record Drawings 1 LS $39,000.00 $39,000 00 SUBTOTAL: $228,200.00 B. WATER MAIN REPLACEMENT Item (Description Quantity Unit Unit Price Amount 1 6"PVC(CL 200) 1,140 LF $32.00 $36,480.00 2 8"PVC WM(CL 200) 5,560 LF $35.00 $194,600.00 3 8"DIP Watermain 40 LF $43.00 $1,720.00 4 Cut In 6"-90 6 EA $1,000.00 $6,000.00 5 Cap Exist 6"WM 2 EA $800.00 $1,600.00 6 6"Gate Valve 14 EA $500.00 $7,000.00 7 8"Gate Valve 33 EA $600.00 $19,800,00 8 Air Release Valve(ARV) 7 EA $1,200.00 $8,400.00 9 Temp. Bact Sample(TBSV) 18 EA $360.00 $6,480.00 10 Perm.Bact Sample(PBSV) 2 EA $1,400.00 $2,800.00 11 Blow Off/TBSV 12 EA $600.00 $7,200.00 12 Fire Hydrant Assembly(FH) 14 EA $900.00 $12,600.00 13 Temp.Jumper 10 EA $1,200.00 $12,000.00 14 Final Connection 10 EA $1,900.00 $19,000.00 15 4"Service Conduit only 200 LF $24.00 $4,800.00 16 1 1/2"Water Service,Long 45 _ EA $700.00 $31,500.00 17 1 1/2"Water Service,Short 45 EA $500.00 $22,500.00 18 2"Water Service, Long 1 EA $1,300.00 $1,300.00 19 2"Water Service,Short 1 EA $1,100.00 $1,100.00 20 3"Water Service,Long 1 EA $1,500.00 $1,500.00 21 3"Water Service,Short 1 EA $1,250,00 $1,250.00 22 Water Meter Boxes 130 EA $110.00 $14,300.00 23 Backflow Prevention Devices 130 EA $110.00 $14,300.00 24 Private Water Service Extension 10 EA $130.00 $1,300.00 25 Extra 3/4"Private Water Service/> 10' 250 LF $13.00 $3,250.00 26 Extra 1 1/2"Water Service 200 LF $24.00 $4,800.00 27 4"Fire Line Connection 1 EA $5,200.00 $5,200.00 28 Additional 6"WM Deflection 2 EA $2,000.00 $4,000.00 29 Additional 8"WM Deflection 4 EA $2,500.00 $10,000.00 30 Sewer Lateral Adjustment(6")for WM 100 LF $50.00 $5,000.00 31 Sewer Clean out for WM 5 EA $400.00 $2,000.00 32 Remove 6"AC Pipe 5,600 LF $18.00 $100,800.00 33 Remove 8"AC Pipe 200 LF $19.00 $3,800.00 34 Grout 6"AC Pipe 500 LF $6.00 $3,000.00 35 Grout 8"AC Pipe 500 LF $6.00 $3,000.00 36 Miscellaneous Abandonment 1 LS $18,000.00 $18,000.00 37 Roadway Remove/Replace 750 LF $17.00 $12,750.00 38 Concrete Driveway Remove/Replace 2,600 SY $35.00 $91,000.00 39 Decorative/Painted Concrete Drive Remove/Replat 300 SY $32.00 $9,600.00 40 Paver Drive Removal/Reinstall 300 SY $12.00 $3,600.00 41 Asphalt Driveway Remove/Replace 250 SY $30.00 $7,500.00 42 DirUGravel Driveway Remove/Replace Concrete 300 SY - $15.00 $4,500.00 l Co� er County 43 Concrete Sidewalk Remove/Replace 1,000 SY $33.00 $33,000.00 . 44 Tactile Strip 6 EA $300.00 $1,800.00 45 Pavement Overlay(1") 264 TON $120.00 $31,680.00 46 Culvert Remove/Replace(15"CMP) 160 LF $12.00 $1,920.00 47 Culvert Remove/Replace(18"CMP) 160 LF $12.00 $1,920.00 48 Culvert Remove/Replace(15"RCP) 160 LF $12.00 $1,920.00 49 Culvert Remove/Replace(18" RCP) 160 LF $12.00 $1,920.00 50 Concrete MES(15"CMP) 4 EA $150.00 $600.00 51 Concrete MES(18"CMP) 4 EA $150.00 $600.00 52 Concrete MES(15"RCP) 4 EA $150.00 $600.00 53 Concrete MES(18"RCP) 4 EA $150.00 $600.00 54 Temporary 6"Striping(Yellow) 250 LF $0.50 $125.00 55 Permanent 6"Striping(Yellow) 500 LF $0.50 $250.00 56 Temporary 12"Striping(White) 400 LF $3.00 $1,200.00 57 Permanent 12"Striping(White) 400 LF $3.00 $1,200.00 58 Temporary 24"Striping(White) 60 LF $5.00 $300.00 59 Permanent 24"Striping(White) 60 LF $5.00 $300.00 SUBTOTAL: $801,265.00 C. FORCE MAIN CONSTRUCTION Item Description Quantity Unit Unit Price Amount 1 24"PVC Force Main 4,500 LF $61.00 $274,500.00 2 42"Steel Casing Jack and Bore 210 LF $980.00 $205,800.00 3 10"PVC Force Main 20 LF $90.00 $1,800.00 4 24"Plug Valve 7 EA $800.00 $5,600.00 5 10"Plug Valve 1 EA $500.00 $500.00 6 24"Double Line Stop, Bypass and Connect 1 LS $68,000.00 $68,000.00 7 Air Release Valve Assembly 6 EA $1,700.00 $10,200.00 8 Concrete Driveway Remove/Replace 10 SY $70.00 $700.00 9 Sewer Lateral Adjustment(6")for Force Main 250 LF $38.00 $9,500.00 10 Sewer Cleanout for Force Main 15 EA $300.00 $4,500.00 11 Total Pavement Reconstruction(subgrade) 10,000 SY $1.80 $18,000.00 12 Total Pavement Reconst.(8"Lirnerock Base) 10,000 SY $8.40 $84,000.00 13 Total Pavement Reconstruction(1"Asphalt) 550 TON $94.00 $51,700.00 14 Pavement Overlay(1") 550 TON $125.00 $68,750.00 15 Culvert Remove/Replace(15"CMP) 160 LF $12.00 $1,920.00 16 Culvert Remove/Replace(18"CMP) 160 LF $12.00 $1,920.00 17 Culvert Remove/Replace(15"RCP) 160 LF $12.00 $1,920.00 18 Culvert Remove/Replace(18" RCP) 160 LF $12.00 $1,920.00 19 Temporary 6"Striping(Yellow) 600 LF $0.50 $300.00 20 Permanent 6"Striping(Yellow) 600 LF $0.50 $300.00 21 Temporary 12"Striping(White) 480 LF $3.00 $1,440.00 22 Permanent 12"Striping(White) 480 LF $3.00 $1,440.00 23 Temporary 24"Striping(White) 72 LF $5.00 $360.00 24 _Permanent 24"Striping(White) 72 LF $5.00 $360.00 SUBTOTAL: $815,430.00 D. MISCELLANEOUS Item Description Quantity Unit Unit Price Amount 1 Furnish/Install New Mailbox 110 EA $150.00 $16,500.00 2 Owner Directed Allowance-Water 1 T&M $150,000.00 $150,000.00 3 Owner Directed Allowance-Wastewater 1 T&M $220,000.00 $220,000.00 SUBTOTAL: $386,500.00 TOTAL BID: $2,231,395.00 MATERIAL MANUFACTURERS THIS FORM MUST BE COMPLETED OR BID SHALL BE DEEMED NON-RESPONSIVE All Bidders shall confirm by signature that they will provide the manufacturers and materials outlined in this Bid specifications, including compliance with Florida Statute 255.20 to provide lumber, timber and other forest products produced and manufactured in the State of Florida as long as the price, fitness and quality are equal. Exceptions(when equals are acceptable) may be requested by completing the Material Manufacturer Exception List below. If an exception for a manufacturer and/or material is proposed and listed below and is not approved by Engineer/Project Manager, Bidder shall furnish the manufacturer named in the specification. Acceptance of this form does not constitute acceptance of material proposed on this list. Complete and sign section A OR B. Section A (Acceptance of all manufactures and materials in Bid specifications) On behalf of my firm, I confirm that we will use all manufacturers and materials as specifically outlined in the Bid specifications. Company: Douglas N. Higgins, Inc. Signature: ( ) Date: 6/15/15 Section B (Exception requested to Bid specifications manufacturers and materials) EXCEPTION MATERIAL EXCEPTION MANUFACTURER 1. 2. 3. 4. 5. Please insert additional pages as necessary. Company: Signature: Date: 16 Construction Services Agreement for Public Utilities:Revised 04152015 LIST OF MAJOR SUBCONTRACTORS THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON-RESPONSIVE The undersigned states that the following is a list of the proposed subcontractors for the major categories outlined in the requirements of the Bid specifications. The undersigned acknowledges its responsibility for ensuring that the Subcontractors for the major categories listed herein are "qualified" (as defined in Ordinance 2013-69 and Section 15 of Instructions to Bidders) and meet all legal requirements applicable to and necessitated by the Contract Documents, including, but not limited to proper licenses, certifications, registrations and insurance coverage. The Owner reserves the right to disqualify any Bidder who includes non- compliant or non-qualified Subcontractors in its bid offer. Further, the Owner may direct the Successful Bidder to remove/replace any Subcontractor, at no additional cost to Owner, which is found to be non-compliant with this requirement either before or after the issuance of the Award of Contract by Owner. (Attach additional sheets as needed). Further, the undersigned acknowledges and agrees that promptly after the Award of Contract, and in accordance with the requirements of the Contract Documents, the Successful Bidder shall identify all Subcontractors it intends to use on the Project. The undersigned further agrees that all Subcontractors subsequently identified for any portion of work on this Project must be qualified as noted above. Major Category of Subcontractor and Address Work 1. Electrical _ H14- 2. Mechanical 3. Plumbing 4. Site Work Se/f- Per iVrtn,d. /-41ac. . to 7-- 5. Identify other subcontractors that A lone.. 4/Iv . to 90 represent more than 10% of price or that affect the critical path of the schedule Company: Douglas N. Higgins,lIn�c. Signature: r , -4L Date: 6/15/15 17 Construction Services Agreement for Public Utilities:Revised 04152015 STATEMENT OF EXPERIENCE OF BIDDER The Bidder is required to state below what work of similar magnitude completed within the last five years is a judge of its experience, skill and business standing and of its ability to conduct the work as completely and as rapidly as required under the terms of the Agreement. Project and Location Reference 1. See attached 2. 3. 4. 5. 6. Dated 6/15/15 Douglas N. Higgins, Inc. Bidder BY: 18 Construction Services Agreement for Public Utilities: Revised 04152015 EXPERIENCE STATEMENT-SOUTHWEST DIVISION Protect Name: SCWTP Rehab Reactor#1 Project Name: Master Pump Station 302 Rehabilitation Owner-Address-Protect Manager-Phone; Owner-Address-Protect Manager-Phone: Collier County Public Utitties Planning Collier County Public Utilities Planning &Project Management &Project Management 3301 East Tamiami Trail 3301 East Tamiami Trail Naples,Fl. 34112 Naples,FL 34112 (239)252-4218 (239)252-4218 Engineer-Address-Phone: Engineer_Address-Phone: N/A Q.Grady Minor&Associates,P.A. David Schmitt 3800 Via Del Ray Bonita Springs,FL 34134 Contract Date: July 28,2009 Contract Date; November 10,2008 Final Contract Amount; $97,400.00 Final Contract Amount; $2,011,347.57 Completion Date: December 3,2009 Completion Date: April30,2010 Protect Description: Rehabilitation of Pump Station 302 Complete Tear out of existing pumps and piping. Instated 8 new 100 HP pumps and associated 30"piping. Bypassed sanitary pump station with a 30,000 GPM bypass system in in extreme tight conditions. Protect Name: Magnolia Pond Drive Stormwater Improvements Project Name: Year 4 Sewer Districts Wastewater Lift Stations-Phase One and Two Owner -Address-Protect Manager-Phone; Owner-Address-Protect Manager-Phone: Collier County Stormwater Dept. Marco Island Utilities 2885 S.Horseshoe Drive 50 Bald Eagle Drive Naples,FL 34104 Marco Island,FL 34145 Val Prince James Miller,Public Works (239)252-5879 (239)394-3880 Engineer-Address-Phone: Engineer-Address-Phone: Q.Grady Minor&Associates Boyle Engineering Corp. 3800 Via Del Rey 4415 Metro Pkwy.,Ste.404 Bonita Springs,FL 34134 Ft.Myers,FL 33910 David Schmitt,P.E. (239)278-7996 (239)947-1144 Contract Date: June 29,2009 Contract Date: May 20,2008 Final Contract Amount: $86,775.00 Final Contract Amount: $1,777,185.54 Completion Date: October 2,2009 Completion Date: April 23,2010 Project Description: Installation 0118 precast concrete wet wells from 15 to 20 feat deep in existing residential neighborhoods.Installed valve vaults,master manholes,hatch covers&12 inch sanitary sewer from master manholes to wet well for 19 lift stations. Protect Name: Master Pump Station 101 Improvements Protect Name: Port of the Islands Mechanical&Electrical Work at Water Well No.3 Owner-Address-Protect Manager-Phone; Owner-Address-Protect Manager-Phone: Collier County Public Utilities Port of the Island Community Improvement 3301 E.Tamiami Trail,Bldg.H District Naples,FL 34112 (239)252-4285 Engineer-Address-Phone: Engineer-Address-Phone: Agnoli,Barber&Brundage,Inc. Hole Mentes,Inc. 7400 Tamlaml Trail N.,Ste.200 950 Encore Way Naples,FL 34108 Naples,FL 34110 (238)597-3111 (239)254-2000 Contract Date: November 30,2009 Contract Date: December 21,2009 Anal Contract Amount; $147,534.62 Final Contract Amount: $169,398.99 Completion Date: August 6,2010 Completion Date: June 2,2010 Protect Description: Protect Description; Install lorcemain and generator at MPS 101 Mechanical&Electrical work associated with new water well No.3,including new well pump,control valve,flow meter and telemetry connection to well No.3 system. s:\Naples Files\Shared Files\Experience Statement 12 1 14.xlsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Mackie Park Phase 3(A)Improvements Project Name: Isle of Capri-Phase I Water Main Improvements Owner-Address-Protect Manager Phone:: Owner -Address-Protect Manager-Phone; City of Marco Island Collier County Public Utilities 50 Bald Eagle Drive 3301 Tamiami Trail East Marco Island,FL 34145 Naples,FL 34112 Diana Dueri 239-252-4218 Engineer-Address-Phone: Engineer-Address-Phone: American Engineering Consultants of Marco island,Inc. David Schmitt,P.E. 573 Bald Eagle Drive Q.Grady Minor Marco Island,FL 34145 3800 Via Del Rey (239)394-1697 Bonita Springs,FL 34134 239-947-1144 Contract Date: January 19,2010 Contract Date; April 29,2010 Final Contract Amount: $240,100.00 Final Contract Amount: $906,080.33 Completion Date: April 30,2010 Completion Date: January 2,2011 Protect Description: Project Description: Park renovations to include: New asphalt walkway around lake,new Installation of new water distribution pipeline that connects to the bollard lighting,new lake fountain,new poligon shelter existing 12-inch water transmission main that goes into the Isles of Capri from Collier Blvd. Includes installation of approx. 4500 LF of 12"PVC and 4500 LF of 6"PVC. Work also involves installation of new service lines and cross connection devices at each service location,along with several new fire hydrants and road restoration. Protect Name: Winlerberry Drive 8 South Heathwood Drive Project Name; MPS 104 Reclaimed Water Main Supt Water Main Improvements Owner-Address-Protect Manager-Phone; Owner-Address-Project Manager-Phone' City of Marco Island Collier County Public Utilities 50 Bald Eagle Drive 3301 E.Tamiami Trail '.. Marco Island,FL 34145 Naples,FL 34112 Timothy E.Pinter,P.E.,Public Works Director Shanthi Sridhar 239-389-5000 239-252-5345 Engineer-Address-Phone: Engineer-Address-Phone: AECOM Technical Services,Inc. Greeley and Hansen 4415 Metro Parkway,Suite 404 1567 Hayley Lane,Suite 201 Fort Myers,FL 33916 Fort Myers,FL 33907 Alfred J.Mittl,P.E. Kevin Higginson,P.E. 239-278-7996 239-226-9660 Contract Date: March 4.2010 Contract Date- April 27,2010 Final Contract Amount: $130,881.37 Final Contract Amount: $245,908.88 Completion.Date; October 29,2010 Completion Date: January 21,2011 Project Description; Project Descript en; 18"Interconnect to existing 38"ductile iron watermain Construction of Approx.240 LF of 16 inch and 18 Inch reclaimed water main and improvements to a wastewater pumping station,including one horizontal directional drill roadway crossing and all pipe,fittings,appurtenances,valves, connection to existing reclaimed water main,air release valves, surface restoration,testing,and placing new reclaimed water main and pumping station improvements in service. S:\Naples Files\Shared Files\Experlence Statement 12.114xlsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Protect Name: Immokalee&Everglades Intersection Improvements Protect Name: Popash Creek Preserve Improvements Owner-Address-Protect Manager-Phone: Owner-Address-Protect Manager-Phone: Collier County Board of Commissioners Lee County Board of County Commissioners 3301 Tamiami Trail East P.O.Box 398 Naples,FL 33412 Fort Myers,FL 33902-0398 Anura Karuna-Muni 239-533-8131 . nnineer-Address-Phone' Enoineer-Address-Phone' Collier County TFCM T.Y.Lin International 2885 Horseshoe Dr. 2400 First St.,Ste.200 Naples,FL 34109 Fort Myers,FL 33901 Richard White Jr.,P.E. (239)332-4846 Contract Date: August 2,2010 Contract Date: December 14,2010 Final•Contract Amount: $50,106.00 Final Contract Amount: $1,035,428.40 Completion Date: November 8,2010 Completion Date. June 30,2011 Protect Description: Prect Description: Subcontract Agreement with Better Roads,Inc. Work at Popash Creek consisted of construction external berms on three sides of the 307 acre preserve,constructing some internal berms in the South area,towering the existing east-west berm(south of the interceptor ditch),installing 36"and 48"RCP's,channel excavation as part of Lake 1, sand cement rip rap installation,rip rap installation,sheet piling,weir gate installation as well as other misc.storm improvements. Project Name: North County Water Reclamation Facility Protect Name; Lee/Hendry County Construction of Flow Meter Replacement,Phase 2 Injection Well Surface Facilities Owner-Address-Protect Manager-Phone; Owner-Address-Protect Manager-Phone: Collier County Board of County Commissioners Lee County Solid Waste Division 3301 East Tamiami Trail 10500 Buckingham Rd. Naples,FL 34112 Fort Myers,FL 33905 Claude Nesbitt,Sr.Project Mgr. Keith Howard,Solid Waste 239-252-8380 239-533-8917 KhowerdtOleeeov.com Engineer-Address-Phone: Enoineer-Address-Phone: Hole Monies MWH Americas,Inc. 950 Encore Way 14311 Metropolis Ave.,Ste.101 Naples,FL 34110 Fort Myers,FL 33912 239-254-2000 Gordon Kennedy(Gordon.P.KennedyOus.mwhglobel.com 239-236-0011 Contract Date: May 21,2010 Contract Date: January 25,2011 Final Contract Amount: $192,994.05 Final Contract Amount: $1,455,900.09 Completion Date: December 8,2010 Completion Date: November 15,2011 Protect Description: Project Description: Furnish and install EQ Tank Construction of a 2 acre injectate Storage Pond,installation of Furnish and install OX Ditch double containment HDPE piping for transfer of leachate, installation of an injection well and monitoring well,installation of an annular pressure tank fed with nitrogen,installation of monitoring well pumps,transducers and appurtenances along with injectate transfer,self-priming,non-clog,horizontal pumps. Project also involved installation of all associated electrical and complicated instrumentation system to cater for the safe transfer of leachate from various storage ponds into the injection well. S:\Naples Files\Shared Files\Experience Statement 12114.xlsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Lakes Park Water Quality Improvements Protect Name' East Naples/Solana Road Pump Station Improvements Owner -Address-Project Manager-Phone: Owner-Address-Project Manager-Phone: Lee County Board of County Commissioners City of Naples-Public Utilities Division P.O.Box 398 380 Riverside Circle Fort Myers,FL 33902-0398 Naples,FL 34102 Anura Karuna-Muni Dave Graff 239-533-8131 239-213-4716 Engineer-Address-Phone: Engineer-Address-Phone: AIM Engineering&Surveying,Inc. Tetra Tech 5300 Lee Blvd. 201 East Pine Street.Ste.1000 Lehigh Acres,FL 33971 Naples,FL 34102 Lee Flynn,P.E. Jennifer Woodall,P.E. 239-332-4569 407-839-3955 Contract Date: April 26,2011 Contract Date: March,2010 Final Contract Amount: $487,985.00 Final Contract Amount: $2,500,000.00 Completion Date: October 30,2011 Completion Date: February,2011 Protect Description: Project Description: Constructing two additional control structures(CS 4 and 5)to enhance Replacement of high services pumps,installation of electrical current flow patterns and reduce stagnant zones at the north and south rooms and roof modifications,VFD Installation,600kw ends of the west lake. The two existing control structures(CS 1 and 5) generator installation as well as other mechanical,structural, were modified by installing slide gates to reduce flow through these electrical and Instrumentation improvements at two booster structures.The project also involved clearing and grading of four stations. existing spoil islands to create littoral shelves by the removal of exotics and spot material and the planting of native wetland vegetation. prnieslt Name: NCWRF Repair 5 Sludge Presses Project Name; SCRWTP Chlorination Improvements Owner-Address-Project Manager-Phone: Owner-Address-Protect Manager-Phone: Collier County Board of County Commissioners Collier County Public Utilities 3301 East Tamiami Trail 3301 E.Tamiami Trail Naples,FL 34112 Naples,FL 34112 Claude Nesbitt,Sr.Project Mgr. Alicia Abbott,Project Manager 239-252-8380 239-252-5344 Engineer-Address-Phone: Engineer-Address-Phone: Komline-Sanderson Engineering Corp. Tetra Tech 12 Holland Ave. 201 East Pine Street,Ste.1000 Peapack,NJ 07977-0257 Naples,FL 34102 Steven Lukacs Jennifer Woodall,P.E. 908-234-1000 407-839-3955 Contract Date: July 15,2010 Contract Date; June 17,2011 Final Contract Amount: $143,000.00 Final Contract Amount: $98,831.00 Completion Date; November 14,2011 Completion Dale: November 3,2011 Protect Descrloeon; Project Description;; Install sludge presses at 1,2,3.5 and 6 Extend two existing chlorine feed lines and installed chlorine residual analyzers. Project Name: NCWRF Deep Injection Well Mag Meter Replacement Protect Name: (4)8'Gravity Line Segment Replacement along Vanderbilt Drive Owner-Address Protect Manager-Phone: Owner-Address-Project Manager-Phone: Collier County Public Utilities Collier County Public Utilities 3339 Tamiami Trail E.,Ste.303 3301 Tamiami Trail E. Naples,FL 34112 Naples,FL 34112 Craig J.Pajer,Project Manager James Sainvilus,Project Manager 239-252-2554 239-252-4285 Engineer-Address-Phone: Engineer-Address-Phone: N/A N/A Contract Date: January 10,2011 Contract Date; August 16,2011 Final Contract Amount: $24,526.72 Final Contract Amount; $158,000.00 Cgm lotion Date: September 13,2011 Completion Date_ September 23,2011 Protect Description: Protect Description; Remove and Install NCWRF DIW Magnetic Flow Meters,electrical Four 9'point repairs on Vanderbilt Drive disconnection and reconnection,provided and installed 24 inch Mega- flange $:\Naples riles\Shared Fnes\Experience Statement 12 114.x15x EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Wyndemere Country Club Remove/Install 43 Fire Project Name; NCWRF Compliance Assurance Hydrants&Valves Owner-Address-Project Manager-Phone; Owner -Address-Protect Manager-Phone: Collier County Water Distribution Collier County Public Utilities 4370 Mercantile Ave. 3301 E.Tamiaml Trail Naples,FL 34104 Naples,FL 34112 Pam Libby Peter Schalt,PMP 239-252-6239 Engineer-Address-Phone: Engineer-Address-Phone_ N/A Hole Monies,Inc. 950 Encore Way Naples,FL 34110 Clifford Pepper,P.E. (239)254-2000 Contract Date: September 5,2011 Contract Date: November 6,2009 Final Contract Amount; $98,350.00 Final Contract Amount: $8,683,000.00 Completion Date: November 21,2011 Completion Date: November 23,2011 Protect Description: Project Description: Remove/Install 43 Fire Hydrants&Valves Upgrade to existing odor control system. Installation of 4 new Remove/Install 3 Inline Valves odor control units. Construction of two HDPE lined water Install 1 new InlIne Valves storage ponds. Repairs and reshaping of existing ponds. Upgrade to existing MLE Aeration basins including fine bubble diffuser systems,centrifugal blower and odor control covers. Stormwater upgrades throughout site including ponds and swaies. Upgrades and modifications to existing chemical supply systems Project Name: Vanderbilt Beach MSTU,Gulf Shore Drive Utility Project Name: Bella Terra-Replace Existing irrigation Relocate Main Owner-Address-Protect Manager-Phone: Owner-Address-Protect Manager-Phone: Collier County Public Utilities Habitat Lakes LLC 3339 Tamiaml Trail E.,Ste.303 782 NW 42nd Ave..Ste 630 Naples,FL 34112 Miami,FL 33126 Mark Sunyak,P.E.(Project Manager 305-445-9855 Engineer-Address-Phone; Engineer-Address-Phone' Malcolm Pirnie Banks Engineering 4315 Metro Pkwy,Ste.520 10511 Ben C.Pratt Pkwy. Ft.Myers,FL 33918 Ft.Myers,FL 33886 239-939-5490 Contract Date; November 28,2011 Contract Date: December 5,2011 Final Contract Amount: $72,778.50 Final Contract Amount: $108,712.18 Completion Date: January 27,2012 Completion Date' January 18,2012 Protect Description: Project Description: Relocate,remove/abandonment of specified portions of existing 8 inch Replace Existing Irrigation Main asbestos cement water pipe,installation of new 8 inch PVC water pipe, connections,fittings,valves,Joint restrains,mechanical fittings and appurtenances,excavating,pipe bedding/backf/ling,grading,sod installation,dispose of pipe and earth material,roadway and site restoration. S:\Naples Files\Shared Files\Experience Statement 121 14.xlsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Pump Station 312.29&312.41 Refurbishment Project Name; Hendry County-Construction of CR 78 Phase 1A&1B Drainage Improvements Owner-Address-Protect Manager Phone: Owner -Address-Project Manager-Phone: Collier County Public Utilities Hendry County Board of County Comm. 3339 Tamiaml Trail E.,Ste.303 P.O.Box 1607 Naples,FL 34112 99 East Cowboy Way Zamira Del Torn,Project Mgr. LaBelle,FL 33975 239-252-6279 Shane Parker,PE !. (863)675-5222 Engineer-Address-Phone: Engineer-Address-Phone: Tetra Tech,Inc. Johnson Engineering 10600 Chevrolet Way,Ste.300 251 W.Hickpochee Ave. Estero,FL 33928 LaBelle,FL 33935 Danny Nelson,P.E. James.V.Lofton,Jr. 239-390-1467 (863)612-0594 Contract Date: August 23,2011 Contract Date: December 1,2011 Final Contract Amount; $267,222.12 Final Contract Amount: $765,518.97 Completion Date: April 25,2012 Completion Date; July 10,2012 Project Description: Protect Description: PS 312.29-Refurbishment of existing PS 312.29 to install new HOPE Remove&Install roadway concrete box culverts and headwalls. discharge piping,new check and plug valves,new pumps and pH probe. Installed concrete sediment basin&ditch block,steel sheet Also amended existing electrical control panels to allow for new pile,grade work for slopes and relocation of swates and components. New curbs,stone,&landscaping installed. ditches,remove and replace guardrails and asphalt. PS 312.41-Refurbishment of existing PS 312.41 to install new HDPE Install pedestrian picket railing,rip-rap,drainage pipe,sod, discharge piping,check and plug valves,pumps,electrical control panels, signage and striping. generator with ATS,new telemetry along with new lining in pump station. Privacy slats were also Installed in existing fence along with new stone landscaping. Project Name: Traditions,Golf Residences and Villas at Grey Oaks Project Name: Michigan Street Sidewalk Project Owner --Address-Project Manager-Phone: Owner -Address-Protect Manager-Phone: CCC Traditions,LLC City of Bonita Springs 135 San Lorenzo Ave. 9101 Bonita Beach Road Coral Gables,FL 33140 Bonita Springs,FL 34135 (239)949.6202 David Liccardi Engineer-Address-Phone: Engineer-Address-Phone: Peninsula Engineering Lake Hickory Ventures,Inc. 2600 Golden Gate Pkwy. 22210 Fairmont Ct. Naples,FL 34105 Estero,FL 33928 CJ Brown (239)898-4008 239-262-2600 Contract Date: January 1,2012 Contract Date: August 15,2012 Figalcontract Amount_ $363,596.00 Final Contract Amount: $175,734.00 Completion Date' July 13,2012 Completion Date; September 28,2012 protect Description; Protect Description: Modification of existing sanitary sewer sysstem from single family Furnish and instated Portland Cement Concrete sidewalk along home layout to multi-family home layout,new city water system, the west side of Michigan Street from Bonita Beach Road to modification of existing drainage system. Pennsylvania Ave. Project consisted of 2220 LF of sidewalk, 15",24",and 30"reinforced concrete pipe,mitered end sections,yard drains,vertical headwal,FDOT approved railing,}ft material,sod,signage,striping,and various incidental Items. S;\Naples Files\Shared Files\Experience Statement 12 1,14.xtsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Protect Name: lrnmokalee Stormwater Downtown Improvements Project Name' Gateway Triangle Residential Area Tertiary Stormwater System Improvements Owner-Address-Project Manager-Phone: Owner -Address-Project Manager-Phone: Collier County Board of County Commissioners Collier County Board of County Commissioners Immokalee Area CRA Bayshore Gateway Triangle CRA 1320 N.15th St. 4069 Bayshore Drive Immokalee,FL 34142 Naples,FL 34112 Bradley Muckel Ashley Caserta (239)867-4121*202 (239)643-1115 Engineer Address-Phone: Engineer-Address-Phone: CDM Smith,Inc. Q.Grady Minor and Assoc.P.A. 2180 West First St.,#400 3800 Via Del Rey Fort Myers,FL 33901 Bonita Springs,FL 34134 Marc Stonehouse,P.E. David Schmidt (239)938-9616 (239)947-1144 Contract Date: January 24,2012 Contract Dale: March 30,2012 Final Contract Amount: $2,709,797.14 Final Contract Amount: $1,731,977.00 Completion Date: December 20,2012 Completion Dale: February,2013 Protect Description: Project Description; Constructed 7.6 acre retention pond and approximately 16,500 LF of This project was designed to reduce known flooding in the RCP storm sewer ranging in size between 18 and 42 inches. The work Gateway Triangle. Removal of existing culverts,mitered ends was completed in a semi-urban part of Immokalee,FL and also included and driveways,installation of over 10,000 LF of culvert pipe: 262 LF of 4 x 0 box culvert parallel to and under an existing road, over 400 mitered ends,300 driveways,regrading/realignment of grass swales and pavement overlay of disturbed areas. Project Name' Irrigation Quality Water Sites-Priority Group 2 Sites Protect Name; NCWRF Multiple Projects-Bleach Piping, Knife Gate Valves,Channel Mixers,Clarifiers, Potable Water Interconnect Owner-Address-Project Manager-Phone: Owner-Address-Project Manager-Phone: Collier County Public Utigtles Collier County Public Utilities 3339 Tamiami Trail E.,Ste.303 3339 Temiami Trail E.,Ste.303 Naples,FL 34112 Naples,FL 34112 Aaron Cromer,PMP Craig Pajer,Project Manager (239)252-5338 (239)252-2554 )=0glneer-Address-Phone; Engineer-Address-Phone: Hole Monies,Inc. Hole Monies,Inc. 950 Encore Way 950 Encore Way Naples,FL 34110 Naples,FL 34110 Frank Feeney,P.E. Jerry Taricska (239)254-2000 (239)254-2000 Contract Date: January 24,2012 Contract Date: July 21,2011 Final Contract Amount: $515,474.13 Final Contract Amount: $457,031.30 Completion Date: February 13,2013 Completion Date: June 21,2013 Puke'Puke'p_e_a_cripflpm Project Description' Allow improved control and monitoring of IQ Water usage at Tarpon Cove, pleach Piping-Remove,replace and paint 1 1/2",2"&3"PVC Calusa Bay,Veteran's Park and Vineyards Elementary School Properties. bleach piping and valves at the North Bleach Facility installation of 4 meter assemblies comprised of an MOV,electromagnetic Knife Gate Valves-Remove 3 existing 30"knife gate valves at flowmeter,flow control valve and all associated power and controls the mixed liquor splitter box and replce with 3-30"plug valves hardware and software. Channel Mixers-Remve 4 existing lhp mixers and replace with 4 1hp vertical solid shaft right angle mixers located in the MLE Aeration Basin Influent channel. Potable Water Interconnect-Install 6"&4"ductile piping,valves and backflow preventer to connect the BFP Booster Pump at the Sludge Handling Building to the potable water system. Clarifiers 8&7-Remove and replace drive systems,rebuild center columns,replace seals,repair,replace and coat corroded metal,piping and valves. S:\Naples Fibs\Shared Files\Experience Statement 12114.xhax EXPERIENCE STATEMENT-SOUTHWEST DIVISION Protect Name: City of Naples-WWTP Filter Rehab. Project Name: NCWRF Filter Set 1 Rehabilitation Job No.862-13 Job No.857-12 Owner-Address-Project Manager-Phone: Owner-Address-Protect Manager-Phone: City of Naples-Public Utilities Collier County Public Utilities 380 Riverside Cir. 3339 Tamiami Trail E.,Ste.303 Naples,FL 34102 Naples,FL 34112 Justin Frederiksen,P.E. Wayne Karlovich,P.E. 239-213-4762 (239)252-5372 Engineer-Address-Phone: Engineer-Address-Phone; Aqua-Aerobic Systems,Inc. Hole Montes,Inc. 050 Encore Way Naples,FL 34110 Frank Feeney,P.E. (239)254-2000 Contract Date: February 6,2013 Contract Date: June 26,2012 Final Contract Amount; $454,916.00 Final Contract Amount: $1,455,517.97 Completion Date: August 22,2013 Completion Date: June 26,2013 Project Descriptor: Project Description_ This project was comprised of the complete rehabilitation of two(2) Complete Removal of four sand bed automatic backwash 90'x 16'automatic backwash filters,including removal and replacement filter systems. Structural improvements to load bearing concrete of all existing media,porour plates,caulking and retaining angles. walls,resurfacing of interior filter walls,and installation of four Also included was removal and replacement of the filter bridge rails new automatic backwash filter systems Including underdrains, and UHMW backwash shoe on each system. Some incidential concrete media,and mechanical equipment. patching was performed,as well as full startup and performance testing. Proiect Name; Southwest Florida International Airport Proiect Name' KIPS 318-Right-of-Way Taking Midfield Terminal Apron Expansion&Taxiway Job No.918-13 Job No.995-12 Owner-Address-Proiect Manager-Phone: Owner-Address-Proiect Manager-Phone: Lee County Port Authority Collier County Public Utilities do Manhattan Construction(Florida),Inc. 3339 Tamiami Trail E.,Ste.303 3705-1 Westview Dr. Naples,FL 34112 Naples,FL 34104 Wayne Karlovich,P.E. Hector Yanez,Project Mgr. (239)252-5372 239-643-6000 Enoineer-Address-Phone; Engineer-Address-Phone: AECOM Transportation Johnson Engineering 4415 Metro Pkwy.,Ste.404 2350 Stanford Ct. Fort Myers,FL 33916 Naples,FL 34112 (239)434-0333 239-278-7996 Jared Brown Contract Date: June 25,2012 Contract Date: September 9,2013 Final Contract Amount; $2,732,733.48 Final Contract Amount $182,818.23 Completion Date: February 11,2014 Completion Date: May 6,2014 Protect Description: Proiect Description: Construction of storm water infrastructure improvements within the Demolition of Retaining walls,fence,and other site imp. SW Fla.Internation Airport newly expanded taxiway and terminal areas- Reconstruction of the demolished Improvements. Work consisted of installing cast-in-place and precast storm structures, Rehab.Of pump station,replace ductile iron pipe with HOPE, approximately 5700 LF of RCP ranging in size from 30"to 72'x 113" abandoning the valve vaults&reconfigure the meter/bypass (2200 LF of which Is large diameter),and implements dewatering systems assembly. Landscape 8,.irrigation replacement. to enable construction of work in dry soil conditions. S:\Naples Files\Shared Files\Experience Statement 12 114,xlsx EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Pinewoods&Naples Bath&Tennis Water System Project Name: Master Pump Station 312 Rehabilitation Improvements Job No.912-13 • Job No. 725-14 Owner-Address-Project Manager-Phone; Owner-Address-Project Manager_Phong; City of Naples-Utilities Department Collier County Public Utilities 380 Riverside Dr, 3339 Tamiami Trail E.,Ste.303 Naples,FL 34102 Naples,FL 34112 David Graff Peter Schell (239)213-4716 (239)252-5343 daraff(wnaolesaov.com Pat j$chaltk�collieraov.net Engineer-Address-Phone: Engineer-Address-Phone: City of Naples-Utilities Department AgnoN,Barber&Brundage,Inc. 380 Riverside Dr. 7400 Tamleml Trail N„Ste.200 Naples,FL 34102 Naples,FL 34108 (239)597.3111 Steve Marlin,P.E.(Martin(gabbinc.com) Contract Date: July 8,2014 Contract Date: February 12,2013 Final Contract Amount: $81,016.00 Final Contract Amount; $5,752,145.14 Completion Date: October 31,2014 Completion Dale: March 6/2014 Prefect Description: Project Description: Install 8"hot taps with valves,install approx.165 ft.of 8"C900 PVC, Complete rehabilitation of wetwell&control building, directional drill&pull in 10"DR 9 pipe and 10"HDPE pipe,6"hot tap including Installation of bioscrubber In series with existing with valves,transition connect 10"HDPE to 6"tap and 8"PVC,flush odor control equipment. Work included 6 new sewage pump pressure test and restore. Asphalt repair. installations,extensive electrical and controls work,dewalering, fencing,sitework,etc. Protect Name: Thomasson Drive 24 Inch Force Main Project Name: WWTP Supplemental Water Line Job No.924-14 Job 720-14 Owner-Address-Project Manager-Phone: Owner-Address-Project Manager-Phone; Collier County Public Utilities City of Naples-Public Utilities 3339 Tamiami Trail E.,Ste.303 380 Riverside Cir. Naples,FL34112 Naples,FL 34102 (239)252-5372 Justin Frederiksen,P.E. Wayne Karlovich,P.E. 230-213-4762 wavnekarlovichPcolliereuv.net jfrederiksen @naulesaov.com Engineer-Address-Phone: Engineer-Address-Phone: Johnson Engineering City of Naples-Utilities Department 2122 Johnson St.,P.O.Box 1550 380 Riverside •lr. Ft.Myers,FL 33902-1550 Naples,FL 34102 Michael Dickey,P.E. Justin Frederiksen,P.E. rnsdraiohnsonena.com iLrederiksen0eaplesaov.com Contract Date: April 29,2014 Contract Date: June 6,2014 Final Contract Amount: $174,390.00 Final Contract Amount: $99,126.00 Completion Date: July 22,2014 Completion Date; September 16,2014 Project Description: Project Description: Approximately 2100 LF of 24 inch force main,plug valves,fittings and Installation of a supplemental water line to the City's W WTP appurtenances.The force main was installed in and around heavy effluent transfer station. Hot tapping an existing 6"CI water line existing utilities. Included in the project was 2 road crossings that were east of the City's Equipment Services Facility;meter/backflow open cut and 42 inch steel casings utilized. assembly,pipeline through plant,discharge assembly,valves, fittings,approx.615 LF of 6"DI pipe,approx.188'of 4"DI pipeline,fittings,hardware,restoration of drives/roads,sod. Project Name: MPS 306 Force Main-Phase 1 project Name: LASIP Davis Blvd.Canal Improvements Job No.740-14 Job No.900-13 Owner-Address-Project Manager-Phone: Owner-Address-Project Manager-Phone: Collier County Public Utilities Cotter County Growth Mgmt.Division 3339 Tamiami Trail E.,Ste.303 2805 South Horseshoe Drive Naples,FL 34112 Naples,FL 34104 (239)252-5372 (239)252-2885 Wayne Karlovich,P.E. Tad Pluc,Project Mgr. wavnekarlovichwcollleraov,net tadnluc(5r.elllsraov.net Engineer-Address-Phone: Engineer-Address-Phone: AECOM Technical Services,Inc. CDM Smith 4415 Metro Pkwy.,Ste.404 12501 World Plaza Ln.,Bldg.51 Ft.Myers,FL 33918 Ft.Myers,FL 33907 (239)2713-7996 (239)938-9600 Donovan S.Bramlett,P.E. Jane Williams,P.E. Contract Date; March 24,2014 Contract Date; January 7,2014 Final Contract Amount; $626,089,00 Final Contract Amount: $1,727,214.43 Completion Date; July 31,2014 Completion Date; September 23,2014 Project Description: Project Description: Directional drilling 2 runs of 30"HDPE force main,900'&1100'tied Regrading 8,400 If of the Davis Blvd.Canal. Reestablishing together with a 30"plug valve,open cut 300'of 30"ductile iron force main, control and repairing erosion along the entire length was a connect to HDPE directional drill with a 30"plug valve,connect entire priority on this job. Extremely hard rock was encountered lino to existing force main. throughout most of the project. A cast in place control weir was built by our forces in coordination with the County&the SFWMD. S:\Naples Filos\Shared FiloAExperience Statement 121.14xhsx '.. EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: SCWRF Odor Control Blowdown Disposal project Name; ARV Replacement Program-Phase II Job No.750-13 Job No.890-13 Owner-Address-Protect Manager-Phone; Owner-Address__Project Manager-Phone: Collier County Public Utilities Collier County Public Utilities 3339 Tamiami Trail E.,Ste.303 3339 Tamiami Trail E.,Ste.303 Naples,FL 34112 Naples,FL 34112 (239)252-5344 (239)252-4233 Alicia Abbott,PM Corrine Trtan,Project Manager pkiaAbottracollieraov.net rrinelnaraccgterimnet Engineer-Address-Phone: Engineer-Address-Phone: CPH Corp. AECOM 5601 Mariner St,Ste.240 4415 Metro Pkwy.,Ste.404 Tampa,FL 33609 Ft.Myers,FL 33916 (813)288-0433 (239)278-7996 W.Wade Wood,P.E. Dustin Chisum,El Contract Date: November 14,2013 Contract Date: June 25,2013 Final Contract Amount; $352,625.51 Final Contract Amount: $322,790.00 Completion Date: August 14,2014 Completion Dale; August 14,2014 Protect Description: Project Description: Install new duplex pump station including an 8x10 precast wetwefl, Remove&replace over a hundred air release valves on various 2-3hp submersible pumps,control panel,electromagnetic flow meter, existing force main lines. Most of the replacements increased ph meter&PLC to provide ph control of effluent.200 ft of 3"force main the size of the air release valve from a two to a three inch. was installed to route pump station discharge to the deep injection well. a bypass to the sanitary sewer system is provided as an alternate discharge location. __..__.._ .............. ................ .._..__... Project Name: Swallow Ave.Drainage-Phase II Project Name: J&C Blvd Roadway Improvements Job No.790-14 Job No.940-13 Owner-Address-Project Manager-Phone: Owner-Address-Protect Manager-Phone; City of Marco Island Collier County Transporation Eng.Dept. 50 Bald Eagle Dr. 2885 South Horseshoe Dr. Marco Island,FL 34145 Naples,FL 34104 Timothy Pinter,P.E. Julio Ordonez (239)389-5018 (239)252-5762 Tuinterrecitvufmarcvhland.com lu)inordoneracolliereov.net Engineer-Address-Phone; Engineer-Address-Phone: AEC of Marco Island,Inc. Agnoii,Barber and Brundage,Inc. 573 Bald Eagle Dr. 7400 Trail Blvd.#200 Marco Island,FL 34145 Naples,FL 34108 (239)394-1697 Edward F.Tryka ill,P.E. (239)597-3111 Contract Date: June 10,2014 Contract Date: February 11,2014 Final Contract Amount: $541,087.00 Final Contract Amount: $1,460,479.30 Completion Date: September 27,2014 Completion Date: September 30,2014 Prefect Description: Project Description: Install oft large structures and large diameter storm drain pipe systems Project consisted of drainage improvements,excavating existing from an existing outfall. Approximately 505 LF of reinforced concrete CMP and replacing with 5,080 ft of new RCP Pipe. Extensive pipe and 820 LF of smooth well HDPE pipe. Misc.storm drain inlets swale grading and the addition of 129 Catch Basin structures, and minor utility work and swale grading(approx.400 LF). Sod In addition the road was widened in both directions ranging in replacement and misc,restoration 2-4 ft then finished with a 1"overlay with new signage and striping,replaced driveways arid sod. Protect Name: SCWRF Proposed 30"&24"Force Maki Phase I Project Name: Golden Gate City Stormwater Drainage and MPS 306 Force Main Phase Ill Improvements Job No.745-14 Job No.795-14 Owner-Address-Project Manager-Phone: Owner-Address-Protect Manager-Phone: Collier County Public Utilities Collier County Growth Mgmt.Div. 3339 Tamiami Trail E.,Ste.303 2085 S.Horseshoe Dr. Naples,FL 34112 Naples,FL 34104 Wayne Kariovich,P.E. Tad Pluc,Inspector (239)252-5312 (239)252-5799 WayneKarlovich@collienzov.net TadPlucescalliersov.net Engineer-Address-Phone: Engineer-Address-Phone: Hole Mentes,Inc. O.Grady Minor&Associates 950 Encore Way 3800 Via Del Rey Naples,FL 34110 Bonita Springs,FL 34134 David Schmitt,P.E. Brent Addison,P.E. (239)252-2000 (239)947-1144 Contract D.ate; June 13,2014 Contract Date: October 28,2014 Final Contract Amount; $410,877.33 Final Contract Amount: $525,316.23 Completion Date: November 26.2014 Completion Date; March 11,2015 Protect Description: Project Description: Install one(1)30"diameter HDPE x 400'horizontal directional drill force Drainage and Sidewalk Improvements-Remove and replace main and one(1)30"diameter HDPE x600'horizontal directional drill existing drainage structures and culverts;install new drainage with 200'of ductile iron force main. Includes all valves,appurtenances structures and culverts in driveways,pavement and sidewalk and restoration patching,swale regrading and misc.site restoration S:\Naples Files\Shared Files\Experience Statement 12 114.she EXPERIENCE STATEMENT-SOUTHWEST DIVISION Project Name: Royal Harbor Water System Improvements-Phase I Project Name: Everglades City Water System Upgrade Phase II Job No.800-14 Job No.825-13 Owner-Address-Project Manager-Phone; Owner -Address-Project Manager-Phone: City of Naples-Utilities Dept. City of Everglades City • 380 Riverside Cir. 102 Copeland Ave. '.. Naples,FL 34102 Everglades City,FL 34139 Aliyson Holland,Deputy Director Mayor Sammy Hamilton,Jr. (239)213-4713 (239)695-3781 AMHof landf8naplesgsv.cont Enaineer-Address-Phone: Engineer-Address-Phone: Tetra Tech,Inc. American Engineering Consultants 10600 Chevrolet Way,Ste.300 573 Bald Eagle Dr. Estero,FL 33928 Marco Island,FL 34145 Brett Messner,P.E. Rony Joel,P.E. (239)390-1467 (239)394-1697 Contract Date; May 21,2014 Contract Date; May 28,2013 Final Contract Amount: $2,072,961.00 Final Contract Amount: $2,534,189.05 Completion Date: March 27,2015 Completion Date: January 14,2015 Project Description: Protect Description: Replace 14,700 LF of asbestos cement water mains with 4 inch and 8 Installation of a new membrane filtration system housed in a inch PVC water main,(2)10 inch HDPE directional drills underneath new structure,upgraded transfer pumps,chemical systems, the intercoastal canal to'loop"the system. Installation of 950 LF of 4 standby generator and associated instrumentation and electrical inch PVC force main to replace deteriorating discharge force main front supply. Installed a new force main to the Copeland Lift Station; the City's Lift Station and approx.290 LF of 12 Inch corrugated PVC upgraded the Carnestown&Copeland Lift Stations;upgraded storm drain piping. water pumps&replaced existing PS roof at booster station. Prefect Name: Livingston Road ICI Water ASR System Well Protect Name: WTP Hand/Guardrail Replacement Below the USDW-Phase 2 Job No.730-14 Job No.1000-13 Owner-Address-Project Manager-Phone: Owner-Address-Protect Manager-Phone: Collier County Public Utilities City of Naples-Utilities Dept. 3339 Tamiami Trail E„Ste.303 380 Riverside Cir. Naples,FL 34112 Naples,FL 34102 Zamira DelToro,PM David Graff,PM (239)252-6279 239-213-4716 Zamirade Itoro rdcolllereov.net Engineer-Address-Phone; Engineer-Address-Phone: CDM Smith City of Naples-Utilities Dept. 2180 W.First St.,Ste,400 380 Riverside Cir, Ft.Myers,FL 33901 Naples,FL 34102 Jason Sciandra,P.E. David Graff,PM (239)938-9600 239-213-4716 Contract Date: December 11,2013 Contract Date; October 29,2014 Final Contract Amount: $2,551,180.45 Final Contract Amount: $64,729.00 Completion Dale: January 30,2015 Completion Date: February 4,2015 Protect Description: Project Description: Driting&testing of new Class V Group Three ASR Injection well system, Removal of sub-standard Hand/Guardrail Systems In three areas designated ASH-2. Construction of ASR Pipeline. Installation of above of the Water Treatment Plant with new aluminium Hand/Guardrail ground mechanical piping and valves,electrical equipment and control Systems meeting OSHA Standards equipment removed to provide space for the required well drill equip. Perform all associated misc.work,restoration and cleanup. S:\Napies Fibs\Shared Files\Experience Statement 12114xlsx Cofer County Administrative Services Department Procurement Services Division AFFIDAVIT FOR CLAIMING STATUS AS A LOCAL BUSINESS SOLICITATION#:15-6457 MPS 306 FORCE MAIN-PHASE III(CHECK APPROPRIATE BOXES BELOW) State of Florida(Select County if Vendor is described as a Local Business DCollier County Lee County Vendor affirms that it is a local business as defined by the purchasing ordinance of the Collier County Board of County Commissioners and the Regulations Thereto. As defined in the Collier County purchasing ordinance; Local business means the vendor has a current Business Tax Receipt issued by the Collier County Tax Collector for at least one year prior to bid or proposal submission to do business within Collier County, and that identifies the business with a permanent physical business address located within the limits of Collier County from which the vendor's staff operates and performs business in an area zoned for the conduct of such business. A Post Office Box or a facility that receives mail, or a non-permanent structure such as a construction trailer, storage shed, or other non-permanent structure shall not be used for the purpose of establishing said physical address. In addition to the foregoing, a vendor shall not be considered a "local business" unless it contributes to the economic development and well-being of Collier County in a verifiable and measurable way. This may include, but not be limited to, the retention and expansion of employment opportunities,support and increase to the County's tax base, and residency of employees and principals of the business within Collier County.Vendors shall affirm in writing their compliance with the foregoing at the time of submitting their bid or proposal to be eligible for consideration as a "local business" under this section. A vendor who misrepresents the Local Preference status of its firm in a proposal or bid submitted to the County will lose the privilege to claim Local Preference status for a period of up to one year. Vendor must complete the following information: Year Business Established in tCollier County or❑ Lee County: 1990 Number of Employees(Including Owner(s) or Corporate Officers): 50 Number of Employees Living in [74 Collier County or c Lee(Including Owner(s)or Corporate Officers): 30 If requested by the County, vendor will be required to provide documentation substantiating the information given in this affidavit. Failure to do so will result in vendor's submission being deemed not applicable. Company Name: Douglas N. Higgins, Inc. Date: 6/15/15 Collier or Lee County Address: 4485 Enterprise Ave., Naples, FL 34104 Sig nature: f ICW Title: Vice President STATE OF MICHIGAN ,WASHTENAW COUNTY ❑ LEE COUNTY Sworn to and Subscribed Before Me, a Notary Public, for the above State and County, on this 15th Day of June , 2015 4►d,1a.IC Notary Public My Commission Expires: t7—/O- aC1�C7 AFFIX OFFICIAL SEAL) SANDRA K GARRISON NOTARY PUBLIC rt STATE OF MICHIGAN COUNTY OF P! I� 25 i es •Agreement for Public •Utilities:Rovised 04152015 My Commission Expires January 10,2020 • FT,.� � C LL1 R COUNTY`BUSINESS 1�AX' - Bt1S1N S`f`AX(�FUM ER 000464r COLUER�COUNTY A)(1 QU ECfiOR-2800 N HORSESHOE DRIVE NAPLES FLORIDA 84104}{ 9)2 -- i =3_� z- VISIT OUR NEBSITE AT:wvuw.00lliertax.com z{z THIS RECEIPT EXPIRES SEPTEMBER 30, 2015 _ # 'M� ISPLAYJ1T PLACE OE BUS NESS FOR PUBLIC INSPECTION.. FAIUURETO DO Sd IS CONTRARY T4 LOCAL LAWS OCATION'4485 ENTEiTPtISE AVE , GALNI6• ZONED INDUSTRIAL"LIC 1541 HIS TAXIS NON-REFUNDABLE BUSINESS PHONE: 774 3130 k- } CORPOtrATION'' STATE LIC: CG 0060189 , r t DOUGLAS N�ITGQ S N t . - Y ;HIGGINS D/NEL F -: F _ _ _ 4485 ENTERPRISE AVE y� NAPLES•FL 34104-0000 _ NUMBER OF EMPLOYEES, 1-10 EMPLOYEES r 41 CLASSIFICATION:GENERAL CONTI7AGTbRz3 : f DATE- g 07/16/2014 CLASSIFICATION Cob. E: 011001017 -_ _ r pct { -.3-4,7 i, RECENT 57,00 This document is a business tax only.Tfiis is not cerl cation tharlicensee is qualified " 15 _`40 It does not pemmrt he Ucensee to violate any existing regulatory zoning laws qt the_d. minty 4r-roes `- nor does if exempt th IL a ee from any other taxes or permits that may be requli dd py Ial t ' : : � _- = . .. #. far- 3. F=. ,-,;-..7.,. A. . State of Florida Department of State I certify from the records of this office that DOUGLAS N. HIGGINS INC. is a Michigan corporation authorized to transact business in the State of Florida, qualified on August 1, 1973. The document number of this corporation is 830666. I further certify that said corporation has paid all fees due this office through December 31, 2015, that its most recent annual report/uniform business report was filed on January 7, 2015, and its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Seventh day of January,2015 y.,././4::„-,- ._,,,i,,_44_ *--....i,,la or ^Ak a d f .1" Of.tips). _ 1kt Secretary of State Authentication ID:CC4969825754 To authenticate this certificate,visit the following site,enter this ID,and then follow the instructions displayed. https://efde.sunbiz.org/certauthver.html TRENCH SAFETY ACT Bidder acknowledges that included in the various items of the bid and in the Total Bid Price are costs for complying with the Florida Trench Safety Act(90-96, Laws of Florida) effective October 1, 1990. The Bidder further identifies the cost to be summarized below: Trench Safety Units of Unit Unit Extended Measure Measure (Quantity) Cost Cost (Description) (LF,SY) 1. S gip' LF td,.s c L/co 42 oat)tC ) 2. 3. 4. 5. TOTAL$ 4,2‘ oc2O Failure to complete the above may result in the Bid being declared non-responsive. Dated 6/15/15 Douglas N. Higgins, Inc. Bidder j� BY: iiy,tad_a. L °i' T 19 Construction Services Agreement for Public Utilities:Revised 04152015 Colter County Administrative Services Department Procurement Services Divisron '.. Collier County Solicitations Substitute W—9 Request for Taxpayer Identification Number and Certification In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information for tax reporting purposes from individuals and companies who do business with the County (including social security numbers if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5) require that the county notify you in writing of the reason for collecting this information, which will be used for no other purpose than herein stated. Please complete all information that applies to your business and return with your quote or proposal. 1. General Information (provide all information) Taxpayer Name Douglas N.Higgins,Inc. (as shown on income tax return) Business Name same (if different from taxpayer name) Address 3390 Travis Pointe Rd.,Ste.A City Ann Arbor State Michigan Zip 48108 Telephone 734-996-9500 FAX 734-996-8480 Email DanH @dnhiggins.com Order Information Remit I Payment Information Address 4485 Enterprise Ave, Address 4485 Enterprise Ave. City Naples State FL Zip 34104 City Naples State FL Zip 34104 FAX 239-774-4266 FAX 239-774-4266 Email BrandvBt dnhig_gins.com Email BrandvB(7dnhiggins.com 2. Company Status (check only one) _Individual/Sole Proprietor X Corporation Partnership _Tax Exempt(Federal income tax-exempt entity Limited Liability Company under Internal Revenue Service guidelines IRC 501 (c)3) C Enter the tax classification (D=Disregarded Entity, C=Corporation, P=Partnership) 3. Taxpayer Identification Number(for tax reporting purposes only) Federal Tax Identification Number(TIN) 38-1807765 (Vendors who do not have a TIN,will be required to provide a social security number prior to an award of the contract.) 4. Sign and Date Form Certification: Under penalties of perjury, I certify that the information shown on this form is correct to my knowledge.Signature rift AMAtilittMir Date 6/15/15 Title Vice President Phone Number 239-774-3130 22 Construction Services Agreement for Public Utilities:Revised 04152015 Upon notification that its Bid has been awarded,the Successful Bidder will execute the Agreement form attached to the Bidding Documents within ten (10) calendar days and deliver the Surety Bond or Bonds and Insurance Certificates as required by the Contract Documents. The bid security attached is to become the property of the Owner in the event the Agreement, Insurance Certificates and Bonds are not executed and delivered to Owner within the time above set forth, as liquidated damages, for the delay and additional expense to the Owner, it being recognized that, since time is of the essence, Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to Owner the required Agreement, Insurance Certificates and Bonds within the required time period. In the event of such failure, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. It is hereby agreed that it is appropriate and fair that Owner receive liquidated damages from the Successful Bidder in the event it fails to execute and deliver the Agreement, Insurance Certificates, and Bonds as required hereunder. The Successful Bidder hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of Owner's actual damages at the time of bidding if the Successful Bidder fails to execute and deliver the Agreement, Insurance Certificates, and Bonds in a timely manner. Upon receipt of the Notice of Award, the undersigned proposes to commence work at the site within 5 calendar days from the commencement date stipulated in the written Notice to Proceed unless the Project Manager, in writing, subsequently notifies the Contractor of a modified (later) commencement date. The undersigned further agrees to substantially complete all work covered by this Bid within three hundred and thirty (330) consecutive calendar days, computed by excluding the commencement date and including the last day of such period, and to be fully completed to the point of final acceptance by the Owner within thirty (30) consecutive calendar days after Substantial Completion, computed by excluding commencement date and including the last day of such period. Respectfully Submitted: State of Michigan County of Washtenaw Kelly A. Wilkie , being first duly sworn on oath deposes and says that the Bidder on the above Bid is organized as indicated and that all statements herein made are made on behalf of such Bidder and that this deponent is authorized to make them. Kelly A. Wilkie , also deposes and says that it has examined and carefully prepared its Bid from the Bidding Documents, including the Contract Drawings and Specifications and has checked the same in detail before submitting this Bid; that the statements contained herein are true and correct. (a)Corporation The Bidder is a corporation organized and existing under the laws of the State of Michigan , which operates under the legal name of Douglas N. Higgins, Inc. , and the full names of its officers are as follows: President Douglas N. Higgins 23 Construction Services Agreement for Public Utilities:Revised 04152015 Secretary Kelly Wilkie, David Wilkie, Tamara Ludwig, Sandra Garrison Treasurer Kelly Wilkie Vice President Kelly Wilkie, Daniel Higgins, Brandy Bartolone The Kelly Wilkie is authorized to sign construction bids and contracts for the company by action of its Board of Directors taken July 1, 2014 , a certified copy of which is hereto attached (strike out this last sentence if not applicable). (b) Co-Partnership The Bidder is a co-partnership consisting of individual partners whose full names are as follows: The co-partnership does business under the legal name of: (c) Individual The Bidder is an individual whose full name is , and if operating under a trade name, said trade name is Complete for information contained in (a) Corporation, (b) Co-Partnership or (c) Individual from previous page. DATED 6/15/15 Legal entity 4/„ ' _ - BY Douglas N. Higgins, Inc.. Witness I Name of Bidder(Typed) • , 1jttif lAILLLICL6' Wyess V Si n ture Vice President Title 24 Construction Services Agreement for Public Utilities:Revised 04152015 • CERTIFICATE OF SECRETARY The undersigned, being the duly elected secretary of Douglas N. Higgins, Inc. , a Michigan corporation, hereby • certifies that the following resolution was duly adopted by the Board of Directors of said corporation at a meeting held on July 1, 2014 and that said resolution is in full force and effect: "RESOLVED, That the following listed persons are hereby authorized to execute, on behalf of .Douglas N. Higgins, Inc. , any and all contracts and documents." Brandy L. Bartolone Daniel N. Higgins 4f f � Douglas N. Higgins (.: 11"i/14/114- * David J. Wilkie Kelly A. Wilkie Ke,Na .botkp,u, • éua. � Kelly A! Wilkie Secretary Dated: July 1, 2014 STATE OF Michigan COUNTY OF Washtenaw The foregoing instrument was acknowledged before me this 15th day of June , 2015, by Kelly Wilkie , as Vice President of Douglas N. Higgins, Inc. , a Michigan corporation, on behalf of the corporation. He/she is personally known to me or has produced Personally Known as identification and did (did not)take an oath. My Commission Expires: ',_1®,,'p t� n, j Q/r1C ►Q/� Q, (Signature of Notary) NAME:Sandra K. Garrison (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Michigan SANDRA K GARRISON Commission No.. NOTARY PUBLIC-STATE OF MICHIGAN COUNTY OF WASHTENAW My Commission Expires January 10,2020 25 Construction Services Agreement for Public Utilities:Revised 04152015 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we Douglas N. Higgins, Inc. (herein after called the Principal) and Hartford Fire Insurance Company , (herein called the Surety), a corporation chartered and existing under the laws of the State of CT with its principal offices in the city of Hartford and authorized to do business in the State of FL are held and firmly bound unto the Collier County Board of County Commissioners (hereinafter called the Owner), in the full and just sum of Five percent of the attached bid dollars ($ 5% ) good and lawful money of the United States of America, to be paid upon demand of the Owner, to which payment well and truly to be made, the Principal and the Surety bind themselves, their heirs, and executors, administrators, and assigns, jointly and severally and firmly by these presents. Whereas, the Principal is about to submit, or has submitted to the Owner, a Bid for furnishing all labor, materials, equipment and incidentals necessary to furnish, install, and fully complete the Work on the Project known as MPS 306 Force Main - Phase III Bid No. 15-6457 NOW, THEREFORE, if the Owner shall accept the Bid of the PRINCIPAL and the PRINCIPAL shall enter into the required Agreement with the Owner and within ten days after the date of a written Notice of Award in accordance with the terms of such Bid, and give such bond or bonds in an amount of 100% the total Contract Amount as specified in the Bidding Documents or Contract Documents with good and sufficient surety for the faithful performance of the Agreement and for the prompt payment of labor, materials and supplies furnished in the prosecution thereof or, in the event of the failure of the PRINCIPAL to enter into such Agreement or to give such bond or bonds, and deliver to Owner the required certificates of insurance, if the PRINCIPAL shall pay to the OBLIGEE the fixed sum of$ noted above as liquidated damages, and not as a penalty, as provided in the Bidding Documents, then this obligation shall be null and void, otherwise to remain in full force and effect. IN TESTIMONY Thereof, the Principal and Surety have caused these presents to be duly signed and sealed this 15th day of June , 2015. Douglas N. Higgins, Inc. Principal BY (Seal) Hartford Fire Insurance Company Surety 14.4 4 , 40 lir wort'Attar' Liala Boli3 (Seal) Resident�#Countersigned WI Si+O NW41st- 10° MI, FL 33178 Local Resident Producing Agent for Hvlant Group, 24 Frads.6tdpricitright Dr., P.O. Box 541, Suite J4100, Ann Arbor, MI 48106 26 Construction Services Agreement for Public Utilities:'Revised 04152015 1 Direct Inquiries/Claims to: THE HAR TFORD POD��R OF ATTORMY One Hartford Plaza Hartford,Connecticut 06155 call:888-266-3488 or fax:860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 36-360851 X Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut X Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana X Hartford Accident and Indemnity Company,a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company,a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company,a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois,a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the'Companies')do hereby make,constitute and appoint, up to the amount of unlimited: Heather M. Johnson,Joel E. Speckman, Terri Mahakian, David Harlock of Ann Arbor, Ml their true and lawful Attorney(s)-in-Fact,each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009 the Companies have caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed,duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. �..wr ,YYt gWW'i ,41,71k—... ��alS is 01-4",;,,eti...11/0 tiAy / -- \. :..rt �AM7 Tr •. 110' ;4: a a !" 2 e s, • ° s ' Sri ,4.4.1 ' ;y�r.t.t,,2 oesr*,0 t;;Y t9 7 fa P i 1a 7 S t 3 1979 • r1..•‘,.19�' 6.,,,�,,�, 'y`�A,.•,l. ti V • \---:•• `•,9 rs'ry tw 11% -7 4n�ts'4 Y. Wr Wesley W.Cowling,Assistant Secretary M. Ross Fisher,Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 12!"day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed the above instrument;that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. .AµT (6)♦ Kathleen T.Maynard Notary Public My Commission Expires July 31,2016 CERTIFICATE I, the undersigned,Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of June 15,2015 . Signed and sealed at the City of Hartford. •_iY Iq1 ,f" *2'))' Y-) x',tis:yJ . , $sI 4 .r+:.. <• o�r� d.r l� � � (0,.......q>,1 a tid t!t"~ 1704 �i�_�• 3 fr� �{ —ii c .ra.► yp t� °i 1867 s t �'.3 v AF�'� T ,lit ! is�es191 va... ■∎ F•a* 0. I t iz/ 9�q tl�ID:'f.f -? 7919 �j + �' k;--`=-`1<,• ��1iMC�p �j�,F'e?v�� ,r • ',,,4141S ...t,;;4:110.` mo „ ,. .. c i� . Gary W.Stomper,Vice President BUSINESS CONTACT INFORMATION Douglas N. Higgins, Inc. (Firm's Complete Legal Name) Main Business 3390 Travis Pointe Rd., Ste. A (Address) Ann Arbor, MI 48108 (City, State, ZIP) Contact Name Dan Higgins Phone No, 734-996-9500 Title Vice President FAX No, 734-996-8480 Email address: DanH(a�dnhiggins.com **************************************************************************************************** ADDITIONAL CONTACT INFORMATION Send Payments To (REQUIRED ONLY if different from above) Douglas N. Higgins, Inc. (Company Name used as Payee) 4485 Enterprise Ave. (Address) Naples, FL 34104 (City, State, ZIP) Contact Name Brandy Bartolone Phone No. 239-774-3130 Title Vice President FAX No. 239-774-4266 Email address: BrandyB @dnhiggins.com Office Servicing Collier County Account /Place Orders/Request Supplies (REQUIRED ONLY if different from above) 4485 Enterprise Ave. (Address) Naples, FL 34104 (City, State, ZIP) Contact Name Brandy Bartolone Phone No. 239-774-3130 Title Vice President FAX No. 239-774-4266 Email Address: BrandyB(a�dnhiggins.com 27 Construction Services Agreement for Public Utilities: Revised 04152015 THIS SHEET MUST BE SIGNED BY VENDOR BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA Purchasing Department BIDDERS CHECK LIST IMPORTANT: Please read carefully, sign in the spaces indicated and return with your Bid. Bidder should check off each of the following items as the necessary action is completed: 1. The Bid has been signed. 2. The Bid prices offered have been reviewed. 3. The price extensions and totals have been checked. 4. Any required drawings, descriptive literature, etc. have been included. 5. Any delivery information required is included. 6. Local Vendor Preference Affidavit completed. 7. Immigration Affidavit completed. 8. Certificate of Authority to Conduct Business in State of Florida. 9. If required, the amount of Bid bond has been checked, and the Bid bond or cashiers check has been included. 10. Any addenda have been signed and included. 11. The mailing envelope has been addressed to: Procurement Director Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 12. The mailing envelope must be sealed and marked with: Bid Number— 15-6457 Project Name—MPS 306 Force Main - Phase III < Opening Date—June 15, 2015 13. The Bid will be mailed or delivered in time to be received no later than the specified opening date and time. Otherwise Bid cannot be considered.) 14. If submitting a manual bid, include any addenda (initialed and dated noting understanding and receipt). If submitting bid electronically, bidder will need to download all related documents on www.colliergov.net/bid. The system will date and time stamp when the addendum files were downloaded ALL COURIER-DELIVERED BIDS MUST HAVE THE BID NUMBER AND PROJECT NAME ON THE OUTSIDE OF THE COURIER PACKET Douglas N. Higgins, Inc. Bidder Name 144 4 ice President Signatu Title DATE: 6/15/15 28 Construction Services Agreement for Public Utilities.Revised 04152015 a4 j �, STATE OF FLORIDA . °( DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION Nuy CONSTRUCTION INDUSTRY LICENSING BOARD (850) 487-1395 00==p 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 HIGGINS, DANIEL NORMAN DOUGLAS N HIGGINS INC 3390 TRAVIS POINTE ROAD SUITE A ANNN ARBOR MI 48108 Congratulations! With this license you become one of the nearly . _ _ one million Floridians licensed by the Department of Business and u,w. Professional Regulation. Our professionals and businesses range �' z STATE OF FLORIDA from architects to yacht brokers,from boxers to barbe ue restaurants, , r e Y q1_ JP, DEPARTMENT OF BUSINESS AND and they keep Florida's economy strong. PROFESSIONAL REGULATION Every day we work to improve the way we do business in order to CGC060189 ISSUED: 08/27/2014 serve you better. For information about our services,please log onto www.myfloridalicense.com. There you can find more information CERTIFIED GENERAL CONTRACTOR about our divisions and the regulations that impact you,subscribe HIGGINS,DANIEL NORMAN to department newsletters and learn more about the Department's initiatives. DOUGLAS N HIGGINS INC Our mission at the Department is:License Efficiently, Regulate Fairly. We constantly strive to serve you better so that you can serve your customers. Thank you for doing business In Florida, IS CERTIFIED under the provisions of Ch 489 FS. and congratulations on your new license! Expiration date:AUG 31,2016 L1408270003526 DETACH HERE RICK SCOTT, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION "1 sf CONSTRUCTION INDUSTRY LICENSING BOARD ,, LICENSE NUMBER Ie - im'��44 4 CGC060189 The GENERAL CONTRACTOR Named below IS CERTIFIED Under the provisions of Chapter 489 FS. Expiration date: AUG 31, 2016 ' HIGGINS, DANIEL NORMAN DOUGLAS N HIGGINS INC rr• r •s ''''" 3390 TRAVIS POINTE ROAD i.1 t '. 7 :.� SUITEA - rF�; ,i ANNN ARBOR MI 48108 0 . 1,,0,1.. n,,,.,-.,.,�,, micro' AN/Ac DC/11 t117Cn RV I AIM CPntt t 1anP97nnfri 7i Florida Department of Transportation RICK SCOTT 605 Suwannee Street ANANTH PRASAD,P.& GOVERNOR Tallahassee,FL 32399-0450 SECRETARY August 27, 2014 • DOUGLAS N. HIGGINS, INC. 3390 TRAVIS POINTE RD ANN ARBOR MI 48108 • RE: CERTIFICATE OF QUALIFICATION Dear Sir/Madam: The Department of Transportation has qualified your company for the type of work indicated below. Unless your company is notified otherwise, this Certificate of Qualification will expire 9/30/2015. Ilowever, the new application is due 1/31/2015. In accordance with S.337.14 (1) F.S. your next application must be filed within (4) months of the ending date of the applicant's audited annual financial state ents and, if applicable, the audited interim financial statements. Section 337.14 (4) F.S. provides that your certificate will be valid for 18 months after your financial statement date. This gives a two month period to allow you to bid on jobs as we process your new application for qualification. To remain qualified with the Department, a new application must be submitted subsequent to' any significant change in the financial position or the structure of your firm as described in Section 14-22.005(3), Florida Administrative Code. Your company's maximum capacity rating has been established based on X Audited Reviewed financial statement's. To access it, please log into the Contractor Prequalification Application System via the following link: httpa://www3.dot.state.fl.us/ContractorPreQualification/ Once logged in, select "View" for the most recently approved application, and then click the "Manage" and "Application Summary" tabs. FDOT APPROVED WORE CLASSES: DRAINAGE, GRADING, MINOR BRIDGES, R&R MINOR BRIDGES FDOT APPROVED SPECIALITY CLASSES OF WORK; UNDERGROUND UTILITIES, WATER MAINS, SANITARY LINES, FORCE MAINS, SEWER LINES, PUL4E STATIONS. ' You may apply, in writing, for a Revised Certificate of Qualification at any time prior to the expiration date of this certificate according to Section 14-22.0041(3), Florida Administrative Code. Please be advised if certification in additional classes of work is d'esire'd, documenta't'ion i5 needed td show that your company has done such work' with your own forces and equipment or that experience was gained with another contractor and that you have the necessary equipment for each additional class of work requested. Sincerely, 7 -rte, Juanita Moore, Manager Contracts Administration Office JM:cj www.dat.state.fl.us • Co rer County Administrative Services Department Procurement Services Division Immigration Law Affidavit Certification Solicitation:15-6457 MPS 306 Force Main -Phase III This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with formal Invitations to Bid (ITB's) and Request for Proposals(RFP)submittals. Further, Vendors/Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the vendor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Failure to Include this Affidavit and acceptable evidence of enrollment in the E-Verifv program, may deem the Vendor/Bidder's proposal as non-responsive. Collier County will not intentionally award County contracts to any vendor who knowingly employs unauthorized alien workers, constituting a violation of the employment provision contained in 8 U.S.C.Section 1324 a(e)Section 274A(e)of the Immigration and Nationality Act("INA"). Collier County may consider the employment by any vendor of unauthorized aliens a violation of Section 274A(e) of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A (e) of the INA shall be grounds for unilateral termination of the contract by Collier County. Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and subsequent Amendment(s))and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Vendor's/ Bidder's proposal. Company Name Douglas N. Higgins, Inc. Print Name Kelly A.Wilkie Title Vice President r t Signature t� Date 6/15/15 State of Michigan County of Washtenaw The foregoing instrument was signed and acknowledged before me this 15th day of June , 2015, by Kelly Wilkie who has produced Personally Known as identification. (Print or Type Name) (Type of Identification and Number) Notary Public Signature Sandra K. Garrison SANDRA K GARRISON Printed Name of Notary Public NOTARY PUBLIC-STATE OF MICHIGAN I —JO- COUNTY OF UVASHTENAVV Notary Commission Number/Expiration My Commission Expires January 10,2020 The signee of this Affidavit guarantees, as evidenced by the sworn affidavit required herein, the truth and accuracy of this affidavit to interrogatories hereinafter made. 21 Construction Services Agreement for Public Utilities:Revised 04152015 ® t'EC Ti g-veriry Company ID Number: 364882 To be accepted as a participant in E-Verify, you should only sign the Employer's Section of the signature page. If you have any questions, contact E-Verify at 888-464-4218. Employer Douglas N.Higgins,Inc. R Suzanne Hawker Name(Please Type or Print) Title Electronically Signed 10/15/2010 _ -_ _ _ Signature Date Department of Homeland Security-Verification Division USCIS Verification Division Name(Please Type or Print) Title Electronically Signed 10/15/2010 Signature Date Information Required for the E-Verify Program Information relating to your Company: Company Name:Douglas N.Higgins,Inc. Company Facility Address:3390 Travis Pointe Rd. Ste.A Ann Arbor,MI 48108 Company Alternate Address: County or Parish: WASHTENAW Employer Identification Number: 381807765 Page 12 of 13 I E-Verify MOU for Employer I Revision Date 09/01/09 www.dhs.gov/E-Verify EVeriFy .T.rgi.[Cr.S.-ic Company ID Number: 364882 North American Industry Classification Systems Code: 237 Administrator: Number of Employees: 20 to 99 Number of Sites Verified for: 4 Are you verifying for more than 1 site?If yes,please provide the number of sites verified for in each State: • MICHIGAN 1 site(s) • FLORIDA 3 site(s) Information relating to the Program Administrator(s)for your Company on policy questions or operational problems: Name: Kelly A Wilkie Telephone Number: (734)996-9500 Fax Number: (734)996-8480 E-mail Address: kwillcie2000 @yahoo.com Name: R Suzanne Hawker Telephone Number: (734)996-9500 Fax Number. (734)996-8480 E-mail Address: rshawker@yahoo.com yahoo.com Page 13 of 13 I E-Verify MOU for Employer I Revision Date 09/01/09 www.dhs.gov/E-Verify CONSTRUCTION AGREEMENT THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ("Owner") hereby contracts with Douglas N. Higgins Inc. ("Contractor") a corporation, authorized to do business in the State of Florida, to perform all work ("Work") in connection with MPS 306 Force Main — Phase III, Bid No. 15-6457 ("Project), as said Work is set forth in the Plans and Specifications prepared by AECOM, the Engineer and/or Architect of Record ("Design Professional") and other Contract Documents hereafter specified. Owner and Contractor, for the consideration herein set forth, agree as follows: Section 1. Contract Documents. A. The Contract Documents consist of this Agreement, the Exhibits described in Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly executed and issued addenda, Change Orders, Work Directive Changes, Field Orders and amendments relating thereto. All of the foregoing Contract Documents are incorporated by reference and made a part of this Agreement (all of said documents including the Agreement sometimes being referred to herein as the "Contract Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A copy of the Contract Documents shall be maintained by Contractor at the Project site at all times during the performance of the Work. B. Owner shall furnish to the Contractor one reproducible set of the Contract Documents and the appropriate number of sets of the Construction Documents, signed and sealed by the Design Professional, as are reasonably necessary for permitting. Section 2. Scope of Work. Contractor agrees to furnish and pay for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely, and fully perform and complete in a good and workmanlike manner the Work required by the Contract Documents. Section 3. Contract Amount. In consideration of the faithful performance by Contractor of the covenants in this Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or cause to be paid, to Contractor the following amount (herein "Contract Amount"), in accordance with the terms of this Agreement: Two Million Two Hundred and Thirty One Thousand Three Hundred and Ninety Five dollars ($2,231,395.00). Section 4. Bonds. A. Contractor shall provide Performance and Payment Bonds, in the form prescribed in Exhibit A, in the amount of 100% of the Contract Amount, the costs of which are to be paid by Contractor. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall meet the requirements of the Department of the Treasury Fiscal Service, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsurance Companies" circular. This circular may be accessed via the web at www.fms.treas.qov/c570/c570.html#certified. Should the Contract Amount be less than 29 Construction Services Agreement for Public Utilities:Revised 04152015 $500,000, the requirements of Section 287.0935, F.S. shall govern the rating and classification of the surety. B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute at its cost and expense another bond and surety, both of which shall be subject to the Owner's approval. Section 5. Contract Time and Liquidated Damages. A. Time of Performance. Time is of the essence in the performance of the Work under this Agreement. The "Commencement Date" shall be established in the written Notice to Proceed to be issued by the Project Manager, as hereinafter defined. Contractor shall commence the Work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Contractor shall achieve Substantial Completion within three hundred and thirty (330) calendar days from the Commencement Date (herein "Contract Time"). The date of Substantial Completion of the Work (or designated portions thereof) is the date certified by the Design Professional when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. Contractor shall achieve Final Completion within thirty five (35) calendar days after the date of Substantial Completion. Final Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner as complete and is so stated by the Owner as completed. As used herein and throughout the Contract Documents, the phrase "Project Manager" refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. B. Liquidated Damages in General. Owner and Contractor recognize that, since time is of the essence for this Agreement, Owner will suffer financial loss if Contractor fails to achieve Substantial Completion within the time specified above, as said time may be adjusted as provided for herein. In such event, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, Two Thousand Three Hundred and Seventy Four dollars ($2,374.00) for each calendar day thereafter until Substantial Completion is achieved. Further, in the event Substantial Completion is reached, but the Contractor fails to reach Final Completion within the required time period, Owner shall also be entitled to assess and Contractor shall be liable for all actual damages incurred by Owner as a result of Contractor failing to timely achieve Final Completion. The Project shall be deemed to be substantially completed on the date the Project Manager (or at his/her direction, the Design Professional) issues a Certificate of Substantial Completion pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to Substantially or Finally Complete the Work within the required time periods. 30 Construction Services Agreement for Public Utilities: Revised 04152015 9 C. Computation of Time Periods. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. D. Determination of Number of Days of Default. For all contracts, regardless of whether the Contract Time is stipulated in calendar days or working days, the Owner will count default days in calendar days. E. Right of Collection. The Owner has the right to apply any amounts due Contractor under this Agreement or any other agreement between Owner and Contractor, as payment on such liquidated damages due under this Agreement in Owner's sole discretion. Notwithstanding anything herein to the contrary, Owner retains its right to liquidated damages due under this Agreement even if Contractor, at Owner's election and in its sole discretion, is allowed to continue and to finish the Work, or any part of it, after the expiration of the Contract Time including granted time extensions. F. Completion of Work by Owner. In the event Contractor defaults on any of its obligations under the Agreement and Owner elects to complete the Work, in whole or in part, through another contractor or its own forces, the Contractor and its surety shall continue to be liable for the liquidated damages under the Agreement until Owner achieves Substantial and Final Completion of the Work. Owner will not charge liquidated damages for any delay in achieving Substantial or Final Completion as a result of any unreasonable action or delay on the part of the Owner. G. Final Acceptance by Owner. The Owner shall consider the Agreement complete when the Contractor has completed in its entirety all of the Work and the Owner has accepted all of the Work and notified the Contractor in writing that the Work is complete. Once the Owner has approved and accepted the Work, Contractor shall be entitled to final payment in accordance with the terms of the Contract Documents. H. Recovery of Damages Suffered by Third Parties. Contractor shall be liable to Owner to the extent Owner incurs damages from a third party as a result of Contractor's failure to fulfill all of its obligations under the Contract Documents. Owner's recovery of any delay related damages under this Agreement through the liquidated damages does not preclude Owner from recovering from Contractor any other non-delay related damages that may be owed to it arising out of or relating to this Agreement. Section 6. Exhibits Incorporated. Exhibits Incorporated: The following documents are expressly agreed to be incorporated by reference and made a part of this Agreement for Solicitation 15-6457 MPS 306 Force Main - Phase III. Exhibit A: Performance and Payment Bond Forms Exhibit B: Insurance Requirements 31 Construction Services Agreement for Public Utilities:Revised 04152015 Exhibit C: Release and Affidavit Form Exhibit D: Contractor Application for Payment Form Exhibit E: Change Order Form Exhibit F: Certificate of Substantial Completion Form Exhibit G: Final Payment Checklist Exhibit H: General Terms and Conditions Exhibit I: Supplemental Terms and Conditions Exhibit J: Technical Specifications Exhibit K: Permits Exhibit L: Standard Details (if applicable) Exhibit M: Plans and Specifications prepared by AECOM and identified as follows: Bid Documents as shown on Plans (Attached) Exhibit N: Contractor's List of Key Personnel Section 7. Notices A. All notices required or made pursuant to this Agreement by the Contractor to the Owner shall be shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Wayne Karlovich Engineering, Collier County Public Utilities Division 3339 Tamiami Trail E, Naples, Florida 34112 Telephone: (239) 252-5372 Fax: (239) 252-5378 WayneKarlovichRcolliergov.net B. All notices required or made pursuant to this Agreement by Owner to Contractor shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Brandy L. Bartolone Vice President, Douglas N. Higgins Inc. 4485 Enterprise Avenue Naples, Florida 34104 Telephone: (239) 774-3130 Fax: (239) 774-4266 BrandyBAdnhiggins.com C. Either party may change its above noted address by giving written notice to the other party in accordance with the requirements of this Section. 32 Construction Services Agreement for Public Utilities: Revised 04152015 c,� Section 8. PUBLIC ENTITY CRIMES. 8.1 By its execution of this Contract, Construction Contractor acknowledges that it has been informed by Owner of the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." Section 9. Modification. No modification or change to the Agreement shall be valid or binding upon the parties unless in writing and executed by the party or parties intended to be bound by it. Section 10. Successors and Assigns. Subject to other provisions hereof, the Agreement shall be binding upon and shall inure to the benefit of the successors and assigns of the parties to the Agreement. Section 11. Governing Law. The Agreement shall be interpreted under and its performance governed by the laws of the State of Florida. Section 12. No Waiver. The failure of the Owner to enforce at any time or for any period of time any one or more of the provisions of the Agreement shall not be construed to be and shall not be a waiver of any such provision or provisions or of its right thereafter to enforce each and every such provision. Section 13. Entire Agreement. Each of the parties hereto agrees and represents that the Agreement comprises the full and entire agreement between the parties affecting the Work contemplated, and no other agreement or understanding of any nature concerning the same has been entered into or will be recognized, and that all negotiations, acts, work performed, or payments made prior to the execution hereof shall be deemed merged in, integrated and superseded by the Agreement. Section 14. Severability. Should any provision of the Agreement be determined by a court to be unenforceable, such a determination shall not affect the validity or enforceability of any other section or part thereof. 33 Construction Services Agreement for Public Utilities:Revised 04152015 Section 15. Change Order Authorization. The Project Manager shall have the authority on behalf of the Owner to execute all Change Orders and Work Directive Changes to the Agreement to the extent provided for under the Owner's Purchasing Policy and accompanying administrative procedures. Section 16. Construction. Any doubtful or ambiguous language contained in this Agreement shall not be construed against the party who physically prepared this Agreement. The rule sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in a contractual term which appears on its face to have been inserted for the benefit of one of the parties shall be construed against the benefited party) shall not be applied to the construction of this Agreement. Section 17. Order of Precedence In the event of any conflict between or among the terms of any of the Contract Documents, the terms of the Construction Agreement and the General Terms and Conditions shall take precedence over the terms of all other Contract Documents including the Owner's Board approved Executive Summary, except the terms of any Supplemental Conditions shall take precedence over the Construction Agreement and the General Terms and Conditions. To the extent any conflict in the terms of the Contract Documents cannot be resolved by application of the Supplemental Conditions, if any, or the Construction Agreement and the General Terms and Conditions, the conflict shall be resolved by imposing the more strict or costly obligation under the Contract Documents upon the Contractor at Owner's discretion. **** 34 Construction Services Agreement for Public Utilities:Revised 04152015 IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s) indicated below. CONTRACTOR: TWO WITNESSES: Douglas N. Higgins Inc. �- -1 d4-L By: r .A6 L -1&L FIRST WITNESS S \lait 6 •r'nt a and Title Date Print Na e 1 .:f - iait tr SECO ID WIT ESS Diuii Print Name JJ Date: erriI OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY FLORIDA Ewight:E BCC , Clerk �= $Y BY: / eVa4tG __ Tim Nance Date Chairman Attest as Io.Chairman's signature only. Appr•ve• as to Form a d Legality: •ssistan County Atli ney Cdken( &veevl-e-- Print Name 35 Construction Services Agreement for Public Utilities:Revised 04152015 CD EXHIBIT A: PUBLIC PAYMENT BOND MPS 306 Force Main—Phase III Bond No. 35BCSAQ4389 Contract No. 15-6457 KNOW ALL MEN BY THESE PRESENTS: That Douglas N. Higgins, Inc. 3390 Travis Pointe, Suite A,Ann Arbor,MI 48108 , as Principal, and Hartford Accident and Indemnity Company , as Surety, located at One Hartford Plaza,T-4,Hartford.CT 06155 (Business Address) are held and firmly bound toThe Board of County Commissioners of Collier County,Flas Obligee in the sum of Two Million Two hundred Thirty-One Thousand Three Hundred Ninety-Five and 00/10$ 2,231,395.00 ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns,jointly and severally. WHEREAS, Principal has entered into a contract dated as of the ?{ 1 day of 2015, with Obligee for MPS 306 Force Main-Phase III,Bid No. 15-6457 in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.05(2). In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this 13th day of July 2015, the name of each party being affixed and these presents duly signed by its under-signed representative, pursuant to authority of its governing body. 36 Construction Services Agreement for Public Utilities:Revised 04152015 0 Signed, sealed and delivered in the presence of: PRINCIPAL Douglas N.Higgins,Inc. heli,Lka. thCa Witnesses as to Principal BNYA:ME: 1y A Wilkie • ITS: Vice-President STATE OF Michigan COUNTY OF Washtenaw The foregoing instrument was acknowledged before me this 13th day of July 20 15 , by Kelly A. Wilkie , as Vice-President of Douglas N. Higgins, Inc, a Michigan corporation, on behalf of the corporation. He/she is personally known to me OR has produced as identification and did (did not) take an oath. (� My Commission Expires: 1-10 � p Z/rlrtlC�...IIC_,>���C�/U'1tCg't (Signature of Notary) SANDRA K GARRISON NAME: 30rtdra-k_ 60/7"i 504 NOTARY PUBLIC•STATE OF MICHIGAN (Legibly Printed) My , LOO (�SHTENAW NotaryPublic, State of Hiehi San y Commission Expires January 10,2020 Commission ssion No.: ATTEST: SURETY: Hartford Accident and Indemnity Company (Printed Name) One Hartford Plaza.T-4 Hartford,CT 06155 (Business Address (Authorized Signature) Witnesses to Surety (Printed Name) 37 Construction Services Agreement for Public Utilities:Revised 04152015 OR I_ f r As .t orney in act (Attach Power of Attorney) Qt.,.yl,( Lrx ,. Heather M.Johnson Witnesses Dawn Radabaug (Printed Name) FL Resident Agen PO Box 541 Ann Arbor,MI 48106 (Business Address) (734)741-0044 (Telephone Number) STATE OF MI COUNTY OF Lenawee acting in Washtenaw The foregoing instrument was acknowledged before me this 13th day of July , 2015, by Heather M.Johnson , as Attorney in Fact of Hartford Accident and Indemnity Company Surety, On behalf of Surety. He/She is personally known to me OR has produced Drivers License as identification and who did (did not) take an oath. My Commission Expires: (Signature Name: ( "W_jr k A-. t�etcm (Legibly Prin') (AFFIX OFFICIAL SEAL) Notary Public, State of: Mt Commission No.: N/A + RY NOrAn . 417)'pFuC ' 4iyq cA • �mm 'F Op .......a A.. r+'+'') 38 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT A: PUBLIC PERFORMANCE BOND MPS 306 Force Main—Phase III Bond No. 35BCSA04389 Contract No. 15-6457 KNOW ALL MEN BY THESE PRESENTS: That Douglas N. Higgins,Inc.,3390 Travis Pointe,Suite A,Ann Arbor,MI 48108 as Principal, and Hartford Accident and Indemnity Company , as Surety, located at One Hartford Plaza,T-4, Hartford, CT 06155 (Business Address) are held and firmly bound to The Board of County Commissioners of Collier County,FT. as Obligee in the sum of Two Million Two Hundred Thirty-One Thousand Three Hundred Ninety-Five and 00/100 ($2,231,395.00 ) for the payment whereof we bond ourselves, our heirs, executors, personal representatives, successors and assigns,jointly and severally. WHEREAS, Principal has entered into a contract dated as of the `741 day of Jul4 2015, with Obligee for MPS 306 Force Main - Phase 111.Bid No. 15-6457 in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to herein as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract; and 2. Pays Obligee any and all losses, damages, costs and attorneys' fees that Obligee sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Obligee; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alterations or additions to the terms of the Contract or to work or to the specifications. This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Obligee for more than the penal sum of this Performance Bond regardless of the number of suits that may be filed by Obligee. IN WITNESS WHEREOF, the above parties have executed this instrument this 13th day of July , 2015, the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. 39 Construction Services Agreement for Public Utilities:Revised 04152015 r Signed, sealed and delivered in the presence of: PRINCIPAL Al . 1 ir -, Douglas N. Higgins, Inc. °��%� �— BY: e.i-'L CI '�.LM L Witnesses as to Principal NAME: Kelly A. ilkie ITS: Vice-President STATE OF Michigan COUNTY OF Washtenaw The foregoing instrument was acknowledged before me this 13th day of July 2015, by Kelly A. Wilkie as Vice-President of Douglas N. Higgins. Inc. , a corporation, on behalf of the corporation. He/she is erp sonally known to me OR has produced as identification and did (did not)take an oath. My Commission Expires: ICI.�C)Ltev�actovI Y p �-/D'�-OaG at. (Signature) Name: cScrl )C Cu rrl Seri (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of: M 1 cI)/9a Yl SANDRA K GARRISON Commission No.: NOTARY PUBLIC-STATE OF MICHIGAN COUNTY OF WASHTENAW My Commission Expires January 10,2020 40 Construction Services Agreement for Public Utilities:Revised 04152015 ATTEST: SURETY: Hartford Accident and Indemnity Company (Printed Name) One Hartford Plaza,T-4 Hartford. CT 06155 (Business Address) (Authorized Signature) Witnesses as to Surety (Printed Name) OR i A. I.L•...L_i a ll I 4.4...4.41 Attorney n Fact (Attach Power of Attorn:, ) e .-° - Ra ,�,R N Heather M. Johnson Witnesses Dawn Radabau (Printed Name) FL Resident Age t PO Box 541 Ann Arbor, MI 48106 (Business Address) (734) 741-0044 (Telephone Number) STATE OF Michigan COUNTY OF Lenawee acting in Washtenaw The foregoing instrument was acknowledged before me this 13th day of July , 2015, by Heather M. Johnson as Attorney in Fact of Hartford Accident and Indemnity Company a Corporate Surety, on behalf of Surety. He/She is personally known to me OR has produced Drivers License as identification and who did (did not)take an oath. My Commission Expires: CO 0 . Qo . 1� 1W41■RAA� 7- a3 - o` ow (Signatur_, A A QQ � Name: C c■c ` A . Xn1�� (Legibly Pri ) (AFFIX 0 IAL SEAL) Notary Public, State of: MI 1111 = Commission No.: N/A ,O '!!�∎(L A. 0 __ 1 C):° ''•.'s NOTARY PUBUC i COUNTY OF LENAWEE 1 41 • Commission Expires • Construction Services Agreement for Public Utilities:Revised 04152015 My . .• July 23,2021 : ■ =NJ`. •••. $ Direct Inquiries/Claims to: POWER OF ATTORNEY THE HARTFORD BOND T-4 One Hartford Hartford,Connecticut 06155 call:888-266-3488 or fax:860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 35-350851 X Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut X Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana X Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the"Companies")do hereby make, constitute and appoint, up to the amount of unlimited: Heather M. Johnson, Joel E. Speckman, Terri Mahakian, David Harlock of Ann Arbor, Ml their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009 the Companies have caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. t'�r bWarr %''try. rw ({ y.yy 1L 11: ;..� tiv�r _q,�., ' �•,- „rte ,�.!,•II., ,:�r `:ap., 'd •�;�+v,r rvfe �••r1M► 1g 7 De s° ly s�r I9t4 t :a.'. .1.�ASN ' jI,V,I 1•�, • \:';Z11;a15• �4.....- '5-'4- •• U t -"Z*-----).242---- Wesley W.Cowling,Assistant Secretary M. Ross Fisher,Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 12th day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. a t4t4444 4 • *mac • Kathleen T.Maynard Notary Public CERTIFICATE My Commission Expires July 31,2016 I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of July 13, 2015 . Signed and sealed at the City of Hartford. ea,tn'rtW r :-' �C' .�;�'H r s_ y „ .v +.`, e � ',IC 1i r:�wr•rr�u4i a �Q� 7.1”' �� ? AV tT`�1 1967 • /1I /n +' %' , f' t,/ G k- is Gary W.Stumper,Vice President EXHIBIT B: INSURANCE REQUIREMENTS The Vendor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in EXHIBIT B of this solicitation. The Vendor shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Vendor waive against each other and the County's separate Vendors, Contractors, Design Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Vendor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Vendors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County." The General Liability Policy provided by Vendor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Vendor under this solicitation and shall contain a severability of interests provisions. Collier County Board of County Commissioners shall be named as the Certificate Holder. The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County's credit card for transactions relating to this solicitation. The "Certificate Holder" should read as follows: Collier County Board of County Commissioners Naples, Florida The amounts and types of insurance coverage shall conform to the minimum requirements set forth in EXHIBIT B with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Vendor has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Vendor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Vendor's sole responsibility. Coverages shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation,whichever is longer. The Vendor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy cancellation or non-renewal on the part of the insurance carrier or the Vendor. The Vendor shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Vendor from its insurer and nothing contained herein shall relieve Vendor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to 42 Construction Services Agreement for Public Utilities:Revised 04152015 c,� be provided by Vendor hereunder, Vendor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. Should at any time the Vendor not maintain the insurance coverages required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverages and charge the Vendor for such coverage purchased. If Vendor fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Vendor under this Agreement or any other agreement between the County and Vendor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverages shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Vendor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Vendor to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. 43 Construction Services Agreement for Public Utilities:Revised 04152015 ,)i; Collier County Florida INSURANCE AND BONDING REQUIREMENTS Insurance/ Bond Type Required Limits 1. ®Worker's Statutory Limits of Florida Statutes, Chapter 440 and all Federal Compensation Government Statutory Limits and Requirements 2. ® Employer's Liability $500,000 single limit per occurrence 3. ® Commercial General Bodily Injury and Property Damage Liability(Occurrence Form) patterned after the $1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily current ISO form Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. ® Indemnification To the maximum extent permitted by Florida law, the ContractorNendor/Consultant shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals'fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the ContractorNendor/Consultant in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 5. ®Automobile Liability $ 1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 6. ❑ Other insurance as ❑ Watercraft $ Per Occurrence noted: ❑ United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑ Pollution $ Per Occurrence ❑ Professional Liability $ per claim and in the aggregate • $1,000,000 per claim and in the aggregate • $2,000,000 per claim and in the aggregate ❑ Project Professional Liability $ Per Occurrence 44 Construction Services Agreement for Public Utilities: Revised 04152015 C ❑ Valuable Papers Insurance $ Per Occurrence 7. ® Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 8. ® Performance and For projects in excess of$200,000, bonds shall be submitted with the Payment Bonds executed contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as"A-" or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders' surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 9. ® Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions. 10. ® Collier County must be named as"ADDITIONAL INSURED"on the Insurance Certificate for Commercial General Liability where required. 11. ® The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. 12. ® Thirty (30) Days Cancellation Notice required. Ljb 4/24/2015 Vendor's Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm Date Vendor Signature Print Name Insurance Agency Agent Name Telephone 45 Construction Services Agreement for Public Utilities:Revised 04152015 CA ACOR El CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) �..�� 7/13/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Hylant Group Inc Ann Arbor (A/c°,"N,Ext):734-741-0044 FAX (A/C, 24 Frank Lloyd Wright Dr J4100 E-MAIL Ann Arbor MI 48105 ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Contlnentall Insurance Company 35289 INSURED HIGGI-5 INSURER B:Continental Casualty Company 20443 Douglas N. Higgins, Inc. INSURER c:Valley Forge Insurance Co 20508 3390 Travis Pointe, Suite A INSURER D:Greenwich Insurance Company 22322 Ann Arbor MI 48108 INSURER E: - INSURER F: COVERAGES CERTIFICATE NUMBER:1227448447 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LTR INSR WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS A GENERAL LIABILITY U1061922047 4/1/2015 4/1/2016 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY PR S l RENTED PREEMIMI E SES(Ea occurrence) $500,000 CLAIMS-MADE X OCCUR MED EXP(Any one person) $15,000 X Includes XCU PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 POLICY X F,E8: LOC $ A AUTOMOBILE LIABILITY U1061922033 4/1/2015 4/1/2016 COMBINED SINGLE LIMIT (Ea accident) $1,000,000 iX ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE HIRED AUTOS AUTOS (Per accident) B X UMBRELLA,LIAB X OCCUR U1061922050 4/1/2015 4/1/2016 EACH OCCURRENCE _ $10,000,000 _ EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DED X RETENTION$0 $ C WORKERS COMPENSATION WC434990543 4/1/2015 4/1/2016 X WC STATU- OTH- AND EMPLOYERS'LIABILITY Y/N TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $500,000 OFFICER/MEMBER EXCLUDED? N N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 D Professional/ PEC0025095 12/10/2014 12/10/2015 2,000,000 Each Claim Pollution 4,000,000 Aggregate DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Job- MPS 306 Force Main—Phase III, Bid No. 15-6457 Additional Insured for General Liability, as required by written contract(primary)- Collier County Board of County Commissioners CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Collier County Board of County Commissioners ACCORDANCE WITH THE POLICY PROVISIONS. 3327 Tamiami Trail, East Naples FL 34412 AUTHORIZED REPRESENTATIVE 611/39.—t ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD EXHIBIT C:RELEASE AND AFFIDAVIT FORM COUNTY OF COLLIER ) STATE OF FLORIDA ) Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ("Contractor') releases and waives for itself and it's subcontractors, material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner dated 2015 for the period from to , excluding all retainage withheld and any pending claims or disputes as expressly specified as follows: (2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) To the maximum extent permitted by law, Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No. CONTRACTOR BY: ITS: President DATE: Witnesses STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of , 2015, by , as of , a corporation, on behalf of the corporation. He/she is personally known to me or has produced as identification and did (did not)take an oath. My Commission Expires: (Signature of Notary) NAME: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commissioner No.: 46 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT D: FORM OF CONTRACT APPLICATION FOR PAYMENT Payment, Schedule of Values and Stored Materials Record applications are available for download at: http://purchasinq.colliergov.net/Forms/Forms/Allltems.aspx 47 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT E: CHANGE ORDER An electronic data entry form may be found at: http://bccsp01/SiteDirectory/ASD/Purchasing/Forms1/Forms/Default.aspx Change Order Form Contract*: Change*: Purchase Order*: Project*: Contractor/Finn Name: Project Name: Project Manager Name Department: a ig inal Conn actlitiork Cedar Amount CiginalBCC Approval Date;Agenda Item Current BCC Approved Amount Last BCC Approval Date; 'Agenda Iterri* Current ContactiVti at Order Arricunt SAP Contract Expiration Dee Master) Dollar Amount of this Change *0 IW0l Tots I C!lenge from Cr lig i nal Amount Revised Con:vac:v*0/3*Order Total 0.00 *0 IV!0l Change from Current BCC Approved Amount Cu mulabie Changes 0.00 OCilV/S! Change from C urrs nt Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Notice to Proceei Original Last Approved Revised Date Date Completion Date= Date reduces ars orange *of Days Added Select Tasks Q Add new task(s) 0 Delete task(s) 0 C hange taskis) Cl Other(see beow) Provide a response to the following:II.)detailed and specific explanationkationale of the requested change(s)to the task(sj and I or the additional days added(if requested);1)why this change was not included in the original contract;and,1)describe the impact if this change is not processed. Attach additional information from the Design Professional erotic Contractor if need . Prepared by: Date: (Project Manager Name and Department) Acceptance of this Change Order shall constrtute a modrftabori to contract work order denlified stove and will be subject to all the same terms and conditions as contained in the contract:work order indicated above,as fully as if the same were stated in this acceptance. The adjustment,if any,to the Contract shall constitute a full and final settlement of any and ariollclaima cif the Contractor if VerdorI Consultant] Design Professionai arising out of or related to the change set forth herein,including claims for impact and delay costa. Accepted by: Date: (Contractor I Vendor/Consultant I Design Profess Onal and Name of Firm,if project applicable) Approved by: Date: (Design Professional and Name of Firm,if project applicable) Approved by: Date: (Procurement Professional 48 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER'S Project No. Design Professional's Project No. PROJECT: CONTRACTOR Contract For Contract Date This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To OWNER And To Substantial Completion is the state in the progress of the Work when the Work (or designated portion) is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the requirements of the Contract Documents on: DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. 49 Construction Services Agreement for Public Utilities:Revised 04152015 0 The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as follows: RESPONSIBILITIES: OWNER: CONTRACTOR The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the Contract Documents. Executed by Design Professional on , 20 Design Professional By: Type Name and Title CONTRACTOR accepts this Certificate of Substantial Completion on 20 CONTRACTOR By: Type Name and Title OWNER accepts this Certificate of Substantial Completion on , 20 OWNER By: Type Name and Title 50 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT G: FINAL PAYMENT CHECKLIST Bid No.: Project No.: Date: 20 Contractor: The following items have been secured by the for the Project known as and have been reviewed and found to comply with the requirements of the Contract Documents. Original Contract Amount: Final Contract Amount: Commencement Date: Substantial Completion Time as set forth in the Agreement: Calendar Days. Actual Date of Substantial Completion: Final Completion Time as set forth in the Agreement: Calendar Days. Actual Final Completion Date: YES NO 1. All Punch List items completed on 2. Warranties and Guarantees assigned to Owner(attach to this form). 3. Effective date of General one year warranty from Contractor is: 4. 2 copies of Operation and Maintenance manuals for equipment and system submitted (list manuals in attachment to this form). 5. As-Built drawings obtained and dated: 6. Owner personnel trained on system and equipment operation. 7. Certificate of Occupancy No.: issued on (attach to this form). 8. Certificate of Substantial Completion issued on 9. Final Payment Application and Affidavits received from Contractor on: 10. Consent of Surety received on 11. Operating Department personnel notified Project is in operating phase. 12. All Spare Parts or Special Tools provided to Owner: 13. Finished Floor Elevation Certificate provided to Owner: 14. Vendor Evaluation 15. Other: If any of the above is not applicable, indicate by N/A. If NO is checked for any of the above, attach explanation. Acknowledgments: By Contractor: (Company Name) (Signature) (Typed Name&Title) 51 Construction Services Agreement for Public Utilities:Revised 04152015 y y By Design Professional: (Firm Name) (Signature) (Typed Name&Title) By Owner: (Department Name) (Signature) (Name&Title) 52 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT H: GENERAL TERMS AND CONDITIONS 1. INTENT OF CONTRACT DOCUMENTS. 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein. 1.2 If before or during the performance of the Work Contractor discovers a conflict, error or discrepancy in the Contract Documents, Contractor immediately shall report same to the Project Manager in writing and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from the Project Manager; said interpretation or clarification from the Project Manager may require Contractor to consult directly with Design Professional or some other third party, as directed by Project Manager. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing any portion of the Work. 1.3 Drawings are intended to show general arrangements, design and extent of Work and are not intended to serve as shop drawings. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the drawings, specifications or other Contract Document provisions, Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents. 2. INVESTIGATION AND UTILITIES. 2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, disposal, handling and storage of materials; availability and quality of labor; water and electric power; availability and condition of roads; work area; living facilities; climatic conditions and seasons; physical conditions at the work-site and the project area as a whole; topography and ground surface conditions; nature and quantity of the surface materials to be encountered; subsurface conditions; equipment and facilities needed preliminary to and during performance of the Work; and all other costs associated with such performance. The failure of Contractor to acquaint itself with any applicable conditions shall not relieve Contractor from any of its 53 Construction Services Agreement for Public Utilities: Revised 04152015 responsibilities to perform under the Contract Documents, nor shall it be considered the basis for any claim for additional time or compensation. 2.2 Contractor shall locate all existing roadways, railways, drainage facilities and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being referred to in this Sub-Section 2.2 as the "Utilities". Contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. Contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work. The Contractor is responsible for coordinating all other utility work so as to not interfere with the prosecution of the Work (except those utilities to be coordinated by the Owner as may be expressly described elsewhere in the Contract Documents). 2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions are encountered at the Project site which are (i) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (ii) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, and which reasonably should not have been discovered by Contractor as part of its scope of site investigative services required pursuant to the terms of the Contract Documents, then Contractor shall provide Owner with prompt written notice thereof before conditions are disturbed and in no event later than three (3) calendar days after first observance of such conditions. Owner and Design Professional shall promptly investigate such conditions and, if they differ materially and cause an increase or decrease in Contractor's cost of, or time required for, performance of any part of the Work, Owner will acknowledge and agree to an equitable adjustment to Contractor's compensation or time for performance, or both, for such Work. If Owner determines that the conditions at the site are not materially different from those indicated in the Contract Documents or not of an unusual nature or should have been discovered by Contractor as part of its investigative services, and that no change in the terms of the Agreement is justified, Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in opposition to such determination by Owner must be made within seven (7) calendar days after Contractor's receipt of Owner's written determination notice. If Owner and Contractor cannot agree on an adjustment to Contractor's cost or time of performance, the dispute resolution procedure set forth in the Contract Documents shall be complied with by the parties. 3. SCHEDULE. 3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award, shall prepare and submit to Project Manager, for their review and approval, a progress schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall relate to all Work required by the Contract Documents, and shall utilize the Critical Path method of scheduling and shall provide for expeditious and practicable execution of the Work within the Contract Time. The Progress Schedule shall indicate the dates for starting and completing the various stages of the Work. 3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly updates to the Progress Schedule shall be subject to the Project Manager's review and approval. Contractor shall submit the updates to the Progress Schedule with its monthly 54 Construction Services Agreement for Public Utilities:Revised 04152015 Applications for Payment noted below. The Project Manager's review and approval of the submitted Progress Schedule updates shall be a condition precedent to the Owner's obligation to pay Contractor. 3.3 All work under this Agreement shall be performed in accordance with the requirements of all Collier County Noise Ordinances then in effect. Unless otherwise specified, work will generally be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Saturday. No work shall be performed outside the specified hours without the prior approval of the Project Manager. 4. PROGRESS PAYMENTS. 4.1 Prior to submitting its first monthly Application for Payment, Contractor shall submit to Project Manager, for their review and approval, a schedule of values based upon the Contract Price, listing the major elements of the Work and the dollar value for each element. After its approval by the Project Manager, this schedule of values shall be used as the basis for the Contractor's monthly Applications for Payment. This schedule shall be updated and submitted each month along with a completed copy of the Application for Payment form signed by the Contractor's authorized representative and attached to the Agreement as Exhibit D. 4.2 Prior to submitting its first monthly Application for Payment, Contractor shall provide to the Project Manager the list of its Subcontractors and materialmen submitted with its Bid showing the work and materials involved and the dollar amount of each subcontract and purchase order. Contractor acknowledges and agrees that any modifications to the list of Subcontractors submitted with Contractor's Bid and any subsequently identified Subcontractors are subject to Owner's prior written approval. The first Application for Payment shall be submitted no earlier than thirty (30) days after the Commencement Date. Notwithstanding anything herein to the contrary, if approved by Owner in its sole discretion, Contractor may submit its invoice for any required Payment and Performance Bonds prior to the first Application of Payment provided that Contractor has furnished Owner certified copies of the receipts evidencing the premium paid by Contractor for the bonds. 4.3 Contractor shall submit all Applications for Payment to Donovan Bramlett, AECOM, located at 4415 Metro Parkway, Suite 404, Fort Myers, Florida 33916. 4.4 Unless expressly approved by Owner in advance and in writing, said approval at Owner's sole discretion, Owner is not required to make any payment for materials or equipment that have not been incorporated into the Project. If payment is requested on the basis of materials and equipment not incorporated into the Project, but delivered and suitably stored at the site or at another location, and such payment and storage have been agreed to by Owner in writing, the Application for Payment also shall be accompanied by a bill of sale, invoice or other documentation warranting that the Owner has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, together with evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect Owner's interest therein, all of which shall be subject to the Owner's satisfaction. Thereafter, with each Application for Payment, Contractor also shall complete and submit to Owner as part of its Application for Payment, the Stored Materials Record attached hereto and made a part hereof as Exhibit D-3. 55 Construction Services Agreement for Public Utilities: Revised 04152015 4.5 Contractor shall submit four (4) copies of its monthly Application for Payment to the Project Manager or his or her designee, as directed by Owner (which designee may include the Design Professional). After the date of each Application for Payment is stamped as received and within the timeframes set forth in Section 218.735 F.S., the Project Manager, or Design Professional, shall either: (1) Indicate its approval of the requested payment; (2) indicate its approval of only a portion of the requested payment, stating in writing its reasons therefore; or (3) return the Application for Payment to the Contractor indicating, in writing, the reason for refusing to approve payment. Payments of proper invoices in the amounts approved shall be processed and paid in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Purchasing Department and the Clerk of Court's Finance Department respectively. In the event of a total denial by Owner and return of the Application for Payment by the Project Manager, the Contractor may make the necessary corrections and re-submit the Application for Payment. The Owner shall, within ten (10) business days after the Application for Payment is stamped and received and after Project Manager approval of an Application for Payment, pay the Contractor the amounts so approved. 4.5 Owner shall retain ten percent (10%) of the gross amount of each monthly payment request or ten percent (10%) of the portion thereof approved by the Project Manager for payment, whichever is less. Such sum shall be accumulated and not released to Contractor until final payment is due unless otherwise agreed to by the Owner in accordance with Florida Statute 255.078. The Project Manager shall have the discretion to establish, in writing, a schedule to periodically reduce the percentage of cumulative retainage held through out the course of the Project schedule. Owner shall reduce the amount of the retainage withheld on each payment request subsequent to fifty percent (50%) completion subject to the guidelines set forth in Florida Statute 255.078 and as set forth in the Owner's Purchasing Policy. 4.6 Monthly payments to Contractor shall in no way imply approval or acceptance of Contractor's Work. 4.7 Each Application for Payment, subsequent to the first pay application, shall be accompanied by a Release and Affidavit, in the form attached as Exhibit C, acknowledging Contractor's receipt of payment in full for all materials, labor, equipment and other bills that are then due and payable by Owner with respect to the current Application for Payment. Further, to the extent directed by Owner and in Owner's sole discretion, Contractor shall also submit a Release and Affidavit from each Subcontractor, sub-subcontractor, or supplier in the form attached as Exhibit C acknowledging that each Subcontractor, sub-subcontractor or supplier has been paid in full through the previous month's Application for Payment. The Owner shall not be required to make payment until and unless these affidavits are furnished by Contractor. 4.8 Contractor agrees and understands that funding limitations exist and that the expenditure of funds must be spread over the duration of the Project at regular intervals based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting its first monthly Application for Payment, Contractor shall prepare and submit for Project Manager's review and approval, a detailed Project Funding Schedule, which shall be updated as necessary and approved by Owner to reflect approved adjustments to the Contract Amount and Contract Time. No voluntary acceleration or early completion of the Work shall modify the time of payments to Contractor as set forth in the approved Project Funding Schedule. 56 Construction Services Agreement for Public Utilities:Revised 04152015 CD 4.9 Notwithstanding anything in the Contract Documents to the contrary, Contractor acknowledges and agrees that in the event of a dispute concerning payments for Work performed under this Agreement, Contractor shall continue to perform the Work required of it under this Agreement pending resolution of the dispute provided that Owner continues to pay Contractor all amounts that Owner does not dispute are due and payable. 4.10 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non-payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. 4.11 The County may, at its discretion, use VISA/MASTER card credit network as a payment vehicle for goods and/or services purchased as a part of this contract. 5. PAYMENTS WITHHELD. 5.1 The Project Manager may decline to approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections that reveal non-compliance with the Contract Documents. The Project Manager may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents by Contractor. 5.2 If any conditions described in 5.1. are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Provided, however, in the event of an emergency, Owner shall not be required to provide Contractor any written notice prior to rectifying the situation at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or non-liquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 5.3 In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off-set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed and/or for materials delivered in association with a contract. 6. FINAL PAYMENT. 6.1 Owner shall make final payment to Contractor in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Purchasing Department and the 57 Construction Services Agreement for Public Utilities: Revised 04152015 Clerk of Court's Finance Department after the Work is finally inspected and accepted by Project Manager as set forth with Section 20.1 herein, provided that Contractor first, and as an explicit condition precedent to the accrual of Contractor's right to final payment, shall have furnished Owner with a properly executed and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly executed copy of the Surety's consent to final payment and such other documentation that may be required by the Contract Documents and the Owner. Prior to release of final payment and final retainage, the Contractor's Representative and the Project Manager shall jointly complete the Final Payment Checklist, a representative copy of which is attached to this Agreement as Exhibit G. 6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and all claims by Contractor against Owner arising out of this Agreement or otherwise relating to the Project, except those previously made in writing in accordance with the requirements of the Contract Documents and identified by Contractor as unsettled in its final Application for Payment. Neither the acceptance of the Work nor payment by Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of Contractor hereunder or to the recovery of damages for defective Work not discovered by the Design Professional or Project Manager at the time of final inspection. 7. SUBMITTALS AND SUBSTITUTIONS. 7.1 Contractor shall carefully examine the Contract Documents for all requirements for approval of materials to be submitted such as shop drawings, data, test results, schedules and samples. Contractor shall submit all such materials at its own expense and in such form as required by the Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the installation thereof. 7.2 Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other suppliers may be accepted by Owner if sufficient information is submitted by Contractor to allow the Owner to determine that the material or equipment proposed is equivalent or equal to that named. Requests for review of substitute items of material and equipment will not be accepted by Owner from anyone other than Contractor and all such requests must be submitted by Contractor to Project Manager within thirty (30) calendar days after Notice of Award is received by Contractor, unless otherwise mutually agreed in writing by Owner and Contractor. 7.3 If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make application to the Project Manager for acceptance thereof, certifying that the proposed substitute shall adequately perform the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application shall state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor's achievement of substantial completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Owner for the Project) to adapt the design to the proposed substitute and whether or not incorporation or use by the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service shall be indicated. The 58 Construction Services Agreement for Public Utilities:Revised 04152015 '00 application also shall contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs for redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Project Manager in evaluating the proposed substitute. The Project Manager may require Contractor to furnish at Contractor's expense additional data about the proposed substitute. 7.4 If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, sequence, technique or procedure of construction acceptable to the Project Manager, if Contractor submits sufficient information to allow the Project Manager to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedures for submission to and review by the Project Manager shall be the same as those provided herein for substitute materials and equipment. 7.5 The Project Manager shall be allowed a reasonable time within which to evaluate each proposed substitute and, if need be, to consult with the Design Professional. No substitute will be ordered, installed or utilized without the Project Manager's prior written acceptance which shall be evidenced by a Change Order, a Work Directive Change, a Field Order or an approved Shop Drawing. The Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. The Project Manager will record time required by the Project Manager and the Project Manager's consultants in evaluating substitutions proposed by Contractor and making changes in the Contract Documents occasioned thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse Owner for the charges of the Design Professional and the Design Professional's consultants for evaluating each proposed substitute. 8. DAILY REPORTS, SIGNED AND SEALED AS-BUILTS AND MEETINGS. 8.1 Unless waived in writing by Owner, Contractor shall complete and submit to Project Manager on a weekly basis a daily log of the Contractor's work for the preceding week in a format approved by the Project Manager. The daily log shall document all activities of Contractor at the Project site including, but not limited to, the following: 8.1.1 Weather conditions showing the high and low temperatures during work hours, the amount of precipitation received on the Project site, and any other weather conditions which adversely affect the Work; 8.1.2 Soil conditions which adversely affect the Work; 8.1.3 The hours of operation by Contractor's and Sub-Contractor's personnel; 8.1.4 The number of Contractor's and Sub-Contractor's personnel present and working at the Project site, by subcontract and trade; 8.1.5 All equipment present at the Project site, description of equipment use and designation of time equipment was used (specifically indicating any down time); 8.1.6 Description of Work being performed at the Project site; 8.1.7 Any unusual or special occurrences at the Project site; 59 Construction Services Agreement for Public Utilities:Revised 04152015 8.1.8 Materials received at the Project site; 8.1.9 A list of all visitors to the Project 8.1.10 Any problems that might impact either the cost or quality of the Work or the time of performance. The daily log shall not constitute nor take the place of any notice required to be given by Contractor to Owner pursuant to the Contract Documents. 8.2 Contractor shall maintain in a safe place at the Project site one record copy of the Contract Documents, including, but not limited to, all drawings, specifications, addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as well as all written interpretations and clarifications issued by the Design Professional, in good order and annotated to show all changes made during construction. The annotated drawings shall be continuously updated by the Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Work Directive Changes and Field Orders, and all concealed and buried installations of piping, conduit and utility services. All buried and concealed items, both inside and outside the Project site, shall be accurately located on the annotated drawings as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The annotated drawings shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in a contrasting color. The "As-Built" record documents, together with all approved samples and a counterpart of all approved shop drawings shall be available to the Project Manager or Design Professional for reference. Upon completion of the Work and as a condition precedent to Contractor's entitlement to final payment, these "As-Built" record documents, samples and shop drawings shall be delivered to Project Manager by Contractor for Owner. 8.3 Contractor shall keep all records and supporting documentation, which concern or relate to the Work hereunder for a minimum of five (5) years from the date of termination of this Agreement or the date the Project is completed or such longer period as may be required by law, whichever is later, pursuant to Florida Public Records Law Chapter 119, including specifically those contractual requirements in F.S. § 119.0701(2(a) — (d) and (3) as follows: (2) In addition to other contract requirements provided by law, each public agency contract for services must include a provision that requires the contractor to comply with public records laws, specifically to: (a) Keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to perform the service. (b) Provide the public with access to public records on the same terms and conditions that the public agency would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. (d) Meet all requirements for retaining public records and transfer, at no cost, to the public agency all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are 60 Construction Services Agreement for Public Utilities:Revised 04152015 exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the public agency. (3) If a contractor does not comply with a public records request, the public agency shall enforce the contract provisions in accordance with the contract. 9. CONTRACT TIME AND TIME EXTENSIONS. 9.1 Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and material-men, as well as coordinating its Work with all work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures, as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's suppliers and contractors as set forth in Paragraph 12.2. herein. 9.2 Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. 9.3 No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 9.4 In no event shall any approval by Owner authorizing Contractor to continue performing Work under this Agreement or any payment issued by Owner to Contractor be deemed a waiver of any right or claim Owner may have against Contractor for delay damages hereunder. 10. CHANGES IN THE WORK. 10.1 Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. 61 Construction Services Agreement for Public Utilities:Revised 04152015 Any alleged changes must be approved by Owner in writing prior to starting such items. Owner will not be responsible for the costs of any changes commenced without Owner's express prior written approval. Failure to obtain such prior written approval for any changes will be deemed: (i) a waiver of any claim by Contractor for such items and (ii) an admission by Contractor that such items are in fact not a change but rather are part of the Work required of Contractor hereunder. 10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change Order in the manner as Owner and Contractor shall mutually agree. 10.3 If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 11 of these General Conditions or else be deemed to have waived any claim on this matter it might otherwise have had. 10.4 In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all Subcontractors' and sub-subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15%). All compensation due Contractor and any Subcontractor or sub-subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub-Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 10.5 Owner shall have the right to conduct an audit of Contractor's books and records to verify the accuracy of the Contractor's claim with respect to Contractor's costs associated with any Change Order or Work Directive Change. 10.6 The Project Manager shall have authority to order minor changes in the Work not involving an adjustment to the Contract Amount or an extension to the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be binding on the Contractor. 10.7 Any modifications to this Contract shall be in compliance with the County Purchasing Policy and Administrative Procedures in effect at the time such modifications are authorized. 11. CLAIMS AND DISPUTES. 62 Construction Services Agreement for Public Utilities: Revised 04152015 11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and matters in question between Owner and Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a Claim shall rest with the party making the Claim. 11.2 Claims by the Contractor shall be made in writing to the Project Manager within forty- eight (48) hours from when the Contractor knew or should have known of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the Claim. Written supporting data shall be submitted to the Project Manager within fifteen (15) calendar days after the occurrence of the event, unless the Owner grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with the provisions of Subsection 10.4. 11.3 The Contractor shall proceed diligently with its performance as directed by the Owner, regardless of any pending Claim, action, suit or administrative proceeding, unless otherwise agreed to by the Owner in writing. Owner shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim. 12. OTHER WORK. 12.1 Owner may perform other work related to the Project at the site by Owner's own forces, have other work performed by utility owners or let other direct contracts. If the fact that such other work is to be performed is not noted in the Contract Documents, written notice thereof will be given to Contractor prior to starting any such other work. If Contractor believes that such performance will involve additional expense to Contractor or require additional time, Contractor shall send written notice of that fact to Owner and Design Professional within forty-eight (48) hours of being notified of the other work. If the Contractor fails to send the above required forty- eight (48) hour notice, the Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension to the Contract Time or adjustment to the Contract Amount. 12.2 Contractor shall afford each utility owner and other contractor who is a party to such a direct contract (or Owner, if Owner is performing the additional work with Owner's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work and shall properly connect and coordinate its Work with theirs. Contractor shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of the Project Manager and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other Contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.3 If any part of Contractor's Work depends for proper execution or results upon the work of any other contractor or utility owner (or Owner), Contractor shall inspect and promptly report to Project Manager in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. Contractor's failure to report 63 Construction Services Agreement for Public Utilities:Revised 04152015 will constitute an acceptance of the other work as fit and proper for integration with Contractor's Work. 13. INDEMNIFICATION AND INSURANCE. 13.1 To the maximum extent permitted by Florida law, Contractor shall indemnify and hold harmless Owner and its officers and employees from any and all liabilities, claims, damages, penalties, demands, judgments, actions, proceedings, losses or costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, whether resulting from any claimed breach of this Agreement by Contractor or from personal injury, property damage, direct or consequential damages, or economic loss, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. 13.2 The duty to defend under this Article 13 is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, Owner and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the Owner or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 13.3 Contractor shall obtain and carry, at all times during its performance under the Contract Documents, insurance of the types and in the amounts set forth in Exhibit B to the Agreement. Further, the Contractor shall at all times comply with all of the terms, conditions, requirements and obligations set forth under Exhibit B. 14. COMPLIANCE WITH LAWS. 14.1 Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, worker's compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Project Manager in writing. To the extent any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain terms in this Agreement in order for this Agreement to be enforceable, such terms shall be deemed included in this Agreement. Notwithstanding anything in the Contract Documents to the contrary, it is understood and agreed that in the event of a change in any applicable laws, ordinances, rules or regulations subsequent to the date this Agreement was executed that increases the Contractor's time or cost of performance of the Work, Contractor is entitled to a Change Order for such increases, except to the extent Contractor knew or should have known of such changes prior to the date of this Agreement. 14.2 By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with 64 Construction Services Agreement for Public Utilities:Revised 04152015 'c� the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 14.3 Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States. The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet-based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Vendors / Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the vendor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Vendors are also required to provide the Collier County Purchasing Department an executed affidavit certifying they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents. If the Bidder/Vendor does not comply with providing both the acceptable E-Verify evidence and the executed affidavit the bidder's / vendor's proposal may be deemed non-responsive. Additionally, vendors shall require all subcontracted vendors to use the E-Verify system for all purchases not covered under the "Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website: http://www.dhs.gov/E-Verify. It shall be the vendor's responsibility to familiarize themselves with all rules and regulations governing this program. Vendor acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. 15. CLEANUP AND PROTECTIONS. 15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 65 Construction Services Agreement for Public Utilities:Revised 04152015 26. EMERGENCIES. 26.1 In the event of an emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner or Design Professional is obligated to act to prevent threatened damage, injury or loss. Contractor shall give Project Manager written notice within forty-eight (48) hours after Contractor knew or should have known of the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Project Manager determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty-eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 27. USE OF PREMISES. 27.1 Contractor shall maintain all construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas identified in and permitted by the Contract Documents and other lands and areas permitted by law, rights of way, permits and easements, and shall not unreasonably encumber the Project site with construction equipment or other material or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from the performance of the Work. 28. SAFETY. 28.1 Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 28.1.1 All employees on or about the project site and other persons and/or organizations who may be affected thereby; 28.1.2 All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Project site; and 28.1.3 Other property on Project site or adjacent thereto, including trees, shrubs, walks, pavements, roadways, structures, utilities and any underground structures or improvements not designated for removal, relocation or replacement in the Contract Documents. 28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. Contractor shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of underground structures and improvements and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation or replacement of their property. Contractor's duties and responsibilities for the safety and 73 Construction Services Agreement for Public Utilities: Revised 04152015 protection of the Work shall continue until such time as the Work is completed and final acceptance of same by Owner has occurred. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 28.3. Contractor shall designate a responsible representative located on a full time basis at the Project site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Owner. 28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner property. All employees of Contractor, as well as those of all subcontractors and those of any other person or entity for whom Contractor is legally liable (collectively referred to herein as "Employees"), shall not possess or be under the influence of any such substances while on any Owner property. Further, Employees shall not bring on to any Owner property any gun, rifle or other firearm, or explosives of any kind. 28.5 Contractor acknowledges that the Work may be progressing on a Project site which is located upon or adjacent to an existing Owner facility. In such event, Contractor shall comply with the following: 28.5.1 All Owner facilities are smoke free. Smoking is strictly prohibited. 28.5.2 All Employees shall be provided an identification badge by Contractor. Such identification badge must be prominently displayed on the outside of the Employees' clothing at all times. All Employees working at the Project site must log in and out with the Contractor each day; 28.5.3 Contractor shall strictly limit its operations to the designated work areas and shall not permit any Employees to enter any other portions of Owner's property without Owner's expressed prior written consent; 28.5.4 All Employees are prohibited from distributing any papers or other materials upon Owner's property, and are strictly prohibited from using any of Owner's telephones or other office equipment; 28.5.5 All Employees shall at all times comply with the OSHA regulations with respect to dress and conduct at the Project site. Further, all Employees shall comply with the dress, conduct and facility regulations issued by Owner's officials onsite, as said regulations may be changed from time to time; 28.5.6 All Employees shall enter and leave Owner's facilities only through the ingress and egress points identified in the site utilization plan approved by Owner or as otherwise designated, from time to time, by Owner in writing; 28.5.7 When requested, Contractor shall cooperate with any ongoing Owner investigation involving personal injury, economic loss or damage to Owner's facilities or personal property therein; 74 Construction Services Agreement for Public Utilities: Revised 04152015 r'�U 28.5.8 The Employees may not solicit, distribute or sell products while on Owner's property. Friends, family members or other visitors of the Employees are not permitted on Owner's property; and 28.5.9 At all times, Contractor shall adhere to Owner's safety and security regulations, and shall comply with all security requirements at Owner's facilities, as said regulations and requirements may be modified or changed by Owner from time to time. 29. PROJECT MEETINGS. Prior to the commencement of Work, the Contractor shall attend a pre-construction conference with the Project Manager, Design Professional and others as appropriate to discuss the Progress Schedule, procedures for handling shop drawings and other submittals, and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. During the prosecution of the Work, the Contractor shall attend any and all meetings convened by the Project Manager with respect to the Project, when directed to do so by Project Manager or Design Professional. The Contractor shall have its subcontractors and suppliers attend all such meetings (including the pre-construction conference) as may be directed by the Project Manager. 30. VENDOR PERFORMANCE EVALUATION Owner has implemented a Vendor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, vendors will be evaluated on their performance upon completion/termination of this Agreement. 31. MAINTENANCE OF TRAFFIC POLICY For all projects that are conducted within a Collier County Right-of-Way, the Contractor shall provide and erect Traffic Control Devices as prescribed in the current edition of the Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local roadways and as prescribed in the Florida Department of Transportations Design Standards (DS), where applicable on state roadways. These projects shall also comply with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by reference. Copies are available through Risk Management and/or Purchasing Departments, and is available on-line at colliergov.net/purchasing. The Contractor will be responsible for obtaining copies of all required manuals, MUTCD, FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to become familiar with their requirements. Strict adherence to the requirements of the Maintenance of Traffic ("MOT") policy will be enforced under this Contract. All costs associated with the Maintenance of Traffic shall be included on the line item on the bid page. If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of Award. 32. SALES TAX SAVINGS AND DIRECT PURCHASE 75 Construction Services Agreement for Public Utilities: Revised 04152015 32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. Additionally, as directed by Owner and at no additional cost to Owner, Contractor shall comply with and fully implement the sales tax savings program with respect to the Work, as set forth in section 32.2 below: 32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from sales tax and may wish to generate sales tax savings for the Project, Owner reserves the right to make direct purchases of various construction materials and equipment included in the Work ("Direct Purchase"). Contractor shall prepare purchase orders to vendors selected by Contractor, for execution by Owner, on forms provided by Owner. Contractor shall allow two weeks for execution of all such purchase orders by Owner. Contractor represents and warrants that it will use its best efforts to cooperate with Owner in implementing this sales tax savings program in order to maximize cost savings for the Project. Adjustments to the Contract Amount will be made by appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the saved sales taxes. A Change Order shall be processed promptly after each Direct Purchase, or group of similar or related Direct Purchases, unless otherwise mutually agreed upon between Owner and Contractor. With respect to all Direct Purchases by Owner, Contractor shall remain responsible for coordinating, ordering, inspecting, accepting delivery, storing, handling, installing, warranting and quality control for all Direct Purchases. Notwithstanding anything herein to the contrary, Contractor expressly acknowledges and agrees that all Direct Purchases shall be included within and covered by Contractor's warranty to Owner to the same extent as all other warranties provided by Contractor pursuant to the terms of the Contract Documents. In the event Owner makes a demand against Contractor with respect to any Direct Purchase and Contractor wishes to make claim against the manufacturer or supplier of such Direct Purchase, upon request from Contractor Owner shall assign to Contractor any and all warranties and Contract rights Owner may have from any manufacturer or supplier of any such Direct Purchase by Owner. 32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal excise taxes. 33. SUBCONTRACTS 33.1 Contractor shall review the design and shall determine how it desires to divide the sequence of construction activities. Contractor will determine the breakdown and composition of bid packages for award of subcontracts, based on the current Project Milestone Schedule, and shall supply a copy of that breakdown and composition to Owner and Design Professional for their review and approval prior to submitting its first Application for Payment. Contractor shall take into consideration such factors as natural and practical lines of severability, sequencing effectiveness, access and availability constraints, total time for completion, construction market conditions, availability of labor and materials, community relations and any other factors pertinent to saving time and costs. 33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying or providing any portion of the Work pursuant to a contract with Contractor. Contractor shall be solely responsible for and have control over the Subcontractors. Contractor shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests for Proposal, with all affected Subcontractors and shall review the costs of those proposals and advise Owner and Design Professional of their validity and reasonableness, acting in Owner's best interest, prior to 76 Construction Services Agreement for Public Utilities:Revised 04152015 Cq requesting approval of any Change Order from Owner. All Subcontractors performing any portion of the Work on this Project must be "qualified" as defined in Collier County Ordinance 2013-69, meaning a person or entity that has the capability in all respects to perform fully the Agreement requirements with respect to its portion of the Work and has the integrity and reliability to assure good faith performance. 33.3 In addition to those Subcontractors identified in Contractor's bid that were approved by Owner, Contractor also shall identify any other Subcontractors, including their addresses, licensing information and phone numbers, it intends to utilize for the Project prior to entering into any subcontract or purchase order and prior to the Subcontractor commencing any work on the Project. The list identifying each Subcontractor cannot be modified, changed, or amended without prior written approval from Owner. Any and all Subcontractor work to be self-performed by Contractor must be approved in writing by Owner in its sole discretion prior to commencement of such work. Contractor shall continuously update that Subcontractor list, so that it remains current and accurate throughout the entire performance of the Work. 33.4 Contractor shall not enter into a subcontract or purchase order with any Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not be required to contract with anyone it reasonably objects to. Contractor shall keep on file a copy of the license for every Subcontractor and sub-subcontractor performing any portion of the Work, as well as maintain a log of all such licenses. All subcontracts and purchase orders between Contractor and its Subcontractors shall be in writing and are subject to Owner's approval. Further, unless expressly waived in writing by Owner, all subcontracts and purchase orders shall (1) require each Subcontractor to be bound to Contractor to the same extent Contractor is bound to Owner by the terms of the Contract Documents, as those terms may apply to the portion of the Work to be performed by the Subcontractor, (2) provide for the assignment of the subcontract or purchase order from Contractor to Owner at the election of Owner upon termination of Contractor, (3) provide that Owner will be an additional indemnified party of the subcontract or purchase order, (4) provide that Owner, Collier County Government, will be an additional insured on all liability insurance policies required to be provided by the Subcontractor except workman's compensation and business automobile policies, (5) assign all warranties directly to Owner, and (6) identify Owner as an intended third-party beneficiary of the subcontract or purchase order. Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract, copies of the Contract Documents to which the Subcontractor will be bound. Each Subcontractor shall similarly make copies of such documents available to its sub-subcontractors. 33.5 Each Subcontractor performing work at the Project Site must agree to provide field (on- site) supervision through a named superintendent for each trade (e.g., general concrete forming and placement, masonry, mechanical, plumbing, electrical and roofing) included in its subcontract or purchase order. In addition, the Subcontractor shall assign and name a qualified employee for scheduling direction for its portion of the Work. The supervisory employees of the Subcontractor (including field superintendent, foreman and schedulers at all levels) must have been employed in a supervisory (leadership) capacity of substantially equivalent level on a similar project for at least two years within the last five years. The Subcontractor shall include a resume of experience for each employee identified by it to supervise and schedule its work. 33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and purchase orders shall provide: 77 Construction Services Agreement for Public Utilities:Revised 04152015 Cq 33.6.1 That the Subcontractor's exclusive remedy for delays in the performance of the subcontract or purchase order caused by events beyond its control, including delays claimed to be caused by Owner or Design Professional or attributable to Owner or Design Professional and including claims based on breach of contract or negligence, shall be an extension of its contract time. 33.6.2 In the event of a change in the work, the Subcontractor's claim for adjustments in the contract sum are limited exclusively to its actual costs for such changes plus no more than 10% for overhead and profit. 33.6.3 The subcontract or purchase order, as applicable, shall require the Subcontractor to expressly agree that the foregoing constitute its sole and exclusive remedies for delays and changes in the Work and thus eliminate any other remedies for claim for increase in the contract price, damages, losses or additional compensation. Further, Contractor shall require all Subcontractors to similarly incorporate the terms of this Section 33.6 into their sub- subcontracts and purchase orders. 33.6.4 Each subcontract and purchase order shall require that any claims by Subcontractor for delay or additional cost must be submitted to Contractor within the time and in the manner in which Contractor must submit such claims to Owner, and that failure to comply with such conditions for giving notice and submitting claims shall result in the waiver of such claims. 34. CONSTRUCTION SERVICES 34.1 Contractor shall maintain at the Project site, originals or copies of, on a current basis, all Project files and records, including, but not limited to, the following administrative records: 34.1.1 Subcontracts and Purchase Orders 34.1.2 Subcontractor Licenses 34.1.3 Shop Drawing Submittal/Approval Logs 34.1.4 Equipment Purchase/Delivery Logs 34.1.5 Contract Drawings and Specifications with Addenda 34.1.6 Warranties and Guarantees 34.1.7 Cost Accounting Records 34.1.8 Labor Costs 34.1.9 Material Costs 34.1.10 Equipment Costs 34.1.11 Cost Proposal Request 34.1.12 Payment Request Records 34.1.13 Meeting Minutes 34.1.14 Cost-Estimates 34.1.15 Bulletin Quotations 34.1.16 Lab Test Reports 34.1.17 Insurance Certificates and Bonds 34.1.18 Contract Changes 34.1.19 Permits 34.1.20 Material Purchase Delivery Logs 78 Construction Services Agreement for Public Utilities:Revised 04152015 cA 34.1.21 Technical Standards 34.1.22 Design Handbooks 34.1.23 "As-Built" Marked Prints 34.1.24 Operating & Maintenance Instruction 34.1.25 Daily Progress Reports 34.1.26 Monthly Progress Reports 34.1.27 Correspondence Files 34.1.28 Transmittal Records 34.1.29 Inspection Reports 34.1.30 Punch Lists 34.1.31 PMIS Schedule and Updates 34.1.32 Suspense (Tickler) Files of Outstanding Requirements The Project files and records shall be available at all times to Owner and Design Professional or their designees for reference, review or copying. 34.2 Contractor Presentations At the discretion of the County, the Contractor may be required to provide a brief update on the Project to the Collier County Board of County Commissioners, "Board", up to two (2) times per contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule to be determined by the County Manager or his designee. Prior to the scheduled presentation date, the Contractor shall meet with appropriate County staff to discuss the presentation requirements and format. Presentations may include, but not be limited to, the following information: Original contract amount, project schedule, project completion date and any changes to the aforementioned since Notice to Proceed was issued. 35. SECURITY If required, Vendor / Contractor / Proposer shall be responsible for the costs of providing background checks by the Collier County Facilities Management Department for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four (4) years. 36. VENUE Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 37. VALUE ENGINEERING All projects with an estimated cost of $10 million or more shall be reviewed for consideration of a Value Engineering (VE) study conducted during project development. A "project" shall be defined as the collective contracts, which may include but not be limited to: design, construction, and construction, engineering and inspection (CEI) services. Additionally, any project with an 79 Construction Services Agreement for Public Utilities:Revised 04152015 cq estimated construction value of $2 million or more may be reviewed for VE at the discretion of the County. 38. ABOVEGROUND/UNDERGROUND TANKS 38.1 The contractor shall ensure compliance with all NFPA regulations: specifically 110 & 30/30A; FDEP chapter 62 regulations: specifically 761, 762, 777, and 780; 376 & 403 Florida Statutes; and STI, UL, PEI, ASME, NACE, NLPA, NIST &API referenced standards pertaining to the storage of hazardous materials and petroleum products. 38.2 The contractor shall notify the Solid & Hazardous Waste Management Department (SHWMD) prior to the installation, removal, or maintenance of any storage tank, including day tanks for generators, storing /will be storing petroleum products or hazardous materials. The contractor shall provide a 10 day and 48 hour notice to SHWMD 239-252-2508 prior to commencement. The contractor shall provide the plans pertaining to the storage tank systems containing hazardous materials/ petroleum products to the SHWMD prior to plans submittal to a permitting entity and then SHWMD must approve the plans prior to contractor's submittal for permitting. 39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on Owner's projects who are neat, clean, well- groomed and courteous. Subject to the Americans with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The Owner may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Owner's projects is not in the best interest of the County. 40. DISPUTE RESOLUTION Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of CONSULTANT with full decision-making authority and by OWNER'S staff person who would make the presentation of any settlement reached during negotiations to OWNER for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the parties shall attempt to resolve the dispute through Mediation before an agreed-upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of CONSULTANT with full decision-making authority and by OWNER'S staff person who would make the presentation of any settlement reached at mediation to OWNER'S board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under Section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 80 Construction Services Agreement for Public Utilities:Revised 04152015 c� EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS 1. The Notice to Proceed will be issued only after the following documentation has been submitted to Owner: a. Complete contractual documents, including payment and performance bonds and insurance certificate; b. Progress schedule, which shall utilize the Critical Path method of scheduling and Microsoft Project; c. Submittal schedule; d. Draw (funding) Schedule, which shall consist of a monthly projection of the value of the work to be completed and materials stored for the entire duration of the project; e. Safety Program/Risk Management Program; f. Quality Assurance/Quality Control Program; and g. Security Plan 2. The CPM Schedule and Draw Schedule shall be updated monthly and submitted with each Contractor Application for Payment. If both items are not submitted with Application for Payment, that payment will be withheld until both items are received and accepted by the Owner and Engineer. 3. All engineering site plans and drawings referencing a specific geographic area must be submitted in an AutoCad 14 or later format drawn in the Florida State Plane East (US Feet) Coordinate System. The drawings should either reference specific established Survey documentation, such as Certified Section Corners (Half or Quarter Sections are also acceptable), or be derived from the RTK(Real-Time Kinematic) GPS Network as provided by the Collier County Transportation Division. 4. Other supporting documents may found at: http://bid.colliergov.net/bid/ 81 Construction Services Agreement for Public Utilities:Revised 04152015 �9 EXHIBIT J: TECHNICAL SPECIFICATIONS Supporting documents found at: http://bid.colliergov.net/bid/ 82 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT K: PERMITS Supporting documents found at: http://bid.colliergov.netlbid/ 83 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT L: STANDARD DETAILS Supporting documents found at: http://bid.colliergov.net/bid/ 84 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT M: PLANS AND SPECIFICATIONS Supporting documents found at: http://bid.colliergov.net/bid/ 85 Construction Services Agreement for Public Utilities:Revised 04152015 EXHIBIT N: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT Name Personnel Category Ken Fritz Construction Superintendent Mike LoBello Project Manager 86 Construction Services Agreement for Public Utilities:Revised 04152015 fir J