Loading...
#14-6213-07 (DN Higgins) j RFP#14-6213-7 WORK ORDER/PURCHASE ORDER Contract 14-6213 "Underground Utility Contractors" Contract Expiration Date: July 7, 2016 This Work Order is for General Utility Contracting services for work known as: Project Name: RFQ #14-6213-7 Golden Gate City Stormwater Drainae Improvements In Conjunction With Sidewalk Improvements, 20th CT. SW, 46th TERR. SW&48tn ST. SW Project No: 51029.4 The work is specified in the proposal dated September 29, 2014 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, Request for Quotation #14-6213-7 and Addenda 1-4, this Work Order/Purchase Order is assigned to: Douglas N. Higgins, Inc. Scope of Work: As detailed in the attached proposal and the following: * Golden Gate City Stormwater Drainage Improvements In Conjunction With Sidewalk Improvements, 20th CT. SW, 46th TERR. SW & 48th ST. SW as described in the plans, bid form, specifications, and Addenda 1- 4 of RFQ #14-6213-7 as provided to all six contractors on annual Contract#14-6213. Schedule of Work: Complete work (Substantial Completion) within 90 days from the date of the Notice to Proceed which is accompanying this Work Order. Complete final completion (Final Completion) within 120 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement # 14-6213 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method: Quotation as provided in the attached proposal. TOTAL FEE $ 546,837.00 Page 1 of 3 RFP#14-6213-7 PREPARED BY: ZC// /l - oseph t�,. Delate, Senior Project Manager ate Transportation Engineering Department APPROVED BY: ,• .4■pir' /6/ //�{ Gary Putaansuu, P.E., Principal Project Manager Date sp-, r .tion En ti ering D- m- t APPROVED BY: �. . , • . / (()(/ (/ I Jay Ahmad, P - ., Director / Date Tr. . .. +atio. ineering !i:.artment w �a - ' - ,o\i APPROVED BY: ck Casalanguida, Administrator Date Growth Management Division By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict o f interest that arises during the Work Order and/or project duration. ACCEPTED BY: Douglas N. Higgins, Inc. /ors— / Brandy Bartolone, iV ceTfesident/Regional Manager Date (Remainder of page intentionally left blank) Page 2 of 3 RFP#14-6213-7 IN WITNESS WHEREOF, the parties hereto,have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock,Clerk of Courts COLLIER COUNTY, FLORIDA By + l _ ).0 _ ( I • By: Tom Henning, Ch man Dated: wag ; 'so _J (SE USt 8it0 Cilifnnan's signature only. Name of Firm: Douglas N. Higgins, Inc. airvi a4, L i y•,r,,. 3 First Witness Signature ; r-b to VP TType/ int signature and titlel' TType/print ness nam,/� Sect d Witness a{'L LeaYl� TType/print witness nameT Ap as to Flnand Legality: /I- de f.e.4. � rrs1!aounty Attorney c-vft R, %e� Print Name Page 3 of 3 BID SCHEDULE ,D J HIc ki / .-I RFQ#14-6213-7 GOLDEN GATE CITY STORMWATER DRAINAGE IMPROVEMENTS IN CONJUNCTION WITH SIDEWALK IMPROVEMENTS 20T11 COURT SW,46T11 TERRACE SW& 48111 STREET SW DESCRIPTION QTY UNIT UNIT PRICE AMOUNT 1 Mobilization/Demobilization 1 LS $50,655.00 $50,655.00 2 Survey Layout/Signed and Sealed Asbuilts 1 LS $14,091.00 $14,091.00 3 Stormwater Pollution Plan 1 LS $1,830.00 $1,830.00 4 Maintenance of Traffic 1 LS $6,442.00 $6,442.00 5 Project Sign 2 EA $563.00 $1,126.00 6 Misc.Storm Structure Demolition 45 EA $232.00 $10,440.00 7 Misc. Culvert Demolition 2800 LF $5.00 $14,000.00 8 Ditch Bottom-C-Box 14 EA $1,255.00 $17,570.00 9 Ditch Bottom-D-Box 8 EA $2,011.00 $16,088.00 10 Ditch Bottom-E-Box 3 EA $2,005.00 $6,015.00 11 Type P Bottom Type C Inlet 8 EA $2,865.00 $22,920.00 12 Type P Bottom Type III Cover 1 EA $2,335.00 $2,335.00 13 15" RCP Culvert 0 LF $0.00 $0.00 14 18" RCP Culvert 312 LF $44.00 $13,728.00 15 24" RCP Culvert 592 LF $54.00 $31,968.00 16 42" RCP Culvert 754 LF $128.00 $96,512.00 17 48" RCP Culvert 43 LF $151.00 $6,493.00 18 12 X 18 ERCP 264 LF $51.00 $13,464.00 19 14 X 23 ERCP 161 LF $54.00 $8,694.00 20 19 X 30 ERCP 211 LF $79.00 $16,669.00 21 24 X 38 ERCP 135 LF $119.00 $16,065.00 22 16" PVC(Dir. Drill) 0 LF $0.00 $0.00 23 Ditch Bottom (Type X) 0 EA $0.00, $0.00 24 MES 48" RCP 1 EA $1,512.00 $1,512.00 25 Pipe Connection Exist. 10 EA $1,403.00 $14,030.00 26 Pavement Removal/Replacement 600 LF $5.00 $3,000.00 27 Sidewalk Removal/Replacement 30 SY $43.00 $1,290.00 28 Driveway Removal/Replacement 420 SY $111.00 $46,620.00 29 Asphalt Overlay 3400 SY $23.00 $78,200.00 30 6" Double Yellow(Temp/Perm) 550 LF $5.00 $2,750.00 31 12"White(Temp/Perm) 125 LF $6.00 $750.00 32 24" White(Temp/Perm) 150 LF $10.00 $1,500.00 33 4"Water Main Deflection 1 EA $1,295.00 $1,295.00 34 6"Water Main Deflection 1 EA $1,469.00 $1,469.00 35 8"Water Main Deflection 1 EA $1,744.00 $1,744.00 36 4" Force Main Deflection 1 EA $2,040.00 $2,040.00 37 10" Force Main Deflection 1 EA $3,532.00 $3,532.00 38 Miscellaneous Contingencies Allowance 1 EA $20,000.00 $20,000.00 Total Bid $546,837.00 REVISED 9/19/14 �r Cox�)ty Adrrirrshrave Services Division Purchasing COLLIER COUNTY FLORIDA REQUEST Quote/Contract 14-6213-7 Due Date: September 22, 2014 PROPOSAL PAGE DUE DATE: 91A44 The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: IN WITNESS WHEREOF, WE have hereunto subscribed our names on this day of September , 2014 in the County of Collier , in the state of Florida Douglas N. Higgins, Inc. Firm's Complete Legal Name 239-774-3130 Telephone Number 239-774-4266 FAX Number BrandvB(a�dnhiggins.com Email Address 4485 Enterprise Ave. Address Naples City Florida State 34104 Zip 830666 Florida Certificate of Authority Document Number(www.sunbiz.org/search/html) 38-1807765 Federal Tax Identification OVD: CCR • • Signature -- Vice President/Regional Mgr. Title Brandy Bartolone a2'7/Of f Print Name Date RFQ ContractDriven 01012013 Pt Email: joedelate @colliergov.net Co ler 0 C Telephone: (239)252-5821 Administrative Services Division FAX: (239) 252-5885 Purchasing ADDENDUM #1 Memorandum Date: September 17, 2014 From: Joseph Delate, Senior Project Manager, Transportation Engineering To: Potential Proposers Subject: Addendum #1 —RFQ#14-6213-7, Golden Gate City Drainage Project The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: -Deadline for RFQ (Quotes) has been extended to Monday, September 29 at 8a.m. -In response to questions from several vendors, please see the following responses: 1.) Is laser profiling or videoing of the new storm drain pipe required? Yes to both, per FDOT standards. 2.) Can a pay item for sod restoration be added? No, that is Contractor's responsibility. 3.) Can a pay item for utility pole holding or relocation be added? No. If in R.O.W. or County easement, it's on utility company. 4.) Can the directional drills be changed to open cut if rock is encountered? Will you create an alternate pay item for this? If so, how are we to be paid for the installation and restoration?We are looking at this now. Our Engineer is determining whether the work associated with these directional drills is necessary. Addendum # 2,which is forthcoming, will address this issue. 5.) Can the material for the directional drills be HDPE pipe or fusible PVC pipe? See answer for#4 above. 6.) The Technical Specs require that the permits are the responsibility of the contractor. Will the contract time start once all permits are received or can additional contract time be added for the time it will take to get the permits? Goal is to have low bidder begin permit process immediately once bids are open and low bidder identified. Work Order has to go to BCC for award so it will take some time for that process. Contractor can get started on dewatering permit, ROW permit, and any other necessary permits during that process. Time can be added by Change Order, or beginning of project delayed, to account for time expended to acquire permits. -The following note is hereby added to the project: ROCK NOTE: IT HAS BEEN THE EXPERIENCE OF THE DEPARTMENT WITH PROJECTS CONSTRUCTED WITHIN THIS GENERAL GEOGRAPHIC AREA THAT, ALTHOUGH PRELIMINARY BORINGS DID NOT INDICATE A CONTSTANT PRESENCE OF ROCK, ROCK WAS ENCOUNTERED WHILE PERFORMING UNDERGROUND INSTALLATIONS. THEREFORE, THE CONTRACTOR SHOULD CONSIDER THE INCREASED COST OF ALL UNDERGROUND WORK ACTIVITIES WHILE PERPARING THEIR BID. ALL COSTS OF ROCK EXCAVATION SHALL BE INCLUDED IN THE A 0_, 1 ) ot\o\\‘‘ APPROPRIATE ITEMS OF WORK CONTAINED WITHIN THE CONTRACT. NO EXTRA COMPENSATION OR TIME EXTENSION WILL BE ALLOWED FOR ADDITIONAL WORK DIRECTLY ASSOCIATED WITH THE SPLITTING, EXCAVATION, CRUSHING, DISPOSAL, REPLACEMENT OF DISPLACED VOLUME OF EXTRACTED ROCK WITH FILL MATERIAL, OR SPECIAL HANDLIONG OF ROCK. If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Evelyn Colon, Purchasing 2 • Colter* v nr County Email: joedelate @colliergov.net Telephone: (239)252-5821 Administrative Services Division FAX: (239)252-5885 Purchasing ADDENDUM #2 Memorandum Date: September 18, 2014 From: Joseph Delate, Senior Project Manager, Transportation Engineering To: Potential Proposers Subject: Addendum #2— RFQ #14-6213-7, Golden Gate City Drainage Project The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: -Directional drilling (16" PVC pipe) and Ditch Bottom type "x" boxes have been removed from the bid (Bid items # 21 and 22). This work associated with these items will not be performed with this project. -Quantities in the bid schedule have been revised to reflect correct quantities of materials for Bid Items# 10, 12, 13, 15, 16, 17, 18, 19, 20, 21, and 22. -Bid form has been revised to reflect these changes (see attachment). Please only use this revised bid schedule, and not the original bid schedule or the bid schedule in the specifications that were previously emailed. -Revised plans will not be issued until after bid opening -Submittal deadline is still Monday, September 29 at 8a.m. due to the BCC Agenda deadline for award. -Bid may be submitted via email, or dropped off at 2885 South Horseshoe Drive office of Transportation Engineering, prior to the bid deadline. If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Evelyn Colon, Purchasing qt,\�y \ 1 Email: joedelate @colliergov.net Colter vlr1> ty Telephone: (239)252-5821 Administrative Services Division FAX: (239)252-5885 Purchasing ADDENDUM #3 Memorandum Date: September 19, 2014 From: Joseph Delete, Senior Project Manager, Transportation Engineering To: Potential Proposers Subject: Addendum #3— RFQ #14-6213-7, Golden Gate City Drainage Project The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: -Bid schedule (bid form) has been revised to reflect that Bid item (Pay item) #2 includes: Construction Survey Layout, and Signed and Sealed As-builts (see attachment). -Please only use this revised bid schedule (bid form), and not the original bid schedule or the bid schedule in the specifications or those that were previously emailed. -In response to Proposer's question concerning swales: Could we put a line item in this bid for swales per LF? Also a detail of the swale? No. Please see PROJECT DESCRIPTION in the Technical Specifications where Site Restoration is defined and is the responsibility of the Contractor and is included in his bid. Following final completion of this drainage project, the County will begin a separate sidewalk project that includes in its scope the regrading of the entire swale. -Submittal deadline is still Monday, September 29 at 8 a.m. due to the BCC Agenda deadline for award. -Bid may be submitted via email, or dropped off at 2885 South Horseshoe Drive office of Transportation Engineering, prior to the bid submittal deadline. If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Evelyn Colon, Purchasing 1 0\6 Email: joedelate @colliergov.net Telephone: (239)252-5821 Admmistiative Servkaes Onnsion FAX: (239)252-5885 Purchasing ADDENDUM #4 Memorandum Date: September 23, 2014 From: Joseph Delate, Senior Project Manager, Transportation Engineering To: Potential Proposers Subject: Addendum #4—RFQ#14-6213-7, Golden Gate City Drainage Project The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: -In response to Proposer's question concerning road crossings (open cut restoration): Are we to be using flowable fill on these road crossings? The open cut road restoration design detail in the plan set calls for a conventional road crossing restoration utilizing compacted backfill and compacted limerock with an asphalt overlay on local roads,which this project entails. However, the contractor may use flowable fill for the open cut restoration in accordance with the design detail in the plan set if he desires. -Submittal deadline is still Monday, September 29 at 8 a.m. due to the BCC Agenda deadline for award. -Bid may be submitted via email, or dropped off at 2885 South Horseshoe Drive office of Transportation Engineering, prior to the bid submittal deadline. If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Evelyn Colon, Purchasing 1