Loading...
Resolution 2014-190 RESOLUTION NO. 2014 - 1 90 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, SUPERSEDING RESOLUTION NO. 2007-162 IN ORDER TO ESTABLISH A REVISED SCHEDULE OF FEES FOR RIGHT-OF-WAY PERMITS. WHEREAS, Collier County Resolution No. 2007-162 established a Schedule of Fees for Right-of-Way Permits; and WHEREAS, as directed by the Board of County Commissioners (Board), County staff reviewed the existing regulatory framework for issuance of permits for special event signs in public rights-of-way and, based on this review, is proposing changes to the permit forms for these temporary signs; and WHEREAS, staff is also proposing a revision to the current Schedule of Fees for Right- of-Way Permits so as to include a fee for a Temporary Directional Sign Permit for Public Event; and WHEREAS, new or increased fees for certain land development activities, including, but not limited to, permitting of special event directional signs for placement in the public rights-of- way, are reflective of the actual cost of processing, reviewing, and inspecting such permit work. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that the Board of County Commissioners hereby declares and approves the revised Schedule of Fees for Right-of-Way Permits, as set forth in the attached Exhibit "A," and finds that said fees are reasonable sums to be assessed to those who receive the benefits of these services, reviews, and inspections required by the County permitting process. BE IT FURTHER RESOLVED, that this Resolution shall be recorded in the minutes of this Board and that Resolution No. 2007-162 is hereby superseded by the adoption of this Resolution. [14-CED-00933/1113818/1] THIS RESOLUTION adopted after motion, second, and majority vote favoring adoption thisZday of sue, e),S,ey— , 2014. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, Clerk COLLIE/4U QTY, FLORIDA 04 0 l►'�bl'l B !t Attest as to chairmliKeuty Clerk TOM HE ING, C i AIRMAN signature only. Approved as to form and legality: Kevin L. Noell L' Assistant County Attorney [14-CED-00933/1113818/1] i.. Exhibit "A" Right-of-way Permits Type Residential Non-residential Small Large Right-of-way Construction $ 200.00 $ 1000.00 (June-Nov) $2000.00 (June-Nov) $ 2000.00 (Dec-May) $4000.00(Dec-May) Work in the ROW (Without Lane $ 50.00(June-Nov) $ 100.00(June-Nov) Closures), Cost Per Day $ 100.00 (Dec-May) $ 200.00 (Dec-May) Miscellaneous Events $ 200.00 PSC Regulated Franchise Utility $100.00 Application Fee + $50/Day inspection fee Renewal/Modification of unexpired or *S 100.00 $ 500.00 $ 1000.00 incomplete Permit Re-inspection-First $ 100.00 $ 100.00 $ 100.00 Second $ 150.00 $ 150.00 S 150.00 Third $ 200.00 $ 200.00 $ 200.00 All subsequent inspections $ 250.00 $ 250.00 S 250.00 Jack-and-Bore/Directional Bore $ 500.00 $ 1000.00 $2000.00 Open-cut Construction $2000.00 $4000.00 $6000.00 Sprinkler I lead Placement in R/W $ 50.00 $ 200.00 S 400.00 Turn Lane Construction $ 500.00 $ 1500.00 $3000.00 County Engineering review on behalf of $ 500.00 S 1000.00 FDOT Drainage Permit. No Discharge into State System ** County Engineering review on behalf of $ 1000.00 $ 2000.00 FDOT Drainage Permit. with Discharge into State System Temporary Directional Sign Permit for $75.00 Public Event After-the-Fact Permit 4 X Normal Fee ($24000.00 max) * If the Renewal/Modification does not require additional staff time and field check (unexpired permit only), there will not be any fees charged **Development two (2) acres or less are considered small Page I 01'4 Exhibit "A" Right-of-way Permit Notes: 1. Unjustified delays meeting permitted deadlines shall require additional fees as authorized. 2. Small Commercial Development shall be defined as a non-residential(single-family or duplex) project generating 600 vehicles trips per day or less. 3. Large Commercial Development shall be defined as a non-residential (single-family or duplex) project generating greater than 600 trips per day. 4. A right-of-way use fee(chart attached) per day shall apply to all non-residential projects requiring a lane closure on a major roadway or sidewalk closure on any roadway(chart attached).A major roadway is defined herein as being one of the following Collier County maintained roadways: Roadway Name From To Immokalee Road Tatman Trail North(US 41) SR 29(Immokalee) Vanderbilt Beach Road Tamiami Trail North(US 41) Collier Boulevard Pine Ridge Road Tamiami Trail North(US 41) Collier Boulevard Golden Gate Parkway Tamiami Trail North(US 41) Collier Boulevard Radio Road Airport Road Davis Boulevard Rattlesnake Hammock Road Tamiami Trail East(US 41) Collier Boulevard Goodlette-Frank Road Tamiami Trail East(US 411 Immokalee Road Airport Road Tamiami Trail East(US 411 Immokalee Road Livingston Road Radio Road Lee County Line Santa Barbara Boulevard Davis-Boulevard Rattlesnake Pine Ridge Rd Hammock Logan Boulevard Pine Ridge Road Lee County Line Collier Boulevard Judge Jolley Bridge Immokalee Road CR 29 Everglades City SR 90(US 41) Bayshore Drive U.S.41 Thomasson Drive Golden Gate Boulevard C R.951 Desoto Boulevard Vanderbilt Drive VBR Vanderbilt Beach Road Lee County Line Gulfshore Boulevard VBR Vanderbilt Beach Road Bluebill Ave. Oil Well Rd Immokalee Rd S.R.29 Randall Boulevard Immokalee Rd Desoto Boulevard Everglades Boulevard Golden Gate Boulevard Immokalee Rd Naples Boulevard Pine Ridge Road Airport Road County Barn Road Davis Boulevard Rattlesnake Hammock Road 5. No refunds of unused fees shall be allowed. 6. Lane use fees shall be calculated by Collier County and shall be due and payable at the time of permit application if a permit is issued. If a Notice of Intent to Issue a permit is provided by the County in lieu of a permit, then the lane use fee shall be due and payable at the time of issuance of the actual permit. 7. If work continues beyond the originally estimated lane use period, then additional lane use fees shall be due and payable within two working days of notice to the Perm ttee of such additional fees. Failure to provide the additional fees to the County within three working days of such notice shall be cause for the project to be "red-tagged" and shut down. Lane use fees shall continue to accrue during any period of shutdown and shall he added to the additional lane use fees calculated by Collier County. 8. Any deviation from the above must be approved by the ROW Permitting and Inspection manager or designee prior to implementation. 9 All future County Projects shall be exempt from the Lane Rental Fee Incentive Program. Page 2 of 4 Exhib�' ",�" Lxhibit "A" SIDEWALK RENTAL FEE (PER DAY) INCENTIVE PROGRAM LANE RENTAL FEE (PER DAY) INCENTIVE PROGRAM $100 $100 $100 $100 $100 $100 $600 $600 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Page 3 of 4 Exhibit "A" SIDEWALK RENTAL FEE (PER DAY) INCENTIVE PROGRAM $100 $100 $100 $100 $100 $100 Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Pagc 4 of 4