FPL Underground Easement & Distribution Facilities Installation Agreeemnet INSTR 4975223 OR 5031 PG 2747
RECORDED 4/30/2014 8:36 AM PAGES 5
DWIGHT E. BROCK, CLERK OF THE CIRCUIT COURT
COLLIER COUNTY FLORIDA
DOC @.70$0 70 REC$44.00
UNDERGROUND EASEMENT (BUSINESS)
Work Request No. S ck. Prepared By:
Name: Troy Todd
Sec. 25, Twp. 49S, Rge. 26E Technical Specialist II
Parcel I.D.: 00289720004 Co. Name: FP&L Co.
(Maintained by County Appraiser) Address: 4105 S.W. 15th Avenue
Form 3722 (Stocked) Rev. 6/11 Naples, Florida 34116
Page 1 of 5 including Exhibit "A"
The undersigned, in consideration of the payment of $1.00 and other good and valuable
consideration, the adequacy and receipt of which is hereby acknowledged, grant and give to
Florida Power & Light Company, its licensees, agents, successors, and assigns ("FPL"), a non-
exclusive easement forever for the construction, operation and maintenance of underground
electric utility facilities (including cables, conduits, appurtenant equipment, and appurtenant above
ground equipment) to be installed from time to time; with the right to reconstruct, improve, add to,
enlarge, change the voltage, as well as, the size of and remove such facilities or any of them within
an easement described as follows:
See Exhibit"A" ("Easement Area")
Together with the right to permit FPL to attach wires to any facilities hereunder and lay cable and
conduit within the easement and to operate the same for FPL's communications purposes; the
right of ingress and egress to the Easement Area at all times; the right to clear the land and keep it
cleared of all trees, undergrowth and other obstructions within the Easement Area; to trim and cut
and keep trimmed and cut all dead, weak, leaning or dangerous trees or limbs outside of the
easement area which might interfere with or fall upon the lines or systems of communications or
power transmission or distribution; and further grants, to the fullest extent the undersigned has the
power to grant, if at all, the rights hereinabove granted on the Easement Area heretofore
described, over, along, under and across the roads, streets or highways adjoining or through said
Easement Area.
IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument on this th
day of , 2014.
Board of County Corn sioners
Collier Coun , Florid-
By 1/116.
Tom Henning, Chair an
3299 Tamiami Trai 'East, Suite 303
Naples, Florida 34112-5746
Attest:
Dwight E. Brock, Clerk
I CC
Deputy GI 'tk;
3299 Tarmiami=° 'rai! East, 4th Floor
Naples, Florida 34112
Attest atto Chairman's.
cin»a4!,01
Approved as to form and legality:
Jennifer A. Belpedio, Ass tant Co.
ounty Attorney
e 1
1
I I
I ADDITION TO WELL SITE 4
O
O.R. 3046, PG 0533
N0026146"W 10.00' 0 20' x 40'
o WELL SITE 4
N89'33'49" POINT OF " WELL SITE NO. 6
40.02' i.,,,v BEGINNING 1 /x/89'33 49 E 1883.27 + PER FIELD SIGNAGE
p S89'33'49'1N 1883.26' y
Iv
20' UTILITY EASEMENT 1
In PER O.R. BOOK 2755 5' UTILITY EASEMENT S00'24'40"E 10.00
PAGE 2556 1 -PER O.R. BOOK 3553
ADDITION TO WELL SITE 3 PAGE 0469
co O.R. 3046, PG 0533
20' X 40' -- H 20' UTILITY EASEMENT
-`t WELL SITE 3 PER O.R. BOOK 2755 I
N WELL SITE No. 5 PAGE 2556
I
o PER FIELD SIGNAGE
o
Z
WEST QUARTER CORNER GRAPHIC SCALE
./-
OF SECTION 25
- - - - _ 0 150 300 600
NORTH LINE SW 1/4
OF THE NW 1/4 OF
THE SW 1/4 OF SECTION 25 (IN FEET)
1 inch= 300 ft.
NOTES
N 1. THIS IS NOT A SURVEY.
co 2. BEARINGS SHOWN HEREON ARE BASED ON THE
`v SOUTH LINE OF THE EAST 1/2 OF SECTION 25,
3 s TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER
'l COUNTY, FLORIDA, BEING N89'51'00"W.
N 3. NO EASEMENT SEARCH OR ABSTRACTING WAS
o DONE BY THE SURVEYOR AND NOTE SHOULD
o
Z BE TAKEN THAT THIS PROPERTY IS SUBJECT TO
WELL SITE 1, PG 2556 ANY FACTS THAT MAY BE REVEALED UNDER A
SITE
40
O.R.R X 2755, AND ACCURATE TITLE SEARCH.
4. ALL DIMENSIONS ARE IN FEET AND DECIMALS
ADDITION TO WELL SITE 1 THEREOF, UNLESS OTHERWISE NOTED.
O.R. 3046, PG 0533 5. SUBJECT TO EASEMENTS, RESERVATIONS, AND
20' X 40' RESTRICTIONS OF RECORD.
6. THIS SHEET IS PART OF AN 2 SHEET SET.
POINT OF COMMENCEMENT
SOUTHWEST CORNER
SECTION 25
! ` ' 41,, JEYING SKETCH & DESCRIPTION
0.13'P 0 ., 41 _ '�,;� 3� A portion of Section 25,
e Township 49 South, Range 26 East,
�'o�1� °C lilt H Collier County, Florida
David J. Hyo 1, .P �, 1% 4 y'
Florida License No. '5834 A LIMITED LIABILITY COMPANY CLIENT: Davidson Engineering PROJECT NO: P-080
Not valid without the signature and MARCO SURVEYING & MAPPING 9 9
original seal of the Florida Licensed 3825 ECK BOULEVARD PROJ. NAME:Resource Recovery Park Wo NO: 13-590
Professional Surveyor and Mapper NAPLES, FLORIDA 34114 DRAFTED BY SCALE DATE DRAWING NO: 1-026
Certificate of Authorization #7705. (239) 389-0026
\ WWW.MARCOSURVEYS.COM MDP _ 1"=300' _ 12/2013 SHEET NO: 1 of 2 I
EXHIB T. A
r).__ I _t A.X..
/ 1
Description Parcel FPL West
Being a portion of Section 25, Township 49 South, Range 26 East, Collier County,
Florida being more particularly described as follows ;
COMMENCING at the Southwest corner of Section 25, Township 49 South, Range
26 East, Collier County, Florida; thence run North 00°26'56" West, along the West
line of the Southwest 1/4 of said Section 25, for a distance of 2687.29 feet to the
West 1/4 corner of said Section 25; thence run North 00°28'49" West, along the
West line of the Northwest 1/4 of said Section 25, for a distance of 672.15 feet to
the Northwest corner of the Southwest 1/4 of the Southwest 1/4 of the Northwest 1/4
of said Section 25; thence run North 89°33'49"East, along the North line of the
South 1/2 of the South 1/2 of the North 1/2 of said Section 25, for a distance of
40.02 feet to the Northeast corner of those lands described as Well Site 3 in Official
Records Book 2755 at Pages 2556 through 2567 of the Public Records of Collier
County, Florida and the POINT OF BEGINNING.
From the POINT OF BEGINNING; thence run North 89°33'49"East, along the
North line of the South 1/2 of the South 1/2 of the North 1/2 of said Section 25, for
a distance of 1883.27 feet to the Northwest corner of those lands described as Well
Site 4 in Official Records Book 2755 at Pages 2556 through 2567 of the Public
Records of Collier County, Florida; thence run South 00°24'40"East, along the West
line of said Well Site 4, for a distance of 10.00 feet; thence run South 89°33'49"
West, for a distance of 1883.26 feet to it's intersection with the East line of said
Well Site 3; thence run North 00°26'46" West, along the East line of said Well Site
3, for a distance of 10.00 feet; to the point of beginning.
Containing 18,832.629 square feet or 0.43 acres more or less.
" EYIN SKETCH & DESCRIPTION
�sl G
hJ 3 A portion of Section 25,
�. v Township 49 South, Range 26 East,
"lI�` J
��� Collier County, Florida
A UNITED LIABILITY COMPANY CLIENT: Davidson Engineering PROJECT NO: P-080
MARCO SURVEYING & MAPPING g 9
3825 BECK BOULEVARD PROJ. NAME:Resource Recovery Park WO NO: 13-590
SUITE 725
NAPLES, FLORIDA 34114 DRAFTED BY SCALE DATE DRAWING NO: 1-026
WWW.uARCOSURVE S coM MDP No Scale 12/2013 SHEET NO: 2 of 2 1
L.XH161 I
Pant ,� of
r 1
WELL SITE 3
/ O.R. 2755,
PG 2556
NO. 5 PER
FIELD SIGNAGE 0 S00'35'56"E 10.00'
N8199.6333 29'E BEGINNING 1 IN89'33'49'E 1958.72' i
"00'24'40`W 10.00' S89'33'49"W 1958.75' i 20' UTILITY EASEMENT
In 1 PER O.R. BOOK 2755
ADDITION TO ADDITION TO WELL SITE 4 PAGE 2556
N WELL SITE 3 O.R. 3046, PG 0533 ADDITION TO WELL SITE 5
°
O.R. 3046, 20' X 40' O.R. 3046, PG 0533
PG 0533 WELL SITE 4 40' X 40'
a WELL SITE NO. 5 O.R. 2755, PG 2556 WELL SITE 5
N PER FIELD WELL SITE NO. 6 PER O.R. 2755, PG2556
o SIGNAGE FIELD SIGNAGE WELL SITE NO. 7 PER
Z FIELD SIGNAGE yI—
T_
WEST QUARTER CORNER
SECTION 25
NORTH LINE SW 1/4
OF THE NW 1/4 OF GRAPHIC SCALE
THE SW 1/4 OF 0 175 350 700
SECTION 25
(IN FEET)
CV l inch= 350 fr.
N.
co
co NOTES
n 1. THIS IS NOT A SURVEY.
N 2. BEARINGS SHOWN HEREON ARE BASED ON THE
z SOUTH LINE OF THE EAST 1/2 OF SECTION 25,
WELL SITE 1 S TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER
O.R. 2755, PG 2556 COUNTY, FLORIDA, BEING N89'51'00141.
40' X 40' 3. NO EASEMENT SEARCH OR ABSTRACTING WAS
ADDITION TO WELL SITE 1 DONE BY THE SURVEYOR AND NOTE SHOULD
O.R. 3046, PG 0533 BE TAKEN THAT THIS PROPERTY IS SUBJECT TO
20' X 40' ANY FACTS THAT MAY BE REVEALED UNDER A
POINT OF COMMENCEMENT FULL AND ACCURATE TITLE SEARCH.
SOUTHWEST 4. ALL DIMENSIONS ARE IN FEET AND DECIMALS
CORNER SECTION THEREOF, UNLESS OTHERWISE NOTED.
25 5. SUBJECT TO EASEMENTS, RESERVATIONS, AND
RESTRICTIONS OF RECORD.
6. THIS SHEET IS PART OF A 2 SHEET SET.
,,\ 11 ' ' 'I, " )EYING SKETCH & DESCRIPTION
J > '
`Ay�� t J .I'.,' ) A portion of Section 25,
• it-L;— H Township 49 South, Range 26 East
^�, I ,.>i V ' Collier County, Florida
David J. Hyat, "S, / �� 2 J'
Florida License No. 5834 A LIMITED LIA6IL1, UMPANY CLIENT:
Not valid without the signature and MARCO SURVEYING & MAPPING Davidson Engineering PROJECT NO: P-080
original seal of the Florida Licensed 3825 ECK BOULEVARD PROJ. NAME:Resource Recovery Park WO NO: 13-590
Professional Surveyor and Mapper NAPLES, FLORIDA 34114 DRAFTED BY SCALE DATE DRAWING NO: 1-025
Certificate of Authorization #7705. (239) 389-0026
WW#.MARCOSUR MDP 1"=350' 12/2013 SHEET NO: 1 OF 2
Page 3 of 4
p
Description Parcel FPL East
Being a portion of Section 25, Township 49 South, Range 26 East, Collier County,
Florida being more particularly described as follows;
COMMENCING at the the Southwest corner of Section 25, Township 49 South, Range
26 East, Collier County, Florida; thence run North 00°26'56" West, along the West line
of the Southwest 1/4 of said Section 25, for a distance of 2687.29 feet to the West 1/4
corner of said Section 25; thence run North 00°28'49" West, along the West line of the
Northwest 1/4 of said Section 25, for a distance of 672.15 feet to the Northwest corner
of the Southwest 1/4 of the Southwest 1/4 of the Northwest 1/4 of said Section 25;
thence run North 89°33'49"East, along the North line of the South 1/2 of the South 1/2
of the North 1/2 of said Section 25, for a distance of 1963.29 feet; to the Northeast
corner of those lands described as Well Site 4 in Official Records Book 2755 at Pages
2556 through 2567 of the Public Records of Collier County, Florida and the POINT
OF BEGINNING.
From the POINT OF BEGINNING thence run North 89°33'49"East, along the North
line of the South 1/2 of the South 1/2 of the North 1/2 of said Section 25, for a
distance of 1958.72 feet to the Northwest corner of those lands described as Well Site 5
in Official Records Book 2755 at Pages 2556 through 2567 of the Public Records of
Collier County, Florida; thence run South 00°35'56"East, along the West line of said
Well Site 5, for a distance of 10.00 feet; thence run South 89°33'49" West, for a
distance of 1958.75 feet to its intersection with the East line of those lands described as
Well Site 4 in Official Records Book 2755 at Pages 2556 through 2567 of the Public
Records of Collier County, Florida; thence run North 00°24'40" West, along the East
line of said Well Site 4, for a distance of 10.00 feet to the point of beginning.
Containing 19,587.35 square feet or 0.450 acres more or less.
JEYING SKETCH & DESCRIPTION
o Cf.
, A portion of Section 25,
Township 49 South, Range 26 East,
Ll; p; z Collier County Florida
LIMITED EYINGTV COMPANY CLIENT: Davidson Engineering PROJECT NO: P-080
MARCO SURVEYING & MAPPING
.3825 BECK BOULEVARD PROD. NAME:Resource Recovery Park Wo NO: 13-590
SURE 725
NAPLES, FLORIDA 34114 DRAFTED BY SCALE DATE DRAWING NO: 1-025
(239) 389-0026
KW.MARCOSURVEYS.COM MDP NO SCALE 12/2013 _SHEET NO: 2 of 2
XHIBI I Al
2ana of
WR#5319499(UG)
FPL
UNDERGROUND DISTRIBUTION FACILITIES INSTALLATION AGREEMENT
This Agreement, made this 8 O day of .4. -2011, y and between Collier County (hereinafter called the Customer) and
FLORIDA POWER & LIGHT COMPANY, a corporation organized and existing under the laws of the State of Florida (hereinafter
called FPL).
WITNESSETH:
Whereas,the Customer has applied to FPL for underground distribution facilities to be installed on Customer's property known as City Gate Dr.located in Collier,Florida.
That for and in consideration of the covenants and agreements herein set forth,the parties hereto covenant and agree as follows:
The Customer shall pay FPL a Contribution in Aid of Construction of$102,802_(the Contribution)to cover the differential cost between an underground and an
overhead system. This is based on the currently effective tariff filed with the Florida Public Service Commission by FPL and is more particularly described on Exhibit
A attached hereto and as follows: INSTALL(2) 150KVA(277/480V)THREE PHASE PAD-MOUNTED TRANSFORMERS,UNDERGROUND PRIMARY,5"
CONDUIT,AND TRENCH
2. That a credit of$0.00 shall be provided to the Customer for trenching,backfilling,installation of Company provided conduit and other work,if applicable,and
approved by FPL.If such credit applies,the resulting Contribution cash payment shall be$0
3. The contribution and credit are subject to adjustment when FPL's tariff is revised by the Florida Public Service Commission and the Customer has requested FPL
to delay FPL's scheduled date of installation. Any additional costs caused by a Customer's change in the Customer's plans submitted to FPL on which the
contribution was based shall be paid for by the Customer. The contribution does not include the cost of conversion of any existing overhead lines to underground
or the relocation of any existing overhead or underground facilities to serve the property identified above.
4. That the Contribution provides for 277/480V underground electrical service with facilities located on private property in easements as required by FPL. The
contribution is based on employment of rapid production techniques and cooperation to eliminate conflicts with other utilities. Underground service,secondary,
and primary conductors are to be of standard FPL design,in conduit,and with above-grade appurtenances.
5. That the payment of the Contribution does not waive any provisions of FPL's Electric Tariff.
If the property is subject to an underground ordinance,FPL shall notify the appropriate governmental agency that satisfactory arrangements have been made with
the Customer as specified by FPL.
Title to and ownership of the facilities installed as a result of this agreement shall at all times remain the property of FPL.
6. That good and sufficient easements,including legal descriptions and survey work to produce such easements,and mortgage subordinations required by FPL for
the installation and maintenance of its electric distribution facilities must be granted or obtained,and recorded,at no cost to FPL,prior to trenching,installation
and/or construction of FPL facilities. FPL may require mortgage subordinations when the Customer's property, on which FPL will install its facilities, is
mortgaged and(1)there are no provisions in the mortgage that the lien of the mortgage will be subordinate to utility easements,(2)FPL's easement has not been
recorded prior to the recordation of the mortgage,(3)FPL's facilities are or will be used to serve other parcels of property,or(4)other circumstances exist which
FPL determines would make such a subordination necessary.
a) The Customer shall furnish FPL a copy of the deed or other suitable document,which contains a full legal description,and exact name of the legal owner to
be used when an easement is prepared,as required by FPL.
b) The Customer shall furnish drawings,satisfactory to FPL,showing the location of existing and proposed structures on the Customer's construction site,as
required by FPL.
c) Should for any reason,except for the sole error of FPL,FPL's facilities not be constructed within the easement,FPL may require the customer to grant new
easements and obtain any necessary mortgage subordinations to cover FPL's installed facilities, at no cost to FPL, and FPL will release the existing
easement. Mortgage subordinations will be necessary in this context when:
1) the Customer's property on which FPL will install its facilities is mortgaged,
2) there are no provisions in the mortgage for subordination of the lien of the mortgage to utility easements,or
3) FPL's facilities are or will be used to serve other parcels of property.
7. Before FPL can begin its engineering work on the underground electric distribution facilities,the Customer shall provide FPL with the following:
a) Paving,grading,and drainage plans showing all surface and sub-surface drainage satisfactory to FPL,
b) A construction schedule,
c) An estimate of when electric service will be required,and
d) Copies of the Customer's final construction plans as well as other construction drawings(plot,site,sewage,electrical,etc.)requested by FPL plats provided
by the Customer must be either recorded by the circuit clerk or other recording officer or prepared and certified as meeting the requirements for recording
(except approval by the governing body)by a registered land surveyor.
8.Prior to FPL construction pursuant to this agreement,the Customer shall:
WR#5319499(UG)
FPL
8.Prior to FPL construction pursuant to this agreement,the Customer shall:
a) Clear the FPL easement on the Customer's property of tree stumps,all trees,and other obstructions that conflict with construction,including the drainage of
all flooded areas. The Customer shall be responsible for clearing,compacting,boulder and large rock removal,stump removal,paving and addressing other
special conditions. The easement shall be graded to within six inches of final grade with soil stabilized.
b) Provide property line and corner stakes,designated by a licensed surveyor,to establish a reference for locating the underground cable trench route in the
easement and additional reference points when required by FPL. Also,the Customer shall provide stakes identifying the location,depth,size and type
facility of all non-FPL underground facilities within or near the easement where FPL distribution facilities will be installed. The Customer shall maintain
these stakes,and if any of these stakes are lost,destroyed or moved and FPL requires their use,the Customer shall replace the stakes at no cost to FPL,
unless the stakes are lost,destroyed or moved by an agent,employee,contractor or subcontractor of FPL,in which case FPL will pay the Customer the cost
of replacing the stakes.
c) It is further understood and agreed that subsequent relocation or repair of the FPL system,once installed,will be paid by the Customer if said relocation or
repair is a result of a change in the grading by the Customer or any of the Customer's contractors or subcontractors from the time the underground facilities
were installed;and,that subsequent repair to FPL's system,once installed,will be paid by the Customer if said repair is a result of damage caused by the
Customer or any of the Customer's contractors or subcontractors.
d) Provide sufficient and timely advance notice(56 days)as required by FPL,for FPL to install its underground distribution facilities prior to the installation of
paving,landscaping,sodding,sprinkler systems,or other surface obstructions. In the absence of sufficient coordination,as determined by FPL,by the
Customer,all additional costs for trenching and backfllling shall be paid by the Customer,and none of the costs of restoring paving,landscaping,grass,
sprinkler systems and all other surface obstructions to their original condition,should they be installed prior to FPL's facilities,shall be borne by FPL.
e) Pay for all additional costs incurred by FPL which may include,but are not limited to,engineering design,administration and relocation expenses,due to
changes made subsequent to this agreement on the subdivision or development layout or grade.
f) Provide a meter enclosure,downpipe and ell which meet all applicable codes and FPL specifications and which will accommodate FPL's service cable size
and design. These items must be confirmed with FPL prior to purchase. FPL will not be responsible for costs involved in modifying or replacing items
which do not meet the above criteria.
9.FPL shall:
a) Provide the Customer with a plan showing the location of all FPL underground facilities,point of delivery,and transformer locations and specifications
required by FPL and to be adhered to by the Customer.
b) Install,own,and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted.
c) Request the Customer to participate in a pre-construction conference with the Customer's contractors,the FPL representatives and other utilities within six
(6)weeks of the start of construction. At the pre-construction conference,FPL shall provide the Customer with an estimate of the date when service may be
provided.
d) FPL shall invoice the customer for payment of the Contribution In Aid of Construction upon completion of the work.
10. This Agreement is subject to FPL's Electric Tariff,including but not limited to the General Rules and Regulations for Electric Service and the Rules of the Florida
Public Service Commission,as they are now written,or as they may be revised,amended or supplemented.
11. This agreement shall inure to the benefit of,and be binding upon,the successors and assigns of the Customer and FPL.
The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing permanent electric service at the time of the Customer's receipt of
a certificate of occupancy. t^+
Accepted: D /o T CoI"41 Con►++1Sf►6,1e�S
I
Accepted: •�
Tme�o� 44t ..
(D at)
c--- March 12,2014 � '
For FPL (Date)
Witness 'WW1 fir -sate)
Witness - (Date)
• •
ATTEST: �'�''
-
DW)GHJ E BROCK,Clerk Approved to form and legality
0 f ...4
Attest as to Assistant County tt ey
signature only.,