Loading...
GG MSTU Agenda 11/19/2013GOLDEN GATE M.S.T.U, ADVISORY COMMITTEE 3299 East Tamiami Tail, Suite 103 Naples, FL 34112 AGENDA: NOVEMBER 19, 2013 11.�O— 1. CALL TO ORDER II. ATTENDANCE DEC 31 2013 III. APPROVAL OF AGENDA IV. APPROVAL OF MINUTES — • SEPTEMBER 17, 2013 • OCTOBER 15, 2013 V. MONTHLY BUDGET REPORT VI. PROJECT MANAGER'S REPORT — DARRYL RICHARD A. West End Entry Sign B. Committee Maintenance Evaluation Report C. Future TECM Project CR 951 — Sidewalk Discussion VII. TRANSPORTATION MAINTENANCE REPORT — HANNULA LANDSCAPING • Tropicana Blvd. • Coronado Pkwy and Hunter Blvd. • Golden Gate Parkway • Sunshine Blvd. • Collier Blvd. and Green Blvd. VIII. LANDSCAPE ARCHITECT'S REPORT — MCGEE & ASSOCIATES A. Maintenance Reports • Tropicana Blvd. • Coronado Pkwy. and Hunter Blvd. • Golden Gate Parkway • Sunshine • Collier Blvd. & Green IX. OLD BUSINESS X. NEW BUSINESS XI. PUBLIC COMMENTS GOLDEN «. GATE ADVISORY COWIN�- 3299 East Tamiami Trail, Suite 103 Naples, FL 34112 SUMMARY OF MINUTES AND MOTIONS III. APPROVAL OF AGENDA Add: VI. C. TECM Future Roadway Project Presentation on Collier Boulevard Vice Chair Spencer moved to approve the September 17, 2013 Agenda as amended. Second by Peggy Harris. Motion carried, 4 -0. IV. APPROVAL OF MINUTES — AUGUST 20, 2013 Vice Chair Spencer moved to approve the August 20, 2013 minutes as presented. Second by Peggy Harris. Motion carried, 4 -0. X. NEW BUSINESS A. Approval of Member Applications Chairman Sims moved to recommend Peggy Harris and Pat Spencer for re- appointment to the Golden Gate Beautification Advisory Committee for approval by BCC. Second by Barbara Segura. Motion carried unanimously, 4 -0. GOLDEN GATE M.S.T.U. ADVISORY COMMITTEE 3299 East Tamiami Trail, Suite 103 Naples, FL 34112 October 15, 2013 MINUTES OF NON - WORKING MEETING I. CALL TO ORDER: The meeting was called to order at 4:05 PM by Chairman Richard Sims. A quorum was not established; only one voting member was present. II. ATTENDANCE: Member: Richard Sims, Chairman Excused: Patricia Spencer, Vice Chair Peggy Harris Michael McElroy Barbara Segura County: Darryl Richard — MSTU Project Manager Harry Sells — MSTU Project Manager Others: Michael McGee — McGee & Associates; Dale Hannula, Jeremy Hannula and Thomas Gonzalez— Hannula Landscaping (JuriStaff— Anne Iacuzzo) Chairman Richard Sims noted since quorum was not established, no vote could be taken on any issue. He opted to review an "information only" item, i.e., a presentation of "Golden Gate City Stormwater Improvement Project" by Joseph Delate, Senior Project Manager, Growth Management Division. February 19, 2013 Presentation: Golden Gate City Drainage Improvement Project: Joseph Delate provided a general synopsis of the Project: • The County's Stormwater Division conducted an analysis and inventory of Golden Gate City two years ago • The area encompasses approximately four square miles • The existing draining system was reviewed and analyzed • It was determined the majority of the system was functionally obsolete and was decaying • The County developed a five -year program to rehabilitate the existing system • A project to replace the drainage was begun during the past year on Hunter and Coronado • It is being replaced with either plastic or concrete pipe and is expected to last approximately 50 years • Funding has been supported by the Board of County Commissioners • Two new projects are under design and will be "bid out" in the near future Mr. Delate referenced the visual aids (maps) as part of the presentation. • The new project will be concentrated in the northwest quadrant of the area, i.e., 551h Street north of Hunter Boulevard • It will take approximately 10 to 15 years to complete the entire program • The cost ($13 to 15M + Design Costs) will be paid from Ad Valorem taxes • An RFP ( "Request for Proposal ") has been released • Four firms will be hired — each firm will be responsible for one quadrant • Two designs are ongoing: one in the northwest quadrant and the other is east of Sunshine • The project was prioritized based on known problems and complaints • The other priority was to coordinate with the County's Road Maintenance Division which will begin a paving project. The plan is to complete the repairs on specific roads prior to paving. • The County has also received a State grant to install sidewalks — one location is Golden Gate Parkway (from Sunshine to 951); the sidewalk will be installed on the south side of the Parkway. • The other location is east of Sunshine. • The sidewalks will be constructed of concrete. • The goal is to improve what exists — if the pipes can be rehabbed or not — if not, they will be replaced Mr. Delate stated he will give the presentation again at the next Committee meeting. Darryl Richard noted there has been flooding on Hunter. He stated the feeder culverts that tie into the area should be "tv'd." February 19, 2013 Chairman Sims mentioned during the storm, the mulch laid by the MSTU washed up into his lot. Michael McGee noted when the improvements were begun on Hunter Boulevard, the pavement was changed and curbing was installed. The flow was redirected in the proper direction. The size of the pipes crossing the road was increased but the system became bottled up at the two exit points because it could not handle the increased flow of water. He suggested examining the system utilizing the tv camera to scope /inspect the system. Chairman Sims stated he lives on Neptune's Canal, to the north of Hunter. The two biggest water events in the `80s were Floyd and Gerry — but he never saw the dump pipes which dump into the canal clog before. The mulch installed by the MSTU "migrated" into the yards. It is no longer on the medians. It was noted the project did not cause the project, it just didn't fix it. Joseph Delate stated he would make it a priority to review the area discussed. NEXT MEETING DATE: November 19, 2013 Time: 4:00 PM Location: Golden Gate Community Center There being no further business for the good of the County, the Meeting was adjourned by order of the Chairman at 4:37 PM. GOLDEN GATE M.S.T.U. ADVISORY COMMITTEE Richard Sims, Chairman The Minutes were approved by the Board /Committee Chair on , 2013, "as submitted" L] OR "as amended" []. /D GOLDEN GATE BEAUTIFICATION MSTU FUND 153 November 19, 2013 Amended Actual Available I Open P.O.s FY 14 Amt. Budget Commitments Expenditures Total Remaining Paid 1 CUR AD VALOREM TAX $ (246,100.00) $ - $ (1,421.79) $ (244,678.21)'; Bentley Electric 45- 147851 Flag Pole Installation $ 1,700.00 $ 2 DEL AD VALOREM 3 FIFTH THIRD INTEREST $ $ - $ $ - $ - $ - Collier County Road Maint. IGC Debris cleanup from flooding $ - $ 408.26 4 INVESTMENT INTEREST $ - (1,000.00) $ - - $ $ (5.38) (215.06) $ $ 5.38 :-Contemporary Controls Diamond 45- 147411 DC Power Supply Cable $ - $ 339.19 5 INTEREST TAX COLLECTOR $ - $ - $ (784.94), Fertilizer 45- 147310 Fertilizer $ 1,000.00 $ 6 REVENUE STRUCTURE $ (247,100.00) $ - $ - (1,642.23) $ $ - (245,457 77) Florida Irrigation Florikan 45- 147312 Irrigation Parts $ 3,645.86 $ 354.14 7 TRANS FROM PROP APPR $ - $ - $ $ 45- 147398 Fertilizer $ 6,000.00 $ 8 TRANS FROM TAX COLL. $ - $ - $ - $ - Forestry Resources 45- 147311 Mulch $ 8,000.00 $ 9 CARRY FORWARD GEN $ (549,400.00) $ - $ - - $ - (549,400.00) FPL Hannula 47- 001891 45- 147287 Electricity $ 2,447.65 $ 282.35 10 CARRY FORWARD OF ENC $ (13,630.00) $ - $ - $ (13,630.00); Indirect Cost Reimb. IGC Landscape Maint. $ 155,420.65 $ 16,419.00 11 NEG 5% EST REV $ 12,400.00 $ - $ - $ 12,400.00 ! Insurance General IGC Collier County BCC Collier County BCC $ $ - $ $ 12 TRANSFERS & CONTRIB $ (550,630.00) $ - $ - $ (550,630.00) . J.M. Todd 45- 147422 Copier Lease (Shared Cost) $ 133.06 $ 13 TOTAL REVENUES $ (797,730.00) $ - $ (1,642.23) $ (796,087.77) J.M. Todd 45- 147480 Copier CPC Monthly $ 100.00 $ - 14 OTHER SALARIES $ 2,000.00 $ - $ - $ 2,000.00 Juristaff Inc. 45- 147271 Secretarial Services $ 2,268.00 $ 232.00 15 PERSONAL SERVICE $ 2,000.00 $ - $ - $ 2,000.00 i McGee & Assoc. 45- 147602 Annual Landscape Services $ 23,894.50 $ 1,815.50 16 ENG FEES OTHER $ 41,170.00 $ 30,064.50 $ 1,815.50 $ 9,290.00 ': McGee & Assoc. 45- 141398 West Entry Sign Improvements $ 6,170.00 $ 17 INDIRECT COST REIMBU 18 INTERDEPT CHARGE $ $ 7,500.00 $ - $ - $ 7,500.00 : Southern Signal & Lighting 45- 148204 Lighting Maintenance on Tropicana $ 200.00 19 LANDSCAPE INCIDENTAL $ - 16,000.00 $ $ - 12,771.00 $ $ 408.26 2,729.00 $ $ (408.26) 500.00 ! Southern Signal & Lighting Staples 45- 148203 45- 147413 lighting Maintenance on Sunshine $ 200.00 20 OTHER CONTRACTUAL SE $ 178,000.00 $ 144,349.65 $ 13,690.00 $ 19,960.35 Wm. Varian Construction 45- 144769 Office Supplies Flag Pole Installation $ $ 200.00 7,460.00 $ $ 21 POST FREIGHT $ - $ - $ - $ 22 ELECTRICITY $ 3,000.00 $ 2,447.65 $ 282.35 $ 270.00 Line 33 + 35 $ 218,839.72 $ 19,850.44 23 RENT EQUIPMENT $ 300.00 $ 133.06 $ - $ 166.94 24 INSURANCE GENERAL $ 700.00 $ - $ - $ 700.00 25 SPRINKLER SYSTEM MAI $ 5,000.00 $ 3,645.86 $ 693.33 $ 660.81 797,305,507 FY 10 Final Taxable Value (2008) 26 MULCH 27 LIGHTING MAINTENANCE $ $ 10,000.00 10,000.00 $ $ 8,000.00 400.00 $ $ - $ $ 2,000.00 - 9,600.00 548,992,684 FY 11 Final Taxable value (2009) 28 LICENSES AND PERMITS $ 2,000.00 $ - $ - - $ 2,000.00 478,980,702 FY 12 Final Taxable Value (2010) 29 OTHER MISCELLANEOUS $ 3,500.00 $ 2,268.00 $ 232.00 $ 1,000.00 516,253,177 FY 13 Final Taxable Value 30 OFFICE SUPPLIES $ 300.00 $ 200.00 $ - $ 100.00 536,912,682 FY 14 July Taxable Value 31 COPYING CHARGES $ 300.00 $ 100.00 $ - $ 200.00 4.00 % Adj. 12 to 13 32 FERTIZER HERBICIDES $ 10,000.00 $ 7,000.00 $ - $ 3,000 00 Millage FY 14 0.4583 FY 13 33 OPERATING EXPENSE $ 287,770.00 $ 211,379.72 $ 19,850.44 $ 56,539.84 Extension 0.4753 Maximum =.5000 34 IMPROVEMENTS GEN $ 467,860.00 $ 7,460.00 $ - $ 460,400.00 246,067 245,375 35 CAPITAL OUTLAY $ 467,860.00 $ 7,460.00 $ - $ 460,400.00 36 TRANS TO 111 UNINCOR $ 27,800.00 $ - $ - $ 27,800.00 Property Tax Limitation Impact 37 TRANSFERS 27,800.00 $ - $ - $ 27,800,00 FY 14 Gross Taxable Value 536,912,682 38 BUDGET TRANS APPR $ 3,500.00 $ - $ 562.12 $ 2,937.88 Minus: New Const. Annex. 1,563,708 39 BUDGET TRANS TC COL $ 6,100.00 $ - $ 41.46 $ 6,058.54 Plus: Amendment #1 TV component 40 TRANSFER CONST $ 9,600.00 $ - $ 603.58 $ 8,996.42 Adj. Taxable Value 0 535,348,974 41 RESERVE FOR CONTINGE $ 2,700.00 $ - $ - $ 2,700.00 13 Levy 42 RESERVES $ 2,700.00 $ - $ - $ 2,700.00 Rolled Back Rate (less Amend. one) 245,375 TOTAL BUDGET $ 797,730.00 $ 218,839.72 $ 20,454.02 $ 558,436.26 91 % of Rolled Back Rate 0.4583 0.4171 Golden Gate MSTU Fund 153 October 15, 2013 Vendor PO# Oct. FY14 $ - $ 408.26 $ 339.19 $ - $ 18.90 $ - $ - $ 194.32 $ 650.00 $ - $ - $ - $ - $ 232.00 $ 1,815.50 $ - $ - $ - $ - $ - $ 3,658.17 Nov. FY14 $ - $ - $ - $ - $ 335.24 $ - $ - $ 88.03 $ 15,769.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 16,192.27 Dec. FY14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Jan. FY14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ $ Feb. FY14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Mar. FY14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Apr. FY14 $ $ - $ - $ $ - $ $ $ - $ - $ $ $ - $ $ - $ - $ $ $ - $ - $ $ - May FY14 $ $ - $ - $ $ - $ $ $ - $ - $ $ $ - $ $ - $ - $ $ $ $ $ $ - Jun. FY14 $ $ - $ - $ $ - $ $ $ - $ - $ $ $ - $ $ - $ - $ $ $ $ $ $ Jul. FY14 $ $ - $ - $ $ - $ $ $ - $ - $ $ $ - $ $ - $ - $ $ $ $ $ $ - Aug. FY14 $ $ $ _ $ $ _ $ $ $ $ - $ $ $ - $ $ - $ - $ $ $ $ $ $ Sep. FY14 $ _ $ $ _ $ $ _ $ $ _ $ $ - $ _ $ $ $ $ - $ - $ $ _ $ $ _ $ $ TOTAL $ $ 408.26 $ 339.19 $ $ 354.14 $ _ $ $ 282.35 $ 16,419.00 $ $ $ $ 232.00 $ 1,815.50 $ $ $ _ $ $ $ 19,850.44 Bentley Electric 45- 147851 Collier Count Road Maint. IGC Contemporary Controls 45- 147411 Diamond Fertilizer 45- 147310 Florida Irrigation 45- 147312 Florikan 45- 147398 Forestry Resources 45- 147311 FPL 47- 001891 Hannula 45- 147287 Indirect Cost Reim. IGC Insurance General IGC J.M. Todd 45- 147422 J.M. Todd 45- 147480 Juristaff Inc. 45- 147271 McGee &Assoc. 45- 147602 McGee & Assoc. 45- 141398 Southern Signal & Lighting 45- 148204 Southern Signal & Lighting 45- 148203 Staples 45- 147412 Wm. Varian Construction 45- 144769 Total St MRRAF 1111: lk 1112LED111! 3649 Progress Avenue — Naples, FL 34104 Tel (239) 643 -4404 / Fax (239) 643 -3194 WWN%.si2nsanclthinLis.coin BILLING INFORMATION Collier County Government Department of Alternative Transportation 2885 Horseshoe Drive South Naples, Fl. 34104 I- e sire pleased to quote the folloniaz scope of work for roar acceptance. DA I E 11/15/2013 —� CONTACT I aryl Richard PHONE (239) 253 -9083 FAX E -MAIL darylrichardCcolliergov.net QUOTED BY MIKE BOYD Fabricate, install , and secure permits: A. excavate and install two steel posts in steel reinforced poured concrete footer systems per engineered drawings and mount existing single faced wood between the two colutnns . Column coibr as selected by owner. Job Cost: $2850.00 Sales Tax: Permit Fees: $250.00 Engineering: $750.00 Grand Total: $3850.00 Deposits: Balance: TEL. 239 -514 0103 FAK 239 -514 0556 CGC 061412 CCC 057950 MM. J. VARIAN CONST�uc7'ION CO. rnc4 GENEIRAL CONTRACTOR 886 110'h AvelN Saitel#9 Napl,P,a; FL 34108 Se4-vGngSota;kwe5CFlvr u a,j, nF .1989 DATE: November 19, 2013 SUBMITTED TO: Darryl Richard, RLA MSTU Project Manager Public Services Division Department of Alternative Transportation Modes 3299 East Tamiami Trail, Suite 103 Naples, Fla. 34112 -5746 WORK PERFORMED AT: Golden Gate Pkwy Median East of 55th Terr Naples, Fl WE HEREBY PROPOSE TO FURNISH THE MATERIALS AND PERFORM THE LABOR NECESSARYTO COMPLETE THE BELOW LISTED WORK BASED ON E -MAIL REQUEST DATED 11/13/13: General: Obtain Building (sign and ROW) permits (Fee paid by owner) Supply proper supervision for all contractor trades Requested Scope: This is a "Lump Sum" quote which includes the following items: 1. Re- location of the existing 5 ft. x 8 ft. sign Foam placard to your shop for retrofitting into new frame as required. All cost for transporting existing sign (which weighs approximately 400 lbs. ( 4 man lift )) shall be included in contractor's quote. 2. X 4 sets of signed and sealed drawings (Fla. Engineer Registration Required) 3. Installation of sign within a 90 day time frame from Notice To Proceed. 4. Supports to have durable surface treatment with professional paint applied to color selection per the MSTU advisory committees desired color. 5. Contractor to provide color selection options for client choice /selection. 6. Contractor to provide MOT as required. All cost associated with Maintenance of Traffic (MOT) Per County /FDOT standard shall be included in lump sum price. 7. Contractor to call in locates per Florida Law (re: Florida One Call —No Cuts "811 system) 8. Prior to award contractor will have to provide evidence of the follow insurances: (1) Workman's Comp; (2) Automobile, (3) Gen. Liability [ Collier County Board of County Commissioner's to be listed as additional insured ] 9. Contractor to obtain Right of Way Permit with Collier County. [ actual permit fees paid by county/MSTU ] 10. Contractor to obtain signage permit with Collier County. [ actual permit fees paid by county /MSTU ] Landscaping: BY OWNER OWNER RESPONSIBLE FOR: SURVEY AND ELEVATION CERTIFICATE IF REQUIRED ASSOCIATION APPROVAL IF REQUIRED ALL MATERIAL IS GUARANTEED TO BE AS SPECIFIED AND THE ABOVE WORK TO BE PERFORMED IN ACCORDANCE WITH SPECIFICATIONS SUBMITTED FOR THE ABOVE WORK AND COMPLETED IN A SUBSTANTIAL WORKMANLIKE MANNER FOR THE SUM OF: Eight Thousand Six Hundred Ten Dollars and 001/00 -- ($8,610.00) PAYMENT SCHEDULE TO BE AGREED AT SIGNING. RESPECTFULLY SUBMITTED: ACCEPTED: WM. J. VARIAN CONSTRUCTION CO. BY _W' J Varfa*v BY William J. Varian, CGR CAPS CGP President NOTE: THIS PROPOSAL IS GOOD FOR THIRTY (30) DAYS. 13-126 From: Bart Zino [mailto:bzino @pbscontractors.com] Sent: Thursday, November 14, 2013 7:25 AM To: RichardDarryl Subject: RE: Request for Quote: Re- Installation of Sign for Golden Gate Community (Golden Gate MSTU / Collier County Project) Darryl, Sorry, but this one is not for us. Manpower and workload issues. Thanks Bart Zino LEED AP, CAPS President co TRq' D D �+ D 'S C . ti I GOLDEN GATE MSTU MAINTENANCE CONTRACTOR PERFORMANCE EVALUATION FORM Name of Contracting Entity: Hannula Landscaping and Irrigation. Inc. Project Title & Number: 12 -5976 Golden Gate MSTU Roadway Maintenance Project Manager: Darryl Richard Every Month for Six Months Evaluation Period From 8 / 20 / 13 to _2 / 20 / 14 Contract Amount: Original $ 200.450.90 Current $ Final $ Performance Considerations (Circle One Point for each): If score is below expectations, Please explain on a separate page the justification for the score. Please give additional input of possible corrective steps. This document will be stored in the project file. ❖ Quality of Work/Service /Product: BELOW EXCEEDED EXPECTATIONS < 1 - 2 - 3 - 4 - 5 > EXPECTATIONS (Did not meet Specifications) (Exceeded Specifications) (All inspections pass 1s'time) ❖ Adherence to Schedule /Delivery: BELOW EXCEEDED EXPECTATIONS < 1 - 2 - 3 - 4 - 5 > EXPECTATIONS (Met start Date) (All target dates meet) (Completion /Final delivery date meet) ❖ Cost Control: BELOW EXCEEDED (Exceeded Contract Amt.) EXPECTATIONS < 1 - 2 - 3 - 4 - 5 > EXPECTATIONS (Exercised Value Engineering) (Final Coast more than 10% under budget) ❖ Business Practices: BELOW EXCEEDED EXPECTATIONS < 1 - 2 - 3 - 4 - 5 > EXPECTATIONS (Responsive /Cooperative to PM'S request) (Accurate and timely reporting) (Job site management) ❖ Performance of Key Personnel: BELOW EXCEEDED (On site, on time, organized) EXPECTATIONS < 1 - 2 - 3 - 4 - 5 > EXPECTATIONS ❖ Safety: BELOW EXCEEDED (Understanding and adherence EXPECTATIONS <1 - 2 - 3 - 4 - 5 > EXPECTATIONS to safety policies) Note: specific performance criteria maybe substituted by the Project Manager /Lead. Total Points assigned for this evaluation Total Available Points — 30, 7 -20- Below Expectations, 21 -28 Meets Expectations, 29 -30 Exceeded Expectations. ov ❖ MSTU Advisory Committee Comments: ❖ Contractor Response /Comments: Project Manager Comments: Project Manager (printed) Project Manager (signature /date) Contractor (printed) Contractor (signature /date) All information contained and /or referenced within this evaluation form is subject to the provisions of Section 119, F. S., otherwise known as "The Public Records Law". 3 GOLDEN GATE MSTU FY 13 -14 RECOMMENDED FERTILIZATION SCHEDULE - TROPICANA BLVD. Plant Type Turf / St. Augustine Palm Trees Shrubs & Grn. Covers Beds Blooming Plants Areas (32,714 S.F.) (16,671 S.F.) (12,474 S.F.) Month 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) 14- 1414 -90 Jan -14 for rotary spreader 15 lb. per 1000 S.F. 7 lbs. per 1000 S.F. 6.5 lbs. per 1000 S.F. (5 - 50 Ib.bags) (2 - 50 lb. bags) ( 4 - 50 lb. bags) z0 -20-20 Feb -14 2.5 lbs./25 gal. H2O per 1000 S.F. (31 lbs.) 15-0-15 for rotary spreader Mar -14 6.5 lbs. per 1000 S.F. (4 - 50 lb. bags) 14 -14 -14-90 Apr -14 7 lbs. per 1000 S.F. (2 - 50 lb. bags) 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) May -14 for rotary spreader 15 lb. per 1000 S.F. 6.5 lbs. per 1000 S.F. (5 - 50 Ib.bags) ( 4 - 50 lb. bags) Jun -14 Jul -14 0 -0-22 SPM 0-0 -22 SPM 0 -0 -22 SPM Aug -14 1 lb. per 100 SY 1 lb. per 100 S.F 1 lb. per 100 S.F ( 7 - 50 lb. bags) (3 - 50 lb. bags) ( 3 - 50 lb. bags) Sep -14 Place request for October 2014 Place request for October 2014 Place request for October 2014 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) 14- 14 -14 -90 10/1120132104 for rotary spreader 15 lb. per 1000 S.F. 7 lbs. per 1000 S.F. 6.5 lbs. per 1000 S.F. (5 - 50 Ib.bags) (2 -50 lb. bags) ( 4 -So lb. bags) zo -zo -2o Nov -13 2.5 lbs./25 gal. H2O per 1000 S.F. (31 lbs.i Optional 21 -0-0 Dec -13 2.2 lbs. per 1000 S.F. (2 - 50 lb. bags) Optional -At maintenance Consultants direction. Blooming Plants - Bougainvillea, Thryallis, Plumbago Optional: Add to pest and /or disease control sprayings for shrubs and turf: Ferromec AC 15 -0 -0 plus 6% iron, 3% sulfur @ 1.5 gal. /100 gal. H2O /L Do not aor)lv to any flower buds or blossoms in flower. 0 GOLDEN GATE MSTU FY 13 -14 RECOMMENDED FERTILIZATION SCHEDULE - HUNTER BLVD. & CORONADO PKWY. Plant Type Palm Trees Large Canopy Trees Canopy Trees, Shrubs & G.C., Blooming Plants/ Bougainvillea. Month Jan -14 Feb -14 Mar -14 Apr -14 May -14 8 -2 -12 -180 (Florikote Collier Palm Blend) Alexander palms: 41bs. per palm, Paurotis palms: 10 lbs. per palm, Foxtail palms: 5 lbs. per palm (13- 50 lb. bags) 8 -2'12 -180 (Florikote Collier Palm Blend) 48 -Oaks, 14 -Crape Myrtles 4 lbs. per tree (5 -50 LB. Bags) 8 -2 -12 -180 (Florikote Collier Palm Blend) 15 lbs. per 1000 S.F. (21 -50 LB. Bags) Jun -14 Jul -14 Aug -14 0-0-22 SPM 1 lb. per 100 S.F (14- 50 lb. bags) 0-0-22 SPM 1 lb. per 100 S.F (14- 50 lb. bags) Sep-14 Place request for October 2014. Place request for October 2014. Place request for October 2014. 10! 1/20132014 8 -2 -12 -180 (Florikote Collier Palm Blend) Alexander palms: 4 lbs. per palm, Paurotis palms: 10 lbs. per palm, Foxtail palms: 5 lbs. per palm (13- 50 lb. bags) 8 -2 -12 -180 (Florikote Collier Palm Blend) 48 -Oaks, 14 -Crape Myrtles 4 lbs. per tree (5 -50 LB. Bags) 8 -2 -12 -180 (Florikote Collier Palm Blend) 15 lbs. per 1000 S.F. (21 -50 LB. Bags) Nov -13 Dec -13 Do not fertilize Sabal palms. Optional: Add to pest and /or disease control sprayings for shrubs and turf: Ferromec AC 15-M plus 6% iron, 3% sulfur 1.5 al. 100 gal. H2O. Do not apply to any flower buds or blossoms in flower. /3 GOLDEN GATE MSTU FY 12 -13 RECOMMENDED FERTILIZATION SCHEDULE - SUNSHINE BLVD. Plant Type Turf / St. Augustine Palm Trees Shrubs & Grn.Cover Beds Blooming Plants Areas (39,520 S.F.) 21,846 S.F.) (5,500 S.F.) Month 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) 14-14 -1490 Jan -14 r rotary spreader for Area fo 15 lb. per 1000 S.F. 7 lbs. per 1000 S.F. 6.5 lbs. per S.F. (7 - 50 lb. bags) (1- 50 lb. bag) (5 - 50 lb. Bags) 20 -20-20 Feb -14 2.5 lbs. /25 gal. H2O per 1000 S.F. 14 lbs. 15 -0-15 for rotary spreader Mar -14 6.5 lbs. per 1000 S.F. (5 - 50 Ib. Bags) 14 -14 -14-90 Apr -14 7 lbs. per 1000 S.F. ( 1- 50 lb. bag) 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) May -14 for rotary spreader 15 lb. per 1000 S.F. 6.5 lbs. per 1000 S.F. (7 - 50 lb. bags) (5 - 50 lb. Bags) Jun -14 Jul -14 0 -0-22 SPM 0 -0 -22 SPM 0-0-22 SPM Aug -14 1 lb. per 100 SY 1 lb. per 100 S.F 1 lb. per 100 SY (8 - 50 lb. bags) (4 - 50 lb. bags) (1- 50 lb. bags) Sep-14 Place request for October 2014 Place request for October 2014 Place request for October 2014 15 -0-15 8 -2 -12 -180 (Florikote Collier blend) 14- 14 -14 -90 10/112D13-2014 forrotaryspreader 15 lb. per 1000 S.F. 7 lbs. per 1000 S.F. 6.5 lbs. per 1000 S.F. (7 - 50 lb. bags) (1- 50 lb. bag) (S - 50 lb. Bags) 20 -20-20 Nov -13 2.5 lbs. /25 gal. H2O per 1000 S.F. Optional 21 -0-0 Dec -13 2.2 lbs. per 1000 S.F. (2 - 50 lb. Bags) Optional -At maintenance Consultants direction. Blooming Plants- Bougainvillea, Indian Hawthorn, Plumbago Optional: Add to pest and /or disease control sprayings for shrubs and turf: Ferromec AC 15-M plus 6% iron, 3% sulfur @ 1.5 gal. /100 gal. H2O Do not apply to any flower buds or blossoms in flower. 0 RECOMMENDED PLANT MATERIAL END PLANTINGS FOR TURN LANE MEDIANS — 10/15/13 Juniperous chinensis'Parsoni' Dianella tasmanica - Variegated Blueberry Flax Lily Ficus microcarpus — 'Green Island' Ficus Mimosa strigillosa - Sunshine Mimosa Ilex vomitoria - Stokes Dwarf Euphorbia milii — Big Rose Crown of Thorn Euphorbia milii — Small Leaf Red Crown of Thorn Carissa macrocarpa — Natal Plum 'Boxwood Beauty or Emerald Blanket' 7&57ee &,4" Landscape Architecture Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Project Manager: Darryl Richards, r.l.a., P.S.D. — A.T.M. Dept. Consultant's Representative: Michael A. McGee, rla, isa Consultant: McGee & Associates Contractor's Representative: Jeremy & Dale Hannula Contractor: Hannula Landscaping & Irrigation Inc. Report Period: FY 13 -14 November 2013 Report No.: Two — FY 13 -14 S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when items are addressed. Please return electronic copy to our office prior to next month's MSTU site review and meeting. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger Si7P. LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Please provide responses as completed, ongoing or proposal submitted and any notation deemed important. Observation date: 11/12 -14/13 MONTHLY ADDRESSED Median #1 X One Sabal palm in the middle of the group appears to have been missed during pruning. X Review Juniper for old auto damaged. Prune out dead and broken foliage. Provide final count for replacements (15) 3 gal. size. JPhoto Proposal submittal recommended. Provide proposal number and submittal date. Median #2 X 2 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. Pedestrian shelter at 31" Ave. SW X X 2 Shelter support posts have paint etching graffiti writing and need to be repainted. phot) Proposal submittal recommended. Provide proposal number and submittal date. Please submit proposal for repainting. Median #3 Bridge X Review and treat as needed dwarf Fakahatchee grass for insect (e.g. mites and /or scale). Median #4 X Turf broadleaf weed treatment was not effective. Retreat as soon as possible. X Review and treat as needed dwarf Fakahatchee grass for insect (e.g. mites and /or scale). X At address 2930: Remove non - Fakahatchee plants. phot X 7 At address 2860: Remove deteriorating Cassia tree. Flagged with yellow tape. Hannula: 11 -12 -13 Completed, M &A: 11 -12 -13 Not completed. X X 17 Treat Bermuda grass in turf area on north end of Bougainvillea bed across from address 2841 Hannula: 11 -12 -13 Completed, M &A: 11 -12 -13 Not completed. X X 17 Treat Bermuda grass in turf area on north end of Thryallis bed across from address 2824 Hannula: 11 -12 -13 Completed, M &A: 11 -12 -13 Not completed. Pedestrian Shelter at W Ave. SW X 4 Prune deadwood out of Tabebuia tree. Hannula: 11 -12 -13 Completed, M&A: 11 -12 -13 Not completed. Design" Environmental Management " Planning " Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417 -0707' Fax (239) 417 -0708 LC 098 ' FL 1023A X -c e & "4"MWw Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Period: FY 13 -14, November 2013 Renort No.: Two LOCATION /WORK AREA 15 1 C I R I MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Median #5 X 2 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. X 5 East R /W: Trees on vacant lot just north of address 2654 are hanging to low over bike path Hannula: 11 -12 -13 It is unclear if we have authority to and need to be pruned to 10 foot ht. above path. cut -back since trees seem to not be on County Property. M &A: Please contact the Project Manager and get a determination. X 5 West R /W: Trees at address 2679 are hanging to low over sidewalk and bike path and need Hannula: 11 -12 -13 It is unclear if we have authority to to be pruned to above 10 foot ht. cut -back since trees seem to not be on County Property. M &A: Please contact the Project Manager and get a determination. X 5 East R /W: Trees at address 2550 are hanging to low over bike path and need to be pruned Hannula: 11 -12 -13 It is unclear if we have authority to above 10 foot ht. cut -back since trees seem to not be on County Property. M &A: Please contact the Project Manager and get a determination. X 6 At address 2654 & 2530: Remove Crape myrtle tree stakes. Hannula: 11 -12 -13 On schedule for Tuesday, November 12th, 2013, M &A: Not complete as of site review for report. Median #6 X South end light pole missing due to accident. QUARTERLY ADDRESSED Accent /Street Lighting X 2 Lights are on during the day: Median #1 north end, & #2 north & south ends. #3, south end, #6 south end light removed due to accident; X 23 Median #2 south end light fixture reflector cover broken. East R/W between 13St Ave. & PL. Lighting Disconnect & Sensor West Alley off 28' Ave. SW Lighting Disconnect & Sensor West R/W in Alley between G.G. Pkwy. & 26"' PL SW, Lighting Disconnect & Sensor West R/W at corner of 30' PL. SW & Tropicana Lighting Disconnect & Sensor Pump Station Electric Meter in Alley west of pump station Pedestrian shelter at 31" Ave. SW Page 2 of 4 Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Pedestrian shelter at 28"' Ave. SW Fertilizations X 3 Schedule for first week of October: Turf, Shrubs, Ground Covers & Blooming plants: Hannula: 11 -12 -13 Fertilizer request to be submitted. Turf- 15 -0-15, 6.5 lbs. per 1,000 S.F. (4 -50 lb. bags) M &A: 11 -14 -12 Because of the overall delay of Shrubs /Grn Covers — 8- 2- 12- 180'Florikote', 15 lbs. per 1,000 S.F. (5 -50 lb. bags) fertilizing to the schedule please request December Blooming plants - 14 -14 -14 -90,7 lbs. per 1,000 S.F. (2 -50 lb. bags) fertilizer now. Schedule for first week of December: Turf 21 -0 -0, 2.2 Its. per 1000 S.F. (2 -20 lb. bags) Please place request for materials from staff. Irrigation X M &A: 11 -14 -13 Please indicate in future report responses the controller watering schedule days of operation at time of the report. Page 3 of 4 %cam & Adao Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Tropicana Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA 151Cj R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS GG MSTU TROPICANA Blvd. Well Annual Water Use for 2013 350,000 300,000 ' 303,057 250,000 200,000 150,000 100,000 ---- -- .� 118 689 0 Non - Potable 50,000 73,607 p 2012 AVG 56,456 0 )an-13 Feb- 1~�� "�� Mar -13 Apr -13 May-13 0 0 0 2012 AVG Jul -13 Aug -13 Non -Potable Sep -13 Oct -13 Nov-13 Dec -13 Water Use Goal: (1.35 ac. of Plants & Turf) Recommended: Supplemental watering rate of .75 to 1 inch per week. one inch per week equals 36,658 gallons per week or 146,633 gallons per month. 2012 total water use: 646,177 gallons or 17.63 inches of supplemental water pumped. 11/01/2013 Page 4 of 4 %�ee &'446 uarw Landscape Architecture Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Project Manager: Darryl Richards, r.l.a., C.C.P.S.D. — A.T.M. Dept. Consultant: McGee & Associates Consultant's Representative: Contractor: Hannula Landscaping & Irrigation Contractor's Representative: Coronado Pkwy. and Hunter Blvd. Michael A. McGee, rla, isa Jeremy and Dale Hannula Report Period: FY 13 -14, November 2013 Report No.: Two - FY 13 -14 S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when items are addressed. Please return electronic copy to our office prior to next month's MSTU site review and meeting. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Observation dates: 11/12 -14/13 MONTHLY ADDRESSED Please provide responses as completed, ongoing or proposal submitted and any notation deemed important. At the Committees request all plant replacements from this point forward are to be in a container size that provides a plant size more closely matching the existing plant sizes adjacent to the replacements locations. Coronado Pkwv. Median #1- Pavers X Remove dead weeds in pavers. Median #2- Pavers X Remove dead weeds in pavers. Median #3 X Review for fungus and treat Bulbine and Society Garlic as needed. Median #4 Median #5 X Review for fungus and treat Society Garlic as needed. Median #6 X Lantana is dry increase irrigation time and days on zones. X 3 Review Lantana for replacements. West end 8— plants need to be replaced. 4 — white, 4 — Replace missing Lantana plants. Provide replacement Lavender. 3 — gal. or 8" basket size if available. plant sizes that are comparable or matching to the size of the remaining existing plants in the bed where they are to be installed. M &A: 9 -12 -13 Replacements on hold until Committee reviews and approves plant types for replacements. Median #7 X Lantana is dry increase irrigation time and days on zones. X 2 Review Coontie /Zamia for replacements. Please provide replacement plants at 3 gal. container Provide proposal. size 16" ht. /spr. Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East/ P. O. Box 8052 Naples, Florida 34101 Phone (239) 417 -0707* Fax (239) 417 -0708 LC 098 * FL 1023A %5%e & "4"CaateQ Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA S C I R I MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS X 3 Review east and west end beds of Lantana for replacements. Remove weeds and provide Replace missing Lantana plants. If the existing count of missing Lantana. Estimated: East end: 66 plants declining, dead or missing. West end Lantana have been cut back and a full 1 gal. size plant 63 plants declining, dead or missing. Replacements to be half white and half lavender. will match the existing plant size then use 1 gal. If not please locate 3 gal. or 8" basket size plants. M &A: 9- 12-13 Replacements on hold until Committee reviews and approves plant types for replacements. Median #8 X Lantana is dry increase time and days on zones. X 3 Review Lantana for replacements. 4 — plants need to be replaced. 2 — white, 2 — Lavender. 3 — M &A: 9 -1 -13 Replacements on hold until Committee gal. or 8" basket size if available. reviews and approves plant types for replacements. Median #8A - Pavers Median #9 X X At address 5419: Continue hand removal and /or over the top treatment of weeds in Mimosa. X 3 At address 5273: Remove vines growing in Paurotis palm. Hannula: 11 -12 -13 Completed. M &A: 11 -12 -13 Not completed at time of site review for report. X 3 At address 5291: Eight dead Coontie /Zamia need to be replaced. Please provide replacement Provide proposal. plants at 3 gal. container size 16" ht. /spr. X 4 At address 5254: Five dead Coontie /Zamia need to be replaced. Please provide replacement Provide proposal. plants at 3 gal. container size 16" ht. /spr. X 4 At address 5401 & 5388: Review Lantana for replacements. Replace missing Lantana plants. If the existing Lantana have been cut back and a full 1 gal. size plant will match the existing plant size then use 1 gal. If not please locate 3 gal. or 8" basket size plants. M &A: 9- 12-13 Replacements on hold until Committee reviews and approves plant types for replacements. Median #10 Bridge X Flax Lily is dry increase time and days on zones. X 2 On west end: review Blueberry Flax Lily for replacements due to recent guardrail installation. Provide proposal. Please provide replacement plants at 3 gal. container size 18" ht. /spr. Median #11 Bridge X Median dry increase time and days on zone. Median #12 X Median dry increase time and days on zone. X 2 Review Lantana for replacements. 10 — plants need to be replaced. 5 — white, 5 — Lavender. 3 — Replace missing Lantana plants. If the existing gal. or 8" basket size if available. I Lantana have been cut back and a full 1 gal. size plant Page 2 of 7 X qZe & J 44Mifed Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA 15 1 C I R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS will match the existing plant size then use 1 gal. If not please locate 3 gal. or 8" basket size plants. M &A: 9- 12-13 Replacements on hold until Committee reviews and approves plant types for replacements. Median #13 X Median dry increase time and days on zone. Median #14 X Median dry increase time and days on zone. R/W Areas Hunter Blvd. X Median dry increase time and days on zone. Median #1 X 2 Review Lantana for replacement count. M &A: 10 -10 -13 Replacements on hold until Committee reviews and approves plant types for replacements. X 3 4`" from south end: Alexander palm needs to be replaced due to auto accident. Also prune out M &A: 9 -12 -13 Replacements on hold until Committee damaged Lantana foliage and then review for replacements. dphot4 reviews and approves plant types for replacements. M &A: 10 -10 -13 Provide proposal for Alexander palm replacement to match existing. Median #2 X Lantana is dry increase time and days on zone. X 2 9/13 roadway flooding washed away soil, uprooted plants and left plants with root exposure. M &A: 11 -12 -13 Replacements on hold until The current estimated plant lose is 22 Lantana plants will need to be replaced. Due to past Committee reviews and approves plant types for flooding additional top dress soil will need to be applied to the median when replanting. replacements. X 3 Review Lantana on south end for replacements. 4— plants need to be replaced. 2 — white, 2 — M &A: 9 -12 -13 Replacements on hold until Committee Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. M &A: 10 -10 -13 Previous missing plants before flooding. Median #3 X Lantana is dry increase time and days on zone. X 2 9/13 roadway flooding washed away soil, uprooted plants and left plants with root exposure. M &A: 11 -12 -13 Replacements on hold until The current estimated plant lose is south end 30 Lantana, 54 Big Rose and 4 Blueberry flax lily Committee reviews and approves plant types for plants will need to be replaced. Due to past flooding additional top dress soil will need to be replacements. applied to some areas in the median when replanting. X 3 Review Lantana on south end for replacements. 8 — plants need to be replaced. 4 — white, 4 — M &A: 9 -12 -13 Replacements on hold until Committee Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. M &A: 10 -10 -13 Previous missing plants before Page 3 of 7 %�6 & AuacdateQ Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS flooding. Median #4 X Lantana is dry increase time and days on zone. X 9/13 roadway flooding washed away soil, uprooted plants and left plants with root exposure. M &A: 11 -12 -13 Replacements on hold until The current estimated plant lose is south end 30 Lantana plants will need to be replaced. Due Committee reviews and approves plant types for to past flooding additional top dress soil will need to be applied to some areas in the median replacements. when replanting. X 3 Review Lantana on south end for replacements. 20 — plants need to be replaced. 10— white, M &A: 9 -12 -13 Replacements on hold until Committee 10 — Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. M &A: 10 -10 -13 Previous missing plants before flooding. Electric meter- 22 "d PI. S.W. X 2 Mow and weed trim around controller & electric meter. Hannula: 11 -12 -13 Completed. M &A: 11 -12 -13 Not completed at time of site review for report. Median #5 X Continue hand removal and /or over the top treatment of weeds in Mimosa. Pump station — Median #5, 7.5 hp, 8" well feeds Hunter & Coronado, G.G. Pkwy. median #12 Irrinet #34 controls Piccolos X 2 Due to the poor performance it is recommended to remove remaining Coontie plants on each M &A: 9- 12 -13: Coontie replacements added by CLM. side of the pump station and then install (8) 7 gal. 'Helen Johnson' dwarf Bougainvillea shrubs. Put hold on Bougainvillea replacements. M &A: 11 -12- 5 to the south and 3 to the north. Review and treat Coontie for scale insects. Please pFevS-'� 13 Replacements on hold until Committee reviews and l.,,.,...,.,Rt .hats at (8) 3 gal ,..Main., size , 6 h. / &.ar approves plant types for replacements. Median #6 X 2 9/13 roadway flooding washed away soil, uprooted plants and left plants with root exposure. M &A: 10 -10-13 at this time it is recommended @ The current estimated plant lose is south end 60 Lantana, @ 2148 24 -Muhly grass, @ 2116 50- address 2100 all the missing or dead plants be Muhly grass, @ 210014 -Helen Johnson Bougainvillea and 6 -Ms. Alice Bougainvillea plants will replaced with 10 gal. size Silver Saw palmettos. M &A: need to be replaced. Due to past flooding additional top dress soil will need to be applied to 11 -12 -13 Replacements on hold until Committee some areas in the median when replanting. reviews and approves plant types for replacements. X 3 Review Lantana on south end for replacements. 40— plants need to be replaced. 20— white, M &A: 9 -12 -13 Replacements on hold until Committee 20 — Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. M &A: 10 -10 -13 Previous missing plants before flooding. X 2 At address 2148 -2164: Due to 9/13 flooding Muhly grass planting will need to be reviewed for M &A: 11 -12 -13 Replacements on hold until replacements. Due to past flooding additional top dress soil will need to be applied to some I Committee reviews and approves plant types for Page 4 of 7 7X 57 e & 14jj6d 4W Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS areas in the median when replanting. replacements. X 3 At address 2100 -2116: Due to 9/13 flooding Muhly grass planting will need to be reviewed for M &A: 11 -12 -13 Replacements on hold until replacements. Due to past flooding additional top dress soil will need to be applied to some Committee reviews and approves plant types for areas in the median when replanting. replacements. X 2 At address 2072: Due to 9/13 flooding Muhly grass planting will need to be reviewed for M &A: 11 -12 -13 Replacements on hold until replacements. Due to past flooding additional top dress soil will need to be applied to some Committee reviews and approves plant types for areas in the median when replanting. replacements. X 2 At address 2090 -2100: Remove remaining Coontie and replant with (12) 'Helen Johnson' dwarf Proposal submittal recommended. Provide proposal Bougainvillea 3 gal. size. «" eentie aFe ffli.55iRg @Ad/eF dead and need •e he FeplaGed. 3 gal number and submittal date. M &A: 9 -12 -13 Place s4e plaRts. replacements on hold. Area is under further review. M &A: 10 -10 -13 On hold pending flooding replacement assessment. Median #7 X Replace two Big Rose crown of thorn. 1 gal. size Provide proposal. Median #8 X At address 5417: Provide count od missing Lantana plants. X 3 At address 5203: Review Lantana on east end for replacements. 4 — plants need to be M &A: 9 -12 -13 Replacements on hold until Committee replaced. 2 — white, 2 — Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. X 3 At address 5242 — 5241: Blueberry Flax Lily replacements. 4 plants are dead or missing and Provide proposal. need to be replaced. Replace with 3 gal. 24" ht. /spr. Size plants. X 7 At address 5261: One replacement Ms Alice Bougainvillea plant has rolled out of its root ball Proposal submittal recommended. Provide proposal and needs to be replaced with a 7 gal. size plant. phot) number and submittal date. X 6 At address 5261- 5250: Four dead Coontie, replace. There are now a total of 11 dead Coontie M &A: Replacements on hold. CLM made Coontie and the recently planted replacement plants all have scale insects. Based upon the decline of replacements. the plants at this location it is recommended to remove all Coontie and replant the area with 19 - dwarf Bougainvillea 'Helen Johnson' in 7 gal. size containers, min. 24" ht. /spr. The existing adjacent dwarf Bougainvillea are growing fine in this location. phot Median #9 X 3 At address 5481: Review Lantana on west end for replacements. 8 — plants need to be M &A: 9 -12 -13 Replacements on hold until Committee replaced. 4 — white, 4 — Lavender. 3 — gal. or 8" basket size if available. reviews and approves plant types for replacements. Median #10 Median #11 Median #12 Page 5 of 7 X %52ee 8c AdQoCWeJ Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwv. & Hunter Blvd. Report Period: FY 13 -14_ NnvPmhPr gn13 Pannrt Nn • T Ain LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS R/W Areas QUARTERLY ADDRESSED Coronado Pkwy. - Medians 1 -14 X 3 Medians need mulch. Coronado Pkwy. - Medians 1 -14 X 4 Paint median numbers on both ends of medians. Proposal submittal recommended. Provide proposal number and submittal date. Hunter Blvd. - Medians 1- 12 X 2 Medians needs mulch. X 3 Paint median numbers on both ends of medians. Proposal submittal recommended. Provide proposal number and submittal date. Fertilization: X 2 Next fertilization scheduled for October 2013, Hannula: 11 -12 -13 To be ordered. M &A: 11 -12 -13 8 -2 -12 -180, 15 lbs. per 1,000 S.F., 21 -50 lb. bags for shrubs & ground covers Please apply as soon as possible before mulching. 13 -50 lb. bags for Palms — Alexander's 4 lbs., Paurotis 10 lbs., Foxtail 5 lbs. (No fertilizer on Sabal palms) 5 — 50 lb. bags for trees — 4 lbs. per trees. General Irrigation: X Increase zone time and days for all zones covering Lantana, Flax lily, Society Garlic and Muhly M &A: 11 -12 -13 Please indicate in future report grass. responses the controller watering schedule days of operation at time of the report. Page 6 of 7 Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Coronado Pkwy. & Hunter Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA I S I C I R I MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS GG MSTU Coronado - Hunter, Well Annual Water Use for 2013 NOV-1i Dec -13 HCoronado • Hunter 02012 AVG. 2 AVG. Water Use Goal: (1.82 ac_ of Plants) Recommended: Supplemental watering rate of .5 or less inches per week. One half inch per week equals 24,846 gallons per week or 99,384 gallons per month. 2012 total water use for Hunter and Coronado: 717,484 gallons or 14.44 inches of supplemental water pumped. Water use total contains plant establishment watering and plant replacement watering. Oak tree and multiple plant replacements occurred in March. 11/01/2013 Page 7 of 7 %5 ee &t Ajdoei Landscape Architecture Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Project Manager: Darryl Richards, r.l.a., C.C.P.S.D. — A.T.M. Dept. Consultant's Representative: Michael A. McGee, rla, isa Consultant: McGee & Associates Contractor's Representative: Jeremy and Dale Hannula Contractor: Hannula Landscaping & Irrigation Inc. Report Period: FY 13 -14 November 2013 Report No.: Two — FY 13 -14 S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor This report is prepared strictly to provide recommendations only and in no manner is to imply any authorization to the Contractor or its Sub - Contractors to perform services for Collier County. Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when and which items are corrected. Please return electronic copy to our office prior to next month's MSTU site review and meeting. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Observation dates: 10/08 -10113 MONTHLY ADDRESSED Median #1 X Auto accident. Provide count for Firebush and one Golden Tabeuia tree. (27) Firebush 3 Provide proposal. al., (1) Golden Tabebuia 30 gal. hot X Remove dead Indian hawthorn plants. X 5 Pavers need to be cleaned to remove stains and gum.(photol1 -14 12 Hannula: 11 -12 -13 Pavers were cleaned, M &A: Please enlarge photos and review. Pavers still have black stains from mold and gum. Median #2 Median #2A — Pavers only X 12 Number median 2A Hannula 7/16/13: County postponed replacements until Oct. 2013., M &A: 9 -12 -13 Provide proposal to staff for painting. Median #3 X Turf very water stressed. Median #4 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 Completed. monthly basis for the next three months. X 2 At the Sewer Lift Station: The Saba[ replacement palm has died and needs to be Hannula: 11 -12 -13 Supervisor to evaluate site replaced. X 6 Liriope on the west end contains Torpedo grass. Treat as needed. Also remove Oak tree Hannula: 11 -12 -13 On weekly schedule sprouts in Liriope. Median #5 X Water stressed turf areas. X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On weekly schedule monthly basis for the next three months. Median #6 X Water stressed turf areas. X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On weekly schedule monthly basis for the next three months. Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417 -0707* Fax (239) 417 -0708 LC 098 * FL 1023A %�ee & '41Qdaeia&4 Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA 151C I R I MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS X 6 Liriope plants in the west end bed have Torpedo grass . Hannula: 11 -12 -13 On weekly schedule Median #7 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule Pump Station- Median #7 east end, 15 monthly basis for the next three months. hp , 8" well, VFD, Motorola Scorpio controller S3405- operates G.G. Pkwy. Medians 1 -10 X 2 East end bed: Continue to remove and treat Torpedo grass in Liriope plants. Hannula: 11 -12 -13 On weekly schedule Median #8 X 4 Provide count to fill in missing Liriope plants in middle area of median. X 10 Continue to remove and treat Torpedo grass in Iris plants. Hannula: 11 -12 -13 On weekly schedule Median #9 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 6 West end bed: The Juniper, Bougainvillea and Liriope plants all have Torpedo grass in Hannula: 11 -12 -13 On weekly schedule them. Continue to remove and treat Torpedo grass in Iris plants. X 13 Damaged area has grown over with native grasses and weeds. Apparent auto damage to Plant material to be replaced; sod will not be replaced turf on west median end. Provide proposal for repair and replacement. hot Median #10 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 6 West end bed: Juniper and Bougainvillea plants have Torpedo grass in them. Continue to Hannula: 11 -12 -13 On weekly schedule remove and treat Torpedo grass in Iris plants. X 10 East end bed: Retreat African iris for torpedo grass. Continue to remove and treat Hannula: 11 -12 -13 On monthly schedule Torpedo grass in Iris plants. X 10 Middle plant bed: Continue to treat African iris and Liriope for torpedo grass. Review Hannula: 11 -12 -13 On monthly schedule Liriope in west end of bed. Continue to remove and treat Torpedo grass in Iris plants. X 12 West end turf area: Area has grown over with native grasses and weeds. Previously Hannula: 11 -12 -13 On monthly schedule water stressed and /or chinch bug damage. Review irrigation coverage and treat as required. Remove dead turf and resod. hot Median #11 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 3 West end bed: Cutback all Iris and remove weeds. M &A: 11 -13 -12 Not completed at time of report. X 15 East end bed: Flax lily has Torpedo grass in them. Continue to remove and treat Torpedo Hannula: 11 -12 -13 On weekly schedule grass in Iris plants. X 11 Middle turf area: Area has grown over with native grasses and weeds. Previously water Hannula: 9 -5 -13 Irrigation adjustment completed. M&A: 9- stressed and /or chinch bug damage. Review irrigation coverage and treat as required. 12 -13 Provide proposal to staff to resod with St. Remove dead turf and resod. (photo Augustin . Median #12 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule Pump Station- Median #12 west end, monthly basis for the next three months. Page 2 of 5 i Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwv. Report Period: FY 13 -14. November 2013 RPnnrt Nn Twn LOCATION /WORK AREA S C R I MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS 15 hp , 8" well, VFD, Motorola Irrinet controller #34- operates G.G. Pkwy. Medians 11 -18 & Hunter Blvd. & Coronado Pk X 3 2 "d bed from east end: Continue to treat Torpedo grass in cutback African Iris plants. Hannula: 11 -12 -13 Completed. Median #13 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. Median #14 X East end bed: Cutback Iris and remove dead foliage. X Turf areas look very bad. Unless an auto accident is to blame the Contractor needs to address this bad turf area that was under its maintenance.. (lohotob X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X West end bed: Remove Oak tree sprouts in Big Rose Crown of thorn. Median #15 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 8 East end bed: Review and retreat Torpedo grass in Liriope and Flax lily plants. Continue Hannula: 11 -12 -13 On monthly schedule treatments on a monthly basis for the next three months. X 8 3 rd bed from east end: Review and retreat Torpedo grass in Liriope plants. Continue Hannula: 11 -12 -13 On monthly schedule treatments on a monthly basis for the next three months. Median #16 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 6 East end bed: Treat Torpedo grass in Agapanthus plants. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 1 9 West end bed: Retreat Torpedo grass in cutback African Iris plants. Continue treatments Hannula: 11 -12 -13 On monthly schedule on a monthly basis for the next three months. (Old Median #17 — East of canal) X East end bed: Iris on north side are dry and need to be cutback. X Turf areas are water stressed along north side back of curbuin . X Broadleaf weed treatment is not totally effective needed. Continue treatments on a monthly basis for the next three months. X 4 4 bed from east end: Expand Flax lily bed into area of removed plants. Remove all Hannula 7/16/13: County postponed replacements until Indian hawthorn plants. (jphot4 Oct. 2013., M&A: 9 -12 -13 Provide proposal to staff for replacements. Median #17 (Old #18 West of canal) X 3 Install fertilizer spikes around Foxtail palm. Provide proposal to install (6) Lutz Palm Tree Spikes #30193. Median Not numbered (Old #19 — X X 14 Fix numbers to number median 19 or number as 17A. Hannula 7/16/13: County postponed changes until Oct. Paver only median) 2013., M&A: 9 -12 -13 Provide proposal to staff for painting. Median #18 (Old #20) X Multiple turf areas are water stressed alon back of curbin . Page 3 of 5 %q a &'4' d& u2tM Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwv. Report Period: FY 13 -14. NnvemhPr 9n1 i Rannrt Nn • Twn LOCATION /WORK AREA 151 C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a Hannula: 11 -12 -13 On monthly schedule monthly basis for the next three months. X 9 East end bed: Area has grown over with native grasses and weeds. Review dead turf area on north side of median for replacement. Median #19 (Old #21, Sign) X 3 West end bed: Hand remove weeds in Iris plants. Hannula: 11 -12 -13 On weekly schedule Pump Station- Median #19 (Old #21) east end bed, 7.5 hp , 6" well, VFD , Motorola Scorpio controller S3401- operates G.G. Pkwy. Medians 19 -22. Median #20 (Old #22) Irrigation General: X X Previous water stressed and /or currently water stressed turf areas exist along the back of M &A: 11 -14 -13 Please indicate in future report responses the curbing in multiple medians. the controller watering schedule days of operation at time of the report. QUARTERLY ADDRESSED Median # 4, 5, 6, 7, 9, 10 thru 17, 19, X 2 St Augustine turf contains large and small amounts of broadleaf weeds in turf. As soon as & 20 weather conditions permit a spray program should begin to remove weeds. Median #9 X 4 TO bed from east end: Add 12- 3 gal. Fakahatchee grass in middle of bed. Hannula 7/16/13: County postponed replacements until Oct. 2013., M&A: 9 -12 -13 Provide proposal to staff for replacements. X 23 The Mr. Farrow and Mr. Melchore memorial plaque and base need to be cleaned and base repainted. hot Median #15 X 2 2 "d bed from west end: Remove declining Variegated Pittisporum and Indian hawthorn Hannula 7/16/13: County postponed replacements until shrubs and replant area with Blueberry Flax Lily. 60 —1 gal. plants will be needed to Oct. 2013., Removal on schedule to completed by expand westward from existing Flax lily bed. 9/15/13., M &A: 11 -13 -14 remove all Pittosporum shrubs and then replant with Flax lily. Provide proposal. Page 4 of 5 %�ee & .4 "4da&w Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Golden Gate Pkwy. Report Period: FY 13 -14, November 2013 GG MSTU Golden Gate Parkway Median #7- 12 -19, Well Annual Water Use for 2013 909,651 1,000,000 900,000 6 ,349 800,000 ` — `909,651 700,000 600,000 434,916 500,000 2 1 43,627 400,000 288167 518,281 268,463 300,000 331,119 0 200,000 03 267, ■Median #19 100,000 -- _ 3,463 ■ Median #12 7 0 97,381 5'4 s Median #7 Jan -13 - - -- 93,231-'1- 7 Feb -13 0 2012 AVG. Mar -13 0 2012 AVG. Apr -13 g May -13 Jun -13 0 Median #7 Jul -13 0 Median #12 Aug -13 0 Sep -13 Oct -13 Median #19 Nov -13 Dec -13 water use coai: (5.73 ac. of Plants & Turf) Recommended: Supplemental watering rate of .75 to 1 inch per week. One inch per week equals 155,594 gallons per week or 622,376 gallons per month. 2012 total water use: 10,915,815 gallons or 70.16 inches of supplemental water pumped. 11/01/2013 Report No.: Two Page 5 of 5 Landscape Architecture Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Project Manager: Darryl Richards, r.l.a., C.C.P.S.D. — A.T.M. Dept. Consultant's Representative: Michael A. McGee, rla, isa Consultant: McGee & Associates Contractor's Representative: Jeremy and Dale Hannula Contractor: Hannula Landscaping & Irrigation Inc. Report Period: FY 13 -14, November 2013 Report No.: Two - FY 13 -14 S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when items are addressed. Please return electronic copy to our office prior to next month's MSTU site review and meeting. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Observation date: 11/12 -14/13 MONTHLY ADDRESSED Please provide responses as will review, ongoing, completed or proposal to be submitted. Once submitted provide proposal number and date and any notation deemed important. Median #1 X Remove dead and replace with (2) Juniper 3 gal. size, on the north end X Plumbago shrubs are water stressed and defoliating. X 2 Remove staking from Crape myrtle tree. Hannula: 11 -12 -13 Completed, M &A: 11 -12 -13 Not completed as of site review for report. X 3 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. Median #2 X Turf has multiple dry or water stressed areas along back of curbing and at beds. X At address 2184: Plumbago shrubs are water stressed and multiple areas of dead and missing folia e. X 2 At 20 Ct. SW: Replace two dead Indian hawthorn. 3 gal. size. Hannula: 11 -12 -13 Completed, M &A: 11 -12 -13 Not completed as of site review for report. X 2 Removespider webs on south end light pole. X 3 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. Hannula: 11 -12 -13 On monthly treatment schedule. M &A: Treatment is not working if broadleaf weeds are being treated on a monthly basis. Review the site turf areas while weeds are flowering to see the issue. Median #3 X 3 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. Hannula: 11 -12 -13 On monthly treatment schedule. M &A: Treatment is not working if broadleaf weeds are being treated on a monthly basis. Review the site turf areas while weeds are flowering to see the issue. Median #4 X 8 Remove dead Indian hawthorn and replant with 3 gal. size. There are still seven missing Hannula: 11 -12 -13 Completed and invoiced. M &A: 11- plants in the median at the time of this report. 12 -13 Dead removed replacements not installed. Request to have on -site meeting at this location before Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417 -0707 * Fax (239) 417 -0708 LC 098 * FL 1023A Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Period: FY 13 -14, November 2013 Report No.: Two LOCATION /WORK AREA 1S 1�glfjl MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS any more work is completed. Median #5 Median #6 X 3 Turf broadleaf weed treatment was not effective. Retreat as soon as possible. Hannula: 11 -12 -13 On monthly treatment schedule. M &A: Treatment is not working if broadleaf weeds are being treated on a monthly basis. Review the site turf areas while weeds are flowering to see the issue. X 2 At address 1770: Replace dead Indian hawthorn. 3 gal. size. Propose and replace. 18 th Place SW Median X Remove dead weeds in pavers. QUARTERLY ADDRESSED Accent/Street Lighting X Lights are on during the day: Median #1 north end; Pump Station - Median #3, 5 hp, 6" well, VFD Lighting Electric Meter 2271 Sunshine Blvd., 1 SUN, Alley off 23`d Ave. SW Lighting Electric Meter & Irrigation Controller Electric , 1995 Sunshine Blvd., 2 SUN, Alley off 20th PL. SW Lighting Electric Meter 4642 18 th PI. SW, 3 SUN, North R/W Fertilizations: X 3 Schedule for first week of October: Turf, Shrubs, Ground Covers & Blooming plants: Hannula: 11 -12 -13 To be scheduled. M&A: 11 -12 -13 Turf- 15 -0 -15, 6.5 lbs. per 1,000 S.F. (5 -50 lb. bags) Because of the overall delay of fertilizing to the Shrubs /Grn Covers — 8 -2 -12 -180 'Florikote', 15 lbs. per 1,000 S.F. (7 -50 lb. bags) schedule please request December fertilizer now. Blooming plants - 14 -14 -14 -90,7 lbs. per 1,000 S.F. (1 -50 lb. bags) Please place request for materials from staff. Schedule for first week of December: Turf 21 -0-0, 2.2 lbs. per 1000 S.F. (2 -20 lb. bags) Please place request for materials from staff. Irrigation: X X Multiple previously water stressed and /or current water stressed turf areas are along back M &A: 11 -12 -13 Please indicate in future report of curbing and planting bed borders. responses the controller watering schedule days of operation at time of the report. The irrigation water use shows an apparent leak in the system. Contractor needs to address such problems in a timely manner and if there are replacement part delays, then it is recommended the Contractor call for an immediate on- site meeting with the Project Manager, County Irrigation Project Manager and Maintenance Consultant.. Page 2 of 3 7&5zee & Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Sunshine Blvd. Report Period: FY 13 -14, November 2013 LOCATION /WORK AREA I S CR MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPOI GG MSTU Sunshine Blvd. Well Annual Water Use for 2013 300,000 250,000 168,562 166,82 200,000 134,591 134,381 150,000 100,000 50,000 0 )an-13 Feb -13 Mar -13 llqqlftl_� Apr -13 ~ May 13 Jun -13 278,688 10,257 17,662 168,562 Jul -13 Auo 13 Sep -13 'Non-Potable Oct-13 Mau -13 Dec -13 ■ Non - Potable M 2012 AVG. Water Use Goal (1.47 ac. of Plants & Turf) Recommended: Supplemental watering rate of .75 to 1 inch per week. One inch per week equals 39,917 gallons per week or 159,668 gallons per month. 2012 total water use: 2,022,743 gallons or 50.67 inches of supplemental water pumped. 11/01/2013 E or rt No.: Two Page 3 of 3 %�ee & Jidda ZaW Landscape Architecture Project: GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Collier Blvd. Part A & B, and Green Blvd. Median #1 Project Manager: Darryl Richards, r.l.a., C.C.P.S.D. — A.T.M. Dept. Consultant: McGee & Associates Consultant's Representative: Michael A. McGee, rla, isa Contractor: Hannula Landscaping & Irrigation Inc. Contractor's Representative: Jeremy and Dale Hannula Report Period: FY 13 -14, November 2013 Report No.: Two — FY 13 -14 S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor This report is prepared strictly to provide recommendations only and in no manner is to imply any authorization to the Contractor or its Sub - Contractors to perform services for Collier County. Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when and which items are corrected. Please return electronic copy to our office prior to next month's MSTU site review and meeting. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Observation dates: 11/12 -14/13 MONTHLY ADDRESSED Part "A" - West R/W Sign Area Median #1 X Median #2 X Remove built up debris at north nose of median. X 2 Auto damage to Firebush shrubs in middle of median. Replant 5 — 3 gal. size. hot Hannula: 11 -12 -13 No Replacements until construction is complete Median #3 X North end of median is dry: Plumbago at T Oak from north end is water stressed. Thryallis at 5 i Oak from north end is water stressed. X Continue to remove dead Indian Hawthorn plants. Dead plants still exist in beds. Median #4 — Paved separator Part "B" -Median #5 X Plumba o shrubs have declining foliage due to water stress and /or insects please review. Median #6 Median #7 X 5 Review Juniper on south end for replacements due to auto damaged. Hannula: 11 -12 -13 No Replacements until construction is complete Median #8 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a monthly basis for the next three months. Hannula: 11 -12 -13 Treatment is ongoing Median #9 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a monthly basis for the next three months. Hannula: 11 -12 -13 Treatment is ongoing Median #10 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a monthly basis for the next three months. Hannula: 11 -12 -13 Treatment is ongoing Median #11 X 2 Broadleaf weed treatment is not totally effective needed. Continue treatments on a monthly basis for the next three months. Hannula: 11 -12 -13 Treatment is ongoing Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417 -0707* Fax (239) 417 -0708 LC 098 * FL 1023A Comment [s21]: INN 7X576 & '41u4eua&4 Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Collier Blvd. A & B and Green Blvd. Report Period: FY13 -14. November 2013 Rennrt Nn • Twn LOCATION /WORK AREA S C R MAINTENANCE SERVICES OBSERVATIONS & RECOMMENDATIONS RESPONSE or COMMENTS Median #12 X Juniper on south end has brown foliage. Prune out and review for insects. Median #13 West R/W Green Blvd. - Median #1 X Sabal palms need pruning. 18th Ave. S.W. Median X Sabal palms have not been pruned. Irrigation: X Previous water stressed and /or currently water stressed turf areas exist along the back of the curbing in multiple medians. M &A: 11 -14 -13 Please indicate in future report responses the controller watering schedule days of operation at time of the report. Part A Pump Station- Median #2, 5 hp, 6" well, VFD Motorola Scorpio controller S3406 Electric meter on west R/W at pump station, G Irrigation 951A Part B Pump Station- Median #13, 7.5 hp, 6" well, VFD Electric Meter Northwest corner of Collier & Green on north R/W adjacent to Median #1 Motorola Scorpio controller S3405 & S3408 QUARTERLY ADDRESSED All Shrub plantings Part "A" - West R/W Sign Area Part "A" Medians #1 thru 3 Part "B" Medians #5 thru 13 Median #5 Medians 1 thru 13 and Green Blvd. Median #1 X 24 Median numbers need to be painted on both ends of the medians. 18 th Ave. S.W. Median Page 2 of 3 X,Cx &'4' "Oa'a%d Landscape Architecture GOLDEN GATE BEAUTIFICATION, M.S.T.U. Location: Collier Blvd. A & B and Green Blvd. Report Period: FY13 -14, November 2013 Report No.: Two GG MSTU Collier Blvd. Part A & B, Well Annual Water Use for 2013 500,000 400,000 351,130 300,000 282,140 { 293,995 240,685 1 270,404 200,000 056 181,090 221,745 206,020 160,405 154, 185,235 MNon- PotableA 100,000 149 [3 Non-Potable B ■ 2012 AVG. 0 4 39 455 Jan -13 Feb -13 Ma r -13 Apr -13 2012 AVG. May -13 Jun -13 0 Jul -13 Aug -13 Non - Potable A Sep -13 Oct -13 Nov -13 Dec -13 Water Use Goal: (1.63 ac. of Plants) Recommended: Supplemental watering rate of .5 to .75 inch per week. Three - quarter inch per week equals 33,196 gallons per week or 132,785 gallons per month. 2012 total water use: 2,222,816 gallons or 50.22 inches of supplemental water pumped. 11/01/2013 Page 3 of 3