VB MSTU Agenda 12/05/2013I. CALL TO ORDER
II. ATTENDANCE
Vcndwdidt BewA MAYA
Advisory Oomomittee
Naples, FL D
AGENDA: DECEMBER 5, 2013,
BY— K�-� I
III. APPROVAL OF AGENDA
IV. APPROVAL OF MINUTES: NOVEMBER 7, 2013
V. LANDSCAPE MAINTENANCE REPORT — ROBERT KINDELAN, CLM
A. Irrigation repair Vanderbilt Drive
VI. PROJECT MANAGER REPORT — HARRY SELLS
A. Financial
Budget
Explanation of Interest
Explanation of Transfers out to other County Funds
B. Clerk's issues with FPL payments.
C. 227 Channel Landscape Restoration
D. Street Lights Vanderbilt Beach and 14 finger streets.
VII. OLD BUSINESS
X. NEW BUSINESS
A. NEXT MEETING DATE
XI. MEMBER COMMENT
XII. PUBLIC COMMENT
NEXT MEETING DATE: JANUARY 2, 2013 — 2:00 PM
"Claussen Family Center" at St. John's Church
625 111TH Ave., Naples, FL
I. CALL TO ORDER
Vwndwdidt lleaeA ) I.S.TA
Advisory GwtNmlittee
3299 East 'famiami Trail Suite 103
Naples, FL 34112
NOVEMBER 7, 2013.
;
MINITTF,C _...
!' 4 [J�
Chairman Charles Arthur called the meeting to order at 2:00 PM.
Roll was called and a quorum was established; five voting members were present.
II. ATTENDANCE
Members: Charles Arthur — Chairman
Bruce Forman, Michael Price, William Sjostrom — Vice Chair, Mark Weber
County: Harry Sells, Project Manager
Others: Robert Kindelan — CLM
(Anne Iacuzzo — JuriSolutions)
III. APPROVAL OF AGENDA
Michael Price moved to approve the Agenda as presented. Bruce Forman offered a
Second in support of the motion. Carried unanimously, 5 — 0.
IV. APPROVAL OF MINUTES — OCTOBER 179 2013
Correction:
• Page 2 (under FY 2013 — 2nd bullet) — "power" lines was changed to "cable" lines
William Sjostrom moved to approve the Minutes of the October 17, 2013 meeting as
amended. Bruce Forman offered a Second in support of the motion.
Carried unanimously, S— 0.
V. LANDSCAPE MAINTENANCE REPORT — ROBERT KINDELAN, CLM f
• There are a "handful" of restorations remaining to be completed on Gulfshore
• Normal maintenance on Vanderbilt:
o Irrigation at the north end of Vanderbilt has been a significant problem
• Two zones are not working due to the control wires that control the
valves along the pipes
• In places where there are large Ficus trees, the roots have wrapped
around and grown around the pipes which stretched the wires
November 7, 2013
• One location can be fixed, the other may not — it is being inspected
to determine if it is repairable
• A temporary (battery- controlled) Controller has been installed as a
valve to ensure distribution of water
• Repairs will involve tearing out the main line and replacing with new
control wires
• Since there will be construction in the area in the near future, it
would be more cost effective to not replace the wires but, as more
wires keep breaking, install the Controllers which work well
• This solution require more maintenance to re- program the Controllers
on an individual basis
• Problem: Eventually the roots will break the pipe — repairs will be
delayed until the power and cable lines are buried
• It the main line breaks, repairs will be costly
• Photos will be emailed to Mr. Sells for distribution to the Committee
members
Harry Sells noted there is a potential for the construction to tear up sections of the pipe.
Chairman Arthur suggested the pipe should be completely replaced.
Robert Kindelan stated the problem was limited to the area where the large Ficus trees
are located on the corners by the sidewalk. He further stated if the pipe breaks, repairs
will involve cutting the pipe (100 to 200 feet down), removing the roots, and splicing
new wires as opposed to replacing the entire pipe. He continued it would not make sense
to do anything while the area is under construction.
Harry Sells suggested discussion short term versus long -term fixes and what the trade-
off is — dollar wise. The MSTU cannot let the landscaping die.
Mr. Kindelan agreed, stating that was the reason why the battery- operated Controllers
were installed.
William Sjostrom asked how long the Controllers last and if they had a timer.
Mr. Kindelan explained the device was a mini - computer which used a 9 volt battery. It
will be programmed to run when the rest of the system is not running.
Mr. Sells noted each Controller must be individually tested.
Mr. Kindelan stated the batteries will work for several months.
Discussion ensued concerning whether or not the large Ficus trees should be removed
since they are in the Right -of -Way and other options, i.e., root pruning.
Action Item: Options will be presented at the next meeting.
Chairman Arthur noted restoration will be needed at his neighbor's ( #227 Channel')
residence in the front yard. Some shrubs were removed — there is bare ground. The
sprinkler is missing and water is shooting straight up from the ground. He stated a photo
of the property prior to construction was available.
Harry Sells confirmed virtually no restoration has been done on the finger streets to date.
Action Item: Harry Sells will inspect the property to assess the damage.
2
November 7, 2013
V1. PROJECT MANAGER'S REPORT — HARRY SELLS
A. Budget FY 14
(Report attached: "Vanderbilt MSTU Fund 143 — November 7, 2013')
• Ad Valorem taxes are being collected
o Approximately $5,000 has been collected
• Budget: $974,400.00
• Landscape Incidentals (Line Item 19):
o $21,042 has been allocated for maintenance to be performed by Commercial
Land on Vanderbilt Drive — not restoration as indicated
o $8,968 is the correct amount allocated to restoration
o $8,000 has been allocated for incidentals
• Other Contractual (Line Item 20):
• There are outstanding contracts in the amount of $421,251.01
• Paid: $53,780.40
• The amount was paid to Bentley Electric
• Conduit has been buried under 58 residences to date
• Average cost upon completion: approximately $2,000 per residence
• Work is part of Phase III
Chairman Arthur asked if anything has been done on South Bay Drive.
Harry Sells replied South Bay Drive was part of Phase II. He explained he may try to
complete Phase II and Phase III at the same time.
• Operating Expense (Line Item 36): $5,778,232.98
• Commitments: $579,271.54
• Expenditures: $61,252.97
• Available: $5,137,708.47
• Total Budget (Line Item 44): $5,241,679.89
• Committed but not spent: $579, 271.54
• Estimated Cash: $5,820,951.43
• Estimated Cash less Missing Income: $4,851,498.80
• Actual Cash: $4,837,292.83
Mr. Sells explained the difference of approximately $37,000 between estimated cash
(less missing income) and actual cash was due to accounting procedures.
William Sjostrom asked why the MSTU earned only $5,000 in interest income on
$4.8Million? He stated it was less than one -tenth of one percent. He claimed the
income was "going somewhere else in the County."
Chairman Arthur noted the interest income from the previous Fiscal Year was also
$5,000.
It was suggested the interest should be at least one percent.
Mr. Sells explained the money was deposited into the County's "General Fund" in a
local bank.
Action Item: Harry Sells will inquire and report back at the next meeting.
November 7, 2013
William Sjostrom questioned the amount of "Transfers out to other County Funds" of
$412,200 which he thought was very high.
Chairman Arthur stated the amount was cumulative since the MSTU was created.
The actual number is $54,000.
Harry Sells explained the MSTU has enough money to do what was needed to be done
within the next two years unless Phase IV was begun during the two -year period.
Chairman Arthur stated in case of a short-fall, his preference was to borrow the funds
necessary to keep the Project moving to completion.
B. Phases II, III, and IV Project
Construction Plan: Phases II, III, and IV
• Phase II: Blue Bill, Vanderbilt Beach Road, and a small portion of South
Bay are "stand alone" and could be done separately or at the same time
since they are isolated
• Construction on Vanderbilt Drive will be difficult because it is so narrow
and with constant traffic both vehicle and pedestrian.
• There are fourteen "finger" streets which could be done 2 or 3 at the same
time, if the crew is available
• Phase IV is totally independent of Phase II and Phase III
■ From Blue Bill Drive north to the second bridge
• Phase IV could be done at the same time as Phase II and III
Chairman Arthur stated the reason why Phase IV was to be done last was because the
MSTU residents preferred to see some progress before work was done on an empty
road.
Harry Sells explained if construction slowed down due to being in season, for
example, and there was a gap, Phase IV could begin. The Phases are independent of
each other and could be done in any order.
The streets: Blue Bill Drive, Vanderbilt Beach Road, Vanderbilt Drive, and Vanderbilt
Drive north of Blue Bill.
Chairman Arthur stated the initial plan was to begin on Gulfshore Drive and work
around the corner; then do the "finger" streets, and Vanderbilt Drive.
Mr. Sells cautioned the corner on Gulfshore was not a good place to start work during
season due to the increased traffic. Additionally, there is heavy traffic on Vanderbilt
Drive during season. Those two streets should be started during March or April.
Chairman Arthur asked if there was a preliminary design.
Mr. Sells responded he had designs from everyone except Century Link which he
expected to receive in the near future.
Chairman Arthur asked if FPL had submitted a binding cost estimate and the reply
was "no."
• Clerk's Issues with FPL payments
November 7, 2013
• As discussed previously, the County Clerk has refused to pay FPL in advance.
• The Clerk's Office has paid only one of four approved Purchase Orders.
• FPL is in negotiation with the Clerk's Office; a verbal agreement was reached
concerning how FPL will bill and how the Clerk's Office will pay.
• The original verbal agreement: Deposit the funds for FPL into a separate
bank account from which the Clerk's Office would pay FPL as each bill was
submitted.
• A written document was drafted by the Clerk's Office and submitted to FPL,
FPL revised the document and sent it to the Clerk's Office; it was again
revised and is currently at FPL for review by their Legal Department.
• If the Clerk's Office accepts the document from FPL, it will be presented to
the Board of County Commissioners for approval.
Harry Sells stated he will present the final agreement to the Committee for their review
as soon as it has been approved. He further stated he attempted to place an item on the
Board of County Commissioners' Agenda in October to pay $192,000 but the County
Attorney, Jeffrey Klatzkow, removed the item from the Agenda and asked the Clerk's
Office to resolve the issue.
Bid Request for CEI (Construction Engineer Inspector)
• The bid has been written and should be published on the County's website
within the week — it has been reviewed by the Purchasing Department
• Work could begin in February, 2014
Excavator Bid
• The MSTU will bid out for an excavator to trench, bore, and lay the conduit
for all four Phases of the Project
• The excavator will lay the conduit and set the concrete pads for FPL,
Comcast, Century Link, and Summit Cable.
■ Time to complete: estimated from 9 months to one year
• The MSTU will bill Summit Cable for the cost on Bluebill since they have
agreed to pay for burial of their facilities.
• The bid for the excavator should be out during the first week in December.
• The contract will be presented to the Board of County Commissioners for
approval.
Chairman Arthur asked when Phase II would begin.
Harry Sells stated his "best guess" was March or April, 2014, starting at South Bay
(formerly Commercial). Easements will be necessary. There are 27 easements to
obtain. RWA will conduct a survey. The contract with RWA has been approved.
• Concept for Construction:
o Vanderbilt Drive: lift a section of the sidewalk at the corner and bore to the
next corner OR lift a section from the middle of the block and bore to the
corner
o Problem: There are two pressurized sanitary lift stations on Vanderbilt Drive
■ There are sixteen 24 to 36 -inch storm drains
November 7, 2013
o Vanderbilt Drive is narrow
o Goal is to avoid tearing up all the sidewalks and minimally disturbing the
landscaping
(Chairman Arthur left at 3:00 PM. Vice Chairman Sjostrom conducted the meeting.)
Residence Notification
• Background: A public meeting was held for the residents of Gulfshore in
2001 before the project began. The #1 issue at the meeting was burying the
lines.
• It was suggested to hold a public meeting (March is preferred) at the
Auditorium at St. John's.
• Vice Chairman Sjostrom suggested contacting the Vanderbilt HOA and will
email a contact name /number to Harry Sells.
• Harry Sells stated the public meeting should also inform the residents
concerning the additional work to be done on Vanderbilt Drive and the
fourteen "finger" streets, i.e., to replace the storm sewers, the sanitary sewers,
and the water lines.
VII. OLD BUSINESS
A. New Member, Mark Weber, and BCC Approval
• Mr. Weber's initial term will expire on November 131h
His new appointment will be presented to the Board of County Commissioners
on December 10th
The next MSTU meeting is December 5th which he can attend as an "interested
member" who cannot vote.
VIII. NEW BUSINESS
• Harry Sells distributed a flow chart for the Utility Conversion Project.
IX. MEMBER COMMENT
(None)
X. PUBLIC COMMENT
(None)
NEXT MEETING DATE: JANUARY 29 2014
"CLAUSSEN FAMILY CENTER" AT ST. JOHN'S CHURCH
625 111TH AVENUE, NAPLES, FLORIDA
There being no further business brought before the Committee, the meeting was
adjourned by order of the Vice Chair at 3:30 PM.
November 7, 2013
VANDERBILT BEACH MSTU ADVISORY
COMMITTEE
CHARLES ARTHUR, CHAIR
WILLIAM SJOSTROM, VICE CHAIR
The minutes approved by the Board/Committee on
"as submitted" [ I OR "as amended" [].
6
l� INIt r�
*07 -��/�
7
2013,
Vanderbilt beach M.5. I .u .
Advisor, Committee
`_re 3299 East Tamiami Trail Suite 103
Naples, FL 34112
NOVEMBER 7,2013 By
SUM MARY: MINUTES AND MOTIONS
III. APPROVAL OF AGENDA
Michael Price moved to approve the Agenda as presented. Bruce Forman offered a
Second in support of the motion. Carried unanimously, 5— 0.
IV. APPROVAL OF MINUTES—OCTOBER 17,2013
Correction:
• Page 2 (under FY 2013—2nd bullet)—"power" lines was changed to "cable" lines
William Sjostrom moved to approve the Minutes of the October 17, 2013 meeting as
amended. Bruce Forman offered a Second in support of the motion.
Carried unanimously, 5—0.
V. LANDSCAPE MAINTENANCE REPORT—ROBERT KINDELAN,CLM
Mr. Kindelan stated there were a"handful"of restorations remaining to be completed on
Gulfshore.
He provided an overview of the maintenance issues on Vanderbilt.
• Irrigation at the north end of Vanderbilt has been a significant problem
o Two zones are not working due to the control wires that control the valves
along the pipes. In places where there are large Ficus trees, the roots have
wrapped around and grown around the pipes which stretched the wires.
o A temporary(battery-controlled) Controller has been installed as a valve
to ensure distribution of water.
o Since there will be construction in the area in the near future, it would be
more cost effective to not replace the wires but, as more wires keep
breaking, install the Controllers which work well.
o Issue: Eventually the roots will break the pipe—repairs will be delayed
until the power and cable lines are buried
Harry Sells noted there is a potential for the construction to tear up sections of the pipe.
Robert Kindelan stated the problem was limited to the area where the large Ficus trees
are located on the corners by the sidewalk. He further stated if the pipe breaks, repairs
will involve cutting the pipe (100 to 200 feet down),removing the roots, and splicing
1
November 7, 2013
new wires as opposed to replacing the entire pipe. He continued it would not make sense
to do anything while the area is under construction.
Discussion ensued concerning whether or not the large Ficus trees should be removed
since they are in the Right -of -Way and other options, i.e., root pruning.
Action Item: Options will be presented at the next meeting.
Chairman Arthur noted restoration will be needed at his neighbor's ( #236) residence in
the front yard. Some shrubs were removed. The sprinkler is missing; water is shooting
straight up from the ground. He stated a photo of the property prior to construction was
available.
Harry Sells confirmed virtually no restoration has been done on the finger streets to date.
Action Item: Harry Sells will inspect the property to assess the damage.
VI. PROJECT MANAGER'S REPORT — HARRY SELLS
A. Budget FY 14
(Report attached: "Vanderbilt MSTU Fund 143 — November 7, 2013')
Harry Sells explained the MSTU has enough money to do what was needed to be done
within the next two years unless Phase IV was begun during the two -year period.
Chairman Arthur stated in case of a short-fall, his preference is to borrow the funds
necessary to keep the Project moving to completion.
B. Phases II, III, and IV Project
Construction Plan: Phases II, III, and IV
• Phase II: Blue Bill, Vanderbilt Beach Road, and a small portion of South
Bay are "stand alone" and could be done separately or at the same time
since they are isolated
• Construction on Vanderbilt Drive will be difficult because it is so narrow
and the constant traffic
• There are fourteen "finger" streets which could be done 2 (or 3) at the same
time, if the crew is available
• Phase IV is totally independent of Phase II and Phase III
■ From Blue Bill Drive north to the second bridge
• Clerk's Issues with FPL payments
• As discussed previously, the County Clerk has refused to pay FPL in advance.
• The Clerk's Office has paid only one of four approved Purchase Orders.
• FPL is in negotiation with the Clerk's Office; a verbal agreement was reached
concerning how FPL will bill and how the Clerk's Office will pay.
• The original verbal agreement: Deposit the funds for FPL into a separate
bank account from which the Clerk's Office would pay FPL as each bill was
submitted.
• A written document was drafted by the Clerk's Office and submitted to FPL,
FPL revised the document and sent it to the Clerk's Office; it was again
revised and is currently at FPL for review by their Legal Department.
• If the Clerk's Office accepts the document from FPL, it will be presented to
the Board of County Commissioners for approval.
November 7, 2013
Bid Request for CEI (Construction Engineer Inspector)
• The bid has been written and should be published on the County's website
within the week — it has been reviewed by the Purchasing Department
• Work could begin in February, 2014
Excavator Bid
• The MSTU will bid out for an excavator to trench, bore, and lay the conduit
for all four Phases of the Project
• The excavator will lay the conduit and set the concrete pads for FPL,
Comcast, Century Link, and Summit Cable.
• The MSTU will bill Summit Cable for the cost.
• The bid for the excavator should be out during the first week in December.
• The contract will be presented to the Board of County Commissioners for
approval.
• Residence Notification
• Background: A public meeting was held for the residents of Gulfshore in
2001 before the project began. The #1 issue at the meeting was burying the
lines.
• It was suggested to hold a public meeting (March is preferred) at the
Auditorium at St. John's.
• Vice Chairman Sjostrom suggested contacting the Vanderbilt HOA and will
email a contact name /number to Harry Sells.
• Harry Sells stated the public meeting should also inform the residents
concerning the additional work to be done on Vanderbilt Drive and the
fourteen "finger" streets, i.e., to replace the storm sewers, the sanitary sewers,
and the water lines.
VII. OLD BUSINESS
A. New Member, Mark Weber, and BCC Approval
• Mr. Weber's initial term will expire on November 131H
His new appointment will be presented to the Board of County Commissioners
on December 131H
The next MSTU meeting is December 5th which Mr. Weber can attend only as
an "interested party" who cannot vote.
VIII. NEW BUSINESS
• Harry Sells distributed a flow chart outlining the stages of the Utility Conversion
Project.
VANDEBILT MSTU
FUND 143
DECEMBER 5, 2013
2,068,487,415 FY 10 Final Taxable Value
2,005,897,752 FY 11 Final Taxable Value
1,910,384,837 FY 12 Final Taxable Value
1,904,053,751 FY 13 July 1 Taxable Value
1,948,849,572 FY 14 July 1 Taxable Value
Millage
Extension
FY 14 Gross Taxable Value
Minus: New Const. Annex.
Plus: Amendment #1
Adj. Taxable Value
13 Levy
Rolled Back Rate
91 % of Rolled Back Rate
2.351/6 Adj. 12 to 13
FY 14 July 1 Taxable Value FY 13
0.5000 0.5000
974,425 952,027
Property Tax Limitation Impact
TV Component
(less Amend. One)
Total Available Balance $ 5,239,359.80
Plus Commited And Not Spent $ 566,486.01
Estimated Cash $ 5,805,845.81
Estimated Cash Less Missing Income $ 4,831,445.81
Millage Cap
Actual Cash $ 4,830,215.42
1,948,849,572
4,640,192
0
1,944,209,380
952,027 955,192 DR 422 Levy
0.4897
0.4456
Vendor
Item
PO#
Budget Commitments
Expenditures
Total
1 CUR AD VALOREM TAX
$ (974,400.00) $
-
$ (113,420.95)
$ (860,979.05)
2 DEL AD VALOREM
$ $
$ -
$ -
3 FIFTH THIRD 0/N INTEREST
$ $
$ (43.49)
$ 43.49
4 INVESTMENT INTEREST
$ (5,000.00) $
$ (1,712.24)
$ (3,287.76)
5 INTEREST TAX COLLECTOR
$ - $
-
$ -
$
6 REVENUE STRUCTURE
$ (979,400.00) $
-
$ (115,176.68)
$ (864,223.32)
7 TRANSFERS FROM PROP APP
$ $
$
$
8 TRANSFERS FROM TAX COLL
$ $
$
$
9 CARRY FORWARD GEN
$ (4,437,000.00) $
-
$ -
$ (4,437,000.00)
10 CARRY FOR OF ENCUMB AMT
$ (517,132.98) $
$
$ (517,132.98)
11 NEG 5% EST REV
$ 49,000.00 $
-
$ -
$ 49,000.00
12 TRANSFERS & CONTRIB
$ (4,905,132.98) $
$
$ (4,905,132.98)
13 TOTAL REVENUE
$ (5,884,532.98) $
-
$ (115,176.68)
$ (5,769,356.30)
14 OTHER SALARIES
$ 25,000.00
$
$ 25,000.00
15 LEGAL FEES
$ 2,500.00 $
-
$ -
$ 2,500.00
16 ENG FEES
Hole Monies
UG CONVERSION PH 1
4500143122
$ 141,758.28 $
36,786.91
$ 4,971.37
$ 100,000.00
17 SURVEYING FEES
RWA
Surveying and Mapping
4500144501
$ 94,504.70 $
44,504 70
$ -
$ 50,000.00
18 INDIRECT COST REIMBURS
Collier County
Indirect Cost
Direct Pay
$ 7,700.00 $
-
$ -
$ 7,700.00
19 INTERDEPT CHARGES
Collier County
Variable Message Sign
Direct Pay
$ 154.00
$ (154.00)
Commercial Land
Restoration
1400147874
$
21,042.00
Commercial Land
Restoration
1400147874
$
2,968.00
$ 6,000.00
Comercial Land
Incidentals
1400147473
$ $
8,000.00
$
20 LANDSCAPE INCIDENTALS
$ 100,000.00 $
32,010.00
$ 61000.00
$ 61,990.00
Bentley Electric Co.
Phase III
4500143690
$ - $
377,839.60
$ 53,030.40
Bentley Electric Co.
Credit on Old PO
4500145262
$ -
$ (50.00)
Commercial Land
Ground Maint.
1400147473
$ - $
'4.270 00
$ 5,480.00
Commercial Land
Restoration
1400147473
4 a •1. 1 4 1
$ -
21 OTHER CONTRACTUAL
$ 5,352,170.00 $
416,521.01
$ 58,480.40
$ 4,877,188.59
22 ELECTRICITY
FPL
Electricity
4700001462
$ 200.00 $
92.40
$ 7.60
$ 100.00
23 WATER AND SEWER
Collier County Util.
Water & Sewer
4700001888
$ 35,000.00 $
26,423.34
$ 3,576.66
$ 5,000.00
24 RENT EQUIPMENT
J.M. Todd
Shared Copier Lease
4500147422
$ - $
133.06
$ 133.06
$ (266.12)
25 INSURANCE GENERAL
Collier County
Insurance General
Direct Pay
$ 2,000.00 $
-
$ -
$ 2,000.00
26 SPRINKLER SYSTEM MAIN
Florida Irrigation
Sprinkler Maint.
4500147267
$ 2,500.00 $
977.29
$ 522.71
$ 1,000.00
27 MULCH
Forestry Resources
Mulch
4500147268
$ 4,000.00 $
1,937.30
$ 62.70
$ 2,000.00
28 PRINTING AND BINDING
29 LICENCES AND PERMITS
$ 1,500.00
$ 1,500.00
30 CLERKS RECORDING FEES
$ 500.00 $
-
$ -
$ 500.00
31 LEGAL ADVERTISING
Naples Daily News
Legal Ads
4500147296
$ 400.00 $
300.00
$ -
$ 100.00
32 OTHER MISCELLANEOUS
Juristaff Inc
Clerical Services
4500147270
$ 3,000.00 $
3,000.00
$ -
$ -
33 OFFICE SUPPLIES
Staples
Office Supplies
4500147413
$ 300.00 $
200.00
$ -
$ 100.00
34 COPYING CHARGES
J.M. Todd
Copier CPC
4500147480
$ - $
-
$ 100.00
$ (100.00)
35 FERT HERB CHEM
Florikan
Fertilizer
4500147386
$ 5,000.00 $
3,600.00
$ -
$ 1,400.00
36 OTHER OPER SUPPLIES
$ 200.00
$
$ 200.00
37 OPERATING EXPENSE
$ 5,778,232.98 $
566,486.01
$ 73,988.50
$ 5,137,758.47
38 TRANS TO 111 UNINCOR
$ 54,000.00 $
-
$ -
$ 54,000.00
40 Budget Trans from Appraiser
$ 8,600.00 $
$ 2,180.25
$ 6,419.75
41 Budget Trans from Tax Collector
$ 24,300.00 $
-
$ 2,518.42
$ 21,781.58
42 TRANSFER
$ $6,900.00 $
-
$ 4,698.67
$ 82,201.33
43 RESERVE FOR CAPITAL
$ 19,400.00 $
$ -
$ 19,400.00
44 RESERVES
$ 19,400.00 $
$
$ 19,400.00
TOTAL BUDGET
$ 5,884,532.98 $
566,486.01
$ 78,687.17
$ 5,239,359.80
2,068,487,415 FY 10 Final Taxable Value
2,005,897,752 FY 11 Final Taxable Value
1,910,384,837 FY 12 Final Taxable Value
1,904,053,751 FY 13 July 1 Taxable Value
1,948,849,572 FY 14 July 1 Taxable Value
Millage
Extension
FY 14 Gross Taxable Value
Minus: New Const. Annex.
Plus: Amendment #1
Adj. Taxable Value
13 Levy
Rolled Back Rate
91 % of Rolled Back Rate
2.351/6 Adj. 12 to 13
FY 14 July 1 Taxable Value FY 13
0.5000 0.5000
974,425 952,027
Property Tax Limitation Impact
TV Component
(less Amend. One)
Total Available Balance $ 5,239,359.80
Plus Commited And Not Spent $ 566,486.01
Estimated Cash $ 5,805,845.81
Estimated Cash Less Missing Income $ 4,831,445.81
Millage Cap
Actual Cash $ 4,830,215.42
1,948,849,572
4,640,192
0
1,944,209,380
952,027 955,192 DR 422 Levy
0.4897
0.4456
Collier County, Florida
Vanderbilt Beach MSTU
Adjusted Balance Sheet (Unaudited)
As of respective date
Total Uses
$ 5,884 532 98
Unaudited
Fiscal 2014 - Unaudited
5,137,708.47
Add back: purchase orders in process - F/C 162543
579,271.54
As of
Subtotal Available to SPEND/Transfer in budget
5,716,980.01
Available cash
4,804,749.11
D/(7ervi
9130/2013
10/15/2013
111412013
121412013 11112014
21112014 31112014 41112014
Pooled cash and investments
$
4,837,292.83
$ 4,798,074.69
$ 4,804,749.11
$ 4,830,215.42 $ -
$ - $ - $ -
Market valuation of investments (done annually)
(12,897.19)
(4,137.32)
(12,897.19)
(12,897.19) -
- - -
Due from Tax Collector
7,127.73
7,107.21
7,127.73
7,127.73 -
- -
Due from Property Appraiser
1,588.33
1,914.81
1,588.33
1,588.33 -
- - -
Due from other funds
-
-
-
-
Interest receivable
5,138.68
4,073.18
5,138.68
5,138.68
Total Assets
$
4,838,250.38
_L4
$ 4,805,706.66
$ 4,831,172.97 $
$ $ - $
Goods Receipt/invoice Receipt
$
4,040.92
$ 1,162.06
$ 54,994.76
$ 656.22 $ -
$ - $ - $ -
Accounts Payable
75,642.01
9,229.40
11,838.24
390.15 -
-
4,572,979.15
Revenues:
Ad Valorem Collections
918,963.39
-
4,944.37
113,420.95 -
- - -
Interest Revenue
15,214.87
-
-
1,755.73 -
- - -
Miscellaneous
-
Expenditures:
Other Contractural Services
(523,519.98)
-
(53,780.40)
(28,233.07) -
- - -
Legal Fees
Engineering
(58,780.72)
-
(4,971.37)
(4,971.37) -
- - -
Surveying Fees
(575.30)
-
-
- -
- - -
Bank Fees
Licenses and Permits
(3,000.00)
-
-
- -
- - -
Indirect Cost Reimbursement
(7,000.00)
-
-
(3,850.00) -
- - -
Water and sewer
(28,989.47)
-
(2,085.58)
(3,576.66) -
- - -
Sprinkler maintenance
(1,512.23)
-
(120.96)
(522.71) -
- - -
Landscaping
(40,010.39)
-
-
(61000.00) -
- -
Mulch
-
-
-
(62.70) -
- - -
Other miscellaneous (fertilizer, electricity, etc.)
(12,433.33)
(154.00)
(294.66)
(418.41) -
-
FPL Underground Conversion
Improvements - General (Capital)
-
-
-
- -
- -
Transfer to PA
(7,269.54)
-
4,947.48
4,947.48 -
- - -
TransfertoTC
(11,499.00)
-
1,440.00
(930.09) -
- -
Transfer to Fund 111 (Unit. MSTD)
(54,000.00)
-
- -
Total Liabilities and Equity
$
4,838,250.38
_S_4 807,032.57
$ 4,805,706.66
$ 4,831,172.97 $ -
$ $ $
Collier County, Florida
Vanderbilt Beach MSTU
Source of monies from inception - CUMULATIVE
Ad valorem taxes
$
9,496,771.29
$ 9,496,771.29
$ 9,501,715.66
$ 9,610,192.24 $
$ - $ - $ -
Miscellaneous income (refund)
503.65
503.65
503.65
503.65 -
- -
Interest earnings
684,108.69
684,108.69
684,108.69
685,864.42 -
- - -
Insurance recoveries
13,085.17
13,085.17
13,085.17
13,085.17 -
- - -
Good and services
(4,944,975.97)
(4,984,194.11)
(4,982,464.06)
(5,067,230.06)
- - -
Transfers out to other County funds
(412,200.00)
(412,200.00) (412,200.00)
(412,200.00) -
-
Cash balance as of respective date
$
4,837,292.83
_L4,798,074
_$_4 804,749 11
$ 4,830,215.42 $ -
$ - $ - $
b:\Derek \vandymee\ing.As
Current Budget -As amended, thru 1011712013
Carryforward
$
4,964,132.98
Ad Valorem Taxes
974,400.00
Less: Revenue Reserve
(49,000.00)
Interest Revenue
5,000.00
Total Sources
$
5,884,532.98
Operating Expenditures
$
5,778,232.98
Transfers Out to Collier MSTD
54,000.00
Balanced
Transfers Out to TC/PA
Reserves for Capital Outlay
32,900.00
19,400.00
Total Uses
$ 5,884 532 98
"Available amounts" in the budget:
Available net of requisitions /Pos - F/C 162543
5,137,708.47
Add back: purchase orders in process - F/C 162543
579,271.54
Add back: requisitions in process - F/C 162543
Subtotal Available to SPEND/Transfer in budget
5,716,980.01
Available cash
4,804,749.11
D/(7ervi
(912,230.90)
Difference mostly due to the fact that FY -2014 budget
is predicated on Ad valorem tax receipts
Budgeted ad valorem receipts, net of 5% reserve
925,680.00
Actual recepils to date
(4,944.37)
DM►erwws 920,735.63
1. With approximately $5 million in the bank, why is interest only $5000, 0.1 %. Seems pretty low
even in these hard times. I would expect about 10 times that amount.
The $5,000 is only a budgeted figure, cannot give you the reasons behind or the factors in its
calculation but I will tell you that OMB generally does not want to set a target that cannot be met. For
reference, last years' interest budget was $15,100 and the actual postings totaled $22,889. The answer
for the small budgeted amount is a reflection of the possibly large spend down of "principal"
balance that is budgeted for FY -2014. Less money in the bank means less interest ... for further reference
we have posted $1,755 against the $5,000 budgeted already in Fy -2014, with November not even posted
yet. The $5,138.68 on the face of the balance sheet is interest receivable, which is recognition of
amounts accrued but not yet received in cash. I did not know which one you were alluding to...
In the balance sheet, what does transfers to other county Funds include?
a. Probably Trans to 111 as overhead to operate the MSTU
Yes, an allocation for staff time.
b. Transfers to and from the appraiser ??
The bill (transfer to) for the appraisal of property, happens in all ad valorem funds. Transfer
from is turnback of excess fees.
c. Transfers to and from the Tax Collector?
The bill (transfer to) for collection, also happens in all ad valorem funds. Transfer from is a
turnback of excess fees.
d. Water Bills?
Irrigation bill from CWS District - 2" meter.
e. Permit Fees?
Even County projects are subject to County permit fees.
f. Payment for work done by other dept. for MSTU?
I did not get the reference on this one... which dollar figure is it related to?
As a point of reference, the MSTU started collecting ad valorem in FY -2003; the $196K was the
aggregate paid by the MSTU from 2003 to FYE 2006 for indirect cost and an allocation of Fund 111 and
101 costs for services rendered to the MSTU (staff time, etc.)
k
}
TIM 4
N
co
0
i � t
:�` ►� d "` ter. !} - —
f
Concept of Construction
Vanderbilt Beach MSTU Utility Conversion Project
Phase II, III, and IV
Aerial Utilities in the Vanderbilt Beach Area consist of power supplied by FP &L, Telephone by Century
Link, and TV Service by Comcast and NuVu. All service including service drops must be converted to
underground.
A Construction Engineering Inspector CEI will be provided by the MSTU to observe all phases of
construction to ensure compliance to the contract, specifications, and safety.
The intent is to remove all aerial utilities and poles form Gulf Shore Drive, Vanderbilt Beach Road,
Commerce Street, Vanderbilt Drive, 14 finger streets off Vanderbilt Drive, and Blue Bill Drive. Even
though the dividing line goes down the center of the boundary streets, we intend to remove poles from
both sides of the street. The only poles left remaining will be stand alone street light poles.
Due to right of way size constraints, one contractor will provide buried conduit, concrete pads, and
vaults for all Utilities in Phase II, III, and IV.
On Vanderbilt Drive the desire is to not destroy the landscape, and sidewalk. To this end, we anticipate
removing a section of sidewalk at each street corner and boring to the next corner, one bore for FPL and
one or more for low Voltage communications. An additional low voltage irrigation control conduit will
be added. If the distance is too far to effectively control the bore or an obstruction is encountered, a
second bore access point will be opened in the center of the block. A four inch irrigation water line will
be added 5' from the last low voltage line.
Vanderbilt Drive and its sidewalk are narrow and heavily traveled and will require special MOT for
pedestrians and automobiles. It is also mandated that the removed portions of sidewalk be placed back
in service as soon as possible. Another contractor will be responsible for replacing the removed
sidewalk.
The general method of construction will be trenching through soil and boring under paved surfaces.
FPL conduit will be in one trench or Bore as near to the outer Right of Way Line as possible and will
maintain a 12" separation from all other utilizes, and a 60" separation from potable water.
If one bore for FPL is not possible, we will use what is necessary and move other utilities to maintain
separation.
FPL Feeder, Primary service, and secondary service conduit can share the same trench or bore.
We would prefer that all low voltage conduits share the same trench or bore while maintaining a 12"
separation from High Voltage and 60" from potable water. This requires a shared trench agreement
executed by all parties. If no shared trench agreement is reached, separate bores /trenches will be used.
The method of construction on the fourteen finger streets off Vanderbilt Drive will be by trenching and
boring under driveways and the street. Cutting and trenching through driveways will be the method of
last resort.
FPL's design calls for a transformer on one side of the street feeding two houses with a secondary
junction box directly across the street feeding two more houses.
We will duplicate this design for low voltage with a video and a voice distribution point next to the FPL
transformer, and a video and a voice distribution point next to the FPL Junction box across the street.
This will require two cross street bores at every transformer.
The parking lot for Conner Park on the North side of Blue Bill extends to the north edge of the Right of
Way. The path through the parking lot will be done by boring from Parking Lot Island to Parking Lot
Island following the same procedure as on Vanderbilt Drive. Cutting asphalt and trenching will be the
method of last resort.
The cross water bore on Blue Bill will require one 6" conduit for FPL and as many as six 2" conduits for
low voltage utilities. The takeoff and landing points will be in the same general vicinity of each other.
The method of construction on Vanderbilt Beach Drive, Gulf Shore Drive, and Commerce Street will be
by trenching, with boring under driveways and streets. Cutting asphalt and trenching will be the
method of last resort.
Having one contractor supply all buried conduits requires close coordination to ensure that the correct
conduit terminates in the correct location.
After all conduits are buried in the project area, separate contractors or the utilities themselves will
follow with the installation of their individual networks. The geographical size of the project area will
allow at least three contractors to be working simultaneously. This will ensure an earlier completion
time of the total project.
When all new networks are installed, tested, and connected, the old network must be taken down as
soon as possible. FPL will take down their old network and their poles but cannot do so until all other
utilities are off the poles.
Landscaping in the way of boring and trenching will be removed by the contractor. Landscaping will be
restored by the MSTU. This is not carte blanche to destroy existing landscaping. All effort should be
made to maintain the look and feel of the neighborhood. After completion in the area, elevations must
be checked for proper drainage and all excess soil, and construction debris removed from the site. There
is no excuse for unprofessional work.
The conversion of individual residences electrical services from aerial to underground will be performed
by Bentley Electric in conjunction with FP &L. The conversions of individual service for cable and
telephone will be done by the supplying companies.