Lely Beautification MSTU Agenda 07/18/2013Ittl GOLF ESTATES BEAUTIFICATION MSTU
ADVISORY COMMITTEE
3299 Tamiami Trail East, Suite 103
Naples, FL 34112
AGENDA:
C�
CALL TO ORDER
11. ATTENDANCE
III. APPRovAL OF AGENDA
/I. APPROVAL OF MINUTES:
/V. BUDGET REPORT
VI. LANDSCAPE MAINTENANCE REPORT — CLM; MCGEE & ASSOCIATES
VII. LANDSCAPE ARCHITECT'S REPORT — MCGEE & ASSOCIATES
A. Pebble Beach Lighting Project
VIII. PROJECT MANAGER'S REPORT — DARRYL RICHARD
IX. FUTURE PROJECTS
X.
COMMITTEE REPORTS
XI. OLD BUSINESS
XII. NEW BUSINESS
X1H. PUBLIC COMMENTS
NEXT MEETING: , 2013 AT 2:00 PM
Collier County East Naples Branch Library
8787 Tamiami Trail East, Naples, FL 34112
Ittv
I. CALL TO ORDER
GOLF ESTATES BEAUTIFICATION MSTU
ADVISORY COMMITTEE
3299 Tamiami Trail East, Suite 103
Naples, FL 34113
MINUTES
JUNE 209 2013
Chairman Slebodnik meeting was called to order at 2:03 PM.
A quorum was established. Five voting members were present.
H. ATTENDANCE
Members: Robert Slebodnik, Chairman
Tony Branco, Kathleen Dammert, David Larson (Vice Chair), Jennifer Tanner
County: Darryl Richard — Project Manager
Others: Michael McGee — Landscape Architect, P.A.
Robert Kindelan — CLM,
(Anne Iacuzzo — JuriStaff)
III. APPROVAL OF AGENDA
Addition:
• Under Item XII, "New Business," the following topics were added:
• A. New Traffic Signage — County
• B. Identification Tags on Light Poles
• C. Monthly Meeting Review
• D. Light Bulb Replacement (New and Old)
Kathleen Dammert moved to approve the Agenda as amended David Larson offered a
second in support of the motion. Carried unanimously, S — 0.
IV. APPROVAL OF MINUTES — MAY 16, 2013
Correction:
• Page 2, under V. (A) — "Landscape Maintenance Report" — (second McGee
comment) change "drop" to "drip"
Kathleen Dammert moved to approve the minutes of the May 16, 2013 meeting as amended
David Larson offered a second in support of the motion. Carried unanimously, S — 0.
V. BUDGET REPORT — DARRYL RICHARD
(Attached: "LELY MSTU — Fund 152, dated June 20, 2013 ")
• Current Ad Valorem Tax: $ 186,600.00 (anticipated to receive)
• Received to date:
$
176,064.75
• To be Collected:
$
10,535.25
• Operating Expense:
$
155,047.26
• Open Purchase Orders:
$
26,068.80
• Expenditures - Paid to date:
$
91,736.35
• Operating Funds Available
$
37,242.11
• Capital Outlay/Improvements:
$
296,300.00
• Open Purchase Orders:
$
24,988.19
• Spent to Date:
$
186,929.27
• Available Total:
$
84,382.54
• Reserves (insurance claims):
$
100,000.00
• Total Budget:
$
222,639.32
June 20, 2013
(Line Item 30)
(Line Items 31 and 32)
Darryl Richard noted Lykins Signtek had submitted a Purchase Order in the amount of
$1,280.00 for the two replacement sign pole at the school crosswalk which had been approved
during last month's meeting.
VI. LANDSCAPE MAINTENANCE REPORT — CLM AND MCGEE & ASSOCIATES
A. CLM (Commercial Land Maintenance) — Robert Kindelan
• Mulching is (basically) complete
• Finished planting replacement plants on Pebble Beach — remaining area on Pebble
Beach will be mulched on Friday
• Water has been turned back on — very little has been used — ground is saturated
• Will remove Torpedo grass from Bougainvillea beds on Pebble Beach within the
next week before it becomes unmanageable
• A dead Foxtail palm will be removed from the median on Doral Circle; will replace
with something else (no palm species)
• Mike McGee noted there is Torpedo Grass in cul -de -sac #20 which must be removed
• Regarding the "missing" Bougainvillea (between the light fixtures) — planting had
been placed on hold can now be replaced
• The top portion of a recently - planted Sabal palm has broken; the tree will be
replaced
B. McGee & Associates — Michael McGee
(Attached: "Landscape Observation Report," dated June 17, 2013)
Comments were included in above discussion.
VII. LANDSCAPE ARCHITECT'S REPORT — MCGEE & ASSOCIATES
Tony Branco asked where the MSTU's responsibility ended concerning signage for Pine Hurst
Estates. He stated there is overgrowth of shrubs by the golf course crossing that blocks the sign
from view.
Mike McGee confirmed it was not the responsibility of the MSTU.
2
June 20, 2013
Action Item: Chairman Slebodnik will notify the Manager of the Hibiscus Golf Course of the
problem.
Tony Branco noted in previous discussions, it was agreed the palms by the light poles were to
be trimmed. He stated there are still a couple that are causing areas to "blackout." He
suggested inspecting the area at night.
Mike McGee replied a Sabal palm is scheduled to be removed from that area. He said he will
do a cite visit at night.
Chairman Slebodnik noted the middle of Median #14 is also "bad" area.
A. Pebble Beach Lighting Project
• Contractor replaced two ballasts that had burned out on Pebble Beach during the
project
• During a walk - through, it was noted two additional ballasts were burned out
• Will contact the manufacturer, Lumec, to replace them (under warranty)
• Bentley Electric stated it would assist by contacting the vendor to ship new
ballasts
Tony Branco noted there is a burned out light opposite #64 Pebble Beach Blvd. He stated
there are two out on the in -bound side of St. Andrew's Blvd, the first pole at the entrance,
the third pole looked "weak," and a fluorescent bulb is out on the in -bound side.
Action Item: Darryl Richard will notify Bentley Electric to check the lights as well as the
electric box on St. Andrew's. He will also contact John Miller at the County regarding who
should check the lugs and the meter voltage readings at each pole.
(Bob Kindelan left at 2:37 PM.)
VIII. PROJECT MANAGER'S REPORT — DARRYL RICHARD
• Regarding construction on 41, still trying to obtain plans from the developer — nothing
has been submitted to the County.
IX. FUTURE PROJECTS
(None)
X. COMMITTEE REPORTS
(None)
XI. OLD BUSINESS
(None)
XII. NEw BUSINESS
June 20, 2013
A. New Traffic Signage — County
• Signs do not fit — too large for existing metal frames
• The HOA paid for the signage initially (private funding) within the community.
• Director of Traffic Operations requested return of all signs and asked if a new standard
sized sign could be placed at the corner of Doral and Rattlesnake Hammock (black
letters /white background); it is a public safety issue.
Consensus: There is no need to replace the signs — especially with poor quality signs.
Doral is a private road — not a county street.
Action Item: Darryl Richard was requested to invite the Director of Traffic Operations
to attend the next meeting.
Suggestion: The County can place its sign in the median on Rattlesnake - Hammock.
B. Identification Tags on Light Poles
Mike McGee explained there is an effort by Traffic Operations to standardize the 3 -inch
high letters used on the street light poles. In Golden Gate, the same decorative poles (as in
Lely) were used in the medians and the County initially insisted the letters were to be
stenciled vertically on each pole. The County relented but some type of ID tags has to be
installed on each light pole.
Preferred method: Stencil the identifying number (2 -in high/black) on the top of the
inbound curb by the light pole rather than on the concrete base of the pole because it would
become covered by dirt.
Jennifer Tanner moved to approve authorizing Bentley Electric to paint identification
numbers on the new light poles on Pebble Beach Boulevard on the top of the inbound curb
in black. Chairman Robert Slebodnik offered a second in support.
Carried unanimously, 5 — 0.
C. Monthly Meeting Review
Darryl Richard noted the major projects for the MSTU have been completely. He asked if
the members wished to continue meeting on a monthly basis, or if they would prefer to meet
every other month.
• The entrance project has been placed "on hold" until details can be obtained
concerning the scope of the developer's plans for the ( "The Isles ") construction
across US 41.
• The traffic management plan has not been filed
• Plant materials and trees are unknown
• Would not want entrance to clash — try to coordinate
• Next project: Doral Circle Utility Project
• Will closely supervise contractor to protect installed landscaping and
irrigation
• Start Date: unknown
Consensus: The members will keep the monthly schedule and amend as needed.
4
June 20, 2013
D. Light Bulb Replacement (New and Old)
Tony Branco noted several bulbs on St. Andrew's (at the entrance) were not working:
• At the 2nd and 3rd poles on the inbound side
• At the 1St pole on the outbound side; the 3 pole is very weak
• The florescent light at the monument on the inbound side is out
His concerns:
• New lights have been added on Pebble Beach Blvd, but the bulbs seem to burn out
very frequently.
• The life expectancy of the bulbs is disappointing.
• Maintenance has been a problem
• The turnaround time to replace burnt -out bulbs can range from one to three months.
• The response by the electrician has been "terrible."
• There have been far too many "black holes."
Suggestions:
• Ask CLM to turn the lights on and inspect on a weekly basis.
• Hire a small electrical company for routine monthly maintenance
Darryl Richard suggested the first step would be to conduct a thorough examination of the
entire system. He also suggested discussing the issue with Chuck at Bentley Electric during
the next field meeting.
Mike McGee stated Bentley Electric may have a service crew in addition to their construction
crews. He suggested drafting a specification for a "service quote" for weekly inspection.
Darryl Richard agreed a lighting maintenance specification should be developed and an
Invitation to Bid released to the list of approved electrical vendors. Can cut a Purchase Order
to allow vendor to carry a supply of light bulbs and immediately replaced burned out bulbs
upon inspection.
Mike McGee will create a spreadsheet to track when a bulb is replaced and how often.
Tony Branco moved to approve establishing a maintenance bid for all lighting within
the MSTU. Second by David Larsen. Carried unanimously, S - 0.
XIII. PUBLIC COMNMNT
(None)
NEXT MEETING: July 18, 2013 at 2:00 PM
Collier County East Naples Library Branch
8787 Tamiami Trail East, Naples, FL 34112
June 20, 2013
There being no further business to come before the Committee, the meeting was adjourned
at 3:20 PM.
LELY GOLF ESTATES BEAUTIFICATION
MSTU ADVISORY COMMITTEE
ROBERT ST FBODNIK, CB[AR MAN
The Minutes were 9pproved by the Committee/Board on /9'
, 2013, -Q��
"as submitted" [ OR "as amended' LJ.
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
LELY MSTU
FUND 152
July 18, 2013
FERTILIZER HERBICIDE CHEMICAL
Amended
5,000.00
$
1,579.82
Actual
2,082.08
Available
Open P.O.s
FY 13 Amt.
Actual
Budget
Commitments
Expenditures
142,999,456
Total
Bentley Electric Co.
4500142148
Lighting Project
$
22,366.79
$ 107,250.67
CUR AD VALOREM TAX
$ (186,600.00)
$
-
$ (179,044.10)
$
(7,555.90)
Bentley Electric Co.
4500143120
Install new pole
$
450.00
$ -
DEL AD VALOREM
$
$
-29,400-300.00 0
$
(403.45)
$
403.45
Bentley Electric Co.
4500144456
Repair Existing Pole
$
1,006.00
FIFTH THIRD INTEREST
$
$
-
$
(78.93)
$
78.93
Collier County ROW
IGC
ROW Permit
$
-
$ 1,000.00
INVESTMENT INTEREST
$ (1,000.00)
$
-
$
(1,016.57)
$
16.57
Collier County Utilities
4700001477
Water
$
502.06
$ 2,497.94
INTEREST TAX COLLECTOR
$ -
$
-
$
(3.85)
$
3.85
Commercial Land
4500140171
Grounds Maintenance
$
10,148.26
$ 43,851.74
REVENUE Sub Total
$(T$T,600.00)$
$ 100,000.00
Extension
186,607 191,743
.90)
$
(7,053.10)
Commercial Land
4500144498
Grounds Maintenance
$
11,685.00
$ -
TRANS FROM PROPERTY APPRAISEI
-
-
43.19
(43.19)
;ommercial Lan.:
4500140390
Tree Fertilizer Spikes
$
-
900.24
TRANSFER FROM TAX COLLECTOR
$ -
$
-
$
-
$
-
commercial Land
4500140705
Washingtonia Palm Removal
$
93,303,282
$ 4,753.40
CARRY FORWARD GENERAL
$ (329,000.00)
$
-
$
$
(329,000.00)
)iamond Fert
4500140509
Fertilizer
$
-
539.00
CARRY FORWARD OF ENCUMB BY A
$ (80,347.26)
$
-
$
$
(80,347.26)
Florida Irrigation
4500140085
Irrigation Parts & Related items
$
378.90
$ 1,621.10
NEG 5% EST REV
$ 9,400.00
$
-
$
-
$
9,400.00
Florikan
4500140165
Fertilizer
$
1,579.82
$ 1,543.08
TRANSFERS & CONTRIB
-
Rolled Back Rate (less Amend One)
2.0550
Forestry Resources
4500140089
Mulch
$
440.60
$ 5,559.40
TOTAL REVENUE
91 % of Rolled Back Rate
1.8701
-
FPL
4500122831
Electricity
$
988.60
$ 1,871.40
ENG FEES OTHER
2. 200.00
Indirect Cost Reimbursemer
IGC
County Services
$
-
$ 21,400.00
INDIRECT COST REIMBURSE
$ 21,400.00
-
$
21,400.00
$
-
Insurance General
IGC
Insurance
$
$ 500.00
LANDSCAPE INCIDENTAL
$ 15,000.00
$
8,361.07
$
8,892.33
$
(2,253.40)
1500140630
Copier Lease (Shared Cost)
$
OTHER CONTRACTUAL
$ 60,000.00
$
13,472.19
$
41,943.05
$
4,584.76
J.M. Todd
4500140630
Copier - CPC Monthly
$
105.24
$ 90.76
POST FREIGHT
$ -
$
-
$
3.68
$
(3.68)
Juristaff, Inc.
4500140164
Secretarial Services
$
2,530.54
$ 1,469.46
ELECTRICITY
$ 8,000.00
$
988.60
$
1,871.40
$
5,140.00
_umec
4500137198 C
Pebble Beach light poles
$
-
$ 72,400.00
WATER AND SEWER
$ 5,000.00
$
502.06
$
2,49794
$
2,000.00
Lumec
4500141431
Doral Cir. Pole Base Parts
$
-
$ 1,239.56
RENT EQUIPMENT
$ -
$
-
$
133,06
$
(133.06)
Lykins Signtek
4500143861
Two Signs
$
1,280.00
$ -
INSURANCE GENERAL
$ 500.00
$
-
$
500.00
$
-
McGee & Assoc
4500133726
Street Lighting Pebble Beach Blvc $
-
$ 1,800.49
SPRINKLER SYSTEM MAINTENANCE
$ 3,000.00
$
378.90
$
1,621.10
$
1,000.00
McGee & Assoc
4500133725
L/A Services Maintenance Service $
-
$ 335.50
MULCH
$ 6,000.00
$
440.60
$
5,559.40
$
-
McGee & Assoc
4500141426
L/A Services Maintenance Service $
-
$ 4,335.00
LIGHTING MAINTENANCE
$ 4,000.00
$
1,456.00
$
1,239.56
$
1,304.44
McGee & Assoc
4500141427
L/A Services Maintenance Service $
3,944.70
$ 7,960.30
LICENSES & PERMITS
$ 2,000.00
$
-
$
1,000.00
$
1,000.00
Postage /Freight
Direct Pay
Postage
$
-
$ 3.68
OTHER MISCELLANEOUS
$ 5,000.00
$
3,810.54
$
1,469.46
$
(280.00)
Staples
4500140158
Office Supplies
$
54.31
$ 245.69
OFFICE SUPPLIES
$ 200.00
$
54.31
$
245.69
$
(100.00)
Whited Holiday Decor
4500141446
Holiday Decorations
$
-
330 no
COPYING CHARGES
$ -
$
105.24
$
90.76
$
(196.00)
Total (lines 31 + 33)
57,460.82
$ 284,631.47
FERTILIZER HERBICIDE CHEMICAL
$
5,000.00
$
1,579.82
$
2,082.08
$ 1,338.10
OPERATING EXPENSE
33,349.33
$
97,275.5"'
142,999,456
FY 09 Final Taxable Value
IMPROVEMENTS GENERAL
296,300.00
24,111.49
187,355.97
84832.54
119,917,030
FY 10 Final Taxable Value
CAPITAL OUTLAY
24,111.49
$
187,355.4'
104,325,032
FY 11 Final Taxable Value
TRANS TO 111 UNINCORPORATED
-29,400-300.00 0
-
29,400.00
-
95,871,609
FY 12 Final Taxable Value
TRANSFERS
$
29,400.0a
-
93,303,282
FY 13 July Taxable Value
BUDGET TRANS APPRAISER
2,000.00
1,684.60
315.40
-2.68% Adj. 12 to 13
BUDGET TRANS TC COLLECTOR
$
4,800.00
$
-
$
4,581.47
$ 218.53
FY 13 FY 12
TRANSFER CONST
Millage
2.0000 2.0000
RESERVE FOR INSURANCE CLAIMS
$
100,000 00
$
-
$
-
$ 100,000.00
Extension
186,607 191,743
RESERVES
$
100,000.00
$
-
$
-
$ 100,000.00
TOTAL BUDGET
587,547.26
57,460.82
320,297.54
209,788.90
Property Tax Limitation Impact
FY 13 Gross Taxable Value
93,303,282
Minus: New Const. Annex.
-310
Plus: Amendment #1 TV Component
0
Adj. Taxable Value
93,303,592
12 Levy
191,743
Rolled Back Rate (less Amend One)
2.0550
91 % of Rolled Back Rate
1.8701
%�ZcG�ee & �o�wu':ated
Landscape Architecture
Project: LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Landscape Observation Report: June - July 2013
Location: MSTU DISTRICIT ROADWAYS
Project Manager: Darryl Richards, r.l.a., C.C.P.S.D. — A.T.M. Dept.
Consultant: McGee & Associates Consultant's Representative: Michael A. McGee, rla, isa
Contractor: Commercial Land Maintenance Contractor's Representative: Robert Kindelan
Report Date: 07/17/13 Observation Date: 07/15/13 Report No. 10
S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor
Contractor is requested to address items as soon as possible and indicate in RESPONSE /COMMENTS column when and which items are corrected.
Please return electronic copy to our office prior to next month's MSTU site review and meeting.
Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size.
LOCATION /WORK AREA
S
C
R
OBSERVATION & RECOMMENDATIONS
RESPONSE or COMMENTS
St. Andrews Blvd. & US 41
In bound RNV South
X
Prune seed stalks out of Alexander palms.
X
Review and treat all Bougainvilleas in front of the sign and along roadway for
caterpillars.
X
Remove volunteer White Fountain grass in east end of Muhly grass bed.
X
6
Replant 6 -3gal Bougainvillea Silhouette that were previously plant replacements or
additions. hoto
X
7
Remove dead turf and replace. hoto
X
16
Multiple turf areas along roadway contain dead areas, broadleaf weeds, crabgrass and
Bermuda grass. Treat areas to remove grasses or weeds and then prepare proposal to
replace turf as needed. (Approx. 110 sq. ft.)
M & A: 5 -13 -13 — Dead turf areas have grown over with
weeds and still need to be treated and new sod installed,
Out bound R/W North
X
Review and treat all Bougainvilleas in front of the sign and along roadway for
caterpillars.
X
At second light from US 41 remove dead turf area and mulch. Lower grade adjacent to
sidewalk so to retain mulch. hot
X
3
One of the sign lights needs to have the cover repaired. Screws are missing.
X
5
Sign banding is pulling away from base.
X
8
Cut and remove Oak tree roots that are above or lifting the asphalt pavement. (hoto
Provide proposal.
X
18
Multiple turf areas along roadway contain dead areas, broadleaf weeds, crabgrass and
Bermuda grass. Treat areas to remove grasses or weeds and then prepare proposal to
replace turf as needed. (Approx. 50 sq. ft.)
M & A: 5 -13 -13 — Dead turf areas have grown over with
weeds and still need to be treated and new sod installed,
St. Andrews Blvd.
Median #1
x4-.
Review and treat Crinum lily for leaf spot fungus and remove damaged foliage.
Design * Environmental Management * Planning x Arborist
5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101
Phone (239) 417 -0707* Fax (239) 417 -0708
LC 098 * FL 1023A
%�Zc��ee 8c �QdQCi�
Landscape Architecture
I GI v r_nl s= FcTATP -q RPAI ITIPIrATION M_R_T_Ll_ Renort Date: 07/15/13 Observation Date: 07/15/13 Report : 10
LOCATION /WORK AREA
S
C
R
OBSERVATION & RECOMMENDATIONS
RESPONSE or COMMENTS
X
Recommend removing stakes /bracing on newly replaced Foxtail palm. Banding is very
tight.
X
Review and treat all Bougainvilleas in front of the sign and along roadway for
caterpillars.
X
Remove weeds in Liriope bed at eastern end.
X
2
Review Vinca annuals for dieback and replacements. Remove weeds.
X
15
Multiple turf areas along roadway contain dead areas, broadleaf weeds, crabgrass and
Bermuda grass. Treat areas to remove grasses or weeds and then prepare proposal to
replace turf as needed. (Approx. 400 sq. ft.)
M & A: 5 -13 -13 — Dead turf areas have grown over with
weeds and still need to be treated and new sod installed.
Median #2
X
Remove grass type weeds in Liriope plants on east end.
X
Remove volunteer plants in dwarf Crown of thorn plants
X
Bee's are back in valve box.
X
2
Review dead or weed infested turf areas for replacements.
Provide proposal.
Median #3
X
Install Bahia sod around telephone pedestals at back of sidewalk on north right-of-way.
Provide proposal.
X
2
Review dead or weed infested turf areas for replacements.
Provide proposal.
X
16
Treat to remove Bermuda grass in turf at culvert crossing.
Median #4
X
Remove Asparagus fern from Juniper east end.
Median #5
X
2
At address 161 replace two 3 gal. Plumba o shrubs.
Provide proposal.
X
5
At address 140 replace one missing Juniper parsoni 3 gal., west end
Provide proposal.
X
10
Tree needs to be re- staked. The top third of the main leader of the newly planted tree
has broken off and caused main trunk damage that will not permit the re- establishment
of a new leader by corrective pruning. Based upon the above it is recommended the
tree be replaced. (Previous comment): The tree trunk is too small to support upper
portion of tree Remove trunk bamboo support stakes and prune top 1/3 of the tree off
at lateral branch to create new central leader. hoto
Median #6
X
6
At address 232: Prune dead out of Plumbago shrubs and provide count for
replacements, 3 gal. size. (photo
Median #7
Median #8
X
Torpedo grass is in east end of Plumba o bed.
Median #8A
Median #9
X
4
Remove staking from Crape myrtle tree.
Median #10
Forrest Hills Blvd
Median #11
Median #12
Page 2 of 6
%�ee & ,A"m a a
Landscape Architecture
i c! v Win! r CQTATCC Q=AI MGICATInM M C T I I RPnnrt natP- (17/15/13 Observation Date: 07/15/13 Report: 10
LOCATION /WORK AREA
S
C
R
OBSERVATION & RECOMMENDATIONS
RESPONSE or COMMENTS
Forrest Hills Cart Crossing &
Lake
X
Review damaged dwarf Crown of thorn for replacements at sign light.
Provide proposal.
Valley Stream Cr. Median #13
X
Continue weekly hand removal of grass type weeds in Mimosa bed.
Pebble Beach Blvd.
Median #14
Median #15
X
Remove and treat Torpedo grass and volunteer Plumbago out of Bougainvillea.
X
8
Plant (2) — 3 gal. dwarf Bougainvillea 'Helen Johnson' shrubs at second Foxtail palm
from south end.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
Median #16
X
Remove and treat Torpedo grass in Bougainvillea on south end.
Median #17
X
8
First and second Plumbago beds from south end (2) 3 gal. Plumbago needs to be
replaced.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
X
8
Second Bougainvillea bed from south end replace (2) 3 gal. dwarf Bougainvillea 'Helen
Johnson' shrubs.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
X
8
North end Bougainvillea bed from south end replace (3) 3 gal. dwarf Bougainvillea
'Helen Johnson' shrubs.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
Median #18
X
South end Bougainvillea bed at second Ilex tree replace (2) 3 gal. dwarf Bougainviliea
'Helen Johnson' shrubs.
Provide proposal.
X
8
South end Bougainvillea bed at second Foxtail palm replace (2) 3 gal. dwarf
Bougainvillea 'Helen Johnson' shrubs.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
Median #19
R/W Lights at Big Springs North
X
2
Provide one foot radius of mulch around base of poles.
Provide proposal and install with lighting project
replacements.
Pebble Beach Blvd. Golf Cart
Crossing
X
Review for replacements the Crown of thorn bed at the southeast corner of crossing.
X
Remove and treat Torpedo grass in Crown of thorn on northwest planting area.
X
8
Prune off seed stalks from Foxtail palms.
M & A: 5 -13 -13 — One palm missed.
Thorncrest Ln. cul -de -sac #20
X
Review and treat Bou ainvilleas for caterpillars.
X
2
Remove and treat Torpedo grass.
Briarcliff Ln. Cu -de -sac #21
X
Weeds are at an unacceptable level.
Page 3 of 6
X ��X & "4' "4CGC &d
Landscape Architecture
L_FLY GOLF ESTATES BEAUTIFICATION. M.S.T.U. Report Date: 07/15/13 Observation Date: 07/15/13 Report : 10
LOCATION /WORK AREA
S
C
X
R
OBSERVATION & RECOMMENDATIONS
Weeds are at an unacceptable level.
RESPONSE or COMMENTS
Heather Grove Ln. Cul -de -sac #22
X
Review and treat Bou ainvilleas for caterpillars.
Baltusrol Signs
X
16
Provide proposal to install (4) 1- gal. Small leaf red crown of thorn on north side.
If already included in previous proposal then plant. If not
provide proposal and install with lighting project
replacements.
Doral Cr.
East R/W
X
3
Treat torpedo grass weeds in Lirio a bed at benches.
X
5
Recommend moving pedestrian crossing sign to 3 feet off back of valley utter.
West R/W
X
3
Review irrigation head at recently replaced concrete sidewalk location. Head type is
wrong and it is not aligned.
X
6
Prune off seed stalks from Foxtail palms.
X
Continue weekly to review and remove overhanging tree over Podocarpus hedge.
X
Continue weekly to remove volunteer plants at the base of the Podocarpus shrubs
adjacent to the fence.
Median #23
X
2
Second Foxtail palm has Ganoderma fungus conk and must be removed as soon as
possible. Tree is marked with white flagging. Remove tree and excavate root ball.
Supply new fill dirt to fill hole.
Treat Fire ants at base and on trunk of palm. hoto
Provide proposal.
X
Remove weeds out of Lantana.
X
7
Prune off seed stalks from Foxtail palms.
Fertilization:
No fertilization until August
Reuse Pump Station- Warren St.
Mixing chamber pump low water float switch was improperly set. Naples Motor Works
reviewed pump station and reset VFD controller. Mixing chamber was down for
approximately two to three weeks. Pump station water use and system scheduling still
being reviewed by consultant and County Irrigation Project Manager. June 2013:
Potable water use 0 gallons, Reuse water 3,561 gallons.
Irrigation General:
Page 4 of 6
X sCx & 'e4"O d�
Landscape Architecture
LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: 07/15/13 Observation Date: 07/15/13
_ _ __— ____._______ ____ _ � � w.•..�..••w.r.w.. n e•�i.wwww��ur•w�.ww.e•
Warren Street Mixing Chamber Water Use Data: 06/2013
DATE
DAY TIME
REUSE
PSI
POTABLE WATER
METER READING
(X x 1000)
POTABLE
WATER USE
GALLONS
REUSE WATER
METER READING
(X x 100)
REUSE WATER
USE GALLONS
TOTAL WATER
APPLIED
6/3/2013
M 1 :30 PM
8
2945
1,510,074.00
-
6/12/2013
W 11:00 AM
7
2945
0
1,512,603,00
1,519.00
1,519.00
6/17/2013
M 8 :30 AM
9
2945
0
1,512,693.00
90.00
90.00
6/24/2013
M 8:30 AM
8.5
2943
0
1,513,546.00
853.00
853.00
7/1/2013
M ! 8;30 AM
9
2945
0
1,513,635,00
89.00
89,00
JUNE
2013 TOTALS;
0.00
3,561.00
3,561.00
PERCENTAGE OF TOTAL VOLUME USEDI
0.0%
100.0%
10
Page 5 of 6
X .CX & 'e4"Ocu4w
Landscape Architecture
LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: 07/15113 Observation Date: 07/15/13 Report : 10
LOCATION /WORK AREA I S I C I R I OBSERVATION & RECOMMENDATIONS RESPONSE or COMMENTS
Lely Golf Estates Beautification MSTU Reuse Mixing Chamber Annual Water Use thru 7/01/13
180,000
160,000
140.000
120,000
100,00[
$0,04
00,04
40,01
20,6
0
_12012 POTABLE AVERAGE
3POTABLE
2012 REUSE AVERAGE
a REUSE
7/1/2013
Page 6 of 6
INDUSTRIAL
BENTLEY C O. ELECTRICAL CONTRACTORS COMMERCIAL
Phone: (239) 643 -5339 Fax: (239) 643 -3685
of Naples, Florida, Inc. P.O. BOX 10572 • NAPLES, FLORIDA 34101
July 18, 2013
Department of Alternative Transportation Modes
3299 East Tamiami Trail, Suite 103
Naples, Fla. 34112 -5746
Attn: Darryl Richard, RLA
MSTU Project Manager
Re: Lely MSTU Lighting Maintenance Report
Bentley Electric has performed the following maintenance in July for Lely MSTU:
• Replaced (11) hand hole plates for decorative poles located at the entry of St. Andrews Blvd and
US 41 on 7/17/13
• Repaired (1) sign entry light at St. Andrews Blvd and US 41 on 7/17/13
• Repaired (2) lights located on St. Andrews Blvd on 7/17/13
• Repaired (4) decorative lights at the entry of St. Andrews Blvd and US 41.
• Spoke with Sesco representative, Charlie McGuire, regarding warranty replacement on Pebble
Beach Blvd on 7/11/13. He said he will send (2) ballasts. We have agreed to install these
ballasts at no charge. To date, we have not received this material.
Thank you for the opportunity to perform this work. If you have any questions, please call my office at
(239) 643 -5339.
Sincerely;
Charles Bentley, President
Bentley Electric Company
AREA No. 1 - ST. ANDREWS BLVD. MEDIAN #1 SHEET No. LT -1
AREA No. 2 - ROW M -1 & M -2
ftadc0l \Is \Projects \CC Trans. Dept\2012 -006 Lety MSTU MaIM FY12- 13\Repotts \FY12 -13 SpecicationMProject Maps \LELYMSTU MAINT BID MAPS.&% 7/18/2013 1:20:06 PM
ST. ANDREWS BLVD. AT US 41 LIGHTING DATA
FIXTURE NO.
CIRCUIT
FIXTURE TYPE
FIXTURE NO.
M.H.
LOCATION
VOLTAGEIWATTS /AMPS
LAMP TYPE
BALLAST TYPE & NO.
POLE NO. & COLOR
ARM NO. & COLOR
SAG -1
A -1
KELSEY -KANE
WPIF40C
1'
N -RAN
120V- MH- 60HZ- 0.43AMPS
48 "- GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -2
A -1
KELSEY -KANE
WPIF40C
1
N -R/W
120V- MH- 60HZ -0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -3
A -1
KELSEY -KANE
WPIF40C
1'
N -RM!
120V- MH- 60HZ- 0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -4
A -1
KELSEY -KANE
WPIF40C
1'
N -RAN
120V- MH- 60HZ -0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -5
A -1
KELSEY -KANE
WPIF40C
1'
N -RAN
120V- MH- 60HZ -0.43AMPS
48 " -GE- F34CW- RS- WM-ECO
FLUORESCENT
SAG -6
A -1
KIM LIGHTING
EL2200E
1'
MED. #1
120V /150W /60HZ
PAR 38 INCANDESCENT
SAG -7
A -1
KIM LIGHTING
EL2200E
1'
MED. #1
120V /150W /60HZ
PAR 38 INCANDESCENT
SAG -8
A -1
KIM LIGHTING
EL2200E
1'
MED. #1
120V /150W /60HZ
PAR 38 INCANDESCENT
SAG -9
A -1
KELSEY -KANE
WPIF40C
1'
S -RM/
120V- MH- 60HZ -0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -10
A -1
KELSEY -KANE
WPIF40C
1'
S -R/W
120V- MH- 60HZ- 0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -11
A -1
KELSEY -KANE
WPIF40C
1'
S -RMi
120V- MH- 60HZ- 0.43AMPS
48 " -GE- F34CW- RS- WM -ECO
FLUORESCENT
SAG -12
A -1
KELSEY -KANE
WPIF40C
1'
S-R/W
120V- MH- 60HZ -0.43AMPS
48 " -GE- F34CW- RS- WM-ECO
FLUORESCENT
SAG -13
A -1
KELSEY -KANE
WPIF40C
1'
S -RAN
120V- MH- 60HZ- 0.43AMPS
48 " -GE- F34CW- RS- WM-ECO
FLUORESCENT
SAP -1
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
N -RM/
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60
R80F -12 -BKTX
SINGLE, DBB -lA-
HZ/LC( -20F)
BKTX
SAP -2
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
N -R/W
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60
R80F -12 -BKTX
SINGLE, DBB -lA-
HZ/LC( -20F)
BKTX
SAP -3
A -2
LUMEC LL
SMALL
DOS -LR -SGQ
13'
N -R M/
240V -175W
METAL HALIDE, ED -17
HPF 90%,240V/50 -60-
RBOF 12 BKTX
SINGLE, DBB -IA-
HZ/LC( -20F)
BKTX
SAP-4
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
N -RM/
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60-
R80F 12 BKTX
SINGLE, DBB -lA-
HZ/LC( -20F)
BKTX
SAP -5
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
MED. #1
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60
R80F -12 -BKTX
SINGLE, DBB -tA-
HZ/LC( -20F)
BKTX
SAP -6
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
MED. #1
240V -175W
METAL HALIDE, ED-17
HPF 90 %,240V/50 -00-
RBOF -I2 -BKTX
SINGLE, DBB -lA-
HZ/LC( -20F)
BKTX
SAP -7
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
MED. #1
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60-
R80F -12 -BKTX
SINGLE, DBB -tA-
HZ/LC( -20F)
BKTX
SAP -8
%� 2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
S -R/W
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V150 -60-
R80F -I2 -BKTX
SINGLE, DBB -IA-
HZ/LC( -20F)
BKTX
SAP -9
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
S -R/W
240V -175W
METAL HALIDE, ED -17
HPF 90%,24OV/50 -60-
RBOF -I2 -BKTX
SINGLE, DBB -lA-
HZ/LC( -20F)
BKTX
SAP -10
A -2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
S -RM/
240V -175W
METAL HALIDE, ED -17
HPF 90 %,240V/50 -60
R80F -12 -BKTX
SINGLE, DBB -tA-
HZ/LC( -20F)
BKTX
SAP -11
A 2
LUMEC DOMUS
SMALL
DOS -LR -SGQ
13'
S -RAN
240V -175W
METAL HALIDE, ED 17
HPF 90 %,240V/50 -60-
R80F -12 -BKTX
SINGLE, DBB -tA-
HZ/LC( -20F)
BKTX
ST. ANDREWS BLVD. AT US 41 MONTHLY LIGHTING REPORT SHEET
� j