Loading...
Haldeman Creek MSTU Minutes 11/03/2010 161 1 A1 - Fiala Hiller Henning Coyle C01etta )/// ,/ Ttt .// ./ fo) ~@~)1wm:lffi Jill AUG 0 9 2011 p)) BY: ,............................... Bayshore Beautification MSTU 4069 Bayshore Drive, Naples, FL 34112 HALDEMAN CREEK DREDGING MSTU ADVISORY COMMITTEE MINUTES OF THE NOVEMBER 3,2010 MEETING The meeting of the Haldeman Creek Dredge MSTU Advisory Committee was called to order by Chairman Mr. Wilson at 4:00 p.m. at the MSTU Office 4069 Bayshore Drive. 1. Roll Call: Present: Advisory Committee Members: Roy Wilson, Joe Patton, Tom Briscoe, and Steve Main. Vicki Tracy was absent. MSTU Staff Present: Sue Trone and Jean Jourdan, MSTU Project Managers. 2. Approval of Aqenda: Mr. Wilson asked for a motion to approve the agenda: Motion to approve: Mr. Main. Second: Mr. Patton. Approved 4-0. 3. Adoption of Minutes: Mr. Wilson asked for a motion to approve the April 28, 2010 regular meeting minutes: Motion: Mr. Briscoe. Second: Mr. Main. Approved 4-0. 4. Proiects Report: a. Sheriff's Update. Cpl. Mike Nelson of the Sheriff's office visited and reported that the general trend of crimes in the area continues to decrease. Cpl. Nelson delivered a report on crime from August 1, 2010 through November 3, 2010 reflecting the continuation of this trend. Cpl. Nelson encouraged Committee members to contact him at 252-9447 or michael.nelson@colliersheriff.orq if they need assistance with law or speed enforcement issues on Haldeman Creek. b. CRA award of two shoreline qrants. Ms. Trone advised the Committee that the CRA had recommended approval of grants for rip-rap for two residential properties adjacent to each other on Riverview Drive. Total project cost: $19,450.00, CRA maximum award: $9,725.00. c. Educational Flyer. Copies of "Canal Owner's Manual," a manual containing general information about owning shoreline property along a canal, was distributed to Committee members and members of the public. This manual is produced by the Environmental Resources Division of Cape Coral, Florida. MSTU staff recommend making a similar document and disseminate throughout the MSTU. Mike Bauer, Natural Resources Manager for the City of Naples, liked the manual and stated he might want to partner with the MSTU on the effort. d. May 20th Mobile Workshop and Follow Up. A brief review of the May 20th Mobile Workshop touched on continued interest in Code issues. November 3, 2010 Minutes \., 161 1 A 7 If<~ Bayshore Beautification MSTU 4069 Bayshore Drive, Naples, FL 34112 e. Attendance to East Naples Bay Advisory Board Meetinq. Staff explained that it is working to build partnerships with relevant groups to leverage outside resources. Among these outside groups is the East Naples Bay Advisory Board. Dr. Mike Bauer, Natural Resources Manager for the City of Naples, works with this board and also attended the Nov. 3 MSTU Advisory Committee meeting, further building on the effort to strengthen partnership bonds. 5. Old Business: a. Replacement of Channel Marker #13. Staff noted that Channel Marker #13 was replaced through a partnership with the Collier County Coastal Zone Management Department. Total cost of the replacement comes to $1,401.92. Motion to pay Coastal Zone Management by Mr. Main. Second: Mr. Briscoe. Approved 4-0. b. Wrappinq channel marker poles. According to Coastal Zone Management: The local seafloor is very rocky. Pilings are installed into shallow, rocky sediment and often pilings are lost because of turbulence in the surf or reckless boaters causing pilings to come loose from their point of installation. Wrapping pilings preserves the material from rotting-pilings do not tend to last long enough to rot. Additionally, Mr. Bauer, from the City of Naples, had a memo entitled "Pilings and the Environment" which summarized various techniques for preserving pilings and how those techniques effect the environment, including: (1) chemical treatment; (2) pile wrapping; (3) full encapsulation; (4) concrete; and (5) plastic. Staff presented comments from Coastal Zone Management and the memo of Mr. Bauer's to the MSTU Advisory Committee. The Committee tasked staff to seek recommendations from marine contractors on how pilings can be preserved and prices. Staff will return to the Committee in December with a summary of the results. 6. New Business: 7. Advisory Committee Communications. a. Speed Zone Siqns. Mr. Wilson noted that there is inconsistency with speed zone signs-for example, coming in from the Bay a sign says "Idle Speed," but the map on the Ordinance says "Slow Speed." b. Veqetative Encroachment. The Committee wants to investigate what ordinance or code requires property owners to trim back vegetation from hanging over the canal.. November 3,2010 Minutes ~ 161 ,I A '7 .. Bayshore Beautification MSTU 4069 Bayshore Drive, Naples, Fl34112 c. Map with Address Points. The Committee requests an aerial map with address points for property owners along the canal. 8. Public Comments. None. 9. Adiournment: Motion to adjourn: Mr. Briscoe. Second: Mr. Main. Approved 5-0. The regular meeting was adjourned at 5:40 pm. S? _/ ,lh'11 A IA/f)(h~ Approved and forWarded by Roy Wilson, MSTU Advisory Committee Chairman. Misc. Corres: Date: \ ~\ \ \ \\ \ ltemt:\u :t:"\ ~-, COPies to: November 3,2010 Minutes -... _.-- .. .. -..- --~ i:';I::\J 11'.01'