Loading...
Forest Lakes MSTU Agenda 05/07/2013FOREST LAKES I. CALL TO ORDER II. ATTENDANCE ROADWAY AND DRAINAGE M.S.T. EGG /9 tl4� ADVISORY COMMITTEE C 4 3299 EAST TAMIAMI TRAIL SUITE 103 ��'Qj� �q NAPLES, FL 34112 MAY 79 2013 �^ III. APPROVAL OF AGENDA IV. APPROVAL OF MINUTES — APRIL 2, 2013 V. BUDGET REPORT — DARRYL RICHARD A. Emerald Green — Quote VI. PROJECT MANAGER'S REPORT - DARRYL RICHARD VII. LANDSCAPE ARCHITECT'S REPORT — SCOTT WINDHAM VIII. OLD BUSINESS IX. NEW BUSINESS X. PUBLIC COMMENTS NEXT MEETING: .TUNE 4, 2013 Forest Lakes Condo Association Clubhouse 1058 Forest Lakes Drive Naples, FL 3410 N n w' 5Z� F � a N w � O LL U W W K Q m ¢ N > w p F O ¢U �mw z w H~ U W Z W �Rm O 6 J ¢ W M W R� O oo Z. � z w D w� §�< N m w U a U K U ww I- W Z wzU' z ? wU z W w w p O a O 0 W p. m o U w W w w z w W w C7 y z ¢ O ¢z?XXp�a�aaWp w,mg� w2,wN ~o WaW aNg� nwzU OJOH¢����?i �y - WOa?��ODO,<m Ua =U wz� C<Uo ¢IzHmOOrcrcfnm �UFazp ZOWWMT maUm ow �m wa: W S�t~/)j LL�OLL Ow W W W ¢U =¢ W QZQ JO���WOK(7 Q2 w0 pw �H� W W ¢ S Cl) K W. Q Z K a. v� N �..' Iwi W W w H W F K Z H 1- J w U Y S m C.O F z QN W �WJ tlLLi �1Fy�j KLL'¢ ¢ W 2 m Zf Ja W N4 8""M LL O<KK.�G W W U IL ?? W¢?? 5 p w 3 a? m 7 a J 0 0 U m m ¢ m E 3 E J F � � U U v K U z K¢ E W m c LL <D o � W 0 0 al` r N r � � U U v K U z K¢ E W m c Quote No: 031213.01 Emerald Green - REVISED Project: Light Pole Repairs Location: Emerald Green County: Collier Estimator: James T Coleman Date: Tuesday, April 02, 2013 �y�V1ERN SX LIGHTING " wwAn& wsuea a A& w= Hudson, FL 34674 Ph: 727 - 819 -2061 Fx: 727 - 857.4097 GRAND TOTAL: $ 1,890.00 COMMENTS: 1.) ABOVE QUOTE AS PER PLANS AND SPECIFICATIONS. 2.) FPL IMPACT FEES, PERMIT FEES, BONDING, PERMITTING AND SURVEYING NOT INCLUDED. 3.) IF AWARDED SOUTHERN SIGNAL & LIGHTING REQUEST TO ATTEND THE PRECONSTRUCTION MEETING. 3.) ABOVE QUOTE IS VALID FOR 30 CALENDAR DAYS. 4.) ALL MAINTENANCE OF TRAFFIC DEVICES REQUIRED ARE TO BE PROVIDED BY PRIME CONTRACTOR, FOR SSL USE. 5.) ANY OFF -DUTY LAW ENFORCEMENT REQUIRED WILL BE THE RESPONSIBILITY OF THE PRIME CONTRACTOR. 6.) ALL SIGNAL & LIGHTING MAINENANCE BONDS IF REQUIRED WILL BE AT THE EXPENSE OF THE PRIME 7.) PLEASE CALL JAMES COLEMAN AT 727 - 919 -5508 FOR ANY QUESTIONS. 8.) CONCRETE APRONS AROUND PULL BOXES IN SIDEWALK TO BE INSTALLED AND FURNISHED BY PRIME 9.) CSL TESTING NOT INCLUDED IN THIS QUOTE 10.) ALL TESTING TO BE DONE BY PRIME Naples Branch Phone: 239 - 331 -8438 3884 Prospect Ave., Naples, FL 34104 Page 1 of 1 Fax: 239 - 331 -8439 To: Forest Lakes MSTU Committee cc: Darryl Richard, Collier County ATM Jim Carr, ABB Reid Fellows, TR Transportation, Inc. From: Scott Windham Date: May 7, 2013 RE: Forest Lakes MSTU Bond Project F -58 Sidewalk Project Improvements Status Report The following is a brief status report for the Forest Lakes Sidewalk, Lighting and Street Tree Improvement projects: FOREST LAKES PROJECT F -58 UPDATES: PHASE 2and 3 Combined: • WSI will submit the Combined Ph 2 and Ph 3 VE 100% bid documents package to county staff by 5/10 for preparation to go to bid. The bid documents include the civil plans for sidewalks, parking and turn lane, the street light plans for the sidewalks and west main entry, the planting plans and irrigation plans. The package will also include Bid Tabulars and Opinions of Cost for all. MAINTENANCE SPECIFICATIONS / MANAGEMENT PLAN: • WSI has submitted combined Ph 1, 2 and 3 maintenance bid documents and specifications to county staff for preparation to go to bid. Please email or call me if you have any questions. Thanks, Scott Windham, ASLA Landscape Architect LA 000 -1516 /-*N Windham Studio, Inc., Landscape Architecture, LC 26000365 P.O. Box 1239, Bonita Springs, Florida 34133 Phone: (239) 390 -1936 Fax: (239) 390 -1937 Email: scott @windhamstudio.com www.xvindhamstudlo.com FOREST LAKES SIDEWALK, F -58 PHASE 2 VE AND PHASE 3, TURN LANE AND ENTRY STREET LIGHTING 100% OPINION OF PROBABLE COST SUMMARY Prepared by: Windham Studio, Inc. 5/7/13 PHASE 2 AND 3 COMBINED BASE BID: PHASE 2 SIDEWALK, PARKING AND LIGHTING: ABB: SIDEWALK / PARKING CONSTRUCTION FS,dewalk, striping, drainage, parking (Includes 15% Contingency) $163,581.29 TR TRANSPORTATION: SIDEWALK LIGHTING CONSTRUCTION Lighting Supply and Install (HPS light, 20' pole, upgrade powdercoat) 15% Contingency Includes $498,433.15 WSI AND ABNEY: LANDSCAPE / IRRIGATION CONSTRUCTION F Lakes Blvd Sod /landsca a /irri atino repair, tree trim, boulders $34,949.54 PHASE 3 ENTRANT URN LANE ABB: TURN LANE CONSTRUCTION Turn Lane traffic signal median refurbishment (Includes 15% Contingency) 1 $108,348.53 1 TR TRANSPORTATION: LIGHTING CONSTRUCTION 11-ighting Supply and Install (Includes 15% Contingency) $24,624.95 WSI AND ABNEY: LANDSCAPE / IRRIGATION CONSTRUCTION Planting (Includes 10% Contingency) $4,334.88 Irriaation (Includes 10% Contingency) 1 $4,600.00 IPHASE 2 AND 3 COMBINED BASE BID TOTAL: T $838,872.34 PHASE 2 AND 3 COMBINED BID ALTERNATES: PHASE 2 SIDEWALK, PARKING AND LIGHTING: WSI AND ABNEY: LANDSCAPE / IRRIGATION CONSTRUCTION (F Lakes Blvd ) Irrigation Mainline Extension $66,968.00 (Woodshire) Planting East Entry Sign, Landscape Lighting $11,501.60 (Woodshire) East Entry Sin Irrigation $28,125.90 Priority Alternates Sub Total: $106,595.50 Base Bid plus Priority Alternates: $945,467.84 6 ft Chain Link Fence along Publix Berm $9,000.00 Street Trees, St. Augustine Sod, Asian Jasmine (Woodshire Lane -ROW ) $30,595.30 Irrigation (Woodshire Lane -ROW) $13,330.00 Performance Bond, MOT $17,500.00 $70,425.30 PHASE 2 AND 3 COMBINED BID ALTERNATES TOTAL: T $177,020.80 BASE BID PLUS ALTERNATES GRAND TOTAL: $1,015,893.14 1AVAILABLE CAPITAL $1,012,053.50 $3,839.64