Loading...
Forest Lakes MSTU Minutes 03/14/2012 FOREST ROADWAY AND DRAINAGE M.S T.U. LAKES ADVISORY COMMITTEE 2885 HORSESHOE DRIVE SOUTH NAPLES,FL 34104 March 14, 2012 Minutes A. Call to order Meeting was called to order at 10:00 a.m. by Robert Jones. A quorum was established. B. Attendance Members: Robert Jones, George Fogg, Dick Barry, Kenneth Bloom (Excused), Kevin McKyton (Absent) County: Darryl Richard—Project Manager, Michelle Arnold-ATM Director, Gloria Herrera-Budget Analyst, Pam Lulich-Landscape Operations Manager Other: Scott Windham-Windham Studio, Karen Stemples-Public, Chuck Stemples-Public, Darlene Lafferty-Juristaff Ill. Approval of Agenda Add: VIII. A. Advisory Committee Vacancy George Fogg moved to approve the agenda as amended. Second by Dick Barry. Motion carried unanimously 3-0. IV. Approval of Minutes — February 8, 2012 Change: VI., page 3, second paragraph, third line should read: utilities and the location of the existing Trees has "never"been an issue. George Fogg moved to approve the minutes of February 8, 2012 as amended. Second by Dick Barry. Motion carried unanimously 3-0. V. Transportation Services A. Budget Report— Gloria Herrera reviewed the following: (See attached) o Uncollected Ad Valorem Tax $16,444,72 o Available Capital Outlay $832,453.60 B. Project Manager Report— Darryl Richard Darryl Richard presented a Quote by Gatekeepers ($964.50) to repair vehicle damage to the Woodshire Fence. 1 Staff suggested installing reflectors along the roadway to hinder vehicle damage to the Fence. After discussion is was agreed to initially repair the fence and subsequently install reflectors along the roadway. George Fogg moved to have the Fence repaired by the Gate Keepers not to exceed$1,000.00. Second by Dick Barry. Motion carried unanimously 3-0. Darryl Richard submitted a Quote by Horvath Lake Fountains to replace the inoperable Fountain at Hole No. 9. and noted: (See attached) o Original cost of the current Fountains was $23,000.00 (per Fountain) o Quote to replace the inoperable Fountain is $5,500.00 George Fogg requested Staff obtain a Quote from Vertex to compare the quality and material of the product with the proposed Fountain by Horvath (bronze in lieu of plastic or stainless steel.) George Fogg moved to replace the Fountain for a cost not to exceed $6,000.00. Motion carried unanimously 3-0. Darryl Richard reviewed email correspondence on the Gordon River Extension: (See attached) o BCC Bid Award is scheduled for April 27th o A new Army Corp Permit is required - If the new Permit is not issued by April 30th the Project will be postponed until April 2013 o The County appropriated Funds for the Project VI. Landscape Architect Report—Windham Studio Scott Windham gave the following Status Reports: (See attached) Phase I o Pre-casting of Light Pole bases is underway o Meetings were held onsite with 3RS, City Utilities, and Staff to Establish procedures to adjust utilities as needed to protect the brittle asbestos water line - Noted the Service lines (to Residences) are essentially non- existent as they are comprised of galvanized steel that has deteriorated Phase III Scott Windham reviewed the Change Order No. 7 - Scope of Services, Fee Matrix, and TR (Transportation Consultants) Estimate for the following Projects as requested by the Committee: (See attached) Street Lighting Design for Forest Lakes Dr. and Quail Run Blvd. o Turn Lane Design and Permitting at the main entrance o Topographic Survey is required as the streets are not documented 2 o Cost Estimate $78,565.00 o TR Construction Cost Estimate for sidewalk Lighting - $417,530.50 Staff clarified the current proposal is to install an extra turn lane exiting the Forest Lakes Community and asserted that an "acceleration" turn lane is not proposed at the front entrance of Forest Lakes. o Construction Cost to install the Turn Lane is pending George Fogg moved to approve the Change Order Design request for Phase Ill not to exceed$80,000.00 to include the components of Lighting on Forest Lakes Drive and Quail Forest Blvd. and the exit Lane onto Pine Ridge Road. Second by Dick Barry. Motion carried unanimously 3-0. Scott Windham recommended installing LED Landscape Lighting in lieu of the original proposed low voltage units as the LED fixtures are energy efficient. George Fogg moved to change the specifications to LED Lighting for the ornamental Lighting on the entrance and the Committee is giving approval to change specifications to LED as long as the price does not exceed 10% of the current Lighting cost. Second by Dick Barry. Motion carried unanimously 3-0. ' VII. Old Business - None VIII. New Business A. Advisory Committee Vacancy Staff advised George Fogg that his term expires April 21, 2012. Noted the vacancy is advertised and the deadline to reapply is March 29th George Fogg questioned the status on the Ficus Hedge cleanup by the Shopping Center. Staff will contact the Shopping Center Property Manager regarding the Ficus Hedge. (Staff Action Item) George Fogg reported cracked sidewalks (4 panels) on the section from the access road to Woodshire that were damaged by contractor trucks. Michelle Arnold suggested improving the striping at the entrance as the alignment is confusing and in most cases is devoid of any striping. Staff directed Scott Windham to add the item to the Project Scope and to provide direction to the Committee. 3 IX. Public Comment Chuck Stemples expressed gratitude to the Committee on the imely manner of addressing the issues with the Black Olive Trees. There being no further business to come before the Committee, the meeting was adjourned by the Vice Chairman at 11:20 a.m. Forest Lakes Roadway and Drainage MSTU Advisory Committee ,_ , Robert Jones, Ch: an These minutes apprg,ved by the Committee on '4/7a19/4 as presented V or amended Next meeting is April 11, 2012 at 10:00 a.m. Growth Management Division - Construction & Maintenance 2885 Horseshoe Drive South, Naples, FL 34104 4