Loading...
Forest Lakes MSTU Minutes 04/19/2011 ~ FOREST LAKES ROADW A Y AND DRAINAGE M.S.T.U. Fiala HHler Henning Coyle COletta ADVISORY COMMITTEE 2~5HORSESHOEDRfVESOUTH NAJPLES,FL 34104 April 19, 2011 ~m.@~;w~~ Field Meeting Minutes BY: ....................... I. Call to order Meeting was called to order at 11 :00 a.m. by Darryl Richard. No quorum was established. II. Attendance Members: George Fogg County: Darryl Richard-Project Manager, Michelle Arnold-Director A TM Other: Scott Windham-Windham Studio, Darlene Lafferty-Juristaff Public Jim Dougherty-President Fairways Forest Garden Villas Condo Bob Gracey- Manger Fairways Forest Garden Villas and Building 2 Jim Lynn-President Forest Lakes Golf and Tennis (Building 2) Eileen Lucey- President Forest Lakes Golf and Tennis (Building 1) Lee Dixon-Turtle Lakes Golf Colony III. Sidewalk Review Scott Windham reviewed the proposed North side Design Plans prior to the walk through. Walk through began at the corner of Quail Forest Blvd. and Forest Lakes Blvd. Review and discussion o A root barrier will be installed to prevent sidewalk damage o The proposed Sidewalk (north side) will follow the street path o The walkway is setback 2 ft from the roadway in key areas o Sod will be installed between the sidewalk and roadway as a visual indicator to pedestrians and motorist o Existing Boulders will be utilized at entrance Directory Sign(s) as part of the Landscaping Lee Dixon requested the existing Boulders in the Turtle Lakes Colony remain in the area. MISC. Corres: Date: ~\\~\ \ \ 1 Item': \"-'o:I::;2- ~\'-\ ). o Lighting will be installed behind the walkway - Pole spacing will be 75 ft. o Sidewalk width is 5 ft. o Overhanging Trees will be pruned up to the required 10 ft. height for clearance o If necessary the Forest Lakes Blvd Sign will be repositioned o Irrigation modifications will be made to redirect water away from the sidewalk (as needed) o Buttonwood Hedge will be removed (Light Post at 499 Forest Lakes Blvd.) for improved visibility o Remove (1) trunk from a Pigmy Date Palm (between 499 Forest Lakes Blvd. and the Recreation area) that is a conflict with the proposed walkway Recreation Area o Plant Trees to replace the small Bottlebrush Jim Lynn perceived installing a walkway near the Pool and Bridge area will prompt curiosity and be a privacy issue. Discussion ensued and the following suggestions were made by Scott Windham, Darryl Richard, and George Fogg to address the privacy issue at the Pool area: o Remove the section of walkway leading directly from the roadway o Remove the concrete bicycle pad o Install a Landscape buffer in front of the Pool area to avert pedestrian traffic o Perceived the suggested changes can be incorporated into the MSTU Sidewalk Project The underground Power Lines (South side) were discussed and the following concerns were noted: o In some areas the Power Line may run underneath the sidewalk - Installing a walkway along the Power Line presents a major problem in the future if FPL repairs are required - The Committee is concerned with potential future repair cost o The Power Line runs the length of the roadway (South side) o The Power Line (South side) is the main feeder for the entire Condo area o (Maintenance) Offsets from Utilities is required Staff stated the RWA Survey will be complete in 30 days. 2 Darryl Richard stated the Attendees will receive a copy of Conceptual Plans by Windham Studio. Michelle Arnold noted the Plans will be available on the County Website. George Fogg stressed the need to move forward expeditiously on the Project and hoped the Attendees would render a decision quickly. Scott Windham strongly recommended installing the Sidewalk on the North side as he perceived the South side is problematic. VI. Old Business - None VII. New Business - None VIII. Public Comments - None IX. Adjournment - 12: 19 p.m. Next meeting is May 11 2011 at 10:00 a.m. Growth Management Division - Construction & Maintenance 2885 Horseshoe Drive South Naples, FL 34104 3