Loading...
#09-5262CI (CardnoTBE Change Order #1)C®�1 er County Administrative Services Division Purchasing ❑ Contract Change Request Purchasing Department Change Modification Form ® Work Order Modification Contract #: 09- Change #: PO/Work Order #: Project Name: Independent Peer Review 5262CI Bride Current BCC Approved Amount 4500138762 for Chokoloskee Bdd a Replacement Project #: 66066.9 Project Manager: Department: Transp. Engr. Contractor /Firm Name: CardnoTBE 24,880.00 Marlene Messam SAP Contract Expiration Date (Master) Dollar Amount of this Change Original Contract/Work Order Amount $ 24,880.00 n/a Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 24,880.00 n/a Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 24,880.00 Delete task(s) SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 10,850.00 Redo Task #1 43.61% Total Change from Original Amount Revised Contract/Work Order Total $ 35,730.00 60% plans. 43.61% Change from Current BCC Approved Amount Cumulative Changes $ 10,850.00 Replacement 60% Phase redesign was as a result of public feedback and was approved by the Board. These events could 43.61%— Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Original completion date: Last approved completion date: completion date (includes this 8/25/2013 12/22/2013 FRevised ange):7 /21/2014 t. Number of days added: 330 Each step on the contract modification checklist form has been reviewed prior to me submitting for approval M.A.M. (this box must be initialed by Project Manager) ❑ Add new task(s) ❑C —ha nge Iask(s) Delete task(s) ® Other eci s (P fy)� Redo Task #1 1. Provide a detailed and specific explanation of the requested change(s) to the task(s) and/or the additional days added: The 60% Phase of the Chokoloskee Bridge Replacement is being redesigned by the Primary Consultant TYLIN under contract #11 -5639. This redesign was approved by the BCC on 09110/2013 by change order No. 1 (Item No. 11G). As a result of the redesign, CardnoTBE contract #09- 5262CI (Bridge) was suspended on 09/10/2013. This change order seeks to reinstate the contract by adjusting time and provides a fee increase to redo the independent peer review of the redesigned 60% plans. 2. Provide detailed rationale for the requested change: The services of CardnoTBE are needed to provide independent peer review of the design documents and calculations because the evaluation and analysis of bridge structures are not available in house and the County typically utilizes the services of consultant to provide these services. Since the redesign of the 60% phase will result in a significant change in the project, a second independent peer review became necessary. 3. Provide explanation why change was not anticipated in original scope of work: The Chokoloskee Bridge Replacement 60% Phase redesign was as a result of public feedback and was approved by the Board. These events could not have been anticipated; therefore, no provision was made in the original scope for a second independent peer review of the 60% design phase. 4. Describe the impact if this change is not processed: In house staff is not able to provide the level of structural analysis and evaluation that is required for public, health, and safety. If this change order is not approved, the County would not be providing due diligence in ensuring the public benefits. Type of Change / Modification ❑ 1. Planned / Elective ® 2. Unforeseen conditions /circumstance ❑ 4. Correction of errors ❑ 3. Quantity or rice ad�ustment ❑ 5. Value added 6. Schedule adjustment Change Requested By Contractor /Consultant Owner Usin Department Revised: 7/26/13 1 Design Professional ❑ Re ulato A enc s eci : Other s eci Purchasing Prof nal Partici at in Negotiation of Change / Modification: ❑ Yes LJ No Approved by: Date: Name and Title: arlene sa 1 , P.E., Sr. PrqMct Manager Reviewed by: v ' Date: Procurement Strategist's Name: Evefyn Colon d� Revised: 7/26/13 2 CHANGE ORDER TO WORKORDER TO: CardnoTBE FROM: Transportation Engineering 22 Sarasota Center Blvd. 2885 South Horseshoe Drive, Sarasota, Florida 34240 Naples, FL 34104 Project Name: Independent Peer Review for Chokoloskee Bridge Replacement Project Number: 66066.9.2 Work Order Date: 10/29/2012 Work Order/Purchase Order No.: 4500138762 Change No.: 1 Date: 12/4/2013 Change Order Description: This change order is to: Change time and Change price. See the attached Scope and fee proposal Original agreement amount ............................... ............................... $24,880.00 Sum of Previous Changes ......................... ..........................$0.00 This Change Order No. 1 Amount ( add) ........... ............................... $10.850.00 Revised Agreement Amount ............................. ............................... $35,730.00 Original contract time in calendar days ................. ............................300 days Adjusted number of calendar days due to previous change orders .............. days This change order adjusted time is ................. ............................... 330 days Revised Contract Time in working .............. ............................... _M g days. .- ��68' d ays j/ Original Notice to Proceed date ................................................. 10/29/2012 Completion date based on original contract time ........................ 08/25/2013 Revised completion date due to change order (s) ........................ 07/21/2014 tl Your acceptance of this change order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in said Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, to this Agreement shall constitute a full and final settlement of any and all claims arising out of, or related to, the change set forth herein, including claims for impact and delay costs. ATTEST: , * t E.13 rc Attest as to CM � � an' sgnatuft`~ App F;ov aia fo and legality Scott R. Teach, Dcputy County Attorney Accepted: January 14, 2014 OWNER: BOARD OF COLLIER C Ge4giaA- 106rTE4., Fla Tom Henning, Chai LOW Change Order No. Page 2 CONTRACTOR: CazdnoTB By:_ P rl ene Mes .E., Project Manager P er Nikolov, P.E., Sr. Vice President DEP IaT MENT DIRECTOR (. By: Co for First Witness J ad, rnff u� Q - Lt T Tint witness name ii �IVISI T TOR Con t r n� W' a //,^, B: 777 � h � � Nick (f A&alafifui Type /print witne s name r;C7 le lity: uty Co ty Attorney PROCUREMENT STRATEGIST By: Rat Evelyn Colon Cardna TSE Scope of Services Independent Peer Review Services for Chokoloskee Bridge (030161) Replacement 60% Resubmittal Change Order for Constructability Review Collier County Project Number: 66066 Scope of Services: Independent Peer Review for Chokoloskee Bridge (030161) Replacement 60% Resubmittal Change Oder for Constructability Review "Independent Peer Review Services for Chokoloskee Bridge Replacement" 1) SCOPE STATEMENT This scope of services is for the independent peer review and consultation on all design engineering drawings and specifications done by others to insure their accuracy and to resolve issues of concern with constructability, relevant codes, including County, FDOT and AASHTO standards, specifications, and recognized engineering practices. The objective is to avoid major changes during construction. As part of the independent peer review services the CONSULTANT will include but not be limited to the independent confirmation of the following: 1. Compatibility of bridge geometry with roadway geometrics including typical sections, horizontal alignment, and vertical alignment. 2. Compatibility of construction phasing with Traffic Control Plans. 3. Potential Conflicts with underground and overhead utilities. 4. Compliance with County, FDOT and other agency design requirements. 5. Conformity to County and FDOT Standards. 6. Structural Analysis Methodology and assumptions. 7. Completeness and accuracy of bridge and roadway plans. 8. Constructability issues. 2) PURPOSE The purpose of this Exhibit is to describe the scope of work and the responsibilities of the CONSULTANT and the COUNTY in connection with the preparation of reports based on the review of the construction documents and calculations provided during the resubmittal of the 60% design phases of the Chokoloskee Bridge Replacement, herein called the Project. 3) SCOPE OF SERVICES A. Project Description: The principal intent of the Project is to replace the existing functionally obsolete bridge (030161) located 5.4 miles south of US41 and on CR 29 (Copeland Avenue) over the Chokoloskee Bay in Collier County, Florida. The existing bridge has been deemed scour susceptible and was constructed in 1955. The replacement bridge will have two lanes with bike lanes /shoulder on each side and sidewalks. The 60% Phase was resubmitted based on feedback from the public information meeting. The changes include: the bridge was made higher and substructures redesign. 2 Scope of Services: Independent Peer Review for Chokoloskee Bridge (030161) Replacement 60% Resubmittal Change Oder for Constructability Review B. Project Tasks: This scope of work will cover the following tasks: Task 1 R: Provide constructability review of the Project at the end of the 60% design Phase. This includes the review of the roadway and structural plans, design, design studies, design calculations for the items that have changed as a result of the 60% resubmittal and verification of incorporation of the original review comments. The constructability review should concentrate on the ability of specific details to be constructed within the requirements of the plans and to propose better details if possible. Task 2R: Prepare a detailed set of constructability review comments based on the work performed under Task 1 R. Task 5R: Meeting and or coordination with the County and the Project designers C. Proiect Design Assumptions: All standards will be prepared in following formats: Design Specification: AASHTO LRFD Bridge Design Specifications — 4th Edition CADD Platform: Bentley Microstation V8 Specifications: Collier County Specification Format prepared in WORD All design calculations used for the development of standards are cataloged in the project calculation book and will be made available to the reviewer. D. Work Plan: The Independent Design Peer Review for Constructability Review Check involves the following activities: Structural, constructability review of the Project Provide complete comments on the following bridge elements as detailed in the plans. i. Review the structural plans and insure that they are constructible, consistent, clear and complete. ii. Provide check of quantity calculations and cost estimate and provide guidance as required. II. Provide review of the supplemental roadway plans Review the roadway plans for completeness, constructability. Provide check of quantity calculations and cost estimate and provide guidance as required. Scope of Services: Independent Peer Review for Chokoloskee Bridge (030161) Replacement 60% Resubmittal Change Oder for Constructability Review III. Meetings/ Coordination The Consultant shall attend one review meetings with County staff and design consultant. The meeting will occur at the end of Task 2R after the submittal of the constructability review comment documents for the purpose of discussing the comments. E. Deliverables: Consultant will furnish documents as required by the County to adequately address the independent design peer review check comments. The CONSULTANT shall provide the County copies of the documents for distribution, as follows: Constructability (60 %) review comments 2 sets 8.5" x 11" bound ""'OMPENSAT'ON The fee for this project will be a negotiated lump sum basis for all Tasks in accordance with the AGREEMENT FOR PROFESSIONAL SERVICES as detailed in Attachment 1. 4 Attachment 1 Task Assignment Breakdown �� Cardno TBE Project Name : Chokoloskee Bridge Replacement Independent Peer Review/ Re- Submittal 60% Constructability Review Project Number: 66066 Contract Number : 09 -5262 CL Task Description Sr. Structural Engin Sr. oadway Engineer Environmental Specialist / Clerical Total Hours Total Fee $155.00 • .00 $115.00 $60.00 111 Constructability Review at 60% Design Phase Structures 32 32 $4,960 Roadway /Drainage /Hydraulics 20 20 $3,100 Task IR Subtotal 32 20 S2 $8,060 211 Constructability Deliverables Structural Review Comments 8 8 $1,240 Roadway Review Comments 6 6 $930 Task 2R Subtotal 8 6 1 14 $2,170 SR Meetings /Coordination 60% Constructability Review Meeting 2 2 4 $620 Task SR Subtotal 2 2 4 $620 Project Grand Total 1 42 28 0 0 70 $101850