Loading...
Ordinance 2013-66ORDINANCE NO. 13- 6 6 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AMENDING ORDINANCE NUMBER 2004 -41, AS AMENDED, THE COLLIER COUNTY LAND DEVELOPMENT CODE, WHICH ESTABLISHED THE COMPREHENSIVE ZONING REGULATIONS FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA BY AMENDING THE APPROPRIATE ZONING ATLAS MAP OR MAPS BY CHANGING THE ZONING CLASSIFICATION OF THE HEREIN DESCRIBED REAL PROPERTY FROM AN AGRICULTURAL (A) ZONING DISTRICT WITHIN WELLFIELD RISK MANAGEMENT SPECIAL TREATMENT OVERLAY ZONES W -3 AND W -4 (ST/W -3 AND ST/W -4) TO A RESIDENTIAL PLANNED UNIT DEVELOPMENT (RPUD) ZONING DISTRICT WITHIN WELLFIELD RISK MANAGEMENT SPECIAL TREATMENT OVERLAY ZONES W -3 AND W -4 (ST/W -3 AND ST/W -4) FOR A PROJECT TO BE KNOWN AS THE LANDINGS AT BEAR'S PAW RPUD TO ALLOW CONSTRUCTION OF A MAXIMUM OF 25 RESIDENTIAL DWELLING UNITS AND UP TO 38 BOAT SLIPS ON PROPERTY LOCATED ON THE GOLDEN GATE CANAL SOUTH OF BEAR'S PAW IN SECTION 35, TOWNSHIP 49 SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA CONSISTING OF 10.75 t ACRES; AND BY PROVIDING AN EFFECTIVE DATE. (PETITION RZ- PL20120002095) WHEREAS, John Passidomo, Esquire and William Dempsey, Esquire of Cheffy Passidomo, P.A., representing Headwaters Development Limited Liability Limited Partnership LLLP, petitioned the Board of County Commissioners to change the zoning classification of the herein described property; and WHEREAS, the Special Treatment zones ST /W -3 and ST /W -4 are not changed by this rezone. NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA that: SECTION ONE: The zoning classification of the herein described real property located in Section 35, Township 49 South, Range 25 East, Collier County, Florida is changed from an Agricultural (A) zoning district to a Residential Planned Unit Development (RPUD) zoning district for a project to be known as the Landings at Bear's Paw RPUD to allow construction of a maximum of 25 residential dwelling units and up to 38 boat slips in accordance with Exhibits "A" through "G ", Landings at Bear's Paw \RZ- PL20120002095 1 of 2 Rev. 10/28/13 0 attached hereto and incorporated by reference herein. The appropriate atlas map or maps as described in Ordinance No. 2004 -41, as amended, the Collier County Land Development Code, is /are hereby amended accordingly. SECTION TWO: This Ordinance shall become effective upon filing with the Department of State. PASSED AND DULY ADOPTED by su er- majority vote of the Board of County Commissioners of Collier County, Florida, this I _day of a-r 2013. ATTEST r.nt BOARD OUNTY C MMISSIONERS DWIGILT'E.- BROCK, CLERK COLLI O T , F RIDA By: C By: Y D u erk9 GEORGIA A. HILLER, ESQUIRE Attest as an s, Chairwoman signature only. Approved as to form and legality: A. (0 Heidi Ashton -Cicko +� Managing Assistant County attorney Attachments: Exhibit A — Permitted Uses Exhibit B — Development Standards Exhibit C — Master Plan (3 pages) Exhibit D — Legal Description Exhibit E — Requested Deviations from LDC Exhibit F — Developer Commitments Exhibit G — Sidewalk Exhibit Exhibit H — Landscape Exhibit CP \12- CPS - 01199 \91 7h is i ,s ;,ancQ f; ±pd with the C of *-ItEe'5 PtiCE �� day day o` . . arld acknowlec�gp? en that C ived this nP 'day Landings at Bear's Paw \RZ- PL20120002095 2 of 2 Rev. 10/28/13 Cq RESIDENTIAL PLANNED UNIT DEVELOPMENT DOCUMENT THE LANDINGS AT BEARS PAW Date of Submittal: October 24, 2013 Prepared by: Cheffy Passidomo, P.A. 9 EXHIBIT A PERMITTED USES No building, structure, or part thereof shall be erected or used within the RPUD, nor shall any portion of the land within the RPUD be used, other than for the following permitted uses and a maximum of 25 residential dwelling units: a. Residential Tract: i. Permitted Principal Uses: 1. Single family detached dwelling units; 2. Single family attached duplex dwelling units; 3. Single family zero lot line dwelling units; 4. Any other use which is comparable in nature with the foregoing list of principal uses, as determined by the Board of Zoning Appeals or Hearing Examiner by the process set forth in the Collier County Land Development Code ( "LDC "). ii. Permitted Accessory Uses: 1. Accessory uses customarily associated with residential uses, including but not limited to private recreational single - family boat docks, mooring pilings, boat lifts /davits, swimming pools, spas, and screen enclosures to serve residents and their guests; 2. Recreational facilities such as clubhouses, observation decks, parks, playgrounds, pedestrian walkways, and bicycle paths to serve residents and their guests; 3. Any other use which is comparable in nature with the foregoing list of permitted accessory uses, as determined by the Board of Zoning Appeals or Hearing Examiner by the process set forth in the Collier County Land Development Code ( "LDC "). b. Amenity Area: i. Permitted Uses: 1. A golf cart path, and uses and structures customarily associated with waterfront residential amenity areas, including but not limited to swimming pools, spas, parking, private recreational single The Landings at Bear's Paw Page 1 of 12 PUDZ- PL20120002095 October 24, 2013 LAO' family boat docks, mooring pilings, boat lifts /davits, picnic areas, and kayak launches to serve residents and their guests; and 2. Any other use or structure which is comparable in nature with the foregoing list of uses and structures, as determined by the Board of Zoning Appeals or Hearing Examiner by the process set forth in the Collier County Land Development Code. c. Golden Gate Canal (as to the Northern 'h of the Golden Gate Canal abutting the project): i. Permitted Uses: private recreational single- family boat docks, mooring pilings, boat lifts /davits, and kayak launches to serve residents and their guests. All docks are reserved for the exclusive use of the owners of dwelling units within the RPUD property. No more than ten (10) boat slips may be constructed adjacent to the Amenity Area, no more than two (2) boat slips may be constructed adjacent to each platted single - family water -front lot, and no more than thirty -eight (38) slips may be constructed within the project. Except for any deviations listed in this RPUD Document, all docks and boat slips shall be subject to the requirements of LDC Section 5.03.06 and, to the extent applicable, the Manatee Protection Plan. d. General: The following structures and uses shall be considered general permitted uses throughout the RPUD: i. Essential Services facilities designed and operated to provide water, sewer, gas, telephone, electricity, cable television or communications to the general public, as described in LDC Section 2.01.03; ii. Water management facilities and related structures; and iii. Guardhouses, gatehouses, and access control structures. The Landings at Bear's Paw Page 2 of 12 PUDZ- PL20120002095 October 24, 2013 D-AO ( EXHIBIT B DEVELOPMENT STANDARDS The following Development Standards shall apply to all development within the RPUD: I. Residential: The table below sets forth the development standards for residential principal and accessory structures within the RPUD. Standards not specifically set forth herein shall be those specified in applicable sections of the LDC in effect as of the date of approval of the SDP or subdivision plat: RESIDENTIAL DEVELOPMENT STANDARDS N 0 TES: 1. FOR FRONT ENTRY GARAGES, A MINIMUM OF 23' FROM EDGE OF SIDEWALK TO THE GARAGE MUST BE PROVIDED. FOR SIDE ENTRY GARAGES, THE MINIMUM FRONT YARD SETBACK MAY BE REDUCED TO 12'. The Landings at Bear's Paw Page 3 of 12 PUDZ- PL20120002095 October 24, 2013 Cq SINGLE - FAMILY SINGLE- FAMILY ATTACHED / DEVELOPMENT STANDARDS DETACHED DUPLEX AND ZERO - LOT -LINE PF&JaPAL STRUCTURES MINIMUM LOT AREA 5,600 S.F. 2,800 S.F. MINIMUM LOT WITH 40' 20' MINIMUM FLOOR AREA 1,200 S.F. 1,200 S.F. MINIMUM FRONT YAR' -) SETBACK ` 20' 20' MINIMUM SIDE YARD SETHAC;K 5' T OR 5' MINIMUM REAR YARD SETRA�:K 20' 20' MINIMUM DISTANCE BETWEEN <0' 0' OR 10' STRUCTURES MAXIMUM BUILDING HEIGHT NOT 35'/30' 35'/30' TO EXCEED (ACTUAL /ZONED) AOCESSM 8IF�ICTUF B MINIMUM FRONT YARD SETBACK'! 10' 10' MINIMUM SIDE YARD SETBACK 5' 0' OR 5' MINIMUM REAR YARD SETBACK 10' 10' MAXIMUM BUILDING HEIGHT NOT 35'/30' 35'/30' TO EXCEED (ACTUAL /ZONED) N 0 TES: 1. FOR FRONT ENTRY GARAGES, A MINIMUM OF 23' FROM EDGE OF SIDEWALK TO THE GARAGE MUST BE PROVIDED. FOR SIDE ENTRY GARAGES, THE MINIMUM FRONT YARD SETBACK MAY BE REDUCED TO 12'. The Landings at Bear's Paw Page 3 of 12 PUDZ- PL20120002095 October 24, 2013 Cq EXHIBIT C CONCEPTUAL MASTER PLAN The Landings at Bear's Paw Page 4 of 12 PUDZ- PL20120002095 October 24, 2013 C CA6 I I wN I �a I w2 I mow I zz� I 1 r I I to w� a a^ p O od I nJ w I 0w z¢ i � via I I I' I 1 I �I I II I 1V I I I l o b I I N n 7sam I I EXHIBIT "C" (1 OF 3) 1 \ �y \� \ �o I a O '1 \ 1 m I a � z J F Q 0 Z m a w N O r °�°acD U�?d U Z � On F- ZN;:: W oQQ z<¢ O Q a Z p w ul i W J ftf O I- Q w�a m U Z rn w i d d� o� K NO I z w aZ W Z O W CY 00 as O O c o C W Q J0> ¢ >6 d 0 ¢\ o Z J c cJ Q w � i1 Lf � p w� in \ O� 03 � nom. x Z W n( LLQJJ z w O Z m wm I w 00 Qo 30 \ a \ �Z \ 2 D 3 CG 6 lr w I � p I � z Lw G i Z - T. w - ¢ LA wwWWw w L) (3 I I I d >'- Fpm I I p 0 3 rV) wN ZN� =O In I U i��rn Q I I I I Q Q Q Q Q Q U Ja 3Q0 I I I Y I WWc2—,Q ¢flf a a Z W W I I 0� O. O QacV I j ,� n LLJ > �C) � a I I n U-) cD N Q }¢ WF-a QZd I I I a a> m U Z ZOO I I I W O W N I I U J OHM 1 I O a Z 0=) 2 >_ U I I O M U OW F- J O u) _ C1. J F ~ Z Z oZ o z w o0a a Q J D D D O C7 Z I I I p �+ La III II III III O c � U o� III � I Z v w U Q OQ 0 Q Q .00 or N a I III. Ili a i�Q w a° O a . ICI I az a N as a / / / / z L w �QQafm I O aQ ? aoo % % I as a a ' / I oo U OZ>'Q} (n0 In D Q U w L'i F_- / I I I I I H I I I I I MATCH Z Z Z LINE EXHIBIT "C" (1 OF 3) 1 \ �y \� \ �o I a O '1 \ 1 m I a � z J F Q 0 Z m a w N O r °�°acD U�?d U Z � On F- ZN;:: W oQQ z<¢ O Q a Z p w ul i W J ftf O I- Q w�a m U Z rn w i d d� o� K NO I z w aZ W Z O W CY 00 as O O c o C W Q J0> ¢ >6 d 0 ¢\ o Z J c cJ Q w � i1 Lf � p w� in \ O� 03 � nom. x Z W n( LLQJJ z w O Z m wm I w 00 Qo 30 \ a \ �Z \ 2 D 3 CG 6 lr w I � p I � z Lw G i Z - T. w - ¢ LA wwWWw w NM p 0 3 rV) wN Q U U U U U U i��rn Q u-, Q Q Q Q Q Q wn p� W WWc2—,Q ¢flf a mw z wow'oow -0=) 0� O. O O O if] LLJ > N n U-) cD N a> W F- J Z 2 Z p M U OW F- J O u) _ C1. J F ~ Z Z oZ < z w U a Q J D D D O W a' w �+ La Q (� DO U o� Z LLJ OQ 0 Q Q .00 or W a a a i�Q w a s w o az a N as a V z L w �QQafm O aQ ? aoo as a a Ora oo U OZ>'Q} (n0 In D Q U w L'i F_- H ~ Q Z W J =(nWSQ Z Z Z W V LLJ F- v M 1- 0 W W W a s a X Q W W wa' d in L.1 aaQO� - 00 O m as rn w U! da � N O O� b � 000- r��o• �� \ Oz0D t -7 Q Ohm !p .Jd Fi-cD �� \ OZoo d 6. Z0�Cb a c) \ C". O O of D r�YO Q J Z J Zo �\ � U U H z 0 Ld 00 \\ V' e. a> Ld w \ 7cp b0 C9 n \ •6 O- HZ r O I\ ZOZ 7 W F- W O IrZ ZN Z Q� Qm d z a r cy0'PS� �\ w U J Q LL w N 1 \ \ oa ¢ m\ — I \ N L w I w \ m Y � � j d D a O N W d } (-) a- z¢ zQ 0 3 a- J O wjZwza n (r W J O Z O W -1NDM (,C)O G� 0 a wo CL Z of 0 am 9 a z J z w d Q a= O Z a w w g w ~ a M Q Q F- F w 0 U O < LU ZO UCH Z < J} w z = J W g z m N =oQ-w F- O o w w Oi J a a 2 Z N O w m O1 w ry W >ap (7 °om=W: a zo =NZ$ V) 0 L! c N W I w� aLL3 rW L p� Y as m Y O 0 0 O 2 W J z W W N W v O Y K > K V F = ZZ z ¢iYOl 5 W V F ¢ °do °a o n a F F y w ¢ g ; w o J — 'M \OIOL 5103N A:. ('(1 n'd (13SOdOHd dO IdVd ION) Cl 021 SS303V; GISOdOdd NM p 0 3 rV) wN ~ Dp a w ~ d Z p 3c� i��rn ❑'F- �z \w�� u-, - Nwam zZQ wymo-L wn p� X WWc2—,Q ¢flf a mw z wow'oow -0=) 0� Y � � j d D a O N W d } (-) a- z¢ zQ 0 3 a- J O wjZwza n (r W J O Z O W -1NDM (,C)O G� 0 a wo CL Z of 0 am 9 a z J z w d Q a= O Z a w w g w ~ a M Q Q F- F w 0 U O < LU ZO UCH Z < J} w z = J W g z m N =oQ-w F- O o w w Oi J a a 2 Z N O w m O1 w ry W >ap (7 °om=W: a zo =NZ$ V) 0 L! c N W I w� aLL3 rW L p� Y as m Y O 0 0 O 2 W J z W W N W v O Y K > K V F = ZZ z ¢iYOl 5 W V F ¢ °do °a o n a F F y w ¢ g ; w o J — 'M \OIOL 5103N A:. 3 O 0 w N � j y 0 r 0 Y U � W Q � O_ ZE Q En u M L, y w W N m 00 y � �m Ln w Z W 0 Y O of o w J ii m t0 J J� aw N � EXHIBIT "C" (2 OF 3) vi z O co N w Ow lWi W N w m 3 f< mN o a z LY Z Q Z Q Z J < C) W a p z Z I O � J U O m v II I U j w a w J w 0 S S W 3 o o W X 00 of U_ Z o m w a �gEL �- w w o a�Z O w CL � w y W w H Q N W y � Ow lWi W N w m 3 f< mN o a z LY Z J < C) W a p z � J U a Q S Z z OW o o n W w o O w CL � w y W w H Q N W y � Z y O z U w U) Of W LL LL [0 E1 0 w_ O 2 m Z O r U W Ij) J Yw W W m Cr W O o a Q F : U Q } Z Q Z J - Q w � CO W 3 Ln 1) z L N f- ° >' 3° O w Q F z J Q U O Q H Q ° W W J wa U O W a w Z L, Z 2L/L(/lwd W Om�w z = = Lr Nw Z W Z W OLn Z Wn�Zw w °0 g000 U�ocn� wp�oog 3ww aoD °`, a °pa�a� �¢ -�a LJ II Q U 3��QQ �:3 t/i °� Q a0U W w amw2W w w w r 0 d �� Y C=j 0 Q H= N d W~ O LLJ U J N� 0 0 Q Ow �? Z (n d 2 H> Q Fn a w h Q 3 Q 0 w° wN-I Y w U (% 'y L 0 ~_ �' Q w Z W 2 W W (U/) w o Z z W W Z Q r Z p z z¢ O r H U I w J a Wm p w 0 �' Q J W 0� Q cf 0 0 W w W �p -:2 << wow aw�- J0Lr) UQ �' zWMa C 3a -zz� -0 }z �J 0VI L Z Y °Z = QO�aD aZ LNiIOQQ Q0aZ OJ W o° O =�O ~Q0 !n W aQ W O- J (np F-- W a0(n V1wO Z O 1n W w xJ d' Q F-a�w Wl r2?�zU wW awUw o w O�a�� woo >zWaa Z O =W w 30 YW3QQ z WLs UZQN w2 Ow wawa H2 w��ww w�aL= oNm° O ~�Upx a�wQZU WQJ� ~° ~� Jwa��Z� 1-CL rZ F� !r =x (n O 0W J J s° H(n p ��a W 3 W W U)w O00 Nr : r-pz - wa D w NC7p -w3= mNL �Wf - O ~O 7 W O U L L J d' m 3 - m~ � I n L n Fo L j 0 O Z m W Z }J Q 0 � m J Z 3 J LLJ w 2 Lj m U Q Z a w w L ~Li nj W Z U U H N 2� O mN N F J H N lL OO Z w r ���~ J J O w Za p° w Z p a 0 L) W O� W= 0= C H¢ 0 O wow a W O a W JQ Q Om NO =U to x0 LD Y0 0f M.SFLQi Z rZUa, F-ZH MZ 0 LD �(la w (D �l.-wa >!Y (6 u) co =� ��Q� om�U¢� oo°og3 nw°� nod¢v ��gwOaQ o� w r O w z 3 4 Z D z w w a� 0 z N O Q Z LWL ON w z� w m Z g U w W r IU�-w �:- o_� p�� to OoLOZ =� 0100 x�w OwaZwmZ UW 0d U� r (/)ZU ~ (n Ow w ~ w�Q Ua ~U O wcO lLN U = ~0 � U °3o =J0 0 Q W w0 j J w p w N wp a Z F- = W: (Y d' w W W w 0= f U w N 3 w ~~ Q N 0 �J to -0� Ln w3 U) -3 zr cn Ol�wwZ �O z Ow I JW 2w ULn a ~am �O(7 (A Dw UJD- >O oa 3 00 � jUJ Ld 0 H J J: 2 U U O- U O J Z U W m m_ U W U U U w U p. W J W a JrN 0 Lcn 0 O Q 0 W OQ pm Fn 0 00I -03 x 9 F_, �- Y 00 Z U W C L' - O J W L � J W > J W O W F- J v Q Ln O Q F () Z a L n F U O 1. r. I f) Q Z 2 m� W W wZ W O m WO J p >wU� 0f MCt W F- f-m Mwww U W¢ �pCJF- L nzw -, ��30 �� ~za ° =�tTn 2nwadaX �xa� ° -Of �r�W�0-00 0 U z w wp �F- U w0W JOLjLJ w� Z w (n00 W zOa(n W W 2N °> w N p W ~c°o lQi_Z 0 W 00H�m(n w w 0� Q w a WIJJ C7 r0 LLJ W O ~¢ ZLL' J LLJ -J a�m J� -a 3 JW Z W W J�waCY�a JQU� J Q aU U J W z a W Oa cl� (1JO OZ OQ w' aOU ZO O ° Cr J Z3 w WQ W Oa?O W MHa Z ~CL' m Cr =o >OO J J wH aU wZ Y �aa Y �J ~ Q YQ�Na W YF=-- jQUpw� YQw3 Y 0L.I Ln w Y Olywja C7 N) of LW = pQ �_� W ?�Q W WZ = w Ww LL Z Z W ao= WQOZ L''1 LnN (n W �L`-zww W O ~ F- p a LW m w Z (n j w 0 N Y W Q U= (/1 w N O p Ln In W Z (n lY O w W (/I U 0 0 ~~ �w OF Z~ N SQL M OZ W z v0�?w ~ `n'OL,jZcr2 LD-j Z Q m o0 2Mw0rm Z�can�Z� Zao� Z�- ~°w zLn�a�= ZLjLLI � Z3�� Z=or� z3=vaiz°¢ LJ Z O= 0� Oa0 o Q(nN O m WO E °I=- 3�LZ.J °�=QN JmQ II-FZ? °r 3�� 0 0 W~(nU�Y/1 O ¢U �_ �> > 0 t0 LLj Ld >Or�o� jUOw¢¢z >�mw > zU¢ z > w�w�0 Q o3cpi >oJO oa °c�i oaw�WO oofpOOO LLI <0 =ia o�o� oLCAi 0f V) om�� °a�g p Q Q Q Q Q Q 3T .R N. .O Z -2 �2 \ a � m �x si a Z J Z J w a 3a= z W ao� g d w ^ >z CL O � Q FWO LLJo Q Q ON co Z 0 � }} W ZQ = J W u LU J LUm y 2 0- Q M �oo w w O � J Q a f NO LU V W 2 m z0 io id 7 z t2 Q LL 3LL > M 3 d Wsd 0 z w l7 J EXHIBIT "C" (3 OF 3) i I T N w z a $ 4 �zw U fo r O w ,3�a. ? �O G�52 +maN rw 1 i I T I 1 S31dVn < _ Y Y y I z W I 1 W JW ~ I U/ to Q Q Q U I I O 1n -WM ' -on_� y �I a� z� a� z� O� 1 w I u Y U I Z R..oCLou 1 I }O R. 0 0_¢ ¢ I 1- - -- - - -- ---- -- - ww - -J Ul h J g p aZ ro a O Q Z_ zJ z z z z N 1 } 1 I w J J z cd w a o- I a a� w�~ 30� z U W H W °¢ w 1 Z 1 a I } r d N p Z s "'' s 1 I m I } W 2LL a° W m a w 0 En O W 1 a I z H L(Sl � r..l vw I U) f owmY Z °J Z =t= wN I I I ^^ LL J I O Q gwQ a L - -- -- ------ - - - - -J W D CD �0 ° W J Z J o Wpm CD Z Z of -' 0 oo z Z LD wZQw < H p `?oz�¢3U� C)oma� O J f- a oai m WCC WNN Lo W Q wZJw zUwd� a O Z Q zw- ¢ U U Z J Q Z L) ON_Qn Bomar Z LU �Wp n <n o J Z p Z K N m Z O W O >p m Z v -- — — — — — — — — N IN F. U0�' Y LL W 0 zgao LL E o"2° YQ Y m U m 1 I Y = Q O I J ;jJ 0 In =0 w-¢ Z a 0 2 c LL m r rri 1 I y zQU mry I O Z Q"3 I p P: a WN 3 d 2' d¢ O I SON Z¢J I Y U W Q z ZC¢.7 z w I I ��p o w Q m ¢Y O� O >H J W a o W J J ly U O J O O I I Q K f- a Vi Z Z LL ' O T 1 U N O g rN I I z g z� zo °m I a s Q %' E-F-U Ix z° z `` ` SINVA a cr Ci O W I I I u- LW < r O N N K -J D > J O � LL 1 J N a Qoo LL 3 o W O W Lu'^ z¢U U W K � m Z Zw OOfU p s oN Zi Z V O U O W 6i 22 M E" w J w z U w a 0 Z 55 H �ss H Y O ¢ zL) N O Z_ QU Z GU m U m Q O m} ° alrn m J C W w r in Ow N (n r O N W (/1 N J a J 0< a cr 0 p zU z Ln w �— — -- — — — — — — — — — — — -- .. W of 'If U p of o° o o a ui r I w r N r I m J p cr o OO - o w Ln N vi Z w z z z > I a O Z W as Y o Z s oN 0 S3NVn a < U W w m 1 I Ln U L - -- — — — — — --- - - - --� w r } Z ? \ zo 3 z J ¢ w w ¢ r O J o 5 3 ° °Y w r O J n: ? w Z J n: m I ¢ ?r V) Z J I oom Z°W <� VI z w �<3:Z C l w�0 �pmaN I NY HOI CLOZ /SZ /ol ONO 'NY1E'1G30N00- N31SNn \[M3a \NVid l 33-00 V315 \WWMM\SON~ 10\1N3N3lllM3 )NUS31 EMU ',f\OLOZ S=3f \%M EXHIBIT D LEGAL DESCRIPTION iN NORTH Y2 OF NORTH Y2 OF SECT-ION 35, TOWNSHIP 49 SOUTH, RANGE 25 LAST, BEGIN AT THE NORTHWEST CORNER OF THE SECTION AND RUN EAST 1 0 1,398.25 FEET; THENCE SGUrH 64* WEST 1555,06 FEET; THENCE NORTH 664.01 FEET TO THE PLACE OF BEGINNING, COLLIER COUNTY, FLORIDA. The Landings at Bear's Paw Page 5 of 12 PUDZ-PL20120002095 October 24, 2013 ((910 EXHIBIT E LIST OF LDC DEVIATIONS NOTE: Nothing in this PUD Document shall approve a deviation to the LDC unless it is listed in this Exhibit E. 1. Deviation # 1 seeks relief from LDC Section 6.06.01.J, "Street System Requirements," which states that dead -end streets are prohibited except when designed as a cul -de -sac, to allow the internal dead -end street to terminate in a "T" junction vehicular turnaround, as generally depicted on the Conceptual Master Plan. Final location and dimensions of the "T" junction shall be determined at the time of site development plan approval, and shall meet local fire district standards. 2. Deviation #2 seeks relief from LDC Section 6.06.01.N, "Street System Requirements," and Appendix B, "Typical Street Sections," which establish a 60 -foot width for local roads, to allow a 50 -foot wide road in accordance with the internal right of way cross section attached under Exhibit C. 3. Deviation #3 seeks relief from LDC Section 6.06.02A.2., "Sidewalks and Bike Lane Pathway Requirements," which requires sidewalks on both sides of a right -of -way or easement internal to a site, to allow for a sidewalk to be constructed along one side of the right -of -way, including the western terminus of the "T" junction described in Deviation # 1, above. 4. Deviation #4 seeks relief from LDC Section 5.03.06.E.5., "Dock Facilities," which requires dock facilities to have a side setback of 15 feet for dock facilities on lots with greater than 60 feet of water frontage, to allow a 7.5 -foot side setbacks for the private single- family community dock facilities located along that section of Golden Gate Canal within the Residential Tract; provided that such slips are parallel to (rather than perpendicular to) the shoreline. Deviation #5 seeks relief from LDC Section 4.07.02.G. L, "Open Space Requirements," which requires that PUD districts composed entirely of residential dwelling units and accessory uses to devote at least 60 percent of the gross area to usable open space, to allow at least 50 percent of the gross area to be devoted to usable open space; provided, however, that landscaping internal to the project shall be provided in substantial conformity with the conceptual enhanced landscape plan attached hereto as Exhibit H. 6. Deviation #6 seeks relief from LDC Section 5.03.02.C.b., "Fences and Walls," which permits walls at a maximum height of 6 feet in the rear and side yards of designated residential components of PUDs, to allow walls at a maximum height of 8 feet in the non - waterfront rear and side yards of the residential lots. 7. Deviation #7 seeks relief from LDC Section 5.06.02.B.1.b., "Development Standards for Signs within Residential Districts," which requires signs within residential PUDs to be The Landings at Bear's Paw Page 6 of 12 PUDZ- PL20120002095 October 24, 2013 CA(� located no closer than 10 feet from the property line or from the edge of the roadway, paved surface, or back of curb, as applicable, to allow project entry signage to be set back a minimum of five (5) feet from the property line. 8. Deviation #8 seeks relief from LDC Section 4.06.02.C.1. "Alternate A: Landscape Buffer," which requires a ten - foot -wide landscape buffer with trees spaced no more than 30 feet on center, to allow a modified Alternate A Landscape Buffer with trees spaced an average of 45 feet on center for that portion of the project adjacent to the Golden Gate Canal. The equivalent number of trees otherwise required by the 30 -foot spacing shall be provided within the Alternative A. Landscape Buffer located on the Residential Tract along the Golden Gate Canal. The Landings at Bear's Paw Page 7 of 12 PUDZ- PL20120002095 October 24, 2013 (191-0 EXHIBIT F LIST OF DEVELOPER COMMITMENTS I. PUD Monitorine: One entity (hereinafter the "Managing Entity ") shall be responsible for PUD monitoring until close -out of the RPUD, and this entity shall also be responsible for satisfying all RPUD commitments until close -out of the PUD. At the time of this RPUD approval, the Managing Entity shall be Headwaters Development Limited Liability Limited Partnership, LLLP, a Florida limited liability limited partnership (the "Developer "). Should the Managing Entity desire to transfer the monitoring and related commitments to a successor entity, then it must provide a copy of a legally binding document to be approved for legal sufficiency by the County Attorney. After such approval, the Managing Entity will be released of its obligations upon written approval of the transfer by County staff, and the successor entity shall become the Managing Entity. As Developer sells off tracts, the Managing Entity shall provide written notice to County that includes an acknowledgement of the commitments required by the RPUD by the new owner and the new owner's agreement to comply with the commitments through the Managing Entity, but the Managing Entity shall not be relieved of its responsibility under this Section. When the RPUD is closed -out, then the Managing Entity is no longer responsible for the monitoring and fulfillment of RPUD commitments. Il. Utilities: Potable water distribution and sewage collection and transmission systems shall be constructed throughout the RPUD by the Developer. Potable water and sanitary sewer facilities constructed within platted rights of way or within City of Naples utility easements shall be conveyed to City of Naples pursuant to the LDC. III. Transportation: a. Access to and from the RPUD and the Golden Gate Parkway right of way is provided by the Right of Way Easement Agreement recorded in Official Records Book 4097, Page 661, as amended in Official Records Book 4535, Page 2342, both of the Public Records of Collier County, Florida (the "Access Easement "), and Developer shall be responsible for fulfilling its obligations under the Access Easement. No later than sixty (60) days after approval of this RPUD, an amendment to the Access Easement between Developer and the County shall completed, signed, and recorded to: 1. Provide terms for maintenance of the improvements within the Access Easement; 2. Provide continuous access over the Access Easement to the County; 3. Permit the construction of a private entry gate within the Access Easement (to be constructed and maintained by Developer, or the homeowner's association described in Section V, below), so long as that portion of the Access Easement over which access is limited by the entry gate is not open to the public or publicly maintained; and 4. Require construction of The Landings at Bear's Paw Page 8 of 12 PUDZ- PL20120002095 October 24, 2013 new Developer's connection between the RPUD and Golden Gate Parkway. Infrastructure internal to the RPUD (not including roads) may be public, private, or a combination of public and private. Roads internal to the RPUD shall be private. b. Prior to issuance of the first certificate of occupancy for any dwelling unit, Developer shall construct a single sidewalk connection between the RPUD and Golden Gate Parkway. Two alternative scenarios may be proposed for the sidewalk connection: i. Default Option: Developer shall construct a sidewalk within the Access Easement from the RPUD entrance to the shared project entrance with the Gordon River Greenway Park; or ii. Alternative Option: At the discretion of the County Parks and Recreation Department and in lieu of the Default Option, the Developer may elect to connect to the Gordon River Greenway Park asphalt sidewalk that runs north south parallel and adjacent to the Access Easement ( "County's sidewalk segment "), provided that the necessary access rights are conveyed to Developer, and — to the extent required by law — the entire sidewalk segment from the RPUD to the Golden Gate Parkway right of way is made to be ADA compliant at Developer's cost. The proposed connection is at or near the southern end of the County's sidewalk segment, as shown on the attached Sidewalk Exhibit, with all design, construction and permitting costs to be paid by Developer. If this option is exercised: 1. Final approval of the sidewalk interconnect plans shall be subject to review and approval by County Parks and Recreation staff, in addition to the appropriate Collier County Growth Management Division staff; and 2. The Developer, its successors and /or assigns (which may include the homeowner's association described in Section V, below), shall bear a proportionate fair share responsibility for maintenance of the County's sidewalk segment in perpetuity. c. Developer and its successor(s) and/or assign(s) (which may include the homeowner's association described in Section V, below) shall be responsible for all operation and maintenance of the internal RPUD roadways, sidewalks or their appurtenances, and Collier County shall have no responsibility for maintenance of any such roadways. The foregoing operation and maintenance obligations include the Access Easement, except that portion of the Access Easement that provides shared access to the Gordon River Greenway Park. d. Developer shall not deprive the County Parks and Recreation Department of use of the Access Easement for purposes of maintaining the Gordon River Greenway Park or any of its related features or appurtenances. The Landings at Bear's Paw Page 9 of 12 PUDZ- PL20120002095 October 24, 2013 cx�, e. Prior to issuance of the first building permit for any structure in the project, Developer shall pay the County (Parks and Recreation Department) one -half of the total sum of $140,365.20 as reimbursement for' /2 of its fair share of the funds expended by Collier County for construction of roadway improvements within the Access Easement. The remaining %2 balance (or $70,182.60) shall be due and payable to the County (Parks and Recreation Department) prior to issuance of the first certificate of occupancy for a dwelling unit. IV. Environmental: Pursuant to LDC Section 3.05.07H.l.f.i. and iii., Developer shall satisfy all of its on -site native vegetation preserve requirement by making a monetary payment to Collier County in the amount of $103,255.00. The payment amount is based on the allocation of the $1,500,000.00 purchase price paid by Developer for the RPUD to the .74 acre area of native vegetation that would otherwise be preserved onsite. The payment shall be made prior to final site plan and/or plat approval, whichever is earlier. Developer, its successors and/or assigns (which may include the homeowner's association described in Section V, below), shall be responsible for maintenance of improvements located within that portion of the Golden Gate Canal within the project boundary, as depicted on Exhibit C. V. Planning and Common Area Maintenance: Prior to issuance of the first residential certificate of occupancy, Developer shall establish a homeowner's association, which shall be responsible for maintenance of the RPUD common areas, water management areas, community infrastructure, improvements within the Access Easement, and internal roadway. VI. Miscellaneous: A certified archaeologist will be onsite during all excavations to monitor for the presence of historical and/or archaeological artifacts or resources. The Landings at Bear's Paw Page 10 of 12 PUDZ- PL20120002095 October 24, 2013 �F�`1 SIDEWALK EXHIBIT The Landings at Bear's Paw Page 11 of 12 PUDZ- PL20120002095 October 24, 2013 yam', Exhibit G APPROXIMATE POTENTIAL GATE LOCATION (VEHICULAR GATE ONLY) J ,L / III APPROXIMATE (TENTATIVE) SIDEWALK - rl 16 EXIS ROUTING WITHIN ACCESS EASEMENT 1' a PROPOSED WATER SYSTEM TREATMEN/AA 20NING: CITY OF NAPLES PO \LANDUSE: `\ ! ,( 5 GOLF COURSE, SINGLE /MULTf FAMILY - ,1 h I; 2 —LASEE RESIDENTIAL (BEARS PAW) ii 1i GRADS f APPROXIMATE (TENTATIVE) CONNECTION ' _ ANCE LE�P'. EA 10" WIDE TYPE' TO PATHWAY WITHIN GREENWAY PARK D BUFFERI ENT _ N-) PRESERVATfON 20' WIDE TYPE ALfN�TE .. AREA \ � TROL : ! MULGH TRAIL 22'.2D ACRES - D BUFFER # .t J @5F, PROPOSED SHADE D 13UFFER�"a # #\ ' SiRJC7URE (TYP) F.F E. AT l# h - # ♦ .� # s # # 1 a EXISTING GRADE OUTSIDE fy P� # #1 PRESERVE AREA ST/W1 F ' ( ✓ f # #' J/ ♦ # T#!, 1�r 4 1� OR RQ' „'. l�l� 3F�T'_ ,;t'•' ;' •I,'Ts� \ \. I � I .t �i. I} .SiiL�E'i�'- ,,emu' J.R. EVANS ENGINEERING, P.A. _ 23150WHIONDRNE,5UITE242 ESEERO, FLORIDr133928 THE LANDINGS AT BEAR'S PAW F�F:"5• w7,49 PHONE: 123912)3 -3996 FR%: 1239)2H8 -253) W— R— SENGINEERING.COM DRAFT SITE PLAN WITH GREENWAY PARK OVERLAY 5�35/i.495/R. 25F I¢C.HNrtIEV. P.F. FL CO N29226 SHEET: 11 of 1 Exhibit G - - -- Al !r II ` "�� 1 iii Ili II 5 - -- i � II 8 _ F No Brener Reiland by Code Tree Stakes are m b remove between 612 monma by the Owner. NTS l ll Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G II J II I $w II II l mel II P tw 2 Piaaaaol ruNLx ho. 14tl �u �9abaneM wM ane �tw I I �n�wnk naMl Mae IIn II II II a§ -le - - _ - Titre - 4ngnu =nx eaakFl ra ���uuu��I unsw' °IIIIIIY 2AIp?pM Is B. TepnNb�parardnpro - aifaation. PS p n1 II Us. abnuate €� Fg II 11 o II u ` I 8 It No Boger Required by Code TIN eg£ III l n_i III BEE �2g� II �gp Ill l 98ITnen ReW inn) x 75% (NaCVe)- 102 Trees LPropose Retention Native Trans Require: 74• Nnve Trees -ded: 74 Rate.-Area Y2 ) 1 -r l 3 5 Retention Area Aa ds Ro e Sw I. l BuNer Require0 by Cotla l l Tree Planting Detail 9 w Tree Stakes are m b remove between 612 monma by the Owner. NTS l ll Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G YE J E fyl._t t3-.f,C,"Frl+ r mel 3' Mukn son -paarooa in 2 Piaaaaol ruNLx ho. 14tl �u �9abaneM wM ane Propond Rea-n� 2.2 Fr Pm i V tan 2a' Radua. Mr Tin �n�wnk naMl Mae IIn Merck OkriMler aEOmefa o d Da ma^ , Reterlbn Area al -le - - _ - Titre - 4ngnu =nx eaakFl ra ���uuu��I unsw' °IIIIIIY 2AIp?pM Is B. TepnNb�parardnpro - aifaation. PS p Pgeon Plum L�; Us. abnuate €� l No BuNer Required by Code � as Tyra 'D'BrrBer 9851, Parmear If adjacent to RNY)M =33 Trees(RBT) 23 se. Sheet Dl for Data Trees Rewire: 33 Tae, Presided: 33 TIN Trees an shmbs (Sections 4- MM.C.141 1 " EMlance Panerg Aree (A) A. Trees 1 V M., 1.75" Cell., 4 Spot. see sentIa 1 ror Detaila 98ITnen ReW inn) x 75% (NaCVe)- 102 Trees LPropose Retention Native Trans Require: 74• Nnve Trees -ded: 74 Rate.-Area Y2 ) 1 F lu i - 4N Type'D' BuNer See 6nee10.1 tar Dealls - 9 Propose Pa.- Re�bMbn Area Pre ectB rgary g�g a Connector to verify It Corrbacmr must proadytnesandaied- bfaecoretrinibit have property lanes slake and located an must verM Pan It tar, an flea coni -,I rai need to g Any Incpnsistsncies ry these acre Tien be reporteda ALD tb Owner. Co. orsnag san(btmey have d th has me most uptoe been apaoved been ndacclmn. bdisir era agcepmd by Tire owner Oefore commenting conetnadbn. Tree Planting Detail Palm Planting Detail Tree Stakes are m b remove between 612 monma by the Owner. NTS Tree Stakes are m se r ind betwnn Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G by tb Dw , J (1. to m CoNkr \, Tree b be stakedon fyl._t t3-.f,C,"Frl+ 4.0 .0 County LDC Section 4.o6.o \a mel 3' Mukn son -paarooa in 2 Piaaaaol ruNLx ho. 14tl �u �9abaneM wM ane a�pad= M .wa to mnmze as o Coo uca� 2.2 Fr Pm i V tan 2a' Radua. Mr Tin �n�wnk naMl Mae IIn Merck OkriMler aEOmefa o d Da ma^ , a. e- Sea plan ter kanmN -le - - _ - Titre - 4ngnu =nx eaakFl ra ���uuu��I unsw' °IIIIIIY 2AIp?pM Is B. TepnNb�parardnpro - aifaation. nYnt ep Ion ynnaetlaaurlloeeuaur10andpIMZLL Pgeon Plum Site Data Shrub & Groundcover Planting Detail NM NTS G aa.4s an4 Nate: At Sri- And Grouncover Snell Ba Triangular IJTs Spaced Along Shaighl Edges And WIN Be PINiadIn P-11.1 Rows Along Curved Entries. Residential Ed of Pso-M. Curb Total SO. Area Beeline sin eFami ResideMlN isbesedooland-sdSlad- g ry Vehicular Use Area Ue z.4 ev "ay ounWnRx secure++ 3' Mukn aaaz o MnY 4'EarOren Salcu Geneal Trees Prm see: 24 Prepared Pacing Sop Backfill lo's -1. Scanty PA BoBOm Site Data Red Maple Landscape Calculations Current or Proposed Zoning Residential N9nimum Number dcenopv Trees Rwuke t(Sect. 4.08.05) Total SO. Area 428.195 SF (9.83 Ac sin eFami ResideMlN isbesedooland-sdSlad- g ry Vehicular Use Area 34.318 SF (0.79 Ae) Pe t,,d 'a afro 71 900 M13 .000 = 21 / 29 Lds = 1 Trees pa LdlRGT) Genera pees Requhe: z4 Total Impervious Area (includes sidetealks) 188,179 SF (4.32 Ac) Geneal Trees Prm see: 24 Total Pervious Area of Site 240,016 SF (5.51 Ae) p� meter Bunsen - Apeman -es A a c (seem s.D9.o2 s Table z41 Total Pervious Area on Residential Lots 71,800 SF (1.7 Ac) Type 1. Mesa in M. =ton. Coccalobe tlivaregolia Pgeon Plum 13131 I'Ismosearin M • 41 Tract, IRBTJ Us. abnuate East Palatka Hog, Trees Required: 41 Trees Proles: 41 No BuNer Required by Code Type'D ". Minimum yNdm= lot. lit Me 199) a 20 It. IN RIV'1 is >99) 9851, Parmear If adjacent to RNY)M =33 Trees(RBT) Trees Rewire: 33 Tae, Presided: 33 Trees an shmbs (Sections 4- MM.C.141 Tees Sprees Requnrn: 5• Tree Sped., Provide. 5 A. Trees 1 V M., 1.75" Cell., 4 Spot. 98ITnen ReW inn) x 75% (NaCVe)- 102 Trees Native Trans Require: 74• Nnve Trees -ded: 74 1A No Buser Requred by Code I Endneu d Planting Area (B) sea sheet 0.1 tar Debts �- - 7�Y-7 PIP -/_ IF ed emmg writ (C) e sneer D.1 ror Derma Propose Reteabn ftabaionA es i ° Ennanbe ryps'A' Brener Sea Sneer 0.1 ar Deab Bhg.r � et o.1 ror D.bla I General Notes 1, AI Pe. stall be Mn.d Nb.1 or ceder, 2. Landscape COmracmrsbllrenew Plana lou lndbate any avail -lity Indus eat time of std, L nslab. a c....... g Tie re iPIrd ble -ing art Irebang at plannng9 as they re drawn on - plan, and seat ve n the eccurecy o! me plant Ibl vs [he "a- plan. a[me time of Ne. 3. In the evert loaf a certain spe[ifinhon b Tint able m b men then contractor anal content ono.., ar 1-1 to discuss anandse.s. 4. Landscape contractor eM1al contirm plant selectbn sunabilny.gmere are any plant sent- concerm they abll be brought m the Landscape Arohnecte- ntlon at [he timeM Did. Larascam contractor snail -111ty any o,MIN, mat may instal. 5. Contactor snarl nave a pre -con=, rev'Mw pf plans w/ Landscape A-Iled Arlon m ordering plant -ti ro van y plans are currant, and that ne -W. era necnsery. 6. -rector.tallabo acbduk swank tnrtlroalbw LaMacepe Archrtadrorevkw laggingand placementof alplantmaterial in, to betel n. C men anus mantionatl meePoga are lmporan[ro tree quality co,. daft tb por "ls,,or ueeabn ,. th, walk co ontike es wimoultbse mmtinganth- O itts- Larclscape Aronnect nave me aetrcy m mars rkM cnanges m me plane at me convacmrs expense. b. Oontacto le aq es.. ar w /ma Collet eounry landscape coda art snap comply wren all of As apalcaDk required, ante. 9. Contactor shall prib Iquann -lt teen. rattune of DW 10. AN s. rstallp on, unit pricessttime o! Did. 11. Al contracton workay on me proleab -pl n lkense1 air tiny iant n etwl q I., 12. The Properly Owner Is resppnsibb tar replacement of all dead plant material& for ir.onsnance of the required irnigalbn eye ern 13. Tree and palm staking anal be removed -.an 6 and 12 modne. 14. AN prs -And exotic vegetaWn shall be removed loom tree area and it hell be maintained tree of axdbs in perpetuity. (LDC 3.05.10.8.2) 15. Tree review antl approval of lmaovement plane e11- iiutrbrit,thetonetructronof require Improvement wbch are ,nconeatera W existing eaii -n a --rd 16. AN aardngs shall be 1-10' bon, utility connecbons. 17. Contractor to vor" - rgroand ublWl With'S- Ion, Slob One cal of Fli 800432 -4770. 18. Contactor tov,r,W.Fert, 8nm and ,acei,ks before combustion. 19. Cordbctor mart nave property lines ebb of antl rocarod, an rn,dd rty pan dimans- and fteb conditbre are oonaistem. 20. Phone b zone. 10.11 ea eueceptibe to damage from cold. 21. Al plant maalielshallb warranbdntolbws : 6momhe forbeeslpekns, 90 days for ahruba/glouecover, a W 30 days tor sod. Warranty period begins at the time of projed ccapbnce by The owner. 22. Comaotor to provlde for and verity too %lrniption coverage for all seta material. 23. Cordador stall mmrlbin a1 pieta material and beds must be dept wan hen untt meptetl by owner. 24. Conactor snail maintain snm a clean fashion and anal remove any waste cream by on-b n. 25. At plant in sen le b b instated an mamtoned as per Collet County (LDC 4.06.95 J). 26. Conductor shag insal a Ed Banner late, around! all palms wMn 4 of pavement or pkntarwab. 27. Large canopy treee locate wnnln 1D' o! ted -lk, or -In 15' of atrucmne. are require ro nave mot Darrera, cur0 or tNCkenatl abewak mat exleMa 20 feet orRirom [Tie tree trunk along tea area of,ghbo, . 2B. P111'. Iobpoe 1tne t snag not b located in coiner coup bans 4.0 tteea and anal n locatedamin. 12.5'fromll trunko!otree aspen Colll.r County and bill 29 se Sod cakulatlon a real, a tlo ased on Into account me sloe antl t mgrew sucn as woe and Derma,Esl- are -neon ,,able area,ass.d an,.oregrade level or pane and tlost not for Wie areas coveretl by existing or propose snrubs, grountl cover, preserves, stand on lakes. 30. GeneraYSb cpntraclgrsbl make cabin at at soil ror aantlng areas slagbol suitable landscape quality "' S.1 anal be cod,prbed of a sandy base, and nave good organic aril gold percolalbn it""". 31. Ge .... YSAe contractor snzl make cii-n al gmerock and ...... Nely compacted solb shall b ""ad from planting bed$. 32. LarWbcapa Contabmr shall nNiecerbin that me stte cmdiWn, me,tW their aaDSbcWn boons ndberil pant material. 33. If I.-, IN -no-bor be any -ems over the - -bllny of plant matemb, Tie must intorm [he owner ineately. 3I. Al ebpea,teapa, man 4:1 shat be parlbtl+titll note, iioadab- AN 4'. l slope. shall IN aodd,d. Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Owner before commencing construction. Exhibit H Page 1 of 3 Lot Typical(52' Wide Lots) Scan: V : sparb, m be planted abrlg Dank In easement wham abpe is 31 jl• Ij `1 Ij Proposed Trees hod, Remmmen4d Ties, ror 3 j Lob ter aL0 1 Tree Pat Lot Required. ' I ,I • Proposed Mist, PlardoV Lot Typical (67' Wide Lots) i No Plan(ings in Easements I' II 1• I BLD By Propose Tree, from Recommentletl Trees for Loh List 1 Tree Per Lot Regmre. BuNer Trees dy tine b along real lot dine ( ro eatbry the nee requrtemerd. P.Mie d Shrub Parties Recommended Trees for Lots Aber rubrum Red Maple 10' QA x V Spd., 1 -314' Cal. Omr,,,,kgido,, LNe Oak 10' OA. a P spa., tdl4• Cal. Roystonea Elate Royal Palm 10' bear.... nuAbW Swietenia mahogany Mahogany 10' O4x 4' Spa., 1a/4- cal. Sateen same. Cabbage Palen II 14'17'dMhee Magnola g- Ifflor� Buraea simanube . Magnolia Gumbo -IN 1V -12'04 10' -12'04 Ilex caseine Dahoon Holy 10' M x 4' Spot., ta/a• Cal. Coccalobe tlivaregolia Pgeon Plum 10' 112 x a' Sptl., 1-3/4• Cal. Us. abnuate East Palatka Hog, 10. .OA, 4'e-d, 7c,I Q� = htxchlectumel Lend Design INCORPORATED 2780 S. Horseenoe Dr, sube 5 Nape, FL 341n (2{9)430.1661 16 .net chrisda Andrea �L \lJ 'V \f �J r/1 1-S d r 45 Chrge D Dotter CA 10.23,13 . Update PPL plan PM 10.22.13 43 Enl,a Pkra rg Areas PM 10.17.13 42 Bute Rev'ebn 10. 4t BuNe tl Irrigatbn PM PM 01.7113 18.13 IXewi 9 Dee. PM 01.03.13 soak: P =ten lz ran x Fie Name: aD1.0h.- w.. mna.ue anrw m_n.1s M -tale+ + wxe,pa 2 Y y I �o Ell i! ER y fj r— I �£b a L — — ��B $a �a� Groemn Perk g = a �SE �5 rype'o' Buper oB t! 1Tree per 30LI p d5 Doude 3' Hedg g LF• eS7 4Tree P AXH, 77 Shrub Reg, F IT Shrub Prov fi. Yga € B Fr €'� No Bulk �9 Darting Green E� 5~ {E i a �ppp Vinland Drive Buffer Section r Retention Area #4 Buffer Section T Golde n Gate Canal Buffer Section S SE1BeCN/ � •• r. 1 \C Wafer RETENTION AREA'S i BUTTON ELEV. = 320 \ I Tr aDo e S< BKfe rblA v 30' D.0 ppmetl Hedge Roe r -I/2' TYPE S III ASPHALTIC CONIC. a 10'Le !S 211'RwMaY T4' B TYPE 'D' CURB � 1 I as0 B1'SM_7J_fL-NS BASj_L-LEL, Do n -� le• STABILIZED SOBG & LBR 40, 98X DENSITY 1� p�� Retention Area #2 Buffer Section Type D Buffer R 1 Tree 30' DC. I SETBCN/ Do— Staggered Hedge Roe .lrl4 LOT ..E. Contactor b—Ify property Ibex and eNeck, oat— construcbn. —actor must have propeM lines slaked and located, and must —dy plan dun.ra m a rt Aeb condiaons am —Wtent Any Inconsislencies cal Neu plain need to b N PRrhtl b ALD Ana Ne C-N, Ldnacbr shall verily Nat he has the must up b Ooh plan., ens Nat they Ave Dean approves art aCC,Md by Ne Owner Before com rn-Cag cons[ruc5pn. -PV[ 111111E (SIZE AND LOCAT: SIDE YARD ORAINALE —ISCC SITE RAN I SWALE XIST. CITY Q NAPLES (SEE SITE PLAN fOR 20' WADING) RAW WATER MAIN STABILIZE WITH PLANTINGS MERE RETENTIDN AREA CDNTRDLLE 31 AT ELEV. = 5.10 RETCNTIDN AREA BOTTU Ex MC seats Paw COUnby CWb ELEV. = 3.20 Wart MaragemeW 1t' p• PPROX. EXIST. - GRADE 2.50 roJr '�' ✓..;: PT -NANO AyRM1 1.7R -HAW 845E ELEV.. 0.1) a -NM N. BERN =633 t0" FT -NAVD XIST, CITY DE A ES 20' RAW WATER IN D Vinland Way Buffer Section R Private Righl- Oi -WaY `PL A WITH / PLAN71K NT[NGS WHERE &i.t. aeee. SCXPX- I —C-------C— R CH .He RGT — egmred G-Anal Traea RBT Regwred BUWr Trees T.whoolbDeled _ —Trees not requiretl __TraealPaYns that court 1.1 _THI. —kna tbaC -2:1 _ Tra —.lms that mount 3:1 Buffer Notes Trees Nat count 1:1 to sa0s11 buaer bias vice requ lla- -ROyal Palm - Pigeon Plum -Live Oak -Bab CYPra- -SM4h Floe Trees Nat court 21 -East Palatal 11.11 - Cie. - Holy - GMucpua Call. Palma Nat coun13:1 . Cabbage Palm - FOxhll PART ........... . 'rT OCO As331 CHR3 Chry...Ianu. . -..._ -, ' m Red Tip CpIUm 3ge lbn 24' Y MeirWb36' -4B' Shr,D Llsrad Bebwams hdcbkredhrenhanmtl ntln a - moo Clusia ourrilan —IN Leaf Clwi.� 10 GebA 41 N Malntaln 46" -72' - CON3 Conmarpw eyed. Green B—Cood 3gebn 20' Y Ma Intain 36"ep' - nM3 Ficus mkrecarpa Green Island Fkw 3 gabn, 16' N Remove dead Mayes - HAMD3 Hameln To— DwaT F—H 3gelbn l6' N Maintain 48' -7T - JAM — n— ...plcibllum Was Jasmine 3gebn 24` N Maintain24'30' - MCto Myrka cerpera Wax MyrW 10, 6'ni Y Malnlain freeform, remove tlead branches RnlI. - MUH1 Muhhnbergi C.,all,lenais Muhl, Gress lgabn 16- Y Cut becko Aayear as...a., - PZio Pinw eIh- -. eCuM Fbrba SMsh Pure 10' -12'Ce z 4'spd, 2 "Cal Y Maintain tree form, remove dead brandies or*. - SPAM Spa Ana Oaken S"`T` 3Ill. 24" Y CM Dark annual, ur e- necessary - TROXF3 Trgsacum Eeclylddesx —A. H.0a- HOWINN, Gress 3g.lbn Z4' Y MainWn36 "M a,i Groundcovers al stir v.............. .... - NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B" Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.- TBD IRRIG lrriew. Irropi Pine Mad ta head —AND. Mulch C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana- 5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al Exhibit H Page 2 of 3 A91UVR-07ure�l Land Dc8i6n INCORPORATED 2780 S. Horx — Dc supe 5 Naples, 1=1.341D4 (Zt a9 ) 434`1661 Itlirc.Wt ChrM nArWrea L'-- No. 1178 S-' al _Y/r_-7-V'-�I 1V Q� M- 0 U kJ cl— As Cl,. D DuMr CA 10.23.13 aA UpWh PPL plan PM 10.22.13 As En oh.ad PMMirq Areas PM 10.17.13 AZ Buller Revision PM 10.16.13 At Buller and IMgaNpn PM OIZL13 de,:1 Date' PM 01.03. 13 Scats: V-50'-0' rrknl 16Fr FW Name: a1eo-00N,avq P. m ae n <wm P49'nt List Trees Zoning. C ResitlerNal / / Cty Sy. B Botanical Name C—rau, Name S Specibabn Natal MabMWOee Butter Trees Can bsuDMBUMO by I re quire -111. tp saOSry many mature tree requirement) 'LD10 c b drvempolM P IR F 10' x 4' z 1.75' cal. Y M Marten troe bon, remove Wad benches only. "GS12 L cetun. b GlaucouaLacsla 1 12'w6'apW.xTCal N M Maintaintreebrm ,removeWatlDranchesonl,. AID N N. Dan A. E East Palatka Holy t tex 4'z 1.T5 -cal XHXrW talk Y M Maintain tae Mm, remove Wa0 Darchea ony. / "IC10 I IMx cassine D Daheon HOpy 1 1p'x 4' z T Cal single trk Y I Its Dee roan, remove Watl barcbsony. / ' 'PE10 P Pines .Hogg tlerea 5 5 Fbriaa Sksn Pine 1 10'- 12'01x4' spa, 2' Cal Y M Maintain It —firm remove aeaa Drancba ony. f - -OV10 c cmuevir,u, ... L Lye Oak 1 10' -12' w x 4'aptl, 1.]5' cal Y M MalMalnt— form,rempve tlead Dmncbsony. a ,,I • •TD14 I I ... Hum du... B Bap cruel. 1 14' -18' pa x 6'.pd, 3S" cal Y M Maintain III roan, remove dead brarches only. •••94`11 3 3a Dal paknetro C C.b.ge Pakn I ITIA1Tct -Wad Y R Remove dead fronds, and seed Poch. SL; euilalrg P Perimeter Planting ' '-WOU12A W Word,— bilurcall F Fmlal Palm 1 12- 14' oa, Staggered bI,MS N R Remove Dead bon., geed pods RGT — egmred G-Anal Traea RBT Regwred BUWr Trees T.whoolbDeled _ —Trees not requiretl __TraealPaYns that court 1.1 _THI. —kna tbaC -2:1 _ Tra —.lms that mount 3:1 Buffer Notes Trees Nat count 1:1 to sa0s11 buaer bias vice requ lla- -ROyal Palm - Pigeon Plum -Live Oak -Bab CYPra- -SM4h Floe Trees Nat court 21 -East Palatal 11.11 - Cie. - Holy - GMucpua Call. Palma Nat coun13:1 . Cabbage Palm - FOxhll PART ........... . 'rT OCO As331 CHR3 Chry...Ianu. . -..._ -, ' m Red Tip CpIUm 3ge lbn 24' Y MeirWb36' -4B' Shr,D Llsrad Bebwams hdcbkredhrenhanmtl ntln a - moo Clusia ourrilan —IN Leaf Clwi.� 10 GebA 41 N Malntaln 46" -72' - CON3 Conmarpw eyed. Green B—Cood 3gebn 20' Y Ma Intain 36"ep' - nM3 Ficus mkrecarpa Green Island Fkw 3 gabn, 16' N Remove dead Mayes - HAMD3 Hameln To— DwaT F—H 3gelbn l6' N Maintain 48' -7T - JAM — n— ...plcibllum Was Jasmine 3gebn 24` N Maintain24'30' - MCto Myrka cerpera Wax MyrW 10, 6'ni Y Malnlain freeform, remove tlead branches RnlI. - MUH1 Muhhnbergi C.,all,lenais Muhl, Gress lgabn 16- Y Cut becko Aayear as...a., - PZio Pinw eIh- -. eCuM Fbrba SMsh Pure 10' -12'Ce z 4'spd, 2 "Cal Y Maintain tree form, remove dead brandies or*. - SPAM Spa Ana Oaken S"`T` 3Ill. 24" Y CM Dark annual, ur e- necessary - TROXF3 Trgsacum Eeclylddesx —A. H.0a- HOWINN, Gress 3g.lbn Z4' Y MainWn36 "M a,i Groundcovers al stir v.............. .... - NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B" Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.- TBD IRRIG lrriew. Irropi Pine Mad ta head —AND. Mulch C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana- 5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al Exhibit H Page 2 of 3 A91UVR-07ure�l Land Dc8i6n INCORPORATED 2780 S. Horx — Dc supe 5 Naples, 1=1.341D4 (Zt a9 ) 434`1661 Itlirc.Wt ChrM nArWrea L'-- No. 1178 S-' al _Y/r_-7-V'-�I 1V Q� M- 0 U kJ cl— As Cl,. D DuMr CA 10.23.13 aA UpWh PPL plan PM 10.22.13 As En oh.ad PMMirq Areas PM 10.17.13 AZ Buller Revision PM 10.16.13 At Buller and IMgaNpn PM OIZL13 de,:1 Date' PM 01.03. 13 Scats: V-50'-0' rrknl 16Fr FW Name: a1eo-00N,avq P. m ae n <wm al stir v.............. .... - NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B" Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.- TBD IRRIG lrriew. Irropi Pine Mad ta head —AND. Mulch C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana- 5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al Exhibit H Page 2 of 3 A91UVR-07ure�l Land Dc8i6n INCORPORATED 2780 S. Horx — Dc supe 5 Naples, 1=1.341D4 (Zt a9 ) 434`1661 Itlirc.Wt ChrM nArWrea L'-- No. 1178 S-' al _Y/r_-7-V'-�I 1V Q� M- 0 U kJ cl— As Cl,. D DuMr CA 10.23.13 aA UpWh PPL plan PM 10.22.13 As En oh.ad PMMirq Areas PM 10.17.13 AZ Buller Revision PM 10.16.13 At Buller and IMgaNpn PM OIZL13 de,:1 Date' PM 01.03. 13 Scats: V-50'-0' rrknl 16Fr FW Name: a1eo-00N,avq P. m ae n <wm rrknl 16Fr FW Name: a1eo-00N,avq P. m ae n <wm w U a ^I P sg 5t 9ia FpF Y a� 9w Y� �l �i E� a €�yF O E n d 2 "s 8 5 I I IIII I —VIII L I II I I I A f I � I I I L `Iel I� 114 E III I I I I IIII I III , II II La I L _ I �— — — — — —� Proposed Wel LxaDOn �� �_ loon gpn weu aapaairy 32ones for Common pros / Cormprwl Man Lihe -------- T......_. - -- il V��—d palm b e) •1, s -- ----- - - - - -- r he. s.e.dL _ __' I -Valley Grater, slam, \ \/ / 'Solari r j' / 111 _ - -- � '• — 3ZOnes ter Gammon Ara �j, /' ♦ \ Sleeves / / .'' •• Shaeves -.Pt .1 Mein LM \'• \ ,, jam. % - - \,, <::- ';;•;. � ``� \. ' "�, .. \ •5 Sew \''. 32eneafon Common Arley F1 All required a.. a palms to he Imgeten w a Dubber (2 8u1obli per tree) AI requged trees a palms b R Migaa and w a builder (z Bower, per bee) l J _ Orlp on el alts Dam _� 'ice tlrchitectural Land Design INCORPORATED —__— � ------------ / 2750S. u 5 BO e Chrbtlan Andrea \' 3ZOrw ter COmngnAm '•••\ ti' `a. �' / \'• \L. - Drip on all .MUD Dade Legend 1.1s Clock ZW'ro (99)StetenO -To Be adb DUWMg Oe" O Raa .arson Man-Clkk pan sensor -TO Se MOinEedon PVC Plea 4'b6 License NO 1176 \ \ \ - t`Fa ® 1"VaM Hunter- '�" —�'�°^ ML — ML —11101a. We PVC Cass 2D0 ' \. ----- - - - - - — u man (1P PVC CI ass 200 (1)6 Sieve (scneduM 00) ' (1)4 sleeve (scnea4e eo) \ •, � - i (1) 2 Sleeve (Schedub 40) / 2 Spare Wine ero b be lrWhd. - — Notes ANWre shall be 14 gage. �i / / ,. CN ;xlon anal poVtleq to to d krg[n t I cack,Bn—rof Pipe Size Chart Contrxto - top b nN p' b t D n It analheme wn[reclors respora bit 3. Al ales -rg teal be tea po Ntty f ate g W Mr ctor Me following pipe scneduk his followed 4 AN c -aloyd k ng n re pr jest h 1 he tl nd fug, -ne— as requ ied. 5 c.leaclo w p 0 f 1 d Pl illy f to - B ig Don syebm 12" Pape 0s gpm 6. Contract0rbrespone de to ensure Gat 100 %Irrga0on coverage exda. 3/4 " Pipe 610 gpm T. Contracor anal adtun head and spray as necessary to minimize overspray and 1 "Pipe 11.16 gpm nng proper Detl coverall. 1- 114" Pipe 17.25 glen 6. AN PVC Pipe to he sized sa that -he, velocity does not excead a speed of 5 feet 1 -12" Pipe 26-40 gpn per s.0 nd. 2" Pipe 41-60 gpn 9. 2 Spare Wires one to be mistral. All Will shall be 14 gauge. / 10. AN PVC inn ation pipe shall as Class 200, minimum; no Man coal Wbingto be usetl. C 11, Pass I'll greatershall beRl ng-TRagaskatedPipe. Specifications 12. Contractor b W provide an A,BUiq drawing of completed project Specifications 11VEal 13. Contrxtorto dbalna R/W parrots ton all lrrigatlon wmin the RNV. td. Contractor m use nsere In al innate hells. The Contractor shell he responsible for p—alico a complete and oplable system \ Irrigation Details 15. Contrxtortouse l2"Popups In aA shrub beds adjacent to walkways. for the inrggion M a1 lindwape planting on aft. Pans and apxlloatbns may no J 16. 30' Rbere ere W he used around -Minp wherever shrubs ere panted indicate a1 dams necessary for me proper inngatan or Me prgeR. This steel no[ reNeve (/ \ 17. Rotor risers shall he staked col Asher or equaly among s,pp,nW, rod, the c,ntr,d, of his caponsibllny to f—an abor, moral, and equipment mquiretl for .11../ Irnkptbn heads mall he paced er mat my provira 1B. bprey heats b he Huller. or sq-1ant BLIetRUte. (OAnerto eppove suDStnutbna) a compile end proper system n .ad -te -Mad co —raga. 100 %overap 19. Contractor a verRy aEegwW pressure exMS On the Omer, line. -r /� ( ✓'( 2D. Contractor to locate at —IN rhj an s4e prior b construction. The Contractor sbaN he responsible for adpahing head be l—, type and sloe and any �Jl...11 21. Uee Low angle... whenever near vehicles. Omer system c°mponrna W comply wDh the requirem ,te of of andecape panting as 22. Valves are sotto he located in carne a areas. installed. Such adjme —n. snail be —. at no cost te Me Owner except wren 23. Plan snows ectai locana— only. aumorbed in wining. Such adjustments coal he mmpensaled at the antl prices ..sated 24. Contractor te verRy pn0pel, lines and setbacks before c,nbuctbn. In the proppsal. 25. Contractor must nave propel, Ins. staked and bcaRN, and must verRy Ilan dimensions and bent cordirona ero c,nsaaK Conbacbrs anal pensonall axsmine the site and fully acquaint thermals. cots ell 26. Ing—, mean W paid for by owner. of the existing c,nded in order that no misunderstanding may afanwerds enw to the 27, bacle, oravanter to pe —stalled by plumper. ch.acter or as W Me extent of me work to he done: el, likewise, in order W advise and Irrigation Water is Poti 26. Drigation conin"to, shall verity that aysam ml work as deaignd ant acceNing to acquaint thenselvas moth a1 preacautiore to he taken in order to avord injury W person A — 11— Pnn.m, coil he necessary 6FWMD requirements. or property. A Rain sensor slat he instagetl on Ma art lions stem. 2B. Contracon s1a1 P.-st andecape archiact should Mere he conflba with aysam's ga y desgn. PLANTING MATERIAL'. The col —cloy shall make every possible effort to .,Did existing paid matenal that hes been tagged for preservation. Where such nsterial falls Main Line / Valve Wire Detail Typical Valve Detail n Ream becohag Me Cn iplr steal —reroute Me pip- or — arrab`n Be Y, W protect the designated pant ta. Any damage u he by Ma wntmdor no Wady l acceptance plant rralerial or sod .Wall be restoretl W he orpinal I1OEa q�0ua condbon pro, to final ecceptarwa by owner. VALVEBW AS -BUILT DRAWINGS: Afhar compktbn of piping iheads Ia, the and pipe W an Back al furnisn Aa -BaiN dmwnga on a saDla rman, ahsving al haada, valves. and pipe aria, W iw LEaO10 O Inentictse, shack, and Pants fist covering equipment wil be provided W the f O. Lateral Pipes WFATHER'tMTlc I1o000W SERIES Orman. REMDTE CONTROL VA O LEVER HSTALtL THREADED rMLE --a SUBSTITUTIONS: Any substit bon made must be app-adl by Owner. Control Wares WHUU GLEE WTM TEFLON TAPE I"P. AN pipe and control lines shall be sleeved With Schedule Be PVC and priced! a Lot Typical (52' Wide Lots) Lot Typical (67' Wide Lots) rh-r. ' mgim in 24' Dabwgrade and heaMilled cots °lea ^land. "a rackatohein bad Scab: 1 -= 40' Scab: 1" = 40' colts PVC pipe DES AND STANDARDS' The t Ron shall he yes onsibk her wnstrudirg me Zone :1 Zoaa:2 Zone :3 Zora:2 Zona:1 E -PLOW- ❑ nr system in mmgba xwrtlance cwMa all applbable modes ontlinancea and hews or any modNbatrons made W conform with said codes, ays and ordinances shall be CoMrectoro are to provide Me Wlbwag Nems n time o1 bad. ea wmpktetl at the wnt actbrs e,,— at rw additional cost to the Clknt. QuentRias of heads, Ii Bf a— line, clock, no of va Nea. ONAVe, EL'ONi Also, cantracotre ere to provide unR paces ton mere Nems. The Irrigation CoMracla is entirely resportibk M the work antl foal acceptance by AN sbevin shall he the respowibillly, or the irtgatbn the Owner, es Chrge D bufar CA 10,23.13 conerclo, AN circrn pipe shall be cuss 160 PVC or a higher grade. AN min (dings shall be ad Updaa PPL Pan PM 10.22.13 v Enhe read Panning Areas PM 10.17. 13 enforced with 2000— poured co—are than docks as shown on tlrawn s 9 ax B=r Reva on PM 10,16.13 red Stone all in SMeyard ConbaRar "19 able for a perad of one (1) year the quality of his mateyate and At BOlhar arts Irrlpgbn Dr=Deb PM 04.2213 PM 01.03.13 workmanship. This psi oil w11 sad with the final Accepter by the Owner. h Indi,dual lot to tea scale: 1" = 50' -0' astl antl canhoKd ter I" Don k and metes phial Main Line Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before commencing construction. Exhibit H Page 3 of 3 Contmcmr W vent/ pmpem Nrea and setbacks behove connrrctwn. Contractor mug nave property hihes stayxd and located, and mug verily Ilan dimension and 6aM caMiDOns are consdent Any Incomisancies col these plats need te he reported W ALD and the Dwner. Contractor shat v,ey tbe, he Iles the most up to date pans, and that they have been approved and accepted by the Owner before commencing construction. t N. FLORIDA DEPARTMENT Q STATE RICK SCOTT Governor December 16, 2013 Honorable Dwight E. Brock Clerk of the Circuit Court Collier County Post Office Box 413044 Naples, Florida 34101 -3044 Attention: Martha Vergara, Deputy Clerk Dear Mr. Brock: ]p � (� � � -TT KEN DETZNER Secretary of State Pursuant to the provisions of Section 125.66, Florida Statutes, this will acknowledge receipt of your electronic copy of Collier County Ordinance No. 13 -66, which was filed in this office on December 16, 2013. ---------- Sincerely, Liz Cloud Program Administrator LC /elr Enclosure R. A. Gray Building • 500 South Bronough Street • Tallahassee, Florida 32399 -0250 Telephone: (850) 245 -6270 • Facsimile: (850) 488 -9879 www.dos.state.fl.us