Ordinance 2013-66ORDINANCE NO. 13- 6 6
AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA AMENDING ORDINANCE
NUMBER 2004 -41, AS AMENDED, THE COLLIER COUNTY LAND
DEVELOPMENT CODE, WHICH ESTABLISHED THE
COMPREHENSIVE ZONING REGULATIONS FOR THE
UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA BY
AMENDING THE APPROPRIATE ZONING ATLAS MAP OR MAPS BY
CHANGING THE ZONING CLASSIFICATION OF THE HEREIN
DESCRIBED REAL PROPERTY FROM AN AGRICULTURAL (A)
ZONING DISTRICT WITHIN WELLFIELD RISK MANAGEMENT
SPECIAL TREATMENT OVERLAY ZONES W -3 AND W -4 (ST/W -3
AND ST/W -4) TO A RESIDENTIAL PLANNED UNIT DEVELOPMENT
(RPUD) ZONING DISTRICT WITHIN WELLFIELD RISK
MANAGEMENT SPECIAL TREATMENT OVERLAY ZONES W -3 AND
W -4 (ST/W -3 AND ST/W -4) FOR A PROJECT TO BE KNOWN AS THE
LANDINGS AT BEAR'S PAW RPUD TO ALLOW CONSTRUCTION OF
A MAXIMUM OF 25 RESIDENTIAL DWELLING UNITS AND UP TO
38 BOAT SLIPS ON PROPERTY LOCATED ON THE GOLDEN GATE
CANAL SOUTH OF BEAR'S PAW IN SECTION 35, TOWNSHIP 49
SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA
CONSISTING OF 10.75 t ACRES; AND BY PROVIDING AN
EFFECTIVE DATE. (PETITION RZ- PL20120002095)
WHEREAS, John Passidomo, Esquire and William Dempsey, Esquire of Cheffy
Passidomo, P.A., representing Headwaters Development Limited Liability Limited Partnership
LLLP, petitioned the Board of County Commissioners to change the zoning classification of the
herein described property; and
WHEREAS, the Special Treatment zones ST /W -3 and ST /W -4 are not changed by this
rezone.
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA that:
SECTION ONE:
The zoning classification of the herein described real property located in Section 35,
Township 49 South, Range 25 East, Collier County, Florida is changed from an Agricultural (A)
zoning district to a Residential Planned Unit Development (RPUD) zoning district for a project
to be known as the Landings at Bear's Paw RPUD to allow construction of a maximum of 25
residential dwelling units and up to 38 boat slips in accordance with Exhibits "A" through "G ",
Landings at Bear's Paw \RZ- PL20120002095 1 of 2
Rev. 10/28/13
0
attached hereto and incorporated by reference herein. The appropriate atlas map or maps as
described in Ordinance No. 2004 -41, as amended, the Collier County Land Development Code,
is /are hereby amended accordingly.
SECTION TWO:
This Ordinance shall become effective upon filing with the Department of State.
PASSED AND DULY ADOPTED by su er- majority vote of the Board of County
Commissioners of Collier County, Florida, this I _day of a-r 2013.
ATTEST r.nt BOARD OUNTY C MMISSIONERS
DWIGILT'E.- BROCK, CLERK COLLI O T , F RIDA
By: C By:
Y
D u erk9 GEORGIA A. HILLER, ESQUIRE
Attest as an s, Chairwoman
signature only.
Approved as to form and legality:
A. (0
Heidi Ashton -Cicko +�
Managing Assistant County attorney
Attachments: Exhibit A — Permitted Uses
Exhibit B —
Development Standards
Exhibit C —
Master Plan (3 pages)
Exhibit D
— Legal Description
Exhibit E —
Requested Deviations from
LDC
Exhibit F —
Developer Commitments
Exhibit G —
Sidewalk Exhibit
Exhibit H —
Landscape Exhibit
CP \12- CPS - 01199 \91
7h is i
,s ;,ancQ f; ±pd with the
C of *-ItEe'5 PtiCE ��
day
day o`
. .
arld acknowlec�gp? en that
C ived this
nP 'day
Landings at Bear's Paw \RZ- PL20120002095 2 of 2
Rev. 10/28/13
Cq
RESIDENTIAL PLANNED UNIT DEVELOPMENT
DOCUMENT
THE LANDINGS AT BEARS PAW
Date of Submittal: October 24, 2013
Prepared by: Cheffy Passidomo, P.A.
9
EXHIBIT A
PERMITTED USES
No building, structure, or part thereof shall be erected or used within the RPUD, nor shall
any portion of the land within the RPUD be used, other than for the following permitted uses
and a maximum of 25 residential dwelling units:
a. Residential Tract:
i. Permitted Principal Uses:
1. Single family detached dwelling units;
2. Single family attached duplex dwelling units;
3. Single family zero lot line dwelling units;
4. Any other use which is comparable in nature with the foregoing
list of principal uses, as determined by the Board of Zoning
Appeals or Hearing Examiner by the process set forth in the
Collier County Land Development Code ( "LDC ").
ii. Permitted Accessory Uses:
1. Accessory uses customarily associated with residential uses,
including but not limited to private recreational single - family boat
docks, mooring pilings, boat lifts /davits, swimming pools, spas,
and screen enclosures to serve residents and their guests;
2. Recreational facilities such as clubhouses, observation decks,
parks, playgrounds, pedestrian walkways, and bicycle paths to
serve residents and their guests;
3. Any other use which is comparable in nature with the foregoing
list of permitted accessory uses, as determined by the Board of
Zoning Appeals or Hearing Examiner by the process set forth in
the Collier County Land Development Code ( "LDC ").
b. Amenity Area:
i. Permitted Uses:
1. A golf cart path, and uses and structures customarily associated
with waterfront residential amenity areas, including but not limited
to swimming pools, spas, parking, private recreational single
The Landings at Bear's Paw Page 1 of 12
PUDZ- PL20120002095
October 24, 2013
LAO'
family boat docks, mooring pilings, boat lifts /davits, picnic areas,
and kayak launches to serve residents and their guests; and
2. Any other use or structure which is comparable in nature with the
foregoing list of uses and structures, as determined by the Board of
Zoning Appeals or Hearing Examiner by the process set forth in
the Collier County Land Development Code.
c. Golden Gate Canal (as to the Northern 'h of the Golden Gate Canal abutting
the project):
i. Permitted Uses: private recreational single- family boat docks, mooring
pilings, boat lifts /davits, and kayak launches to serve residents and their
guests. All docks are reserved for the exclusive use of the owners of
dwelling units within the RPUD property. No more than ten (10) boat
slips may be constructed adjacent to the Amenity Area, no more than two
(2) boat slips may be constructed adjacent to each platted single - family
water -front lot, and no more than thirty -eight (38) slips may be
constructed within the project. Except for any deviations listed in this
RPUD Document, all docks and boat slips shall be subject to the
requirements of LDC Section 5.03.06 and, to the extent applicable, the
Manatee Protection Plan.
d. General: The following structures and uses shall be considered general permitted
uses throughout the RPUD:
i. Essential Services facilities designed and operated to provide water,
sewer, gas, telephone, electricity, cable television or communications to
the general public, as described in LDC Section 2.01.03;
ii. Water management facilities and related structures; and
iii. Guardhouses, gatehouses, and access control structures.
The Landings at Bear's Paw Page 2 of 12
PUDZ- PL20120002095
October 24, 2013
D-AO (
EXHIBIT B
DEVELOPMENT STANDARDS
The following Development Standards shall apply to all development within the RPUD:
I. Residential: The table below sets forth the development standards for residential
principal and accessory structures within the RPUD. Standards not specifically set forth
herein shall be those specified in applicable sections of the LDC in effect as of the date of
approval of the SDP or subdivision plat:
RESIDENTIAL DEVELOPMENT STANDARDS
N 0 TES:
1. FOR FRONT ENTRY GARAGES, A MINIMUM OF 23' FROM EDGE OF SIDEWALK TO
THE GARAGE MUST BE PROVIDED. FOR SIDE ENTRY GARAGES, THE MINIMUM
FRONT YARD SETBACK MAY BE REDUCED TO 12'.
The Landings at Bear's Paw Page 3 of 12
PUDZ- PL20120002095
October 24, 2013
Cq
SINGLE - FAMILY
SINGLE- FAMILY
ATTACHED /
DEVELOPMENT STANDARDS
DETACHED
DUPLEX AND
ZERO - LOT -LINE
PF&JaPAL STRUCTURES
MINIMUM LOT AREA
5,600 S.F.
2,800 S.F.
MINIMUM LOT WITH
40'
20'
MINIMUM FLOOR AREA
1,200 S.F.
1,200 S.F.
MINIMUM FRONT YAR' -) SETBACK `
20'
20'
MINIMUM SIDE YARD SETHAC;K
5'
T OR 5'
MINIMUM REAR YARD SETRA�:K
20'
20'
MINIMUM DISTANCE BETWEEN
<0'
0' OR 10'
STRUCTURES
MAXIMUM BUILDING HEIGHT NOT
35'/30'
35'/30'
TO EXCEED (ACTUAL /ZONED)
AOCESSM 8IF�ICTUF B
MINIMUM FRONT YARD SETBACK'!
10'
10'
MINIMUM SIDE YARD SETBACK
5'
0' OR 5'
MINIMUM REAR YARD SETBACK
10'
10'
MAXIMUM BUILDING HEIGHT NOT
35'/30'
35'/30'
TO EXCEED (ACTUAL /ZONED)
N 0 TES:
1. FOR FRONT ENTRY GARAGES, A MINIMUM OF 23' FROM EDGE OF SIDEWALK TO
THE GARAGE MUST BE PROVIDED. FOR SIDE ENTRY GARAGES, THE MINIMUM
FRONT YARD SETBACK MAY BE REDUCED TO 12'.
The Landings at Bear's Paw Page 3 of 12
PUDZ- PL20120002095
October 24, 2013
Cq
EXHIBIT C
CONCEPTUAL MASTER PLAN
The Landings at Bear's Paw Page 4 of 12
PUDZ- PL20120002095
October 24, 2013
C CA6
I
I
wN I
�a I
w2 I
mow I
zz� I
1 r I
I
to
w�
a
a^
p O
od
I
nJ
w
I 0w
z¢
i � via
I
I
I'
I
1
I �I
I II
I 1V
I I I l o b
I
I
N
n
7sam
I I
EXHIBIT "C" (1 OF 3)
1 \
�y
\� \ �o
I a O
'1 \
1 m
I a �
z
J
F
Q
0
Z
m
a
w
N
O r
°�°acD
U�?d U
Z
�
On F-
ZN;:: W
oQQ
z<¢ O
Q
a Z p w
ul i W J
ftf O I-
Q
w�a
m U Z
rn
w i
d
d�
o�
K
NO I
z
w
aZ
W
Z O W
CY
00 as
O
O c o
C
W
Q J0>
¢ >6 d
0
¢\
o
Z J
c
cJ
Q
w
�
i1
Lf
�
p
w�
in \
O�
03 �
nom. x
Z W n(
LLQJJ z w
O Z
m
wm
I
w
00
Qo
30 \
a
\ �Z
\ 2
D 3
CG 6
lr
w
I � p
I �
z Lw
G i
Z -
T.
w - ¢
LA
wwWWw
w
L) (3
I I I
d
>'-
Fpm
I I
p 0 3
rV)
wN
ZN�
=O In
I
U
i��rn
Q
I I
I I
Q Q Q Q Q
Q
U Ja
3Q0
I I I
Y I
WWc2—,Q
¢flf
a
a Z
W
W I
I
0�
O.
O
QacV I j
,�
n
LLJ
>
�C) �
a I I
n U-) cD
N
Q }¢
WF-a
QZd I I I
a
a>
m U Z
ZOO I I I
W
O
W N I I
U
J
OHM 1 I
O
a
Z
0=)
2
>_ U I I
O
M
U
OW
F-
J
O u)
_
C1. J
F ~
Z Z
oZ
o
z
w
o0a
a Q
J
D D D
O
C7 Z I I I
p
�+
La
III
II
III
III
O
c
�
U o�
III
� I
Z
v w
U
Q
OQ
0
Q Q
.00 or
N
a
I
III.
Ili
a
i�Q w
a°
O
a .
ICI
I
az
a N
as a
/ /
/ /
z
L
w
�QQafm
I
O
aQ
? aoo
% % I
as a
a
' / I
oo U
OZ>'Q}
(n0 In
D
Q U w
L'i F_-
/ I
I
I
I
I
H
I
I
I
I
I
MATCH
Z Z Z
LINE
EXHIBIT "C" (1 OF 3)
1 \
�y
\� \ �o
I a O
'1 \
1 m
I a �
z
J
F
Q
0
Z
m
a
w
N
O r
°�°acD
U�?d U
Z
�
On F-
ZN;:: W
oQQ
z<¢ O
Q
a Z p w
ul i W J
ftf O I-
Q
w�a
m U Z
rn
w i
d
d�
o�
K
NO I
z
w
aZ
W
Z O W
CY
00 as
O
O c o
C
W
Q J0>
¢ >6 d
0
¢\
o
Z J
c
cJ
Q
w
�
i1
Lf
�
p
w�
in \
O�
03 �
nom. x
Z W n(
LLQJJ z w
O Z
m
wm
I
w
00
Qo
30 \
a
\ �Z
\ 2
D 3
CG 6
lr
w
I � p
I �
z Lw
G i
Z -
T.
w - ¢
LA
wwWWw
w
NM
p 0 3
rV)
wN
Q
U U U U U
U
i��rn
Q
u-,
Q Q Q Q Q
Q
wn
p�
W
WWc2—,Q
¢flf
a
mw z
wow'oow -0=)
0�
O.
O
O O
if]
LLJ
>
N
n U-) cD
N
a>
W
F-
J
Z
2
Z p
M
U
OW
F-
J
O u)
_
C1. J
F ~
Z Z
oZ
<
z
w
U
a Q
J
D D D
O
W
a'
w
�+
La
Q
(�
DO
U o�
Z
LLJ
OQ
0
Q Q
.00 or
W
a
a
a
i�Q w
a s w
o
az
a N
as a
V
z
L
w
�QQafm
O
aQ
? aoo
as a
a
Ora
oo U
OZ>'Q}
(n0 In
D
Q U w
L'i F_-
H
~ Q
Z W J
=(nWSQ
Z Z Z
W V
LLJ
F- v
M 1- 0
W W W
a s a
X
Q
W W
wa'
d
in
L.1
aaQO� -
00 O
m
as
rn
w U!
da
� N
O
O�
b �
000-
r��o• �� \ Oz0D t
-7
Q Ohm
!p .Jd Fi-cD
�� \ OZoo
d 6. Z0�Cb a c)
\ C". O O
of D
r�YO Q J
Z J
Zo �\ � U U
H
z 0 Ld
00
\\ V' e. a> Ld
w \ 7cp b0 C9 n
\ •6 O- HZ r O
I\
ZOZ
7
W F- W O
IrZ ZN
Z
Q� Qm
d
z a
r
cy0'PS� �\ w U
J Q
LL
w N
1 \ \ oa
¢ m\ —
I \ N L
w I
w \
m
Y � �
j d D a O N
W d
} (-) a-
z¢ zQ
0 3 a- J O
wjZwza n
(r W J O Z
O W -1NDM
(,C)O G�
0
a
wo
CL Z
of 0
am
9
a
z J
z
w d
Q a=
O Z
a w w g
w ~ a M
Q Q F-
F w 0 U O
< LU ZO
UCH
Z < J} w
z = J W
g z m N
=oQ-w
F- O o
w w
Oi
J
a
a 2
Z N O
w m O1 w ry
W >ap
(7 °om=W:
a
zo =NZ$
V) 0 L!
c N W I
w� aLL3
rW
L
p�
Y
as
m Y
O
0 0
O 2
W
J z W W
N W v O Y
K > K V F
= ZZ z
¢iYOl 5
W V F ¢
°do °a o
n a
F
F y
w ¢
g ;
w o
J
— 'M \OIOL 5103N A:.
('(1 n'd (13SOdOHd dO IdVd ION) Cl 021 SS303V; GISOdOdd
NM
p 0 3
rV)
wN
~
Dp
a w ~ d Z p
3c�
i��rn
❑'F- �z \w��
u-,
- Nwam
zZQ wymo-L
wn
p�
X
WWc2—,Q
¢flf
a
mw z
wow'oow -0=)
0�
Y � �
j d D a O N
W d
} (-) a-
z¢ zQ
0 3 a- J O
wjZwza n
(r W J O Z
O W -1NDM
(,C)O G�
0
a
wo
CL Z
of 0
am
9
a
z J
z
w d
Q a=
O Z
a w w g
w ~ a M
Q Q F-
F w 0 U O
< LU ZO
UCH
Z < J} w
z = J W
g z m N
=oQ-w
F- O o
w w
Oi
J
a
a 2
Z N O
w m O1 w ry
W >ap
(7 °om=W:
a
zo =NZ$
V) 0 L!
c N W I
w� aLL3
rW
L
p�
Y
as
m Y
O
0 0
O 2
W
J z W W
N W v O Y
K > K V F
= ZZ z
¢iYOl 5
W V F ¢
°do °a o
n a
F
F y
w ¢
g ;
w o
J
— 'M \OIOL 5103N A:.
3
O
0
w
N �
j
y
0 r
0
Y U �
W Q �
O_ ZE Q
En u
M L,
y w
W
N m
00
y �
�m
Ln
w Z
W
0
Y
O
of o
w
J ii
m
t0 J
J�
aw
N �
EXHIBIT "C" (2 OF 3)
vi
z
O
co
N
w
Ow lWi W N
w
m
3
f< mN
o a z LY
Z
Q
Z
Q
Z
J < C) W
a p z
Z
I
O
� J
U
O m
v
II
I U
j
w
a
w
J
w
0
S
S
W
3
o
o
W
X 00
of
U_ Z
o
m
w a
�gEL
�-
w w
o
a�Z
O w
CL
� w
y
W
w
H
Q N
W y
�
Ow lWi W N
w
m
3
f< mN
o a z LY
Z
J < C) W
a p z
� J
U
a
Q
S
Z z
OW
o
o
n
W w
o
O w
CL
� w
y
W
w
H
Q N
W y
�
Z y
O z
U
w
U)
Of
W
LL
LL
[0
E1
0
w_
O
2
m
Z
O
r
U
W
Ij)
J Yw W W m Cr W
O o a
Q F : U Q } Z Q Z J - Q w � CO W 3 Ln 1)
z L N f- ° >' 3° O w Q F z J Q U O Q H Q ° W W J
wa U O W a w Z L, Z 2L/L(/lwd W Om�w z = = Lr Nw Z W Z W OLn Z
Wn�Zw w °0 g000 U�ocn� wp�oog 3ww aoD °`, a °pa�a�
�¢ -�a LJ II Q U 3��QQ �:3 t/i °� Q a0U W w amw2W w
w w r 0 d �� Y C=j 0 Q H= N d W~ O LLJ U J N� 0 0 Q Ow �? Z (n d 2 H> Q Fn
a w h Q 3 Q 0 w° wN-I Y w U (% 'y L 0 ~_ �' Q w Z W 2 W W (U/) w o Z z
W W Z Q r Z p z z¢ O r H U I w J a Wm p w 0 �' Q J W 0� Q cf 0 0 W w W
�p -:2 << wow aw�- J0Lr) UQ �' zWMa C 3a -zz� -0
}z �J 0VI L Z Y °Z = QO�aD aZ LNiIOQQ Q0aZ OJ W o° O =�O ~Q0
!n W aQ W O- J (np F-- W a0(n V1wO Z O 1n W w xJ d' Q F-a�w Wl
r2?�zU wW awUw o w O�a�� woo >zWaa Z O =W
w 30 YW3QQ z WLs UZQN w2 Ow wawa H2
w��ww w�aL= oNm° O ~�Upx a�wQZU WQJ� ~° ~� Jwa��Z�
1-CL rZ F� !r =x (n O 0W J J s° H(n p ��a W 3 W W
U)w O00 Nr : r-pz - wa D w NC7p -w3= mNL �Wf - O ~O
7 W O U L L J d' m 3 - m~ � I n L n Fo L j 0 O Z m W Z }J Q 0 � m J Z 3 J LLJ
w 2 Lj m U Q Z a w w L ~Li nj W Z U U H N 2� O mN N F J H N lL OO Z w r
���~ J J O w Za p° w Z p a 0 L) W O� W= 0= C H¢ 0 O wow a W O a W JQ Q
Om NO =U
to x0 LD Y0 0f M.SFLQi Z rZUa, F-ZH MZ 0 LD �(la w (D �l.-wa >!Y
(6 u)
co =� ��Q� om�U¢� oo°og3 nw°� nod¢v ��gwOaQ
o� w r O w z 3 4 Z D z w w a� 0 z N O Q Z LWL ON w z� w m Z g U w W
r IU�-w �:- o_� p�� to OoLOZ =� 0100 x�w OwaZwmZ
UW 0d U� r (/)ZU ~ (n Ow w ~ w�Q Ua ~U O wcO lLN U = ~0 � U °3o =J0
0 Q W w0 j J w p w N wp a Z F- = W: (Y d' w W W w 0= f U w N 3 w ~~ Q N
0 �J to -0� Ln w3 U) -3 zr cn Ol�wwZ �O z Ow I JW 2w
ULn a ~am �O(7 (A Dw UJD- >O oa 3 00 � jUJ Ld
0 H J J: 2 U U O- U O J Z U W m m_ U W U U U w U p. W
J W a JrN 0 Lcn 0 O Q 0 W OQ pm Fn 0 00I -03 x 9 F_, �- Y 00 Z U W
C L' - O J W L � J W > J W O W F- J v Q Ln O Q F () Z a L n F U O 1. r. I f) Q Z 2
m� W W wZ W O m WO J p >wU� 0f MCt W F- f-m Mwww U W¢ �pCJF-
L nzw -, ��30 �� ~za ° =�tTn 2nwadaX �xa� ° -Of �r�W�0-00
0 U z w wp �F- U w0W JOLjLJ w� Z w (n00 W zOa(n
W W 2N °> w N p W ~c°o lQi_Z 0 W 00H�m(n w w 0� Q w a WIJJ C7 r0 LLJ
W O ~¢ ZLL' J
LLJ -J a�m J� -a 3 JW Z W W J�waCY�a JQU� J Q aU U J W z a W Oa cl�
(1JO OZ OQ w' aOU ZO O ° Cr J Z3 w WQ W Oa?O W MHa Z ~CL' m Cr =o >OO J
J wH aU wZ Y �aa Y �J ~ Q YQ�Na W YF=-- jQUpw� YQw3 Y 0L.I Ln w Y Olywja C7 N) of
LW = pQ �_� W ?�Q W WZ = w Ww LL Z Z W ao= WQOZ L''1 LnN (n W �L`-zww W
O ~ F- p a LW m w Z (n j w 0 N Y W Q U= (/1 w N O p Ln In W Z (n lY O w W (/I U 0 0 ~~
�w OF Z~ N SQL M OZ W z v0�?w ~ `n'OL,jZcr2 LD-j Z Q m o0 2Mw0rm
Z�can�Z� Zao� Z�- ~°w zLn�a�= ZLjLLI � Z3�� Z=or� z3=vaiz°¢ LJ Z O= 0� Oa0 o Q(nN O m WO E °I=- 3�LZ.J °�=QN JmQ II-FZ? °r 3�� 0 0 W~(nU�Y/1
O ¢U �_ �> > 0 t0 LLj Ld >Or�o� jUOw¢¢z >�mw > zU¢ z > w�w�0
Q o3cpi >oJO oa °c�i oaw�WO oofpOOO LLI <0 =ia o�o� oLCAi 0f V) om�� °a�g
p Q Q Q Q Q Q
3T .R N. .O Z -2
�2
\ a
� m
�x
si
a
Z J
Z J
w a
3a= z
W
ao� g
d w
^ >z CL
O �
Q
FWO LLJo
Q Q ON
co
Z 0 �
}} W
ZQ = J W u
LU J LUm y
2
0- Q M
�oo
w w
O �
J
Q
a
f
NO
LU V W 2 m
z0 io
id 7
z t2
Q LL 3LL
> M 3
d
Wsd
0
z
w
l7
J
EXHIBIT "C" (3 OF 3)
i
I
T
N
w z a
$
4
�zw
U
fo r
O w
,3�a.
?
�O
G�52
+maN rw
1
i
I
T
I
1
S31dVn
< _
Y
Y
y
I
z
W I
1 W JW ~ I
U/
to
Q Q
Q U
I
I
O 1n -WM
' -on_�
y
�I
a�
z�
a�
z�
O� 1
w
I
u
Y
U
I
Z
R..oCLou
1
I
}O
R.
0
0_¢
¢
I
1- - -- -
- -- ----
-- -
ww
- -J Ul
h
J
g
p
aZ
ro
a
O Q
Z_
zJ
z
z z
z N
1
} 1
I
w
J J z
cd
w a
o-
I
a
a�
w�~
30�
z
U W
H W
°¢ w 1
Z 1
a
I }
r
d N
p Z
s "''
s 1
I
m
I
}
W
2LL
a°
W
m a
w 0
En
O
W
1
a
I
z
H
L(Sl
� r..l
vw
I
U) f
owmY
Z °J
Z =t=
wN
I
I
I
^^
LL
J
I
O Q
gwQ
a
L - -- --
------
- - -
- -J
W D CD
�0
°
W
J
Z
J
o
Wpm
CD Z Z
of
-'
0
oo
z
Z
LD wZQw
<
H p
`?oz�¢3U�
C)oma�
O
J
f- a
oai
m WCC WNN
Lo W Q
wZJw
zUwd�
a O Z
Q
zw-
¢ U U Z J Q
Z L)
ON_Qn
Bomar
Z LU
�Wp
n
<n
o
J
Z p Z
K N m Z
O W
O
>p m
Z v
-- — — — — — —
— —
N IN
F.
U0�'
Y
LL
W 0
zgao
LL E
o"2°
YQ
Y
m
U
m 1
I
Y
= Q O
I
J
;jJ 0
In =0 w-¢
Z a 0 2 c LL
m
r
rri
1
I
y
zQU mry
I
O Z
Q"3
I
p
P: a
WN 3
d 2'
d¢
O
I
SON Z¢J
I Y
U W Q
z
ZC¢.7
z
w I
I
��p
o w
Q
m
¢Y
O�
O >H
J W a
o
W
J
J ly U
O J
O
O
I
I Q
K
f- a Vi
Z Z LL
'
O
T
1
U
N
O
g
rN
I
I
z
g
z�
zo
°m
I
a
s
Q %'
E-F-U
Ix
z° z `` ` SINVA a cr Ci O W
I
I
I
u-
LW
< r
O
N
N
K
-J D
>
J
O � LL
1
J
N
a
Qoo
LL
3
o
W
O
W
Lu'^
z¢U
U W K
�
m
Z Zw
OOfU p
s
oN Zi Z V
O
U
O
W
6i
22 M
E"
w J w
z U w a
0
Z
55
H
�ss
H
Y
O
¢ zL)
N
O
Z_ QU
Z
GU
m
U
m
Q
O m}
° alrn
m
J
C
W
w
r
in Ow
N (n
r
O
N W
(/1
N
J
a
J 0<
a cr
0
p
zU z
Ln
w
�— —
-- — — — — — —
— — —
— — --
.. W
of
'If
U
p
of
o°
o
o a
ui
r I
w
r N
r
I
m
J p
cr o
OO -
o
w
Ln
N vi
Z
w
z
z
z
>
I
a
O
Z
W as
Y
o Z s
oN
0
S3NVn
a
< U W
w m
1
I
Ln
U
L - --
— — — — — ---
- -
- --� w
r
} Z
? \ zo
3
z
J
¢
w
w
¢
r O J
o 5
3
°
°Y
w
r
O
J
n:
?
w
Z
J n: m
I
¢
?r V)
Z
J
I
oom Z°W <�
VI z w
�<3:Z
C l w�0
�pmaN
I
NY HOI CLOZ /SZ /ol ONO 'NY1E'1G30N00- N31SNn \[M3a \NVid l 33-00 V315 \WWMM\SON~ 10\1N3N3lllM3 )NUS31 EMU
',f\OLOZ S=3f \%M
EXHIBIT D
LEGAL DESCRIPTION
iN NORTH Y2 OF NORTH Y2 OF SECT-ION 35, TOWNSHIP 49 SOUTH, RANGE 25
LAST, BEGIN AT THE NORTHWEST CORNER OF THE SECTION AND RUN EAST
1 0
1,398.25 FEET; THENCE SGUrH 64* WEST 1555,06 FEET; THENCE NORTH 664.01
FEET TO THE PLACE OF BEGINNING, COLLIER COUNTY, FLORIDA.
The Landings at Bear's Paw Page 5 of 12
PUDZ-PL20120002095
October 24, 2013
((910
EXHIBIT E
LIST OF LDC DEVIATIONS
NOTE: Nothing in this PUD Document shall approve a deviation to the LDC unless it is listed
in this Exhibit E.
1. Deviation # 1 seeks relief from LDC Section 6.06.01.J, "Street System Requirements,"
which states that dead -end streets are prohibited except when designed as a cul -de -sac, to
allow the internal dead -end street to terminate in a "T" junction vehicular turnaround, as
generally depicted on the Conceptual Master Plan. Final location and dimensions of the
"T" junction shall be determined at the time of site development plan approval, and shall
meet local fire district standards.
2. Deviation #2 seeks relief from LDC Section 6.06.01.N, "Street System Requirements,"
and Appendix B, "Typical Street Sections," which establish a 60 -foot width for local
roads, to allow a 50 -foot wide road in accordance with the internal right of way cross
section attached under Exhibit C.
3. Deviation #3 seeks relief from LDC Section 6.06.02A.2., "Sidewalks and Bike Lane
Pathway Requirements," which requires sidewalks on both sides of a right -of -way or
easement internal to a site, to allow for a sidewalk to be constructed along one side of the
right -of -way, including the western terminus of the "T" junction described in Deviation #
1, above.
4. Deviation #4 seeks relief from LDC Section 5.03.06.E.5., "Dock Facilities," which
requires dock facilities to have a side setback of 15 feet for dock facilities on lots with
greater than 60 feet of water frontage, to allow a 7.5 -foot side setbacks for the private
single- family community dock facilities located along that section of Golden Gate Canal
within the Residential Tract; provided that such slips are parallel to (rather than
perpendicular to) the shoreline.
Deviation #5 seeks relief from LDC Section 4.07.02.G. L, "Open Space Requirements,"
which requires that PUD districts composed entirely of residential dwelling units and
accessory uses to devote at least 60 percent of the gross area to usable open space, to
allow at least 50 percent of the gross area to be devoted to usable open space; provided,
however, that landscaping internal to the project shall be provided in substantial
conformity with the conceptual enhanced landscape plan attached hereto as Exhibit H.
6. Deviation #6 seeks relief from LDC Section 5.03.02.C.b., "Fences and Walls," which
permits walls at a maximum height of 6 feet in the rear and side yards of designated
residential components of PUDs, to allow walls at a maximum height of 8 feet in the non -
waterfront rear and side yards of the residential lots.
7. Deviation #7 seeks relief from LDC Section 5.06.02.B.1.b., "Development Standards for
Signs within Residential Districts," which requires signs within residential PUDs to be
The Landings at Bear's Paw Page 6 of 12
PUDZ- PL20120002095
October 24, 2013
CA(�
located no closer than 10 feet from the property line or from the edge of the roadway,
paved surface, or back of curb, as applicable, to allow project entry signage to be set back
a minimum of five (5) feet from the property line.
8. Deviation #8 seeks relief from LDC Section 4.06.02.C.1. "Alternate A: Landscape
Buffer," which requires a ten - foot -wide landscape buffer with trees spaced no more than
30 feet on center, to allow a modified Alternate A Landscape Buffer with trees spaced an
average of 45 feet on center for that portion of the project adjacent to the Golden Gate
Canal. The equivalent number of trees otherwise required by the 30 -foot spacing shall be
provided within the Alternative A. Landscape Buffer located on the Residential Tract
along the Golden Gate Canal.
The Landings at Bear's Paw Page 7 of 12
PUDZ- PL20120002095
October 24, 2013
(191-0
EXHIBIT F
LIST OF DEVELOPER COMMITMENTS
I. PUD Monitorine:
One entity (hereinafter the "Managing Entity ") shall be responsible for PUD monitoring
until close -out of the RPUD, and this entity shall also be responsible for satisfying all
RPUD commitments until close -out of the PUD. At the time of this RPUD approval, the
Managing Entity shall be Headwaters Development Limited Liability Limited
Partnership, LLLP, a Florida limited liability limited partnership (the "Developer ").
Should the Managing Entity desire to transfer the monitoring and related commitments to
a successor entity, then it must provide a copy of a legally binding document to be
approved for legal sufficiency by the County Attorney. After such approval, the
Managing Entity will be released of its obligations upon written approval of the transfer
by County staff, and the successor entity shall become the Managing Entity. As
Developer sells off tracts, the Managing Entity shall provide written notice to County that
includes an acknowledgement of the commitments required by the RPUD by the new
owner and the new owner's agreement to comply with the commitments through the
Managing Entity, but the Managing Entity shall not be relieved of its responsibility under
this Section. When the RPUD is closed -out, then the Managing Entity is no longer
responsible for the monitoring and fulfillment of RPUD commitments.
Il. Utilities:
Potable water distribution and sewage collection and transmission systems shall be
constructed throughout the RPUD by the Developer. Potable water and sanitary sewer
facilities constructed within platted rights of way or within City of Naples utility
easements shall be conveyed to City of Naples pursuant to the LDC.
III. Transportation:
a. Access to and from the RPUD and the Golden Gate Parkway right of way is
provided by the Right of Way Easement Agreement recorded in Official Records
Book 4097, Page 661, as amended in Official Records Book 4535, Page 2342,
both of the Public Records of Collier County, Florida (the "Access Easement "),
and Developer shall be responsible for fulfilling its obligations under the Access
Easement. No later than sixty (60) days after approval of this RPUD, an
amendment to the Access Easement between Developer and the County shall
completed, signed, and recorded to: 1. Provide terms for maintenance of the
improvements within the Access Easement; 2. Provide continuous access over the
Access Easement to the County; 3. Permit the construction of a private entry gate
within the Access Easement (to be constructed and maintained by Developer, or
the homeowner's association described in Section V, below), so long as that
portion of the Access Easement over which access is limited by the entry gate is
not open to the public or publicly maintained; and 4. Require construction of
The Landings at Bear's Paw Page 8 of 12
PUDZ- PL20120002095
October 24, 2013
new
Developer's connection between the RPUD and Golden Gate Parkway.
Infrastructure internal to the RPUD (not including roads) may be public, private,
or a combination of public and private. Roads internal to the RPUD shall be
private.
b. Prior to issuance of the first certificate of occupancy for any dwelling unit,
Developer shall construct a single sidewalk connection between the RPUD and
Golden Gate Parkway. Two alternative scenarios may be proposed for the
sidewalk connection:
i. Default Option: Developer shall construct a sidewalk within the Access
Easement from the RPUD entrance to the shared project entrance with the
Gordon River Greenway Park; or
ii. Alternative Option: At the discretion of the County Parks and Recreation
Department and in lieu of the Default Option, the Developer may elect to
connect to the Gordon River Greenway Park asphalt sidewalk that runs
north south parallel and adjacent to the Access Easement ( "County's
sidewalk segment "), provided that the necessary access rights are
conveyed to Developer, and — to the extent required by law — the entire
sidewalk segment from the RPUD to the Golden Gate Parkway right of
way is made to be ADA compliant at Developer's cost. The proposed
connection is at or near the southern end of the County's sidewalk
segment, as shown on the attached Sidewalk Exhibit, with all design,
construction and permitting costs to be paid by Developer. If this option is
exercised: 1. Final approval of the sidewalk interconnect plans shall be
subject to review and approval by County Parks and Recreation staff, in
addition to the appropriate Collier County Growth Management Division
staff; and 2. The Developer, its successors and /or assigns (which may
include the homeowner's association described in Section V, below), shall
bear a proportionate fair share responsibility for maintenance of the
County's sidewalk segment in perpetuity.
c. Developer and its successor(s) and/or assign(s) (which may include the
homeowner's association described in Section V, below) shall be responsible for
all operation and maintenance of the internal RPUD roadways, sidewalks or their
appurtenances, and Collier County shall have no responsibility for maintenance of
any such roadways. The foregoing operation and maintenance obligations include
the Access Easement, except that portion of the Access Easement that provides
shared access to the Gordon River Greenway Park.
d. Developer shall not deprive the County Parks and Recreation Department of use
of the Access Easement for purposes of maintaining the Gordon River Greenway
Park or any of its related features or appurtenances.
The Landings at Bear's Paw Page 9 of 12
PUDZ- PL20120002095
October 24, 2013
cx�,
e. Prior to issuance of the first building permit for any structure in the project,
Developer shall pay the County (Parks and Recreation Department) one -half of
the total sum of $140,365.20 as reimbursement for' /2 of its fair share of the funds
expended by Collier County for construction of roadway improvements within the
Access Easement. The remaining %2 balance (or $70,182.60) shall be due and
payable to the County (Parks and Recreation Department) prior to issuance of the
first certificate of occupancy for a dwelling unit.
IV. Environmental:
Pursuant to LDC Section 3.05.07H.l.f.i. and iii., Developer shall satisfy all of its on -site
native vegetation preserve requirement by making a monetary payment to Collier County
in the amount of $103,255.00. The payment amount is based on the allocation of the
$1,500,000.00 purchase price paid by Developer for the RPUD to the .74 acre area of
native vegetation that would otherwise be preserved onsite. The payment shall be made
prior to final site plan and/or plat approval, whichever is earlier.
Developer, its successors and/or assigns (which may include the homeowner's
association described in Section V, below), shall be responsible for maintenance of
improvements located within that portion of the Golden Gate Canal within the project
boundary, as depicted on Exhibit C.
V. Planning and Common Area Maintenance:
Prior to issuance of the first residential certificate of occupancy, Developer shall establish
a homeowner's association, which shall be responsible for maintenance of the RPUD
common areas, water management areas, community infrastructure, improvements within
the Access Easement, and internal roadway.
VI. Miscellaneous: A certified archaeologist will be onsite during all excavations to monitor
for the presence of historical and/or archaeological artifacts or resources.
The Landings at Bear's Paw Page 10 of 12
PUDZ- PL20120002095
October 24, 2013
�F�`1
SIDEWALK EXHIBIT
The Landings at Bear's Paw Page 11 of 12
PUDZ- PL20120002095
October 24, 2013
yam',
Exhibit G
APPROXIMATE POTENTIAL GATE
LOCATION (VEHICULAR GATE ONLY)
J ,L
/ III
APPROXIMATE (TENTATIVE) SIDEWALK
-
rl 16 EXIS
ROUTING WITHIN ACCESS EASEMENT
1'
a PROPOSED WATER
SYSTEM TREATMEN/AA
20NING: CITY OF NAPLES PO
\LANDUSE:
`\
!
,(
5
GOLF COURSE, SINGLE /MULTf FAMILY
-
,1
h I; 2 —LASEE
RESIDENTIAL (BEARS PAW)
ii 1i GRADS
f
APPROXIMATE (TENTATIVE) CONNECTION
' _ ANCE
LE�P'. EA
10" WIDE TYPE'
TO PATHWAY WITHIN GREENWAY PARK
D BUFFERI
ENT
_
N-)
PRESERVATfON
20' WIDE TYPE
ALfN�TE ..
AREA
\ � TROL : ! MULGH TRAIL 22'.2D ACRES
-
D BUFFER
#
.t
J @5F,
PROPOSED SHADE
D 13UFFER�"a # #\ ' SiRJC7URE (TYP) F.F E. AT
l# h
- # ♦ .�
# s # # 1 a EXISTING GRADE OUTSIDE
fy P�
# #1 PRESERVE AREA
ST/W1
F ' (
✓ f # #'
J/
♦ # T#!, 1�r 4 1�
OR RQ'
„'. l�l� 3F�T'_
,;t'•'
;' •I,'Ts� \ \. I � I .t �i. I} .SiiL�E'i�'- ,,emu'
J.R. EVANS ENGINEERING, P.A.
_ 23150WHIONDRNE,5UITE242
ESEERO, FLORIDr133928
THE LANDINGS AT BEAR'S PAW
F�F:"5•
w7,49
PHONE: 123912)3 -3996
FR%: 1239)2H8 -253)
W— R— SENGINEERING.COM
DRAFT SITE PLAN WITH GREENWAY PARK OVERLAY
5�35/i.495/R. 25F
I¢C.HNrtIEV. P.F.
FL CO N29226
SHEET: 11 of 1
Exhibit G
- - -- Al !r
II `
"�� 1 iii Ili
II
5 - -- i
� II
8
_ F
No Brener Reiland by Code
Tree Stakes are m b remove between 612 monma by the Owner. NTS
l ll
Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G
II
J
II
I
$w
II
II l
mel
II
P
tw
2 Piaaaaol ruNLx ho. 14tl
�u �9abaneM wM ane
�tw
I I
�n�wnk
naMl Mae
IIn
II
II
II
a§
-le
- - _ -
Titre - 4ngnu =nx eaakFl ra
���uuu��I unsw'
°IIIIIIY 2AIp?pM
Is
B.
TepnNb�parardnpro -
aifaation.
PS
p
n1
II
Us. abnuate
€�
Fg
II
11
o
II
u
`
I
8 It
No Boger Required by Code
TIN
eg£
III
l
n_i
III
BEE
�2g�
II
�gp
Ill l
98ITnen ReW inn) x 75% (NaCVe)- 102 Trees
LPropose
Retention
Native Trans Require: 74• Nnve Trees -ded: 74
Rate.-Area Y2
)
1
-r
l
3
5
Retention Area
Aa ds Ro e Sw I. l
BuNer Require0 by Cotla l
l
Tree Planting Detail
9 w
Tree Stakes are m b remove between 612 monma by the Owner. NTS
l ll
Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G
YE
J
E
fyl._t t3-.f,C,"Frl+
r
mel
3' Mukn
son -paarooa
in
2 Piaaaaol ruNLx ho. 14tl
�u �9abaneM wM ane
Propond Rea-n�
2.2 Fr Pm
i V tan 2a' Radua.
Mr Tin
�n�wnk
naMl Mae
IIn
Merck OkriMler aEOmefa o d Da
ma^ ,
Reterlbn Area al
-le
- - _ -
Titre - 4ngnu =nx eaakFl ra
���uuu��I unsw'
°IIIIIIY 2AIp?pM
Is
B.
TepnNb�parardnpro -
aifaation.
PS
p
Pgeon Plum
L�;
Us. abnuate
€�
l
No BuNer Required by Code
�
as Tyra 'D'BrrBer
9851, Parmear If adjacent to RNY)M =33 Trees(RBT)
23
se. Sheet Dl for Data
Trees Rewire: 33 Tae, Presided: 33
TIN
Trees an shmbs (Sections 4- MM.C.141
1
"
EMlance Panerg Aree (A)
A. Trees 1 V M., 1.75" Cell., 4 Spot.
see sentIa 1 ror Detaila
98ITnen ReW inn) x 75% (NaCVe)- 102 Trees
LPropose
Retention
Native Trans Require: 74• Nnve Trees -ded: 74
Rate.-Area Y2
)
1
F
lu
i
-
4N Type'D' BuNer
See 6nee10.1 tar Dealls -
9
Propose Pa.-
Re�bMbn Area
Pre ectB rgary
g�g
a Connector to verify
It Corrbacmr must
proadytnesandaied- bfaecoretrinibit
have property lanes slake and located an must verM Pan
It tar, an flea coni -,I rai need to g Any Incpnsistsncies ry these acre Tien be reporteda ALD tb Owner.
Co. orsnag
san(btmey have
d th
has me most uptoe
been apaoved
been
ndacclmn.
bdisir
era agcepmd by Tire owner Oefore commenting conetnadbn.
Tree Planting Detail
Palm Planting Detail
Tree Stakes are m b remove between 612 monma by the Owner. NTS
Tree Stakes are m se r ind betwnn
Tree b W staked accoming m CdNer county LDC Saotbn 4.06.05.G
by tb Dw ,
J
(1.
to
m CoNkr \,
Tree b be stakedon
fyl._t t3-.f,C,"Frl+
4.0 .0
County LDC Section 4.o6.o
\a
mel
3' Mukn
son -paarooa
in
2 Piaaaaol ruNLx ho. 14tl
�u �9abaneM wM ane
a�pad= M
.wa
to mnmze as o
Coo uca�
2.2 Fr Pm
i V tan 2a' Radua.
Mr Tin
�n�wnk
naMl Mae
IIn
Merck OkriMler aEOmefa o d Da
ma^ ,
a. e-
Sea plan ter kanmN
-le
- - _ -
Titre - 4ngnu =nx eaakFl ra
���uuu��I unsw'
°IIIIIIY 2AIp?pM
Is
B.
TepnNb�parardnpro -
aifaation.
nYnt ep Ion ynnaetlaaurlloeeuaur10andpIMZLL
Pgeon Plum
Site Data
Shrub & Groundcover Planting Detail
NM NTS
G aa.4s an4
Nate: At Sri- And Grouncover Snell Ba Triangular IJTs
Spaced Along Shaighl Edges And WIN Be PINiadIn
P-11.1 Rows Along Curved Entries.
Residential
Ed of Pso-M. Curb
Total SO. Area
Beeline
sin eFami ResideMlN isbesedooland-sdSlad-
g ry
Vehicular Use Area
Ue z.4 ev "ay
ounWnRx secure++
3' Mukn
aaaz o
MnY
4'EarOren Salcu
Geneal Trees Prm see: 24
Prepared Pacing
Sop Backfill
lo's -1.
Scanty PA BoBOm
Site Data
Red Maple
Landscape Calculations
Current or Proposed Zoning
Residential
N9nimum Number dcenopv Trees Rwuke t(Sect. 4.08.05)
Total SO. Area
428.195 SF (9.83 Ac
sin eFami ResideMlN isbesedooland-sdSlad-
g ry
Vehicular Use Area
34.318 SF (0.79 Ae)
Pe t,,d 'a afro 71 900 M13 .000 = 21 / 29 Lds = 1 Trees pa LdlRGT)
Genera pees Requhe: z4
Total Impervious Area (includes sidetealks)
188,179 SF (4.32 Ac)
Geneal Trees Prm see: 24
Total Pervious Area of Site
240,016 SF (5.51 Ae)
p� meter Bunsen - Apeman -es A a c (seem s.D9.o2 s Table z41
Total Pervious Area on Residential Lots
71,800 SF (1.7 Ac)
Type 1. Mesa in M. =ton.
Coccalobe tlivaregolia
Pgeon Plum
13131 I'Ismosearin M • 41 Tract, IRBTJ
Us. abnuate
East Palatka Hog,
Trees Required: 41 Trees Proles: 41
No BuNer Required by Code
Type'D ". Minimum yNdm= lot. lit Me 199) a 20 It. IN RIV'1 is >99)
9851, Parmear If adjacent to RNY)M =33 Trees(RBT)
Trees Rewire: 33 Tae, Presided: 33
Trees an shmbs (Sections 4- MM.C.141
Tees Sprees Requnrn: 5• Tree Sped., Provide. 5
A. Trees 1 V M., 1.75" Cell., 4 Spot.
98ITnen ReW inn) x 75% (NaCVe)- 102 Trees
Native Trans Require: 74• Nnve Trees -ded: 74
1A No Buser Requred by Code I
Endneu d Planting Area (B)
sea sheet 0.1 tar Debts
�- - 7�Y-7
PIP
-/_ IF
ed emmg writ (C)
e sneer D.1 ror Derma
Propose Reteabn
ftabaionA es
i
° Ennanbe ryps'A' Brener
Sea Sneer 0.1 ar Deab
Bhg.r �
et o.1 ror D.bla I
General Notes
1, AI Pe. stall be Mn.d Nb.1 or ceder,
2. Landscape COmracmrsbllrenew Plana lou lndbate any avail -lity Indus eat time
of std, L nslab. a c....... g Tie re iPIrd ble -ing art Irebang at plannng9 as they
re drawn on - plan, and seat ve n the eccurecy o! me plant Ibl vs [he "a- plan. a[me
time of Ne.
3. In the evert loaf a certain spe[ifinhon b Tint able m b men then contractor anal
content ono.., ar 1-1 to discuss anandse.s.
4. Landscape contractor eM1al contirm plant selectbn sunabilny.gmere are any plant
sent- concerm they abll be brought m the Landscape Arohnecte- ntlon at [he timeM
Did. Larascam contractor snail -111ty any o,MIN, mat may instal.
5. Contactor snarl nave a pre -con=, rev'Mw pf plans w/ Landscape A-Iled Arlon m
ordering plant -ti ro van y plans are currant, and that ne -W. era necnsery.
6. -rector.tallabo acbduk swank tnrtlroalbw LaMacepe Archrtadrorevkw
laggingand placementof alplantmaterial in, to betel n.
C men anus mantionatl meePoga are lmporan[ro tree quality co,. daft tb por
"ls,,or ueeabn ,. th, walk co ontike es wimoultbse mmtinganth- O itts-
Larclscape Aronnect nave me aetrcy m mars rkM cnanges m me plane at me convacmrs
expense.
b. Oontacto le aq es.. ar w /ma Collet eounry landscape coda art snap comply wren
all of As apalcaDk required, ante.
9. Contactor shall prib Iquann -lt teen. rattune of DW
10. AN s. rstallp on, unit pricessttime o! Did.
11. Al contracton workay on me proleab -pl n lkense1 air tiny iant n etwl q I.,
12. The Properly Owner Is resppnsibb tar replacement of all dead plant material& for
ir.onsnance of the required irnigalbn eye ern
13. Tree and palm staking anal be removed -.an 6 and 12 modne.
14. AN prs -And exotic vegetaWn shall be removed loom tree area and it hell be maintained
tree of axdbs in perpetuity. (LDC 3.05.10.8.2)
15. Tree review antl approval of lmaovement plane e11- iiutrbrit,thetonetructronof
require Improvement wbch are ,nconeatera W existing eaii -n a --rd
16. AN aardngs shall be 1-10' bon, utility connecbons.
17. Contractor to vor" - rgroand ublWl With'S- Ion, Slob One cal of Fli
800432 -4770.
18. Contactor tov,r,W.Fert, 8nm and ,acei,ks before combustion.
19. Cordbctor mart nave property lines ebb of antl rocarod, an rn,dd rty pan
dimans- and fteb conditbre are oonaistem.
20. Phone b zone. 10.11 ea eueceptibe to damage from cold.
21. Al plant maalielshallb warranbdntolbws : 6momhe forbeeslpekns, 90 days for
ahruba/glouecover, a W 30 days tor sod. Warranty period begins at the time of projed
ccapbnce by The owner.
22. Comaotor to provlde for and verity too %lrniption coverage for all seta material.
23. Cordador stall mmrlbin a1 pieta material and beds must be dept wan hen untt
meptetl by owner.
24. Conactor snail maintain snm a clean fashion and anal remove any waste cream by
on-b n.
25. At plant in sen le b b instated an mamtoned as per Collet County (LDC 4.06.95 J).
26. Conductor shag insal a Ed Banner late, around! all palms wMn 4 of pavement or
pkntarwab.
27. Large canopy treee locate wnnln 1D' o! ted -lk, or -In 15' of atrucmne. are
require ro nave mot Darrera, cur0 or tNCkenatl abewak mat exleMa 20 feet orRirom [Tie tree
trunk along tea area of,ghbo, .
2B. P111'. Iobpoe 1tne t snag not b located in coiner coup bans 4.0 tteea and anal n
locatedamin. 12.5'fromll trunko!otree aspen Colll.r County and bill
29 se Sod cakulatlon a real, a tlo ased on Into account me sloe antl t mgrew sucn as
woe and Derma,Esl- are -neon ,,able area,ass.d an,.oregrade level or
pane and tlost not for Wie areas coveretl by existing or propose snrubs, grountl cover,
preserves, stand on lakes.
30. GeneraYSb cpntraclgrsbl make cabin at at soil ror aantlng areas slagbol
suitable landscape quality "' S.1 anal be cod,prbed of a sandy base, and nave good organic
aril gold percolalbn it""".
31. Ge .... YSAe contractor snzl make cii-n al gmerock and ...... Nely compacted solb
shall b ""ad from planting bed$.
32. LarWbcapa Contabmr shall nNiecerbin that me stte cmdiWn, me,tW their
aaDSbcWn boons ndberil pant material.
33. If I.-, IN -no-bor be any -ems over the - -bllny of plant matemb, Tie
must intorm [he owner ineately.
3I. Al ebpea,teapa, man 4:1 shat be parlbtl+titll note, iioadab- AN 4'. l slope. shall
IN aodd,d.
Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Owner before commencing construction.
Exhibit H
Page 1 of 3
Lot Typical(52' Wide Lots)
Scan: V :
sparb, m be planted abrlg
Dank In easement wham
abpe is 31
jl• Ij
`1 Ij Proposed Trees hod,
Remmmen4d Ties, ror
3 j Lob ter
aL0 1 Tree Pat Lot Required.
' I
,I
•
Proposed Mist, PlardoV
Lot Typical (67' Wide Lots)
i No Plan(ings in Easements
I' II
1• I
BLD
By Propose Tree, from
Recommentletl Trees for Loh
List
1 Tree Per Lot Regmre. BuNer
Trees dy tine b along real lot dine
( ro eatbry the nee requrtemerd.
P.Mie d Shrub Parties
Recommended Trees for Lots
Aber rubrum
Red Maple
10' QA x V Spd., 1 -314' Cal.
Omr,,,,kgido,,
LNe Oak
10' OA. a P spa., tdl4• Cal.
Roystonea Elate
Royal Palm
10' bear.... nuAbW
Swietenia mahogany
Mahogany
10' O4x 4' Spa., 1a/4- cal.
Sateen same.
Cabbage Palen
II 14'17'dMhee
Magnola g- Ifflor�
Buraea simanube .
Magnolia
Gumbo -IN
1V -12'04
10' -12'04
Ilex caseine
Dahoon Holy
10' M x 4' Spot., ta/a• Cal.
Coccalobe tlivaregolia
Pgeon Plum
10' 112 x a' Sptl., 1-3/4• Cal.
Us. abnuate
East Palatka Hog,
10. .OA, 4'e-d, 7c,I
Q� =
htxchlectumel
Lend Design
INCORPORATED
2780 S. Horseenoe Dr, sube 5
Nape, FL 341n
(2{9)430.1661
16 .net
chrisda Andrea
�L \lJ
'V
\f
�J
r/1 1-S
d r
45 Chrge D Dotter CA 10.23,13
. Update PPL plan PM 10.22.13
43 Enl,a Pkra rg Areas PM 10.17.13
42 Bute Rev'ebn 10.
4t BuNe tl Irrigatbn PM PM 01.7113 18.13
IXewi 9 Dee. PM 01.03.13
soak: P =ten
lz ran x
Fie Name: aD1.0h.-
w.. mna.ue anrw m_n.1s
M -tale+ + wxe,pa
2
Y
y
I
�o
Ell
i!
ER y
fj
r—
I
�£b
a L — —
��B
$a
�a� Groemn Perk
g
= a
�SE
�5
rype'o' Buper
oB t! 1Tree per 30LI
p
d5 Doude 3' Hedg
g LF•
eS7 4Tree P AXH,
77 Shrub Reg,
F IT Shrub Prov
fi.
Yga
€ B Fr
€'� No Bulk
�9
Darting Green
E�
5~
{E
i
a
�ppp
Vinland Drive Buffer Section r Retention Area #4 Buffer Section T Golde n Gate Canal Buffer Section
S SE1BeCN/ � •• r. 1 \C
Wafer
RETENTION AREA'S i
BUTTON ELEV. = 320 \
I Tr aDo e S< BKfe
rblA v 30' D.0
ppmetl Hedge Roe
r -I/2' TYPE S III ASPHALTIC CONIC. a
10'Le !S
211'RwMaY T4' B
TYPE 'D' CURB
� 1 I as0
B1'SM_7J_fL-NS
BASj_L-LEL, Do n -�
le• STABILIZED SOBG &
LBR 40, 98X DENSITY
1� p�� Retention Area #2 Buffer Section
Type D Buffer R
1 Tree 30' DC. I SETBCN/
Do— Staggered Hedge Roe .lrl4 LOT ..E.
Contactor b—Ify property Ibex and eNeck, oat— construcbn.
—actor must have propeM lines slaked and located, and must —dy plan
dun.ra m a rt Aeb condiaons am —Wtent
Any Inconsislencies cal Neu plain need to b N PRrhtl b ALD Ana Ne C-N,
Ldnacbr shall verily Nat he has the must up b Ooh plan., ens Nat they Ave
Dean approves art aCC,Md by Ne Owner Before com rn-Cag cons[ruc5pn.
-PV[ 111111E
(SIZE AND LOCAT:
SIDE YARD ORAINALE —ISCC SITE RAN I
SWALE XIST. CITY Q NAPLES
(SEE SITE PLAN fOR 20'
WADING) RAW WATER MAIN
STABILIZE WITH
PLANTINGS MERE
RETENTIDN AREA CDNTRDLLE 31
AT ELEV. = 5.10
RETCNTIDN AREA BOTTU Ex MC seats Paw COUnby CWb
ELEV. = 3.20 Wart MaragemeW 1t' p•
PPROX. EXIST.
- GRADE 2.50
roJr '�' ✓..;: PT -NANO
AyRM1 1.7R -HAW
845E ELEV.. 0.1) a -NM N. BERN =633
t0" FT -NAVD
XIST, CITY DE A ES
20' RAW WATER IN
D Vinland Way Buffer Section
R
Private Righl- Oi -WaY
`PL
A WITH
/ PLAN71K NT[NGS WHERE
&i.t. aeee.
SCXPX- I
—C-------C—
R CH .He
RGT — egmred G-Anal Traea
RBT Regwred BUWr Trees
T.whoolbDeled _ —Trees not requiretl
__TraealPaYns that court 1.1
_THI. —kna tbaC -2:1
_ Tra —.lms that mount 3:1
Buffer Notes
Trees Nat count 1:1 to sa0s11 buaer bias vice requ lla-
-ROyal Palm
- Pigeon Plum
-Live Oak
-Bab CYPra-
-SM4h Floe
Trees Nat court 21
-East Palatal 11.11
- Cie. -
Holy
- GMucpua Call.
Palma Nat coun13:1
. Cabbage Palm
- FOxhll PART
........... .
'rT OCO
As331 CHR3 Chry...Ianu. . -..._ -,
' m Red Tip CpIUm 3ge lbn 24' Y MeirWb36' -4B'
Shr,D Llsrad Bebwams hdcbkredhrenhanmtl ntln a
- moo Clusia ourrilan —IN Leaf Clwi.� 10 GebA 41 N Malntaln 46" -72'
- CON3 Conmarpw eyed. Green B—Cood 3gebn 20' Y Ma Intain 36"ep'
- nM3 Ficus mkrecarpa Green Island Fkw 3 gabn, 16' N Remove dead Mayes
- HAMD3 Hameln To— DwaT F—H 3gelbn l6' N Maintain 48' -7T
-
JAM — n— ...plcibllum Was Jasmine 3gebn 24` N Maintain24'30'
- MCto Myrka cerpera Wax MyrW 10, 6'ni Y Malnlain freeform, remove tlead branches RnlI.
- MUH1 Muhhnbergi C.,all,lenais Muhl, Gress lgabn 16- Y Cut becko Aayear as...a.,
- PZio Pinw eIh- -. eCuM Fbrba SMsh Pure 10' -12'Ce z 4'spd, 2 "Cal Y Maintain tree form, remove dead brandies or*.
- SPAM Spa Ana Oaken S"`T` 3Ill. 24" Y CM Dark annual, ur e- necessary
- TROXF3 Trgsacum Eeclylddesx —A. H.0a- HOWINN, Gress 3g.lbn Z4' Y MainWn36 "M
a,i Groundcovers
al stir v.............. ....
- NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves
TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B"
Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.-
TBD IRRIG lrriew. Irropi Pine Mad ta head —AND.
Mulch
C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana-
5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary
Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al
Exhibit H
Page 2 of 3
A91UVR-07ure�l
Land Dc8i6n
INCORPORATED
2780 S. Horx — Dc supe 5
Naples, 1=1.341D4
(Zt a9 ) 434`1661
Itlirc.Wt
ChrM nArWrea
L'-- No. 1178
S-'
al
_Y/r_-7-V'-�I
1V
Q�
M-
0
U
kJ
cl—
As Cl,. D DuMr CA 10.23.13
aA UpWh PPL plan PM 10.22.13
As En oh.ad PMMirq Areas PM 10.17.13
AZ Buller Revision PM 10.16.13
At Buller and IMgaNpn PM OIZL13
de,:1 Date' PM 01.03. 13
Scats: V-50'-0'
rrknl
16Fr
FW Name: a1eo-00N,avq
P.
m ae n <wm
P49'nt List
Trees
Zoning. C
ResitlerNal /
/
Cty Sy. B
Botanical Name C—rau, Name S
Specibabn Natal MabMWOee
Butter Trees Can bsuDMBUMO by I
re quire -111. tp saOSry many mature tree requirement)
'LD10 c
b drvempolM P
IR F
10' x 4' z 1.75' cal. Y M
Marten troe bon, remove Wad benches only.
"GS12 L
cetun. b
GlaucouaLacsla 1
12'w6'apW.xTCal N M
Maintaintreebrm ,removeWatlDranchesonl,.
AID N
N. Dan A. E
East Palatka Holy t
tex 4'z 1.T5 -cal XHXrW talk Y M
Maintain tae Mm, remove Wa0 Darchea ony.
/
"IC10 I
IMx cassine D
Daheon HOpy 1
1p'x 4' z T Cal single trk Y I
Its Dee roan, remove Watl barcbsony.
/ '
'PE10 P
Pines .Hogg tlerea 5
5 Fbriaa Sksn Pine 1
10'- 12'01x4' spa, 2' Cal Y M
Maintain It —firm remove aeaa Drancba ony.
f -
-OV10 c
cmuevir,u, ... L
Lye Oak 1
10' -12' w x 4'aptl, 1.]5' cal Y M
MalMalnt— form,rempve tlead Dmncbsony.
a ,,I •
•TD14 I
I ... Hum du... B
Bap cruel. 1
14' -18' pa x 6'.pd, 3S" cal Y M
Maintain III roan, remove dead brarches only.
•••94`11 3
3a Dal paknetro C
C.b.ge Pakn I
ITIA1Tct -Wad Y R
Remove dead fronds, and seed Poch.
SL; euilalrg P
Perimeter Planting '
'-WOU12A W
Word,— bilurcall F
Fmlal Palm 1
12- 14' oa, Staggered bI,MS N R
Remove Dead bon., geed pods
RGT — egmred G-Anal Traea
RBT Regwred BUWr Trees
T.whoolbDeled _ —Trees not requiretl
__TraealPaYns that court 1.1
_THI. —kna tbaC -2:1
_ Tra —.lms that mount 3:1
Buffer Notes
Trees Nat count 1:1 to sa0s11 buaer bias vice requ lla-
-ROyal Palm
- Pigeon Plum
-Live Oak
-Bab CYPra-
-SM4h Floe
Trees Nat court 21
-East Palatal 11.11
- Cie. -
Holy
- GMucpua Call.
Palma Nat coun13:1
. Cabbage Palm
- FOxhll PART
........... .
'rT OCO
As331 CHR3 Chry...Ianu. . -..._ -,
' m Red Tip CpIUm 3ge lbn 24' Y MeirWb36' -4B'
Shr,D Llsrad Bebwams hdcbkredhrenhanmtl ntln a
- moo Clusia ourrilan —IN Leaf Clwi.� 10 GebA 41 N Malntaln 46" -72'
- CON3 Conmarpw eyed. Green B—Cood 3gebn 20' Y Ma Intain 36"ep'
- nM3 Ficus mkrecarpa Green Island Fkw 3 gabn, 16' N Remove dead Mayes
- HAMD3 Hameln To— DwaT F—H 3gelbn l6' N Maintain 48' -7T
-
JAM — n— ...plcibllum Was Jasmine 3gebn 24` N Maintain24'30'
- MCto Myrka cerpera Wax MyrW 10, 6'ni Y Malnlain freeform, remove tlead branches RnlI.
- MUH1 Muhhnbergi C.,all,lenais Muhl, Gress lgabn 16- Y Cut becko Aayear as...a.,
- PZio Pinw eIh- -. eCuM Fbrba SMsh Pure 10' -12'Ce z 4'spd, 2 "Cal Y Maintain tree form, remove dead brandies or*.
- SPAM Spa Ana Oaken S"`T` 3Ill. 24" Y CM Dark annual, ur e- necessary
- TROXF3 Trgsacum Eeclylddesx —A. H.0a- HOWINN, Gress 3g.lbn Z4' Y MainWn36 "M
a,i Groundcovers
al stir v.............. ....
- NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves
TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B"
Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.-
TBD IRRIG lrriew. Irropi Pine Mad ta head —AND.
Mulch
C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana-
5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary
Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al
Exhibit H
Page 2 of 3
A91UVR-07ure�l
Land Dc8i6n
INCORPORATED
2780 S. Horx — Dc supe 5
Naples, 1=1.341D4
(Zt a9 ) 434`1661
Itlirc.Wt
ChrM nArWrea
L'-- No. 1178
S-'
al
_Y/r_-7-V'-�I
1V
Q�
M-
0
U
kJ
cl—
As Cl,. D DuMr CA 10.23.13
aA UpWh PPL plan PM 10.22.13
As En oh.ad PMMirq Areas PM 10.17.13
AZ Buller Revision PM 10.16.13
At Buller and IMgaNpn PM OIZL13
de,:1 Date' PM 01.03. 13
Scats: V-50'-0'
rrknl
16Fr
FW Name: a1eo-00N,avq
P.
m ae n <wm
al stir v.............. ....
- NEB( Nephrobpre DMaerota Sword F.�f "Mach(' lgapw 12' N Remo +e Wad Moves
TRAM TncAeblpermumasielicum mlNme 0lverf A.Mn Xi —Ile 4' C.-Mal N MakWin B"
Cy Sy. 8otankil?,— Common Na— SPeelkatbn NaWe Malnlana.-
TBD IRRIG lrriew. Irropi Pine Mad ta head —AND.
Mulch
C1y Sym Satan k I Name Commw Name S"iti ation Native Mariana-
5,1500 MULL Mukh EuwypDn "Gna - 3'Nbl1 Mukh on an ----I beep, nPansh area... necessary
Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before cnlnnencing construction. 18.12 wX 4• and. t75• al
Exhibit H
Page 2 of 3
A91UVR-07ure�l
Land Dc8i6n
INCORPORATED
2780 S. Horx — Dc supe 5
Naples, 1=1.341D4
(Zt a9 ) 434`1661
Itlirc.Wt
ChrM nArWrea
L'-- No. 1178
S-'
al
_Y/r_-7-V'-�I
1V
Q�
M-
0
U
kJ
cl—
As Cl,. D DuMr CA 10.23.13
aA UpWh PPL plan PM 10.22.13
As En oh.ad PMMirq Areas PM 10.17.13
AZ Buller Revision PM 10.16.13
At Buller and IMgaNpn PM OIZL13
de,:1 Date' PM 01.03. 13
Scats: V-50'-0'
rrknl
16Fr
FW Name: a1eo-00N,avq
P.
m ae n <wm
rrknl
16Fr
FW Name: a1eo-00N,avq
P.
m ae n <wm
w
U
a ^I
P
sg 5t
9ia
FpF
Y
a�
9w
Y�
�l
�i
E�
a
€�yF
O
E
n
d
2
"s
8
5
I
I IIII I
—VIII L
I II I I I A
f
I � I
I I L `Iel I�
114 E
III I
I I
I IIII
I III ,
II
II
La
I
L _
I
�— — — — — —� Proposed Wel LxaDOn
�� �_ loon gpn weu aapaairy
32ones for Common pros / Cormprwl Man Lihe --------
T......_. - --
il
V��—d palm b e)
•1,
s
-- ----- - - - - --
r he. s.e.dL
_ __' I -Valley Grater,
slam, \ \/ / 'Solari
r j'
/ 111 _ - -- � '•
— 3ZOnes ter Gammon Ara �j, /' ♦ \
Sleeves / / .'' ••
Shaeves -.Pt .1 Mein LM \'•
\
,, jam. % - - \,, <::- ';;•;. � ``� \.
' "�, .. \ •5 Sew \''.
32eneafon Common Arley
F1
All required a.. a palms
to he Imgeten w a Dubber
(2 8u1obli per tree)
AI requged trees a palms
b R Migaa and w a builder
(z Bower, per bee) l J
_ Orlp on el alts Dam _� 'ice
tlrchitectural
Land Design
INCORPORATED
—__—
� ------------ /
2750S. u 5
BO e
Chrbtlan Andrea
\' 3ZOrw ter COmngnAm '•••\ ti'
`a.
�' / \'• \L. - Drip on all .MUD Dade Legend
1.1s Clock ZW'ro (99)StetenO -To Be adb DUWMg
Oe" O Raa .arson Man-Clkk pan sensor -TO Se MOinEedon PVC Plea 4'b6 License NO 1176
\ \ \ - t`Fa ® 1"VaM Hunter- '�" —�'�°^
ML — ML —11101a. We PVC Cass 2D0
' \. ----- - - - - - — u man
(1P PVC CI ass 200
(1)6 Sieve (scneduM 00)
' (1)4 sleeve (scnea4e eo)
\ •, � - i (1) 2 Sleeve (Schedub 40)
/ 2 Spare Wine ero b be lrWhd.
- — Notes ANWre shall be 14 gage.
�i / / ,. CN ;xlon anal poVtleq to to d krg[n t I cack,Bn—rof Pipe Size Chart
Contrxto - top b nN p' b t D n It analheme wn[reclors respora bit
3. Al ales -rg teal be tea po Ntty f ate g W Mr ctor Me following pipe scneduk his
followed
4 AN c -aloyd k ng n re pr jest h 1 he tl nd fug, -ne— as requ ied.
5 c.leaclo w p 0 f 1 d Pl illy f to - B ig Don syebm 12" Pape 0s gpm
6. Contract0rbrespone de to ensure Gat 100 %Irrga0on coverage exda. 3/4 " Pipe 610 gpm
T. Contracor anal adtun head and spray as necessary to minimize overspray and 1 "Pipe 11.16 gpm
nng proper Detl coverall. 1- 114" Pipe 17.25 glen
6. AN PVC Pipe to he sized sa that -he, velocity does not excead a speed of 5 feet 1 -12" Pipe 26-40 gpn
per s.0 nd. 2" Pipe 41-60 gpn
9. 2 Spare Wires one to be mistral. All Will shall be 14 gauge.
/ 10. AN PVC inn ation pipe shall as Class 200, minimum; no Man coal Wbingto be usetl. C
11, Pass I'll greatershall beRl ng-TRagaskatedPipe. Specifications
12. Contractor b W provide an A,BUiq drawing of completed project Specifications
11VEal
13. Contrxtorto dbalna R/W parrots ton all lrrigatlon wmin the RNV.
td. Contractor m use nsere In al innate hells. The Contractor shell he responsible for p—alico a complete and oplable system
\ Irrigation Details 15. Contrxtortouse l2"Popups In aA shrub beds adjacent to walkways. for the inrggion M a1 lindwape planting on aft. Pans and apxlloatbns may no J
16. 30' Rbere ere W he used around -Minp wherever shrubs ere panted indicate a1 dams necessary for me proper inngatan or Me prgeR. This steel no[ reNeve (/ \
17. Rotor risers shall he staked col Asher or equaly among s,pp,nW, rod, the c,ntr,d, of his caponsibllny to f—an abor, moral, and equipment mquiretl for .11../
Irnkptbn heads mall he paced er mat my provira 1B. bprey heats b he Huller. or sq-1ant BLIetRUte. (OAnerto eppove suDStnutbna) a compile end proper system n
.ad -te -Mad co —raga. 100 %overap 19. Contractor a verRy aEegwW pressure exMS On the Omer, line. -r /� ( ✓'(
2D. Contractor to locate at —IN rhj an s4e prior b construction. The Contractor sbaN he responsible for adpahing head be l—, type and sloe and any �Jl...11
21. Uee Low angle... whenever near vehicles. Omer system c°mponrna W comply wDh the requirem ,te of of andecape panting as
22. Valves are sotto he located in carne a areas. installed. Such adjme —n. snail be —. at no cost te Me Owner except wren
23. Plan snows ectai locana— only. aumorbed in wining. Such adjustments coal he mmpensaled at the antl prices ..sated
24. Contractor te verRy pn0pel, lines and setbacks before c,nbuctbn. In the proppsal.
25. Contractor must nave propel, Ins. staked and bcaRN, and must verRy Ilan
dimensions and bent cordirona ero c,nsaaK Conbacbrs anal pensonall axsmine the site and fully acquaint thermals. cots ell
26. Ing—, mean W paid for by owner. of the existing c,nded in order that no misunderstanding may afanwerds enw to the
27, bacle, oravanter to pe —stalled by plumper. ch.acter or as W Me extent of me work to he done: el, likewise, in order W advise and
Irrigation Water is Poti 26. Drigation conin"to, shall verity that aysam ml work as deaignd ant acceNing to acquaint thenselvas moth a1 preacautiore to he taken in order to avord injury W person
A — 11— Pnn.m, coil he necessary 6FWMD requirements. or property.
A Rain sensor slat he instagetl on Ma art lions stem. 2B. Contracon s1a1 P.-st andecape archiact should Mere he conflba with aysam's
ga y desgn. PLANTING MATERIAL'. The col —cloy shall make every possible effort to .,Did
existing paid matenal that hes been tagged for preservation. Where such nsterial falls
Main Line / Valve Wire Detail Typical Valve Detail n Ream becohag Me Cn iplr steal —reroute Me pip- or — arrab`n Be
Y, W protect the designated pant ta. Any damage u he by Ma
wntmdor no Wady l acceptance plant rralerial or sod .Wall be restoretl W he orpinal
I1OEa q�0ua condbon pro, to final ecceptarwa by owner.
VALVEBW
AS -BUILT DRAWINGS: Afhar compktbn of piping iheads Ia, the and pipe W
an Back al furnisn Aa -BaiN dmwnga on a saDla rman, ahsving al haada, valves. and pipe aria, W
iw LEaO10 O Inentictse, shack, and Pants fist covering equipment wil be provided W the
f O. Lateral Pipes WFATHER'tMTlc I1o000W SERIES Orman.
REMDTE CONTROL VA
O LEVER HSTALtL THREADED rMLE --a SUBSTITUTIONS: Any substit bon made must be app-adl by Owner.
Control Wares WHUU GLEE WTM TEFLON TAPE I"P.
AN pipe and control lines shall be sleeved With Schedule Be PVC and priced! a
Lot Typical (52' Wide Lots) Lot Typical (67' Wide Lots) rh-r. ' mgim in 24' Dabwgrade and heaMilled cots °lea ^land. "a rackatohein bad
Scab: 1 -= 40' Scab: 1" = 40' colts PVC pipe
DES AND STANDARDS' The t Ron shall he yes onsibk her wnstrudirg me
Zone :1
Zoaa:2
Zone :3
Zora:2
Zona:1
E -PLOW-
❑ nr
system in mmgba xwrtlance cwMa all applbable modes ontlinancea and hews or
any modNbatrons made W conform with said codes, ays and ordinances shall be
CoMrectoro are to provide Me Wlbwag Nems n time o1 bad.
ea wmpktetl at the wnt actbrs e,,— at rw additional cost to the Clknt.
QuentRias of heads, Ii Bf a— line, clock, no of va Nea.
ONAVe, EL'ONi
Also, cantracotre ere to provide unR paces ton mere Nems.
The Irrigation CoMracla is entirely resportibk M the work antl foal acceptance by
AN sbevin shall he the respowibillly, or the irtgatbn
the Owner,
es Chrge D bufar
CA 10,23.13
conerclo,
AN circrn pipe shall be cuss 160 PVC or a higher grade. AN min (dings shall be
ad Updaa PPL Pan PM 10.22.13
v Enhe read Panning Areas PM 10.17. 13
enforced with 2000— poured co—are than docks as shown on tlrawn s
9
ax B=r Reva on
PM 10,16.13
red Stone
all in SMeyard
ConbaRar "19 able for a perad of one (1) year the quality of his mateyate and
At BOlhar arts Irrlpgbn
Dr=Deb
PM 04.2213
PM 01.03.13
workmanship. This psi oil w11 sad with the final Accepter by the Owner.
h Indi,dual lot to tea
scale:
1" = 50' -0'
astl antl canhoKd
ter I" Don
k and metes
phial Main Line
Contractor shall verify that he has the most up to date plans, and that they have been approved and accepted by the Omer before commencing construction.
Exhibit H
Page 3 of 3
Contmcmr W vent/ pmpem Nrea and setbacks behove connrrctwn.
Contractor mug nave property hihes stayxd and located, and mug verily Ilan
dimension and 6aM caMiDOns are consdent
Any Incomisancies col these plats need te he reported W ALD and the Dwner.
Contractor shat v,ey tbe, he Iles the most up to date pans, and that they have
been approved and accepted by the Owner before commencing construction.
t
N.
FLORIDA DEPARTMENT Q STATE
RICK SCOTT
Governor
December 16, 2013
Honorable Dwight E. Brock
Clerk of the Circuit Court
Collier County
Post Office Box 413044
Naples, Florida 34101 -3044
Attention: Martha Vergara, Deputy Clerk
Dear Mr. Brock:
]p � (� � � -TT
KEN DETZNER
Secretary of State
Pursuant to the provisions of Section 125.66, Florida Statutes, this will acknowledge receipt of your
electronic copy of Collier County Ordinance No. 13 -66, which was filed in this office on December 16,
2013. ----------
Sincerely,
Liz Cloud
Program Administrator
LC /elr
Enclosure
R. A. Gray Building • 500 South Bronough Street • Tallahassee, Florida 32399 -0250
Telephone: (850) 245 -6270 • Facsimile: (850) 488 -9879
www.dos.state.fl.us