10/21/2013 AgendaHeritage Greens Community Development District
Board of Supervisors
It01)<1I.I Parrott. Chairman Calvin Fei ��%e Dkitict'14, 6
Ccorge Coombs. Vice Chairman Greg I_JrbIR11 • ,.ri,, Co ] S
Marsha Caghlan. Assistant Secretary Jarn Carr. P is�t"01 :yginC,
lim Marshall. Assistant Secretary
I lens Michaelson. Assistant Secretary l
Vote: Next meeting is scheduled for Monday, November 18. 2013 at 6:00 p.m.
District Office:
210 N Uriversily Drive, Suite 702
Coral Springs, Florida
954 - 753 -5841
www.heritagegreenscdd.org
Meeting Location:
Heritage Greens Community Center
2215 Heritage Greens Drive
Naples, Florida
Regular Meeting Agenda
S
Monday October 21. 2013 - 6:00 p.m.
/+
I.
(toll Call
2.
Approval of Agenda
3.
Audience Comments
4.
Approval of the Minutes of the September 16, 2013 Meeting
>.
Old Business
A. School Crossing Guard Update
13. Security Discussions
C. Sidewalk Repair Project Update
D. Update on Vegetation Removal
6.
New Business
A. Stormwater Pipe Cleaning Proposals
7.
;Manager's Report
A. Follow -Up Items
B. Motion Assigning Fund Balance as of September 30, 2013
C'. Approval of Financial Statements
8.
Attorney's Report
9.
Engineer's Report
10.
Supervisors' Requests and /or Comments
11.
Audience Comments
12.
Adjournment
Vote: Next meeting is scheduled for Monday, November 18. 2013 at 6:00 p.m.
District Office:
210 N Uriversily Drive, Suite 702
Coral Springs, Florida
954 - 753 -5841
www.heritagegreenscdd.org
Meeting Location:
Heritage Greens Community Center
2215 Heritage Greens Drive
Naples, Florida
Tincher Concrete Construction, Inc.
CHANGE ORDER 1.
16900 Gator Road Fort Myers, FL 33912
(239) 267 -7766 FAX (239) 267 -3532
Proposal #
1071939
Submitted To
Phone
954 - 753 -5841
Fax
954- 796 -0623 Date 9/11/2013
'., Company
Severn Trent Services
Project
Heritage Greens Sidewalk Repair
Address
210 North University Drive,
Location
Naples
City
Coral Springs
Engineer
°Date
State
FL Zip 33071
Project #
R Date
CODE !DESCRIPTION *0r. RATE Q1Y UOM >FOFAL
ITEM #1 $25.00 327 LF $8,175.00
Root Barrier Optional
Includes 19.5" deep root barrier
Application to help prevent sidewalk lifting from roots
Total: $8,175,00
This is a proposal only. Contractual and scheduling details to be agreed upon efore start of work. In order to guarantee
pricing, Tincher Concrete Construction, Inc, must be noted of proposal acceptance within 30 days of date of proposal.
Access to work area to be provided (chute pour from readymix truck). Does not include sealers, (concrete or joint),
joints other than sawcut or 1/2" bitiminous fiber or surface treatments. Concrete work only, layout by others, to be cut
and compacted to proper grade. Price based on one crew per day during normal daylight hours, Monday through Friday.
AN quantities are approximate, final payment based on field measure.
Does not include excavation, engineering, testing, or lruf c control
Tincher Concrete Construction, Inc. will choose its own concrete supplier.
Note: All concrete is 3000 PSI with no re inlorcement unless otherwise noted.
We hereby propose to fumish labor and materials - complete in accordance with the above specifications,
for: dollars $ $8,175.00
By: Terry
Signature Title Date
P—ted i On 520139:0627 AM
Page t
SIDEWALK
LENGTH X 4'
BARRIER
STREET
ADDRESS
WIDE
RECOMMENDED
FEET
HERITAGE GREENS DR
ENTRANCE*
8
2396
8
*
8
2392
8
*
8
2388
4
2376
8
*
8
SCHOOL XING (2)
6
2372
4
2368
8
*
8
2360/2358
8
*
8
2252
4
2236
4
2224
4
2220 FRONT
8
*
8
2220 SIDE (2)
16
*
16
SUBTOTAL
96
64
CRESTVIEW WAY
MORNING SUN LN TO GC
10
XOVER (2)
2041
4
202112015
13
*
13
1997 -126
16
*
16
1997 -127
20
*
20
1981 -138
10
*
10
1981 -140
10
*
10
1957 -157
10
1953 -163
4
1953 -162
4
*
8
1945 -167
26
*
16
1945 -165
6
1937 -170
8
*
8
1917
14
*
14
1913
13
*
13
1909
9
*
9
1905
4
1901
9
*
9
1897
10
*
10
1893 (2)
8
*
8
1889
6
1885
6
*
6
SUBTOTAL
220
170
MORNING SUN LN
1601*
5
1649*
5
1657*
5
1665/1661
5
1697
5
1717
5
1737/1733
5
1871
5
1959
5
1987 AT GC ROVER
12
*
12
1991/1995
20
10
2019
5
*
10
2055/2051
5
2117
5
2127
10
*
10
2135
5
2139
15
*
1S
2155
5
2185/2179
12
*
12
2189
12
*
12
SUBTOTAL
153
Bi
AVAIAN CT ENTRY*
1841
12
12
SUBTOTAL
12
12
9� �fFf
r 4�,
Xz
a aa'
8�+'n
After (pictures taken while job was
being done)
'• a4 .,r ra ;,,,.s+"Y� ✓�,.fr � :� 'sl" p-w =.s„' �"y, ,�- ,,,, wF ~'�&�✓.,,� y�#��•.
� j •. e �'" .- - � .•ti ''...i 'yr v' -- Y`,- '�,,,' -^a — "�. -v". " .v. ..,,,•• w•-,• 'c": f — +i�
ti
F � 3
a
�` 1 a� ` .rJ r.'a '```� ►°4rta`✓ `w � i:�skr t �' ��� �•. Fx
� r
Ft
IsV" p
�WV
- 'M M—
Vi
- �px
60
144:
tr
or
Pictures taken on 10/16/13 of the area
south of the pathway.
� :+';
f " 04
tto
pU
ti
b �"
him�
4
• �w.,_ � ".t sue?' F � ��5 � ^. ' ^w..�.. �
is z,
4 b
r
'�L
r.':
�#
�i
4
• �w.,_ � ".t sue?' F � ��5 � ^. ' ^w..�.. �
i tyF
ble
r T LL
A c V€
wt
_� ..; � - ,F`7 —r'sF t ���.., 34',x,.' �, � 9 �n aya ��y Q �-wk) •:`
r �
w • iT
R
P
j.
14 'fY+
r
C
� :�•.� t A'.x fi.�eF".� phi d' �� x•'
An V
s '
i tyF
ble
r T LL
A c V€
wt
_� ..; � - ,F`7 —r'sF t ���.., 34',x,.' �, � 9 �n aya ��y Q �-wk) •:`
r �
w • iT
R
P
j.
14 'fY+
a, ter, ^e'" ,f,�- '"" ` "T� ...P.,.�'""`, ` _3,,,;T -•• �-^""' �,.-- �, .�' .. ;)
>.e Pte✓' �� ;� ��v��' �,� t,,.r.�„ ��,
3° s�" � �"-�' •�' r °,,*' .,�.ms. fir,.. «'"a" �,° r'°^ �„*^^""
r
x
1
ell—
V4 t
�� Ye
M 'q'N'
S..
Aw
r
p�
f
f i
i
rfa'
r
zP
^
`J
3N
of
k`
Sj S
F �
R
iYZ,
w Co
d
�� Ye
M 'q'N'
w i
i
rfa'
r
s
^
`J
k`
Sj S
Vz
iYZ,
w Co
d
2 Li 2
R - d
2 k
to Q
0 co
3 322
k
0
E
$ �
E
E
8
u
k
k
g
2
$
e
r
#
0
w
7
�
\ �
m
m 2
q
■
¥
Cl
w
§
CL
_
k L §
■ E /
§ � k
� k k
m = c
u \ \
E
k
%
88
E
5 ■
e
o
w
%
$
m
m 2
q
¥
Cl
w
, o
Q =
AA-
�
W
L
-�r (A
§
f
} 2
$
7
$
2
a c
%
q P4
Q
E
6
6
@
2
=
.-1
�
Z
�
&
m
=
§
§
7
§
■
E
§
°
�
$
R�
v
r,
rl
Ln
7
§
CL
_
k L §
■ E /
§ � k
� k k
m = c
u \ \
Pepin, Christopher
From: Pepin, Christopher
Sent: Friday, September 20, 2013 1:44 PM
To: 'Scott Copeland (copelandsei @aol.com)'
Subject: Heritage Greens - Storm Water Structure - Cleaning Request
Attachments: MAIN PLANS.PDF; HG - APPENDIX D - SYSTEM ASSESSMENT SPREADSHEET.PDF; HG
- Locations of Deficient Storm Water Structures.pdf
Hi Scott,
I have the below described project coming up and wanted to know if this is something you would like to bid on?
If so, just let me know if you have any questions.
The Heritage Greens CDD is asking that we obtain proposals to clean out multiple storm water structures
throughout their community. Can you please provide us 4 separate proposals to complete the following tasks:
1. Clean out 4 inter - connect inlets that are classified as high priorities. Locations are identified as purple on
the attached plans.
2. Clean out 8 inter - connect inlets that are classified as medium priorities. Locations are identified as
yellow on the attached plans.
3. Clean off l 1 manhole covers and inspect the insides of each basin. Clean out the structure if needed.
Locations are identified as green on the attached plans.
4. Try and locate the 8 manhole covers that were not found during the Storm Water Management
inspection. If located in grass clean off the manhole cover and inspect the insides of each basin. Clean
out the structure if needed. Locations are identified as orange on the attached plans. If the manhole
covers are under asphalt only mark the location.
Heritage Greens is located at: 2215 Heritage Greens Drive. Naples, FL 34119
Please have your proposals back to us by October 14`h
Thank you,
Christopher Pepin
Severn Trent Services
Management Services - Ft. Myers
T: +1 239 245 7118 ext. 302
M: +l 239 220 1620
F: +1 239 245 7120
E: c e inL&severntrentms.com
Item #
Item Description
Pipe
Dia.
Current Condition
Recommendation of Corrective Action
In
HW -16
Headwall
30
36
30
24
24
24
1 14 ".Sediment Flush Sediment:from Structure & Upstream Pi e
8 "Sediment Flush Setlf fr rn & Pi " "
HW -20
HW -23
Headwall
Headwall
Headwall
Headwall
Headwall
HW -33
HW -3e
HW -38
CB -43
I Catch Basin
Headwall
24
36
1 15' Sedime Fluah'Setlirrterd'Obm'Structure &U60re8m Pi'
HW -55
HW -68
Headwall
24
8" Sod. Bank Erosion Lt Ve . Flush Sad, from Structure & Pipe, Add Fill and Co act in'Ero ed Areas
HW -73
Headwall
24
8 "cSed. cracked Concrete I Flush Sed. from Structure & Upstream Pipe. Monitor n
MH -79A
HW -81
Manhole
Headwall
18
30
1 t=luO SWirim int rom, ure.• &.' " tf68miPi
MH -83A
Manhole
Manhole
24
24
24
18
18
Headwell `T Sediment Flush' Sediment` from Stnihture & U, tream P a
MH -88A
MH -90A
Manhole
Catch Basin
CB -109
MES -113
Mitered End
MES -117
Mitered End
18
Headwall 6" Sediment flush Sediment from S cture tr m PI e
CB -118
CB -122
Catch Basin
Catch Basin
Catch Basin
Catch Basin
18
is
18
18
18
24
24
30
30
36
18
24
24
CB -126
CB -132
P2
Headwall
Manhole
MH-3
MH-14A
Manhole
MH -26
Manhole
Manhole
Manhole
Manhole
Manhole
MH -29A
MH -29B
MH -59
MH -73A
MH -86A
Manhole
20% to 49 % blockia e
Will
I
log I i M f 0
'!.": :.;;", ? I i I 190"t I ,
.........
;;iiiiii3nu;M, till
W. M IN; MH "IMM I HUM, if It; a MINICIMM...
Copeland Southern Enterprises,lnc.
PROFESSIONAL SERVICES AGREEMENT BETWEEN
COPELAND SOUTHERN ENTERPRISES, INC. AND
Heritaee Green Community Development District
OWNER INFORMATION:
OWNER'S ADDRESS: 2215 Heritage Greens Drive, Naples, FI 34119
BILL TO THE ATTENTION OF: Christopher Pepin, Management
Services
PROJECT NAME: High priority Culvert Cleaning of HW -16, 23, 33, 36
DATE: 09/25/2013
OWNER INFORMATION:
TELEPHONE NO.: (239) 245.7118 / 302
Fax No: (239) 245 -7120
E -MAIL: cpgin@,sevemtrentms.com
PROJECT MANAGER: Scott Copeland
FEE AND TYPE:
Time & Materials based upon the Rate Schedule
in effect at the time service is rendered.
Estimated Fees: $
Not -To- Exceed Fixed Fee based upon the Rate
WORK DESCRIPTION: Clean out four lake culverts that are 50% - 75% 1 Schedule in effect at the time service is rendered:
plugged with sediment which is impeding water flow from street drainage $
REMARKS: 1) 1100 feet of Lake Culverts will be flushed out from upstream Lump Sum Fixed Fee: $ 7700.00
structure plus headwall end are to be cleared of sand after flush has been
completed to insure many years of proper flow conditions. 2) Work can be done Total Fees: S 7700.00
now, during high water, but it is our recommendation to wait for the dry season
when the water levels are lower, which will allow us greater access to the lakes
with our equipment so we can remove more material which is causing the
obstruction in front of the headwalls.
Dear Christopher Pepin
Pursuant to your request, Copeland Southern Enterprises, Inc. is pleased to submit the following proposal for over 1100 feet of Lake
Culverts that will be flushed and cleaned in Lakes 12 through 14 for the above - referenced project:
SCOPE OF SERVICES (Limited to the following):
1. A 3 man crew will clean out 4 culverts totaling over 1100 feet of 24" and 30" RCP from junction boxes to headwalls in
Lakes with high pressure water pumps which will use existing lake water.
2. MOT will be set up around street and work areas to insure safety for local residents, visitors and workers.
3. Inlet grates will be locked back in place after work is completed on each culvert.
4. Work should take 3 days to complete all 1100 feet of the culvert cleaning project on phase 1.
Note: Any additional work and services requested, and is not found in this Proposal can be done, but will require
additional cost to be paid in full with proposal fee upon the completion of 388 ft of culvert cleaning.
We at Copeland Southern Enterprises hope this meets your approval and satisfies your requirements. If so please sign the attached
contract and return a copy to our office by Fax or Email. Should you have any questions or need any additional information, Please do
not hesitate to call Scott Copeland at 239 - 995 -3684 or Mobile # 239 - 707- 6806.Fax 239 - 995 -0058
OWNER AUTHORIZATION: I warrant and represent that I am authorized to enter into this contract for professional services
and I hereby authorize the performance of the above services and agree to pay the charges upon the completion of the Job resulting
there from as identified in the "FEE TYPE" section above. 1 have read, understand and agree to these Standard Business Terms.
Authorized Signature:
Typed Name & Title:
Date:
Copeland Southern Enterprises, Inc.
PROFESSIONAL SERVICES AGREEMENT BETWEEN
COPELAND SOUTHERN ENTERPRISES, INC. AND
Heritaee Green Community Development District
OWNER'S ADDRESS: 2215 Heritage Greens Drive, Naples, FI 34119
BILL TO THE ATTENTION OF: Christopher Pepin, Management
Services
PROJECT NAME: Culvert Cleaning Phase 2 for HW -20, 38, 55, 68, 73, 81
and MES -113,117
WORK DESCRIPTION: Clean out 8 lake culverts that are 50% plugged
with sediment which is impeding water flow from street drainage systems.
REMARKS: 1) 1270 feet of Lake Culverts will be flushed out, from upstream
structure plus headwalls and MES will be cleared of sand after flush has been
completed to insure many years of proper flow conditions. 2) Work needs to be
done during dry season when the water levels are lower, which will allow us
greater access to the lakes with our equipment so we can remove more material
which is causing the obstruction in front of the headwalls which will be needed
in order to rebuild eroded slope on Lake 15.
DATE: 09/25/2013
OWNER INFORMATION:
TELEPHONE NO.: (239) 245 -7118 / 302
Fax No: (239) 245 -7120
E -MAIL: eneoinAseverntrentms.com
PROJECT MANAGER: Scott Copeland
FEE AND TYPE:
Time & Materials based upon the Rate Schedule
in effect at the time service is rendered.
Estimated Fees: S
Not -To- Exceed Fixed Fee based upon the Rate
Schedule in effect at the time service is rendered:
S
Lump Sum Fixed Fee: $ 10,570.00
Total Fees: S 10.57D.00
Dear Christopher Pepin
Pursuant to your request, Copeland Southern Enterprises, Inc. is pleased to submit the following proposal for over 1270 feet of Lake
Culverts that will be flushed and cleaned in Lakes 2, 10 -12, 15, 16 for the above - referenced project:
SCOPE OF SERVICES (Limited to the following):
1. A 3 man crew will clean out 8 culverts totaling over 1270 feet of 18" to 36" RCP from junction boxes to headwalls in
Lakes with high pressure water pumps that use existing lake water.
2. MOT will be set up around street and work areas to insure safety for local residents, visitors and workers.
3. Inlet grates and Manhole lids will be locked back in place after work is completed on each structure.
4. Crews will pull material from bottom of Lake and place on slope around HW 68 to match existing lake slope for 20
feet either side of headwall, erosion Matt then will be installed to hold material in place and stop erosion, plus
pickerelweeds and soft rush will be planted within the 40 foot repaired area on the south end of Lake 15.
5. Work should take 5 days to complete all 1270 feet of the culvert cleaning and planting project on phase 2.
Note: Any additional work and services requested, and is not found in this Proposal can be done, but will require
additional cost to be paid in full with proposal fee upon the completion of 388 ft of culvert cleaning.
We at Copeland Southern Enterprises hope this meets your approval and satisfies your requirements. If so please sign the attached
contract and return a copy to our office by Fax or Email. Should you have any questions or need any additional information, Please do
not hesitate to call Scott Cooeland at 239 - 995 -3684 or Mobile # 239 - 707- 6806.Fax 239 - 995 -0058
OWNER AUTHORIZATION: 1 warrant and represent that 1 am authorized to enter into this contract for professional services
and I hereby authorize the performance of the above services and agree to pay the charges upon the completion of the Job resulting
there from as identified in the "FEE TYPE" section above. I have read, understand and agree to these Standard Business Terms.
Authorized Signature:
Typed Name & Title:
Date:
Copeland Southern Enterprises, Inc.
PROFESSIONAL SERVICES AGREEMENT BETWEEN
COPELAND SOUTHERN ENTERPRISES, INC. AND
Heritaee Green Community Develoament District
OWNER INFORMATION:
OWNER'S ADDRESS: 2215 Heritage Greens Drive, Naples, Fl 34119
BILL TO THE ATTENTION OF: Christopher Pepin, Management
Services
PROJECT NAME: Structure Clear and Clean Phase 3 for CB -43, 109, 118,
122, 126, 132 Plus MH -79A, 83A, 88A, 90A and P -2
WORK DESCRIPTION: Clear off and clean out I 1 lake culverts that are
50% plugged with sediment which is impeding water flow from street drainage
REMARKS: 1) 2170 feet of Lake Culverts will be flushed out from upstream
structure plus headwalls and MES will be cleared of sand after flush has been
completed to insure many years of proper flow conditions. 2) Work needs to be
done during dry season when the water levels are lower, which will allow us
greater access to the lakes with our equipment so we can remove more material
in front of the headwalls and cut back vegetation.
DATE: 09/25/2013
OWNER INFORMATION:
TELEPHONE NO.: (239) 245 -7118 / 302
Fax No: (239) 245 -7120
E -MAIL; cneninaa severntrentms com
PROJECT MANAGER: Scott Copeland
FEE AND TYPE:
Time & Materials based upon the Rate Schedule
in effect at the time service is rendered.
Estimated Fees: $
Not -To- Exceed Fixed Fee based upon the Rate
Schedule in effect at the time service is rendered:
Lump Sum Fixed Fee: $ 15,170.00
Total Fees:S 1
Dear Christopher Pepin
Pursuant to your request, Copeland Southern Enterprises, Inc. is pleased to submit the following proposal for over 2170 feet of Lake
Culverts that will be flushed and cleaned in Lakes 6, 10 -11, 15, 16 for the above - referenced project:
SCOPE OF SERVICES (Limited to the following):
I. A 3 man crew will clean off, inspect and clean out 11 culverts totaling over 2170 feet of 18" to 24" RCP from junction
boxes to headwalls in Lakes with high pressure water pumps that use existing lake water.
1 Crews will trim back vegetation and remove debris blocking structure and haul debris off -site to the County dump.
3. MOT will be set up around street and work areas to insure safety for local residents, visitors and workers.
4. Inlet grates and Manhole lids will be locked back in place after work is completed on each structure.
5. Work should take 5 days to complete all 2170 feet of the culvert cleaning and debris removal on phase 3.
Note: Any additional work and services requested, and is not found in this Proposal can be done, but will require
additional cost to be paid in full with proposal fee upon the completion of this phase.
We at Copeland Southern Enterprises hope this meets your approval and satisfies your requirements. If so please sign the attached
contract and return a copy to our office by Fax or Email. Should you have any questions or need any additional information, Please do
not hesitate to call Scott Copeland at 239 - 995 -3684 or Mobile # 239 - 707- 6806.Fax 239 - 995 -0058
OWNER AUTHORIZATION: 1 warrant and represent that I am authorized to enter into this contract for professional services
and I hereby authorize the performance of the above services and agree to pay the charges upon the completion of the Job resulting
there from as identified in the "FEE TYPE" section above. I have read, understand and agree to these Standard Business Terms.
Authorized Signature:
Typed Name & Title:
Date:
Copeland Southern Enterprises, Inc.
PROFESSIONAL SERVICES AGREEMENT BETWEEN
COPELAND SOUTHERN ENTERPRISES, INC. AND
Heritage Green Community Development District
OWNER INFORMATION:
OWNER'S ADDRESS: 2215 Heritage Greens Drive, Naples, Fl 34119
BILL TO THE ATTENTION OF: Christopher Pepin, Management I
Services
PROJECT NAME: Locate and Clean off Manhole Structures
DATE: 09/25/2013
OWNER INFORMATION:
TELEPHONE NO.: (239) 245 -7118 / 302
Fax No: (239) 245 -7120
E -MAIL: cpepinAsevemtrentms.com
PROJECT MANAGER: Scott Copeland
FEE AND TYPE:
Time & Materials based upon the Rate Schedule
in effect at the time service is rendered.
Estimated Fees: $ 7.00 per foot
Not -To -Exceed Fixed Fee based upon the Rate
WORK DESCRIPTION: Locate 8 buried manhole structures, buried under Schedule in effect at the time service is rendered:
years of vegetation growth. Clean off manhole top and remove debris from site. $
REMARKS: After manholes have been located and inspected, and are found Location and clean off Fee: $ 1320.00
in need of flushing, an additional fee of seven dollars per foot of pipe will be
charged for culverts in need of cleaning. But only after the approval is given to Total Fees: $ 00
CSEI for the additional funds needed, and a request to proceed from the owners.
Dear Christopher Pepin
Pursuant to your request, Copeland Southern Interprises, Inc. is pleased to submit the following proposal for the location and clean off
of vegetation so South Florida water management can -do their annual inspections for the above - referenced project:
SCOPE OF SERVICES (Limited to the following):
I . MOT will be set up around street and work areas to insure safety for local residents, visitors and workers.
2. A 3 man crew will locate missing manhole structures, dig out and clean off each structure's top and remove vegetation,
dirt and debris from site to County dump, for a fee of $165 per structure.
3. Manhole lids will be locked back in place after structure inspection work is completed on each manhole.
4. Dig out and cleanup work should take 2 days to complete project on phase 4, not including any additional pipes that
may need to be flushed after inspections.
5. After structure tops have been cleaned and culverts are found in need of flushing it will be an additional charge of
seven dollars per foot to clean structure culverts.
Note: Any additional work and services requested, and is not found in this Proposal can be done, but will require
additional cost to be paid in full with proposal fee upon the completion of phase.
We at Copeland Southern Enterprises hope this meets your approval and satisfies your requirements. If so please sign the attached
contract and return a copy to our office by Fax or Email. Should you have any questions or need any additional information, Please do
not hesitate to call Scott Copeland at 239 - 995 -3684 or Mobile 9 239 - 707- 6806.Fax 239 - 995 -0058
OWNER AUTHORIZATION: I warrant and represent that I am authorized to enter into this contract for professional services
and I hereby authorize the performance of the above services and agree to pay the charges upon the completion of the Job resulting
there from as identified in the "FEE TYPE" section above. I have read, understand and agree to these Standard Business Terms.
Authorized Signature:
Typed Name & Title:
Date:
r,OSH0
L andsh ore Enterprises, LLc
. vN -';,7,4
Streambanlr & Shoreline protection /stabilization /reclamation
Design Build (Engineering, Surveying, Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over s decade
Heritage Greens CDD
Attn: Mr. Chris Pepin
Severn Trent Management Services
Fort Myers, FL
ESTIMATE #2024
Date: 10!9!2013
Clean out 4 inter - connect inlets that are classified as high priorities.
Landshore Enterprises, LLC will use suction dredge to clean out 4 culverts. Each culvert will be cleaned inside at least 10'
into the culvert and all sand in front will be dredged to the deep end of the pond. Any debris around headwall or pipe end
will be removed and disposed.
General Site Preparation /Mobilization
Cleaning Operation
Hydraulic dredging
Earthwork
Sand
Culvert Inverts
HW -16
Headwall -30
HW -23
Headwall -30
HW -33
Headwalk24
HW -36
Headwall -24
Landscaping
Sodding
Cleaning
18 C.Y.
15" Sediment Flush Sediment From Structure & Upstream Pipe
16 "Sediment Flush Sediment From Structure & Upstream Pipe
15" Sediment Flush Sediment From Structure & Upstream Pipe
24 "Sediment Flush Sediment From Structure & Upstream Pipe
200 S.F.
1 E.A.
TOTAL ESTIMATED JOB COST
$2,650.001
$3,800.00
$288.001
$370.001
Landshore Enterprises, LLC 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (9S4) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com 1 of 8
�y L andshore Enterprises, LLc
Streambaak & Shoreline protection /stabilisation /reclamation
Design Build (Engineering, Surveyinx Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over it decade
O S � e R R M _OM
Landshore Enterprises' payment policy is as follows:
25% Booking Date
35% Commencement Date
40% Completion Date
"'Invoice is due upon receipt`"
The prices quoted in this proposal are based on visual observation only. The client is responsible for survey, engineering and
permitting with all government agencies having jurisdiction over the subject site. Actual prices may vary due to pre- existing
geotechnical, or hydrographic conditions which will require different equipment, labor and material. No changes to the approved
contract will be made without written approval from the client Landshore Enterprises, LLC will reimburse to the client 90% of
savings resulting from value engineering.
Unless the client provided comprehensive and conclusive engineering report or paid for the same services to Landshore
Enterprises, LLC, the stipulated above price does not include rock removal, addition of suitable material as necessary, heavy
equipment, land surveying, bathymetric survey, geotechnical exploration, engineering or permitting.
Landshore Enterprises, LLC is not responsible for damage to utilities if as -built drawings or locations are not provided by the client,
Landshore Enterprises, LLC reserves the right to change this estimate unless an agreement is reached within 90 days of the original
estimate date.
This is an estimate only. This is not a contract. This estimate is for completing the job described above, based on our evaluation. It
does not include unforeseen price increases or additional labor and materials which may be required should problems arise.
Client Representative Signature
Erosion Restoration Representative Signature
Landshore Enterprises, LLC 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com
Date
Date
2 of8
�y L c3.tr11Q�S.h' ®�"G' Enterprises t�'��iI"l S(', S9 LLc
Stneamban& & Shoreline protection /stabilization /reclamation
Design Build (Engineering, Surveying, Permitting, Construction)
d/b /s Erosion Restoration, LLC Reinforcing the American Soils for over a decade
Heritage Greens CDD
Attn: Mr. Chris Pepin
Severn Trent Management Services
Fort Myers, FL
Clean out 8 inter - connect inlets that are classified as medium priorities.
ESTIMATE #2025
Date: 10/9/2013
dshore Enterprises, LLC will use suction dredge to clean out 8 culverts. Each culvert will be cleaned inside at least 10'
the culvert and all sand in front will be dredged to the deep end of the pond. Any debris around headwall or pipe end
be removed and been disposed.
eneral Site Preparation/Mobilization
leaning Operation
Hydraulic dredging
Sand
Culvert Inverts
HW -20
Headwall -36
HW -38
Headwall -24
HW -55
Headwall -36
HW -68
Headwall -24
HW -73
Headwall -24
HW -81
Headwall -30
MES -113
Mitered End -18
MES -177
Mitered End -18
Sodding
Cleaning
36 C.Y.
14" Sediment
8" Sediment
15" Sediment
6" Sed., Bank Erosion, Lt Veg.
8" Sed., Cracked Concrete
6" Sediment
(Headwall) 6" Sediment
(Headwall) 6" Sediment
450 S F.
1 E.A.
$4,200.00
$6, 240.00
$576.
Flush Sedimet From Structure & Upstream Pipe
Flush Sedimet From Structure & Upstream Pipe
Flush Sedimet From Structure & Upstream Pipe
Flush Sed. From Structure & Pipe. Add Fill and Compact in Eroded Areas
Flush Sed. From Structure & Upstream Pipe. Monitor Cracking
Flush Sediment From Structure & Upstream Pipe
Flush Sefiment From Structure & Upstream Pipe
Flush Sediment From Structure & Upstream Pipe
$582.
TOTAL ESTIMATED JOB COST
Landshore Enterprises, LLC - 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com 3 of 8
�ypSHO/7�.
L andsh ore Enterprises, LLc
• aNi�a9 Streambsnk & Sboreline protection /stsbilization /reclamation
Design Build (Engineering, Surveying, Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over a decade
u #FA Fi- T MAR
Landshore Enterprises' payment policy is as follows:
25% Booking Date
35% Commencement Date
40% Completion Date
* *Invoice is due upon receipt **
prices quoted in this proposal are based on visual observation only. The client is responsible for survey, engineering e
itting with all government agencies having jurisdiction over the subject site. Actual prices may vary due to pre -exist
achnical, or hydrographic conditions which will require different equipment, labor and material. No changes to the appro%
act will be made without written approval from the client. Landshore Enterprises, LLC will reimburse to the client 90%
igs resulting from value engineering.
Unless the client provided comprehensive and conclusive engineering report or paid for the same services to Landshore
Enterprises, LLC, the stipulated above price does not include rock removal, addition of suitable material as necessary, heavy
equipment, land surveying, bathymetric survey, geotechnical exploration, engineering or permitting.
Landshore Enterprises, LLC is not responsible for damage to utilities if as -built drawings or locations are not provided by the client.
Landshore Enterprises, LLC reserves the right to change this estimate unless an agreement is reached within 90 days of the original
estimate date.
This is an estimate only. This is not a contract. This estimate is for completing the job described above, based on our evaluation. It
does not include unforeseen price increases or additional labor and materials which may be required should problems arise.
Client Representative Signature
Erosion Restoration Representative Signature
Landshore Enterprises, LLC 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com
Date
Date
4 of8
�pSHORE
y
L andshore Enterprises, LLc
. eNt�'aQ Stresmbank &Shoreline protection /stabilization /reclamation
Design Build (Engineering, Surveying, Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over a decade
Heritage Greens CDD
Attn: Mr. Chris Pepin
Severn Trent Management Services
Fort Myers, FL
ESTIMATE #2026
Date: 101912013
"J08A1.4113TIAN
lean off 11 manhole covers and inspect the insides of each basin. Clean out the structure if needed.
- andshore Enterprises, LLC will clean 11 manhole covers and inspect inside of each catch basin. We will remove all
iebris or any unforseen material that goes through the manhole covers.
General Site Preparation /Mobilization
Cleaning Operation
Labor with hand equipment
115 H.R.
Culvert Inverts
CB -43
Catch Basin -24
Heavy Debris
MH -79A
Manhole -18
Covered by Grass
MH -83A
Manhole -24
Covered by Grass
MH -88A
Manhole -24
Covered by Grass
MH -90A
Manhole -24
Covered by Grass
CB -109
Catch Basin -18
5' Sediment
CB -118
Catch Basin -18
Heavy Vegetation
CB -122
Catch Basin -18
Heavy Debris
CB-126
Catch Basin -18
8" Sediment, Filter Fabric
CB -132
Catch Basin -18
4" Sediment
P2
Headwall -18
4" Sediment, Light Vegetation
Landscaping
Cleaning
1 E.A.
$3,150.00
$6,325.00
Remove Debris.
Remove Grass and Perform Maintenance if Required
Remove Grass and Perform Maintenance if Required
Remove Grass and Perform Maintenance if Required
Remove Grass and Perform Maintenance if Required
Flush Sediment From Structure & Upstream Pipe
Clear & Grub Vegetation
Remove Debris
Remove Fabric, Flush Sedimentation from Structure & Upstream Pipe
Flush Sedimentation from Structure & Upstream Pipe
Flush Sed. From Structure & Upstream Pipe. Clear & Grub Vag.
$200.
TOTAL ESTIMATED JOB COST
Landshore Enterprises, LLC - 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com 5of6
Je
�y Landshore .Enterprises, .LLc
• eN� �aQ�`�h Streambank & Sboreline protection /stabiliaation/reclamstion
Design Build (engineering, Surveying, Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over a decade
Landshore Enterprises' payment policy is as follows:
25% Booking Date
35% Commencement Date
40% Completion Date
* *Invoice is due upon receipt **
The prices quoted in this proposal are based on visual observation only. The client is responsible for survey, engineering and
permitting with all government agencies having jurisdiction over the subject site. Actual prices may vary due to pre- existing
geotechnical, or hydrographic conditions which will require different equipment, labor and material. No changes to the approved
contract will be made without written approval from the client. Landshore Enterprises, LLC will reimburse to the client 90% of
(savings resulting from value engineering.
Unless the client provided comprehensive and conclusive engineering report or paid for the same services to Landshore
Enterprises, LLC, the stipulated above price does not include rock removal, addition of suitable material as necessary, heavy
equipment, land surveying, bathymetric survey, geotechnical exploration, engineering or permitting.
ILandshore Enterprises, LLC is not responsible for damage to utilities if as -built drawings or locations are not provided by the client.
Landshore Enterprises, LLC reserves the right to change this estimate unless an agreement is reached within 90 days of the original
estimate date.
This is an estimate only. This is not a contract. This estimate is for completing the job described above, based on our evaluation. It
does not include unforeseen price increases or additional labor and materials which may be required should problems arise.
Client Representative Signature
Erosion Restoration Representative Signature
Landshore Enterprises, LLC - 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info@landshore.com
Date
Date
6 of8
H 0
�y
`` Landshore Enterprises, Lac
• ENS�aQ` o Streambank & Sborelrne protection /stabilization /reclamation
Design Bur7d (Engineering; Surveying, Permitting, Construction)
d/b /a Erosion Restoration, LLC Reinforcing the American Soils for over a decade
Heritage Greens CDD
Attn: Mr. Chris Pepin
Severn Trent Management Services
Fort Myers, FL
ESTIMATE #2027
Date: 101912013
S.� 0 OxDE60 RCRT, QN' tMC r ,:. ,,>c''`�tk53�..�„�,en��" ..O . a,b.�:�^
Try and locate the 8 manhole covers that were not found during the Storm Water Management inspection, If located in
grass clean off the manhole cover and inspect the insides of each basin. Clean out the structure if needed
Landshore Enterprises, LLC will locate manhole covers and write report on what needs to be done at each one. Can't
provide a solid proposal, too little information was provided.
General Site Preparation /Mobilization
Culvert Inverts
MH -3
Manhole -24
Could Not Locate
MH -14A
Manhole -24
Could Not Locate
MH -26
Manhole -30
Could Not Locate
MH -29A
Manhole -30
Could Not Locate
MH-29B
Manhole -36
Could Not Locate
MH -59
Manhole -18
Could Not Locate
MH -73A
Manhole -24
Could Not Locate
MH -86A
Manhole -24
Could Not Locate
Landscaping
Cleaning
E.A.
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
Locate and Perform Maintenance if Required
TOTAL ESTIMATED JOB COST
$1,980.00
$200.001
Landshore Enterprises, LLC 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com 7 of8
Pia 5 t-I O RF ,
y�y L andshore Enterprises, LLc
Streambank & Shoreline protection /stabilization /reclamation
Design Build (Engineering, Surveying, Permitting, Construction)
d/b /a Brosion Restoration, LLC Reinforcing the American Soils For over decade
x � MW � ��� ��� _ xt
Landshore Enterprises' payment policy is as follows:
25% Booking Date
35% Commencement Date
40% Completion Date
* *Invoice is due upon receipt**
The prices quoted in this proposal are based on visual observation only. The client is responsible for survey, engineering and
permitting with all government agencies having jurisdiction over the subject site. Actual prices may vary due to pre -existing
geotechnical, or hydrographic conditions which will require different equipment, labor and material. No changes to the approved
contract will be made without written approval from the client. Landshore Enterprises, LLC will reimburse to the client 90% of
savings resulting from value engineering.
Unless the client provided comprehensive and conclusive engineering report or paid for the same services to Landshore
Enterprises, LLC, the stipulated above price does not include rock removal, addition of suitable material as necessary, heavy
equipment, land surveying, bathymetric survey, geotechnical exploration, engineering or permitting.
Landshore Enterprises, LLC is not responsible for damage to utilities if as -built drawings or locations are not provided by the client.
Landshore Enterprises, LLC reserves the right to change this estimate unless an agreement is reached within 90 days of the original
estimate date.
This is an estimate only. This is not a contract. This estimate is for completing the job described above, based on our evaluation. It
does not include unforeseen price increases or additional labor and materials which may be required should problems arise.
Client Representative Signature
Erosion Restoration Representative Signature
Landshore Enterprises, LLC 5601 Powerline Road, Suite 306, Fort Lauderdale, Florida 33309
Tel: (954) 327 -3300 Fax: (954) 533 -1556 • Email: info @landshore.com
Date
Date
8 of8
Severn Trent Services
4837 Swift Road, Suite 100
Sarasota, FL 34231
United States
T: +1 941 925 3088
TF: +1 800 535 6832
F: +1 941 924 7203
www.severntrentservices.com
CONTRACT
IN CONSIDERATION of the mutual covenants and promises contained herein, Severn Trent
Environmental Services, Inc. (the "Company ") agrees to perform the following services for Heritage
Greens (the "Client "):
Location of Work: Heritage Greens
Start Date: Upon Approval Anticipated Completion Date:
L DESCRIPTION OF SERVICES:
a) Clean off eleven (11) manhole covers & inspect the inside of each $4,950.00
basin; clean out the structure if needed.
b) Dive and clean out four (4) inter- connect lines that are classified as $5,390.00 +/-
high priorities. This price could increase or decrease dependent upon
findings from the dive.
c) Locate eight (8) buried manhole covers that were unable to be located $1,485.00
during the storm water management inspection. If located in the
grass — they will be uncovered, basin inspected and structure cleaned
as needed. If located under asphalt, the manhole cover will be marked
by paint.
d) Dive and clean out eight (8) inter - connect inlets that are classified as $6,625.00 +/-
medium priorities. This price could increase or decrease dependent
upon findings from the dive.
II. CONTRACT PRICE:
ThP Crunt no -reel to nav the Comnanv for the services provided under this agreement as follows:
Item Description
Unit Cost or
Hourly Rate
Total Cost
Items A, B, C & D
n/a
See Above
Unless stated otherwise above, payments are due in accordance with the standard terms and conditions of
this Contract.
One—off 10152013.doc Agreed to: (please initial)
Page 1 of 4
III. ITEMS TO BE PROVIDED BY THE CLIENT
THE STANDARD TERMS AND CONDITIONS on the pages following this Contract are agreed to be a
part of this Contract.
Offered by: Accepted by:
Severn Trent Environmental Services, Inc. Client:
By:
Title:
IN
Title:
Address for Notices:
Date: October 16, 2013 Date:
One —off constuction agrement.doc Agreed to: (please initial)
Page 2 of 4
STANDARD TERMS AND CONDITIONS
Definitions. As used herein, the following terms shall have the following
meanings:
• "Change of Law" the occurrence of any of the events listed in (i) through (iv)
below, which results or can reasonably be expected to result in a direct
increase to the Company's cost of providing the Services:
(i) there is passed or promulgated any federal, state, or other local law,
statute, ordinance, rule or regulation different from those existing on the
date of the Contract; or
(ii) there is passed or promulgated any amendment to, or change in, any
federal, state, or other local law, statute, ordinance, rule or regulation
(including any applicable sales tax regulation) following the date of the
Contract; or
(iii) there comes into existence an order or judgment of any federal, state, or
local court, administrative agency or other governmental body following
the date of the Contract containing interpretations of law relating to the
provision of the Services by the Company that is inconsistent with
generally accepted interpretations in effect on the date of the Contract;
(iv) (a) the imposition of any condition different from those existing on the
date of the Contract on the issuance or renewal of any official permit,
license or necessary approval related to the provision of the Services by
the Company, or (h) there shall be a suspension, termination,
interruption, revocation, denial or failure of renewal of any official
permit, license or necessary approval related to the provision of the
Services by the Company, including without limitation such of the
foregoing as are issued or approved by the USEPA, the Occupational
Safety and Health Administration or any local Environmental and /or
Building Department;
• "Client" means the party or parties identified as such in this Contract. In
addition, the term "Client" specifically includes the party or parties to whom
the Company provides Services and the party or parties responsible for
paying the Company for Services provided pursuant to this Contract;
• "Contract" means these terns and conditions, any additional terms and
conditions attached hereto and/or expressly incorporated herein directly or by
reference including, without limitation, the Company's proposal to perforn
the Services to the extent such proposal is referenced or attached herein;
• "Contract Price" means the compensation to be paid by the Client to the
Company in accordance with the terns of this Contract;
• "Company" means Severn Trent Environmental Services, Inc. and its
permissible successors and /or assigns. Any reference to actions taken or not
taken by the Company shall include those actions taken or not taken on
Company's behalf;
• "Services" means the evaluation, rehabilitation and restoration services to be
provided by the Company to the Client as identified in this Contract;
• "Uncontrollable Circumstances " means any act, event or condition to the
extent that it materially and adversely impacts the cost of performance of or
materially and adversely affects the ability of the Company to perform the
Services in accordance with the terms of the Contract if such act, event or
condition, in light of any circumstances that should have been known or
reasonably believed to have existed at the time, is beyond the reasonable
control and is not a result of the willful or negligent act, error or omission or
failure to exercise reasonable diligence on the part of the Company. Such
acts, events or conditions may include, but shall not be limited to, the
following: (a) an act of God, landslide, earthquake, fire, explosion, flood,
sabotage, or similar occurrence, acts of a public enemy, extortion, war,
blockade or insurrection riot or civil disturbance; or (b) a Change of Law; or
(c) the failure of any appropriate governmental agency or private utility to
provide and maintain utilities required by the Company in order to perform
the Services, etc.
Construction of Agreement. Whenever the context requires, the gender of all
words used in this Contract includes the masculine, feminine, and neuter. All
references to Articles and Sections refer to articles and sections of this Contract,
and all references to F.xhihits are to Exhibits attached to this all purposes.
Captions, headings, cover pages, tables of contents and footnote instructions
contained in this Contract are inserted only to facilitate reference and for
convenience and in no way define, limit or describe the scope, intent or meaning
of any provisions of this Contract. Words and abbreviations that have well
C \Karen \Forms \Contract Templates \One —off constuction alacun ril,doc
known technical or trade meanings are used in this Contract in accordance with
such recognized meanings.
Offer to Contract. Company's proposal and the accompanying documents
referred to under the definition of the term "Contract" herein (including the
terms and conditions set forth herein) constitute an offer to contract which may
be accepted by the client within thirty (30) days from the date hereof (or within
such shorter or longer period of time, if any is specified in the Company's
proposal) and only on the exact terms hereof, If additional or different terms are
proposed by Client, such proposal or request shall constitute a counter offer
which Company may, at its option, accept by written notice to the Client signed
by the Company. This Contract shall not be binding on the Company unless it is
executed by the Client and a duly executed copy is delivered to the Company
within the period of time specified above.
Entire Agreement. The terms and conditions set out herein are the entire terms
and conditions of this Contract and any prior or contemporaneous
understandings or agreements, oral or written, are merged herein. There are no
representations or warranties, agreements, or covenants other than those
expressly set forth in this Contract. This Contract may be amended or modified
and /or any right or obligation arising under this Contract may be waived from
time to time only by a written instrument executed by the Client and the
Company. The failure of the Company at any time to enforce any of the
provisions of this Contract shall not constitute a waiver of such provision.
Quality of Work and Materials. All Services to be provided hereunder shall
be performed by qualified personnel in accordance with professional standards.
Company acknowledges that the Client is relying on the Company to use the
effort, skill, diligence and quality control /quality assurance measures expected of
a qualified professional firm performing services of a similar nature to the
Services to be performed by the Company pursuant to this Contract. Any
materials furnished by the Company shall be current, of merchantable quality
and in compliance with any technical standards or specifications incorporated
into this Contract. When certain materials are specified by a reference standard,
Company may select any suitable commercially acceptable material meeting the
standard.
Compliance with Law. All parties shall comply with all applicable laws in
performing their respective obligations hereunder.
Contract Schedule. The date of completion provided in this Contract, if any, is
approximate and is based upon prompt receipt by Company of all necessary
information and data required to he supplied by the Client, and is subject to
weather, groundwater conditions and unforeseen site conditions. Company will
use all reasonable efforts to meet the stipulated completion date and completion
of the Services within a reasonable time shall constitute the Company's full
compliance with this Contract.
Additional Work_ (a) All additional labor, materials, tools, bonds, insurance,
equipment, licenses, taxes, transportation, surveys, engineering, other
professional services and any additional item provided by or on behalf of the
Company as a result of Uncontrollable Circumstances (including a Change of
Law) shall constitute additional work extending beyond the scope of the Services
to be provided by Company hereunder. Company shall be compensated for all
such additional work commensurate with the appropriate unit prices and /or
hourly rates indicated in this contract and if no such prices or rates are provided,
Company shall be compensated for the fair and equitable value of such
additional work in an amount reasonably agreeable to the parties; (b) The
parties may add, delete, modify, alter, or accelerate the Services to be performed
hereunder, including without limitation, order changes to the Services, or require
the Company to perform additional services but only through a duly executed
change or field order. All change and field orders shall be in writing and require
the signature and acceptance by Company prior to becoming effective. Unless
agreed to otherwise by the Company, all such change and field orders shall
reflect the parties' agreement regarding price and proposed completion date.
Employee Safety. Company shall be responsible for the safety, efficiency and
adequacy of its employees and any vehicles and /or machinery, equipment or
materials furnished or utilized by the Company during the performance of
Services. Company, however, shall not assume any obligation or incur any
liability for personal injury or property damage caused by (i) unsafe site
conditions not created by the Company or by any of its agents, employees and
subcontractors, (ii) work being performed by other parties not related to the
Company, (iii) the negligence of the Client, and /or (iv) the negligence of any
third party not related to the Company.
Agreed to: (please initial)
Pg. 3 of 4
Uncontrollable Circumstances. Any delay, default or termination in or of the
performance of the Services by the Company hereunder caused directly or
indirectly by Uncontrollable Circumstances shall not be deemed a breach of this
Contract. The occurrence of such event shall suspend the obligations of the
Company as long as performance is delayed or threatened thereby, and the fees
due hereunder shall be equitably adjusted.
Ownership of Documents and Inventions. (a) All tracing, specifications,
computations, notes and other original documents as instruments of service
shall, following the full payment of the Contract Price, become the property of
the Client, provided however that the Company shall be entitled to keep copies
of same; (h) All inventions, discoveries and copyright in work of authorship,
including those in formative stages, made by the Company (either alone or
jointly with the Client) shall from the time of conception or, in the case of works
of authorship, from the time of creation be the property of Company.
Approval of Work. Services performed by Company shall be deemed approved
and accepted by Client within a reasonable period of time (but in no event longer
than thirty (30) days) after the Client has had the opportunity to review and/or
inspect such services unless Client objects within such period of time by written
notice specifically stating the details in which Client believes such services are
incomplete or detective. Under all circumstances, final payment of the Contract
Price shall be deemed as conclusive evidence that the Client has accepted all
Services provided.
Payment Terms. Unless specifically stated otherwise, all payments are due Net
30 days from the date of invoice. Any payment delayed beyond thirty (30) days
from the specified due date, unless occasioned by fault of the Company, shall be
subject to one and one -half percent (1.5 %) per month interest on the unpaid
balance.
Taxes. Prices do not include sales, use, excise, ad valorem, property or other
taxes now or hercafler imposed directly or indirectly, by any governmental
authority or agency with respect to this Contract. Client shall pay directly or
reimburse Company for any such taxes that the Company may be required to
pay. If the Client is a tax- exempt entity, the Client shall provide the Company
with proof of such exemption.
Default and Termination. 'his Contract may be terminated by either party
upon a seven (7) days written notice in the event of substantial failure by the
other party to perform in accordance with the terms hereof through no fault of
the terminating party. In the event of any termination, Company shall be paid
for all services rendered and materials supplied (including materials specifically
manufactured/madc for the Client that have yet to be supplied) through the date
of termination. For purposes of this section, the failure of the Client to pay
Company in accordance with the payment terms of this Contract shall he
considered such a substantial failure. In the event of a substantial failure on the
part of the Client, Company, in addition to the right to terminate set forth in this
paragraph, may also elect to suspend work until the default in question has been
cured. No delay or omission on the part of Company in exercising any right or
remedy hereunder shall constitute a waiver of any such right or remedy on any
future occasion.
Indemnification. (a) Company agrees to indemnify and save harmless the Client
from and against any claim, demands, suits, liabilities, losses and expenses
incurred by the Client as a result of Company's negligence, misconduct, or
breach of this Contract; provided, however, that in the event that both Client and
Company are determined by a finding of fact to be negligent and the negligence
of both is a proximate cause of such claim for damage, then in such event, Client
and Company shall each be responsible for the portion of the liability equal to its
comparative share of the total negligence; (b) Client agrees to indemnify and
save harmless the Company from and against any damages suffered by the
Company as a result of (i) the Client's negligence, misconduct, or breach of this
Contract; or (it) changes in plans or specifications made by the Client or others;
or (iii) work performed by the Client or other contractors hired by the Client.
Disclosure of Information and Cooperation of the Parties. (a) The Client
represents and warrants that it will famish the Company with all items, if any,
described in this Contract in a diligent and timely manner, (b) The Client further
represents and warrants that it has disclosed, and it will continue to disclose, any
and all information it now has, or may have in the future, to the extent that Stich
information is relevant to the Company in performing its duties and obligations
hereunder; (c) Each party hereto agrees that it will cooperate in good faith with
the other and its agents, employees, representatives, officers, contractors and
subcontractors to facilitate the performance of ttte mutual obligations set forth in
this Contract
C \KarenTonns \Contract Templates\One_off conshrciion agrentent.doc
No Third Party Beneficiaries. This Contract is entered into solely between,
and may he enforced only by the Company and Client; and this Contract shall
not be deemed to create any rights in third parties, including clients, suppliers, or
customers of a party, or to create any obligations of a party to any such third
parties.
Restriction on Use of Reports. Any reports rendered under this Contract by the
Company are prepared for their intended purposes only. Use of the reports and
data contained therein for other purposes is at the Client's sole risk and
responsibility.
Notices. Wherever under this Contract one party is required or permitted to give
notice to the other party, such notice shall be in writing and shall be delivered
personally, sent by facsimile transmission, sent by nationally recognized express
courier or sent by certified, registered, first class mail, postage prepaid, but not
by electronic mail. Any such notice shall be deemed given when actually
received when delivered either personally, by facsimile transmission or by
express courier, or if mailed, on the fifth day after its mailing, postage prepaid to
the recipient party.
Governing Law, This Contract and performance under it shall be governed by
and construed in accordance with the laws of the state in which the client's
principal office is located. Venue for any action under this Contract shall be in
the state court in the county in which the client's principal office is located.
Severability. Each and every provision of law and government regulation
required by law to be inserted in this Contract shall be deemed to be inserted and
this Contract shall read and shall be enforced as though so included herein, and
if through mistake or otherwise any such provision is not inserted or is not
correctly inserted, then upon the application of either party, this Contract shall
be deemed to be amended to make such insertion or correction. If this Contract
contains any unlawful provision, the same shall be deemed of no effect and
shall, upon the application of either party, be deemed stricken from this Contract
without affecting the binding force of the remainder.
Company's Liability. In the event that claim(s) raised against the Company on
account of this Contract, or on account of the Services performed hereunder,
is /are covered under the Company's insurance policies, the Company shall not
be responsible for any loss, damage or liability beyond the amounts, limits and
conditions of such insurance policies. With respect to any other cause of action
and /or claim arising under this Contract, or otherwise arising us a result of, or on
account of, the Services provided hereunder, Company's total liability shall not
exceed the Contract Price.
Insurance. Company shall procure and maintain through the period of this
Contract, at Company's own cost and expense (a) general liability insurance in
the amount of not less than one million dollars ($1,000,000) combined single
limit for personal injury and property damage; (b) errors and omissions
insurance in an amount of not less than one million dollars ($1,000,000); and (c)
worker's compensation insurance in accordance with all statutory requirements.
Successors and Assigns. Neither Client or Company shall assign, sublet, or
transfer any rights under or interest in (including, but without limitation, moneys
that may become due or moneys that are due) this Contract without the written
consent of the other, except to the extent that any assignment, subletting or
transfer is mandated by law or the effect of this limitation may be restricted by
law.
Agreed to: (please initial)
Pg. 4 of 4
HERITAGE GREENS
COMMUNITY DEVELOPMENT DISTRICT
Motion: Assigning Fund Balance as of 9130/13
The Board hereby assigns the FY 2013 Reserves as follows:
Operating Reserve
.$49,897
Reserves — Drainage
$6,000
Reserves - Fountains
$5,500
Reserves - Irrigation System
$7,500
Reserves -Roads and Sidewalks
$26,201
Reserves - Signage
$1,000
Reserves -Wall Painting
$6,000
Reserves -Wall Replacement
$12,786
HERITAGE GREENS
Community Development District General Fund
Heritage Greens
Community Development District
Exhibit "A"
Allocation of Fund Balances
AVAILABLE FUNDS
Amount
Beginning Fund Balance - Fiscal Year 2013 $ 126,105
Net Change in Fund Balance - Fiscal Year 2013 -
Reserves - Fiscal Year 2013 Additions 10,000
Total Funds Available Estimated - 9/30/2013 136,105
ALLOCATION OF AVAILABLE FUNDS
Assigned Fund Balance
Operating Reserve - First Quarter Operating Capital (1)
49,897
Reserves - Irrigation System
7,500
Reserves - Drainage
6,000
Reserves - Wall Painting
6,000
Reserves - Wall Replacement
12,786
Reserves - Fountain
5,500
Reserves - Signs
1,000
Reserves - Roads & Sidewalks
16,201
Reserves - Roads & Sidewalks (FY13 Proposed)
10,000
Subtotal
114,884
Total Allocation of Available Funds
114,884
Total Unassigned (undesignated) Cash $
21,221
Notes
(1) Represents approximately 3 months of operating expenditures
Annual Operating Budget
Fiscal Year 2013 Page 8
Heritage Greens
Community Development District
Financial Report
September 30, 2013
Prepared by
HERITAGE GREENS
Community Development District
FINANCIAL STATEMENTS
Balance Sheet Page I
Statement of Revenues, Expenditures and Changes in Fund Balances
General Fund ............................................ I ... .... ...... Page 2 - 4
SUPPORTING SCHEDULES
Non -Ad Valorem Special Assessments ........................... ............................... Page 5
Cash & Investment Report ........................... ............................... Page 6
SunTrust Bank Reconciliation ........................... ............................... Page 7
Check Register ........................... ............................... Page 8
HERITAGE GREENS
Community Development District
Financial Statements
(Unaudited)
September 30, 2013
HERITAGE GREENS
Community Development District General Fund
Balance Sheet
September 30, 2013
ACCOUNT DESCRIPTION TOTAL
ASSETS
Cash - Checking Account
$ 46,324
Investments:
Money Market Account
116,048
SBA Account
454
SBA Account - Restricted
172
TOTAL ASSETS
$ 162,998
LIABILITIES
Accounts Payable $ 4,950
Accrued Expenses 943
TOTAL LIABILITIES 5 883
FUND BALANCES
Assigned to:
Operating Reserves
49,897
Reserves - Drainage
6,000
Reserves - Fountains
5,500
Reserves- Irrigation System
7,500
Reserves - Roads and Sidewalks
26,201
Reserves - Signage
1,000
Reserves -Wall Painting
6,000
Reserves - Wall Replacement
12,786
Unassigned:
42,221
TOTAL FUND BALANCES
$ 157,105
TOTAL LIABILITIES & FUND BALANCES
$ 162,888
Report Date: 10/8/2013
Page 1
HERITAGE GREENS
Community Development District General Fund
Statement of Revenues, Expenditures and Changes in Fund Balances
For the Period Ending September 30, 2013
ANNUAL
ADOPTED YEAR TO DATE YEAR TO DATE VARIANCE (5)
ACCOUNT DESCRIPTION BUDGET BUDGET ACTUAL FAV(UNFAV)
REVENUES
Interest - Investments
$ 400 $
400 $
550 $
150
Special Assmnts- Tax Collector
217,904
217,904
217,904
-
Special Assmnts- Discounts
(8,716)
(8,716)
(7,883)
833
Gate Bar Code/Remotes
-
750
978
978
TOTAL REVENUES
209,588
209,688
211,549
1,961
EXPENDITURES
Administration
P/R -Board of Supervisors
1,800
(1,800)
FICA Taxes
-
-
138
(138)
ProfServ- Engineering
750
750
714
36
ProfServ-Legal Services
3,500
3,500
2,489
1,011
ProfServ-Mgmt Consulting Sery
35,895
35,895
35,695
-
ProfServ- Property Appraiser
3,269
3,269
3,269
ProfServ- Specal Assessment
5,463
5,463
5,463
-
ProfServ-Web Site Development
650
650
619
31
Auditing Services
3,200
3,200
3,200
-
Communication - Telephone
50
50
1
49
Postage and Freight
500
500
1,459
(959)
Insurance - General Liability
7,000
7,000
7,615
(615)
Printing and Binding
1,500
1,500
785
715
Legal Advertising
1,200
1,200
767
433
Misc-Bank Charges
500
500
563
(63)
Misc - Assessmnt Collection Cost
4,358
4,358
4,200
158
Office Supplies
300
300
248
52
Annual District Filing Fee
175
175
175
Total Administration
68,310
68,310
69,400
(1,090)
Report Date: 10/7/2013
Page 2
HERITAGE GREENS
Community Development District
General Fund
Statement of Revenues, Expenditures and Changes in Fund Balances
18,000
18,000
For the Period Ending September 30, 2013
2,015
Contracts - Preserve Management
2,000
ANNUAL
1,760
240
Electricity - Irrigation
2,000
ADOPTED
YEAR TO DATE
YEAR TO DATE
VARIANCE (E)
ACCOUNT DESCRIPTION
BUDGET
BUDGET
ACTUAL
FAV(UNFAV)
2,600
2,600
1,295
1,305
R &M- Fountain
Public Safety
900
1,897
(997)
R &M- Grounds
Contracts - Security Services
48,000
48,000
47,019
981
Contracts -HVAC
350
350
-
350
Contracts -Sheriff
3,000
3,000
1,700
1,300
Communication - Telephone
1,500
1,500
1,136
362
Electricity - Entrance
2,200
2,200
1,795
405
Utility - Water & Sewer
900
900
640
260
Lease - Carts
1,500
1,500
1,500
-
R &M -Gate
4,352
4,352
1,283
3,069
R &M- Gatehouse
1,500
1,600
242
1,258
Op Supplies - Clubhouse
-
-
515
(515)
Op Supplies - Transmitters
-
-
664
(664)
Op Supplies - Gatehouse
250
250
654
(404)
Cap Outlay - Equipment
6,726
6,726
-
6,726
Total Public Safety
70,278
70,278
57,150
13,128
Landscape
Contracts - Landscape
18,000
18,000
15,985
2,015
Contracts - Preserve Management
2,000
2,000
1,760
240
Electricity - Irrigation
2,000
2,000
1,934
66
R &M- Renewal and Replacement
1,500
1,500
1,440
60
R &M- Canals
2,600
2,600
1,295
1,305
R &M- Fountain
900
900
1,897
(997)
R &M- Grounds
8,500
8,500
45
8,455
R &M- Irrigation
2,500
2,500
1,020
1,480
R &M- Preserves
500
500
-
500
Misc - Special Projects
4,000
4,000
5,326
(1,326)
Total Landscape
42,500
42,500
30,702
11,798
Road and Street Facilities
Electricity - Streetlighting
11,000
11,000
9,556
1,444
R &M- Drainage
2,500
2,500
18,004
(15,504)
R &M -Roads & Alleyways
2,000
2,000
360
1,640
R &M- Sidewalks
1,750
1,750
-
1,750
Traffic Signage Rehabilitation
1,250
1,250
1,330
(80)
Reserve - Roadways
10,000
10,000
10,000
Total Road and Street Facilities
28,500
28,500
29,250
(750)
TOTAL EXPENDITURES
209,588
209,588
186,502
23,086
Report Date: 10/7/2013
Page 3
HERITAGE GREENS
Community Development District General Fund
Statement of Revenues, Expenditures and Changes in Fund Balances
For the Period Ending September 30, 2013
ANNUAL
ADOPTED YEAR TO DATE YEAR TO DATE VARIANCE ($)
ACCOUNT DESCRIPTION BUDGET BUDGET ACTUAL FAV(UNFAV)
Excess (deficiency) of revenues
Over (under) expenditures
Net change in fund balance
FUND BALANCE, BEGINNING (OCT 1, 2012)
FUND BALANCE, ENDING
25,047 25,047
$ - $ - $ 25,047 $ 25,047
132,058 132,058 132,058
$ 132,058 $ 132,058 $ 157,105
Report Date: 10/7/2013
Page 4
HERITAGE GREENS
Community Development District
Supporting Schedules
September 30, 2013
HERITAGE GREENS
Community Development District
Non -Ad Valorem Special Assessments
Collier County Tax Collector - Monthly Collection Report
For the Fiscal Year ending September 2013
Discount / Gross
Date Net Amount (Penalties) Collection Amount
Received Received Amount Costs Received
ents Levied FY 2013 $ 217,904
in % 100%
11/07/12
$
1,247.06
$
71.30
$
25.45
$
1,343.81
11/14/12
$
23,340.07
$
992.40
$
476.33
$
24,808.80
11/29/12
$
44,346.14
$
1,885.56
$
905.02
$
47,136.72
12/13/12
$
109,729.78
$
4,632.20
$
2,239.38
$
116,601.36
01/04/13
$
4,520.17
$
142.60
$
92.25
$
4,755.02
01/31/13
$
10,071.56
$
266.64
$
205.54
$
10,543.74
03/06/13
$
1,203.49
$
12.39
$
24.56
$
1,240.44
04/10/13
$
2,427.21
$
4.13
$
49.54
$
2,480.88
04/30/13
$
6,013.31
$
(37.20)
$
122.72
$
6,098.83
06/04/13
$
417.36
$
(12.40)
$
8.52
$
413.48
06/21/13
$
2,504.17
$
(74.40)
$
51.11
$
2,480.88
TOTAL
$
205,820
$
7,883
$
4,200
$
217,904
% Collected
100.00%
TOTAL OUTSTANDING $ 0
Report Date: 10/7/2013
Page 5
HERITAGE GREENS All Funds
Community Development District
Cash and Investment Report
September 30, 2093
General Fund
Maturity
)ku
Balance
Account Name
Bank Name
Checking Account - Operating
SunTrust Bank
Checking Account - Operating
Bank United
Operating Acct
SBA
Operating Acct (Restricted)
SBA
Money Market Account
Bank United
Investment Type
Maturity
)ku
Balance
n/a
n/a
0.10%
$45,324
n/a
n/a
0.00%
$1,000
n/a
n/a
0.18%
$454
n/a
n/a
0.00%
$172
Business MMA
n/a
0.35%
$116,048
Total $162,999
Report Date: 1017/2013 Prepared By:
Severn Trent Management Services Page 6
Heritage Greens CDD
Bank Reconciliation
Bank Account No.
9920
Statement No.
09.13
Statement Date
09/30113
GIL Balance (f)
45,323,87
Statement Balance
49,903.00
GIL Balance
45,323.87
Outstanding Deposits
0.00
Positive Adjustments
0.00
- - --
Subtotal
49,903.00
Subtotal
45,323.87
Outstanding Checks
4,579.13
Negative Adjustments
0.00
Total Dftrences
0.00
Ending GIL Balance
45,323.87
Ending Balance
45,323.87
Difference
0.00
Postino
Cleared
2111k Document Type
Document No.
Deacrlotion
Amoun
Amoun t
Difference
Outstanding Checks
08/29/13 Payment
2708
JAMES MARSHALL
38.99
0.00
38.99
09/18/13 Payment
2722
RONALD C. PARROTT
134.70
0.00
134.70
09/25/13 Payment
2723
COLLIER COUNTY UTILITY BILLING
50.78
0.00
50.78
09/27/13 Payment
2724
FEDEX
8.27
0.00
8.27
09/27/13 Payment
2725
PJM LAWN SERVICE
1,225.00
0.00
1,225.00
09127/13 Payment
2727
SEVERN TRENT ENVIRONMENTAL SERVICES
3,121.39
0.00
3,121.39
Total Outstanding Checks . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . 4,579.13
Page 7
Heritage Greens
Community Development District
Check Register by Fund
For the Period from 8/1/2013 to 9130/2013
iSorted by Check No.)
Find
No.
hack
No.
CheUc
Data
Payee
Invoiu NO.
Invoice Desplp8an
G/L Account Noma
CVl Acooum$
Chock Arlour$
GENERAL FUND - 001
,
001
2708
09103113 COLEMAN, YOVANOVICH
40
LEGALFEES -LILY
ProlSery -L gel Services
$31023 -51401
$803.75
001
2710
00103/13 FEDEX
2 -374 -05110
BILLING PERIOD THRU 8112
Postage and Freight
541006 -51301
$8.19
001
2711
09103113 KENT OF NAPLES
30012274
SECURITY 8114.8120
f:ontraclsSecudry 8er4cea
534037.52001
$892.00
001
2712
09103/13 SEVERN THE NT ENVIRONMENTAL SERVICES
2050D75
MGTFEES-AUG
PralServ-Mgmt ConeulUng Sav
53102751201
52,091.25
001
2712
D903113 SEVERN TRENT ENVIRONMENTAL SERVICES
2060076
MGT FEES-AUG
Postage and Freight
541006 -51301
$54.02
001
2712
09103113 SEVERN TRENT ENVIRONMENTAL SERVICES
2089075
MGTFEES-AUG
Printing and Binding
547001 -51301
$72.60
001
2712
09/03/13 SEVERN TRENT ENVIRONMENTAL SERVICES
2068078
MGTFEES-AU13
Op Supplier- Clubhouse
552003 -52001
$515.00
001
2712
0/)103/13 SEVERN TRENT ENVIRONMENTAL SERVICES
2089076
MGTFEES -AUG
Op Suppllos- Gaethouse
552029 -52001
$74.90
001
2713
D91D6113 CENTURY LINK
08221354270
#3122042708/22 -0/21
Cwnnrurdceticn- T.I.Phme
541003.52001
3107.08
001
2714
0&08113 FEDEX
2-381,,3302
BILLING PERIOD THRI 8120
Poelege end Freight
5410D8 -51301
$8.19
001
2715
0 0108113 FPL
082813
BILUNO PERIOD 7 129.8/28
Electrkiy - Imgatfon
543033.53002
$154.80
001
2715
0906113 FPL
082813
BILLING PERIOD 709-8/28
Elect -Ity - Entrance
543008.52001
$137.72
001
2115
0908113 FPL
082813
BILLING PERIOD 7/29-8/28
Electricity - Streadighting
543013.54101
$638.40
001
2716
0906/13 PJM LAWN SERVICE
1758
LAWN SERVICE - AUGUST
Contraca- Landscape
534050.53802
$1,255.00
001
2717
0906/13 RAYMENT POOLS LLC
57
ENTRANCE FOUNTAIN SVC
R&M. Fountain
546032 -53902
576.00
001
2718
0917/13 AQUATIC SYSTEMS
0000251715
QUARTERLY FOUNTAIN MNNT -SEPT
R&M- Fountain
540032.53802
5150.00
001
2719
0917113 KENT OF NAPLES
30012297
SECURITY 8121 -5127
ConlradsSecurity Services
534037.52001
$892.00
001
2719
0917/13 KENT OF NAPLES
30012328
SEOURf1Y &20 -9 /3
Contra l.Saady Sarmces
534037 -52001
$958.00
001
2721
D9/17/13 NAPLES DAILY NEWS
3277819
LEGAL AD- NOTICE OF WORKSHOP 8118
Legal Adven4ng
54800251301
$167.34
001
2723
0 9125113 COLLIER COUNTY UTILITY 81LLW3
091013 -51400
#040035514008/5 -&9
Utility - Water B Sewer
543021 -52001
$50.78
001
2724
0927/13 FEDEX
2 ,,02 -08083
BILLING PERIOD 99
Postage and I'might
541000.51301
$8.27
001
2725
0927113 KENT OF NAPLES
30012354
SECURITY &4-910
Contract.- S-fity Service.
53403732001
$892.00
OD1
2726
0927113 PJM LAWN SERVICE
1821
LAWN SERVICE -DEPT
Gontracte -LUdm pe
53405063802
$1,225.00
001
2727
0927113 SEVERN TRENT ENVIRONMENTAL SERVICES
2069500
MOTFEES-SEPT
ProfS. -Mgml G --- ItIng It-
53102751201
$2,991.25
001
2727
0927113 SEVERN TRENT ENVIRONMENTAL SERVICES
2060590
MGT FEES-SEPT
Postage and Freight
541005 -51301
$43.34
001
2727
0927/13 SEVERN TRENT ENVIRONMENTAL SERVICES
2069590
MGTFEE"EPT
Printing and Binding
547001 -51301
$88.80
001
2722
0918/13 RONALD C. PARROTT
PAYROLL
Septanber 18, 2013 Payroll Posting
$134.70
Fund Total
$10,468.94
Total Checks Paid $18,488.94
Prepared by. Pa e 8
Report Date tOB2013 Sevent Trent Management Selvkea g