Loading...
#08-5011-091 (WO Haskins) WORK ORDER Agreement for Fixed Term Underground Utilities Contract#08-5011 Contract Date: March 11,2008 Fixed Term Contract Expires March 10,2014 (R •Q#08-5011-91) BCC approval Date: July 9,2013 Item#16.C.2 This Work Order is for Underground Utility Construction services for work known as: Project Name: PS312.21 Rehabilitation Project No: 70046 The work is specified in the Proposal Page, dated June 7,2013,which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation #08-5011-91 dated May 17,2013, attached hereto a part of this Work Order is assigned to: Haskins Inc. Scope of Work: Per quote form attached and the following: Existing valve vault, wet well piping and pumps shall be removed. The wet well shall be patched and coated. New wet well piping, pumps, guide bars, brackets, floats, etc. are proposed along with new above ground piping and valves, and electrical upgrades are also included. The Contractor is responsible for all required bypassing and shall provide power to pump station throughout construction. * Task I -From Item 1 to Item 44 of Quote. Supply and install pumps,control panels,piping in the wet well, above ground piping,and other necessary materials to complete the work as intended by the plans. * Task II- Item 45 of Quote. Owner-Directed Work for geological or Corrosion Unforeseen Conditions(Allowances) Schedule of Work: A limited NTP will be issued to Contractor to purchase materials and obtain permits. Another NTP will be issued to complete work within 140 days from the date of the Notice to Proceed. Compensation: In accordance with Agreement#08-5011,the County will compensate the Firm in accordance with following method(s): Negotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs; Time & Material (non-guaranteed, owner directed work); ['Cost Plus Fixed Fee,as provided in the attached proposal. Task I $223,630.00 (Lump Sum) Task II $ 32,500.00 (Time& Material) $256,130.00 TOTAL COST FOR TASKS I & II $256,130.00 PREPARED BY: . .CA.A.AA,i Zamira DelToro, Project Manager D to Planning& Project Management Department APPROVED BY: - ( 3 Craig Po P.E.,Pl3ncipal Project Manager Date Planni _ . Project Management Department APPROVED BY: / / 0540/3 Tom Chmelik, P.E., Director Date Planning& Project Management Department �9 • RFQ#08-5011-91 Page 2 APPROVED AEiG---^— GAL �S eth Johnsse nterim Director to 14t0 Wastewater partment 6 I ?�/ APPROVED BY: - %_.. _. / 3 George Yilmaz,Administrator Date Public Utilities Division APPROVED BY: ((), VN,/1i3p3 (Q//7//3 Evelyn Corm,n,Procurement Specialist Date Purchasing Department ATTEST BO' • 4 0 C 4 UNTY COMMISSIONERS Dwi•._E. Lock,Clerk _ Collier 4 ou ,'Flo .. � . ` . O By ■-silty Clerk— Georgia A.Hiller,Esq.,Chairwoman ur 's Attest as to haman signature only. Haskins By: yy� As/ 411Ae 111' ,la (Print Name/Title) ATTEST: / / Approved as to form and legality By: A T .„ 1111 ea ''''. _ ';., _ . Print Name/Tit e) Assistant ` ounty A •may Cotter County Adninstrative Services Division Purchasing COLLIER COUNTY FLORIDA REQUEST FOR QUOTATION RFQ#08-5011-91 Refurbishment of Pump Station 312.21 PROPOSAL PAGE DUE DATE: June 7, 2013 at 11:30 a.m. The undersigned, as quoter, hereby declares that the firm has examined the specifications and is informed fully in regard to all terms and conditions pertaining to the project and, if this Proposal is accepted, to furnish same in full, according to the following: See separate Quote Schedule IN WITNESS WHEREOF, WE have hereunto subscribed our names on this -1*' day of 37An2 , 2013 in the County of Lcre. , in the state of FL. FASK;nS Inc. Firm's Complete Legal Name 2.39-9117--I$4to Telephone Number -91-f -3851 FAX Number engncphe-c haSL.:Ins►nG,,ru. Email Address 109 S ,F e, cis... A , Address 4o 'gc as FL City Ft. State 314(35 Zip 6-7q159 FloriCertificate of uthority Document Number(www.sunbiz.orq/searchPubmi) Sign ature �5fr„ Title , y+�M /774 Print Name Date RFQ_ContraclDriven_RevisedSeptem ber2009 4 (1) BID SHEET COLLIER COUNTY PS 312.21 IMPROVEMENTS Item Estimated Unit No DESCRIPTION Quantity Unit Cost Total Cost 1 Mobilization/Demobilization 1 LS $4,500 $4,500 2 Pre-Construction Video and Post Construction Video 1 LS $1,200 $1,200 3 Record Drawings 1 LS $1,900 $1,900 Demolition,Relocation,and Temporary Facilities $0 4 Demolition of Existing Wetwell Concrete Top,Valve Vault,Piping and Slab 1 LS $1,000 $1,000 5 Clearing and Grubbing 1 LS $500 $500 6 Demolition of Electrical Panel,Main Breaker Panel,and Meter 1 LS $1,500 $1,500 7 Temporary Bypass Piping and Pumping Operations 1 LS $4,300 $4,300 Mechanical $0 Flygt CP 3127-484 Impeller Submerisble Pumps and Appurtenances 8 (Equipment Only) 3 EA $19,000 $57,000 9 Installation of Pumps and Appurtenances 1 LS $1,950 $1,950 10 4-inch Tee Fitting(Fused) 2 EA $500 $1,000 11 4-inch Tee Fitting(FL) 1 EA $850 $850 12 4-Inch 90°Bend(Fused) 4 EA $300 $1,200 13 4-inch Plug Valve(FL) 4 EA $700 $2,800 14 4-inch Check Valve(FL)(Re-Use Existing) 2 EA $180 $360 15 H-Tec 986 SS ARV w/1-Way Check Valve 2 EA $5,700 $1 1,400 16 4-inch HDPE Above Ground Piping I LS $1,100 $1,100 17 4-inch HDPE Risers 1 LS $1,700 $1,700 18 Pipe Supports 5 EA $4,675 $23,375 19 Stainless Steel Pressure Gauges w/Hand Valve 2 EA $650 $1,300 20 4-inch Bypass Connection(DI Riser,3"Camlock,and Plastic Valve Box) 1 LS $2,300 $2,300 21 Link Seals for HDPE Risers 2 EA $300 $600 22 4-inch x 6-inch Increaser 1 EA $550 $550 23 6-inch Plug Valve(MJ,wNalve Box) 2 r EA $1,500 $3,000 24 6-inch Tee(FL) 1 EA $750 $750 25 6-inch x 12-inch Increaser 1 EA $1,900 $1,900 26 6-inch 45 Bend(MJ) 2 EA $990 $1,980 27 Below Grade PVC Piping 1 LS $1,275 $1,275 28 Roto-Float S4ONO Floats 1 LS $960 $960 29 Clean and Re-Coat the Entire Wet Well 1 LS $4,600 $4,600 Civil $0 30 6'Metal Fence w/2 Gates(Style to Match Existing,See Plans) 1 LS $8,900 $8,900 31 Dewatering,Excavation,and Backfill 1 LS $1,500 $1,500 32 Site Work(Concrete Slabs,Replace Sidewalk,etc.) 1 LS $8,050 $8,050 33 New Concrete Wet Well Top and Hatch 1 LS $1,500 $1,500 34 Compacted Sub-base for Entry Way I LS $3,190 $3,190 Electrical 35 Counterpoise I LS $6,675 $6,675 36 TCU Panel(Equipment Only) 1 LS $5,250 $5,250 37 Installation of TCU Panel 1 LS $5,250 $5,250 38 Relocate Antenna 1 LS $8,900 $8,900 39 Flygt Control Panel and Electrical Rack(Equipment Only) 1 LS $11,500 $1 1,500 40 Installation of Flygt Control Panel and Electrical Rack 1 LS $9,350 $9,350 41 Conduit&Wire 1 LS $2,790 $2,790 42 240/120V Panelboard 1 LS $1,725 $1,725 Site Restoration 43 Clean,Fill,and Sod Installation,Re-Grade,Weed Control,etc. 1 LS $8,900 $8,900 44 Hedge and Tree Replacement 1 LS $3,300 $3,300 Subtotal $223,630 Owner Directed Allowance for Geological or Corrosion Unforeseen 45 Conditions 1 TM $32,500 $32,500 TOTAL BID $256,130 NOTE: Owner reserves these funds for owner-directed work. There is no guarantee that the contractor will receive any portion of these additional funds. 1(:) Notes (1)Contractor will be responsible for any items required during the installation and system start up that are excluded in manufacturer's quotations. Contractor to coordinate with the County and install odor control unit,pumps and control panel. (2)The Contractor is responsible for all required bypassing and shall provide power to lift station throughout construction. (3)Weekly progress meetings will be held for the project. The Contractor shall have his Project Manager and Job Superintendent at all progress meetings. The Contractor shall provide an update of all work in the past week and a two (2) week look ahead. The Contractor on a weekly basis shall provide an updated project schedule.The Contractor will need to supplement with additional crews as necessary to remain on schedule for timely completion. (4) All Contractor Personnel (including subcontractors) shall complete a Collier County Facilities Contractor background check. Only those personnel passing this security check shall be allowed on the Project Site. All personel shall wear the issued badge at all times while on the project. The Contractor shall be responsible for all costs of obtaining the background checks and issued identification badge. Badges shall be reissued annually as req ui red. (5)All excavation shall be unclassified with no additional payment to be made for rock, muck or other materials.Contractor will be responsible for all replacement fill material. (6) Pre-Construction/Post-Construction Video recording in accordance with the County Specification(022200)shall be completed. (7)The Contractor shall designate a representative,such as their Superintendent who will be on-site during all work to assist the County in responding to customer questions or needs. (8) The Contractor is responsible for preparation of a safety program/risk management program.This document should not only address daily activities but also required actions for tropical storms and hurricanes. (9)All quotes to be per the Utility Underground Contract,plans,standards,specifications and all documentation provided within the Bid Package. ipco ler y Administrative Services isionl Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT#08-5011 "Annual Contract for Underground Utilities" Date: May 17, 2013 From: Evelyn Colon, Contract Specialist 239-252-2667, Telephone Number 239-252-6549, Fax Number evelyncolon col liergov.net To: Prospective Vendors Subject: RFQ #08-5011-91 Refurbishment of Pump Station 312.21 As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. Your response must be received in the Purchasing Department, 3327 E. Tamiami Trail Naples, Florida 34112 or via email to evelyncoloncollierqov.net no later than 11:00 a.m. on June 7, 2013. Any response received after that time shall not be considered. All quotations for this project shall be in accordance with the terms, conditions, and specifications stated herein and in accordance with the terms and conditions of Contract #08-5011 of which your firm was an awardee. NO OTHER FIRMS ARE ELIGIBLE TO SUBMIT OR RECEIVE AN AWARD FOR THIS PROJECT. If you have any questions regarding the specifications or intended scope of work, you must make those inquiries by 3:00 p.m. May 28, 2013. For general questions, you may contact the Purchasing staff member noted above. Your quotation response for the project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. No late quotation responses will be accepted. We look forward to your participation in this request for information/quotation process. cc: Zamira DelToro, Project Manager RFQ_ContractDriven_RevisedSeptember2009 1 CI